You are on page 1of 17

DC Electronic Load Applications and Examples

Application Note

V 3032009

22820 Savi Ranch Parkway Yorba Linda CA, 92887-4610 www.bkprecision.com


Table of Contents

INTRODUCTION.........................................................................................................................3
Overview of software examples........................................................................................................3
POWER SUPPLY TESTING.......................................................................................................4
Load Transient Response.................................................................................................................4
Load Regulation................................................................................................................................5
Current Limiting................................................................................................................................6
BATTERY TESTING...................................................................................................................7
Battery Discharge Curves.................................................................................................................7
Battery Internal Resistances.............................................................................................................8
PERFORMANCE TESTING OF DC LOADS...........................................................................10
Slew Rate.......................................................................................................................................10
OTHER DC LOAD APPLICATIONS........................................................................................12
Voltmeter........................................................................................................................................12
Fuse...............................................................................................................................................12
SOFTWARE EXAMPLES.........................................................................................................12
Battery Discharge Test....................................................................................................................13
Voltmeter Reading..........................................................................................................................15
Fuse Application.............................................................................................................................15
Reference.................................................................................................................................16
in the later sections utilize
INTRODUCTION B&K Precision's DC load model
Unfortunately, the software
8500 as part of the different
files are supported only for
setups and test configurations.
Windows platforms. However,
Most applications can be
due to the excellent cross-
simulated in the same fashion
platform capabilities of
As technology is constantly with other brands of DC loads,
python, some users may be
advancing, demands for with the exception of all the
able to get the library (which
quality test instruments software examples. They are
does not have to be utilized
increase due to the need for written specifically for full
via COM) working on other
making better and accurate compatibility with B&K
platforms. Please see the
measurements to Precision's 8500 series DC
library's documentation for
accommodate newer loads and are not intended to
more details.
technologies. For most support other brands of DC
electronic applications today, loads. In general, any
using energy efficient and measurements made with B&K
Although the software and
reliable power sources is Precision's equipments are
examples are written in
critical. For this reason, it is typical, but not guaranteed.
python, users who have other
important to have a test particular preferences in terms
instrument that can accurately Overview of software of the programming language
portray results that define the to use can easily use the COM
examples
performance of the power library provided in the
sources used to provide software package to write
electricity for devices such as Throughout some of the similar examples in the
electrical vehicles, computer sections in this application language of their choice.
power supplies, 3G cellular note, software examples are Some languages that have
phones, and even consumer provided to enhance and been found to work well with
standard household batteries. simplify test methods as well the COM library are Visual
Programmable DC Electronic as to bolster features of B&K Basic and Visual C#. Other
loads are one such instrument Precision's 8500 series DC languages are also expected
that will aid in testing various loads that can be controlled to work with the library, given
settings, configurations, remotely with a PC computer the correct declarations and
schemes, and methodologies. via RS-232 interface. Unless modifications within the
The intention of this otherwise noted, all examples program.
application note is to provide a are written in python
general scope of a DC load's programming language. They
usage. Some standard also require two python
performance tests for testing libraries and the 8500 DC load
power supplies will be COM library installed on the PC
described in details. used for communication in
Furthermore, several methods order to operate correctly. To
for testing the DC load itself obtain all these as well as
will be included in the later instructional documentation
sections. Additional details on for installation and setup,
practical DC load applications please visit one of our DC load
and setup information are product pages at:
provided as a source to assist http://www.bkprecision.com/p
in performing various test roducts/categories/sub_catego
setups and measuring data. ries/models/?
As a note, all applications and model=8500#software.
software examples contained

3 of 17
POWER SUPPLY
TESTING

For design testing and


verification, the need for
regulated power supplies are
increasing with ongoing
advancement in technology.
More so, it has become a
necessity in newer electronic
devices to be tested with
precise and sophisticated
power supplies. There are
some specifications that
determine some underlying
performance factors in typical
power supplies. Particularly, Figure 2. Transient Response for B&K Precision 9130
the load transient response,
load regulation, and current
limit. In the following are ignored, and therefore the load current. In order to
sections, each of these factors results may vary and may not verify the response,
are addressed as an example reflect exactly what is shown measurements of the rise and
to describe and demonstrate in the following sections. fall times upon a step change
the setup, configuration, and in the load is necessary.
equipment required for testing Generally, this type of test
Load Transient requires a load that is able to
and verification. Each
example will utilize B&K
Response produce a rise and fall time
Precision's 8500 DC load as approximately five times
part of the setup. An important element to faster than the power supply.
power supply testing is a The following application
Disclaimer: The following measurable unit of load demonstrates an effective
sections include general transient response, which approach to testing the load
setups with some settings characterizes the capability of transient response of a B&K
specified for the test the power supply to stabilize Precision power supply model
environment. Some details itself upon a step change in 9130.

Power Supply DC Load


Settings: 5 V Mode: Transient
Trigger: Pulse 0.1 A to 3.0 A
Digital Oscilloscope
Limit: 3.1 A Trigger: negative slope
+ - + -

Figure 1. Load Transient Response Test Setup

4 of 17
Objective transient response is observed to the rated current load of
during the rise time in the load the power supply.
Characterize the time it takes with a step change from 1.5 A
for a power supply to stabilize to 3 A. The output voltage
its output voltage after a step Approach
dropped by approximately 1.6
change in the load. mV. Use a DC voltmeter to
measure the voltage change
Approach when the DC load is used to
step the power supply from 0
Connect a DC load (B&K Load Regulation current to rated current.
Precision 8500 DC load) to a
power supply. Use the DC
load's transient mode to apply Load regulation is another Setup
a step change in load to the important element when
testing a power supply. It is a The measurement is
power supply.
performance measurement conceptually simple, but it is
that requires setting the power critical that the voltmeter
Setup supply to its rated voltage. To used to measure the voltage
be specific, the test for change is connected to the
A B&K Precision 9130 power output terminals of the power
measuring this element is
supply was set to 5 V output supply independently of the
based on measuring the
with the current limit set to 3 leads used to connect to the
output voltage levels of the
A. A B&K Precision 2542 DC load. Failure to do this will
supply when a load connected
digital oscilloscope was used measure the contact
to it changes from zero
to view the power supply's resistance of the power leads,
current to rated current, which
output voltage. The scope overestimating the load
differs depending on the
was AC coupled and set to regulation and output
model used under testing.
trigger on a negative slope. resistance of the power
The purpose for this test is to
ensure the accuracy and supply. Connect the voltmeter
DC Load Setup capability for a power supply and DC load in parallel to the
to maintain its voltage output power supply's terminals (See
The DC load was set to level under rated load current Figure 3 for setup diagram).
transient mode from 1.5 A to changes. Before testing,
3 A. Pulse triggering mode verify that the load used for
was selected for the DC load, DC Load Setup
the test supports the
which means a trigger signal maximum rated current and Press the I-set button (for B&K
causes the load to go from 1.5 voltage of the power supply. Precision 8500) to change the
A to 3 A, then back to 1.5 A. DC load to constant current
mode (you may have to press
Objective
Results the button twice). Set the
Measure the change in output current to the rated current of
Looking at Figure 2, the load voltage from no current load the power supply.

DC Load
Mode: CC mode Power Supply
Settings: Rated output V Voltmeter
Current: Rated current of
pow er supply Current: Max. limit

+ - + - + -

Figure 3. Load Regulation Test Setup

5 of 17
Procedure measuring 30 V with 100 V characteristics look like Figure
resolution is required to have 4, with small or very minimal
1. Turn on the power supply two significant figures in the bending near the crossover
and set it to its rated load regulation number. This point. It is good practice to
output voltage. Ensure measurement would require a test the current limits of a
that the current adjust 6 digit voltmeter. power supply because it will
knob, if present, is set to aid in protecting the
its maximum value. equipment for its application.
2. Write down the measured
Current Limiting Without a certain degree of
voltage of the power current regulation, the supply
supply. Call this value V0. Power supplies in constant may even over power or
voltage mode generally have a damage certain devices. The
3. Press I-set on the DC load preset limit to the maximum following describes a test
to set to power supply's current output. Current limit setup for testing current limit
rated value. Turn on the testing consists of of a B&K Precision 9120A
input of the load by measurements that define the power supply.
pressing On/Off. behavior of a power supply
4. Write down the measured and its current regulation.
These measurements can be Objective
voltage of the power
supply. Call this value V. characterized by a voltage vs. Determine the current limit of
current curve, which portrays a power supply under test.
5. Turn off the DC load's input how and when the power
by pressing the On-Off supply enters from CV to CC
button. mode. Ideally, precise current Approach
6. Turn off the power supply. regulation reflects a voltage Use a power supply, DC load,
vs. current curve similar to and a computer to analyze
Calculate the load regulation Figure 4.
(in percent) of the power voltage versus current
supply by characteristics.
For CV/CC mode power
supplies, typical current limit
V0 −V
100 (1)
V0

You can also calculate the


output resistance of the power
V 0 −V 
supply as where i
i
is the current drawn in this
test.

High quality power supplies


have low output resistances in
the order of 1 m or less.
This means measuring V0 and
V with enough digits is
necessary to avoid loss of
significance in the subtraction.
As an example, for a 30 V
supply rated at 3 A with an Figure 4. Voltage vs. Current Curve
output resistance of 1 m,

6 of 17
Setup Power supply for electronic products have
been discovered and are far
Connect the power supply in measurements
more complex than they were
parallel to the DC load. Set (readings from power supply)
several decades ago. With
the power supply to its rated Voltage Current Mode increasing need in our society
voltage and set a preset value for clean and efficient energy,
32.0001 V 0.00024 A CV
for current. The DC load engineers have now turned
31.9999 V 2.65178 A CV
should display the rated their focus to develop
voltage if power supply's 31.9999 V 2.99467 A CV
applications that utilize, for
output is on. Incrementally 0.1569 V 2.99999 A CC example, fuel cells,
increase the current drawn supercapacitors, and
from the load and observe the Table 1: Measured Data from B&K
Precision 9120A. photovoltaic energy. Due to
behavior of the voltage in the the complexity in the design of
power supply. When the these sources, it is useful to
current on the load gets close It follows that the have a programmable test
to the power supply preset measurements demonstrate a instrument that can verify
current limit, observe before, voltage vs. current curve precise details of the sources'
during, and after the crossover similar to Figure 4. Drawing behavior. This is often where
point, where the power supply from the data, the voltage a DC load comes in handy
switches from CV to CC mode. drops immediately upon because of its programmable
reaching the crossover point, flexibility as well as its
DC Load Setup which is at 2.99467 A in this capability to run discharge
case. The power supply tests on power sources like
Set the DC load to CC mode changes to CC mode after this batteries. This section will
by pressing I-set (for B&K point, and voltage remains at provide a basic overview that
Precision 8500). You have 0.1569 V, with current limited demonstrate an efficient way
have to press twice. Turn on to 2.99999 A. This behavior is to perform battery discharge
DC load's input. normal and expected for a CV/ and internal resistance testing.
CC power supply. There are
Results other types of power supplies
with different current limit
Battery Discharge
A B&K Precision 9120A DC designs such as foldback Curves
power supply rated at 32 V current and CV power supplies
and 3 A was tested with a DC (without CC mode). The When designing and testing a
load. The voltage from before voltage versus current curve battery for powering a device,
to after the current crossover will greatly differ from that of a great deal of attention
point was observed. Table 1 CV/CC power supplies, so it is reflects on energy efficiency
shows the data of some advised to test their current and lifetime. For this reason,
measurements to demonstrate limit characteristics before a standard performance test
the power supply behavior utilizing them in devices or consists of analyzing discharge
before and after the crossover applications. curves that characterize the
point. behavior of the battery. By
observing these curves, the
BATTERY TESTING battery life can be measured,
and its efficiency can be
computed. Some DC loads
provide this feature to allow
battery discharge
measurement, in which the
The forms and standards for total charge is provided in Ah
storing, renewing, and using (ampere*hour) to a specified
energy are evolving. New voltage. B&K Precision's 8500
methods for providing power DC load series all provide this

7 of 17
useful built-in function for data file is aa_test and “78deg
quick setup and testing. F” is a string included at the
Battery discharge can also be end of each line of the file.
tested with the provided DC Load
Note: For more details on the
program under the “Software
program commands and to
Examples” section of this note.
run the test, find the
+ -
Additionally, small changes to
instructions and use the
the program will offer even
python script provided
greater control for the test,
towards the end of this
allowing measurements to be
application note categorized
made under different modes
under “Battery Discharge
and settings. The following + AA size battery -
Test”.
describes the discharge test
setup for a consumer “AA” size
battery. Similar setups can Battery Internal Figure 5. Battery Discharge Test
also be used for other types of Resistances Setup
batteries.
The DC load is an effective to idealize the internal losses
Setup tool for measuring the internal in the battery when current is
resistance of a battery. The flowing. If the battery's
Connect the battery to the DC
battery is typically modeled as electrochemistry is regarded
load. You can either solder
the dashed area in the circuit as a network of voltage
wires to the battery or use a
illustrated in Figure 8. The sources and resistances, then
battery holder.
voltage source Vo is considered Vo and Ri comprise the
ideal and is the open circuit Thevenin equivalent circuit.
DC Load Setup voltage of the battery. The For alkaline batteries, the
internal resistance Ri is used internal resistance goes up as
The setup is controlled by the
program, but be sure to
manually set the voltage and
current range prior to running
the test program. If the
current is reasonably large,
you might also want to
suggest they use the remote
voltage sensing feature of the
DC load.

Results
Provided as an example is a
plot (see Figure 6) of the
battery discharge curve for the
AA Alkaline battery tested with
the setup in Figure 5. The
command line used to run the
program for the data is shown
in Figure 7. The settings of
the command are indicated in
order as set to com port 5 in
constant current mode with
0.5 A and a cut off voltage of
0.5 V. The file name for the Figure 6. AA Alkaline Battery Discharge Curve

8 of 17
the battery's chemical energy python battery.py 5 cc 0.5 0.5 aa_test 78deg F
is used up. The internal
resistance drops as the Figure 7. Command Used to Run Program
temperature increases.
If VL is the voltage across the measured as: displayed and label this as V.
load, we have Use equation (4) to calculate
V o−V the internal resistance. A
V L =Vo iR i (2) Ri = (4)
0.5 setup diagram is provided in
Thus, Figure 9 for the purpose of
illustration.
∣V L−Vo∣ Setup
R i= (3)
i Connect the battery to the DC DC Load Setup
This gives us a way to load. Use a battery holder or
evaluate the internal solder wires to the battery if 1. Turn on DC Load's
resistance using the DC load, necessary. If soldering wires, remote sense feature.
either manually or by a do not overheat the battery
2. Set trigger to
program. due to risk of rupture.
immediate.
Connect two wires as close to
For smaller batteries, a the battery terminals as 3. Set load to CC mode at
programming approach is an possible and run these to the 0.005 A.
advantage. Measurements remote sense terminals on the
can be made quickly, causing 4. Setup transient mode
DC load (be sure to observe
less drain on the battery. with current levels from
the proper polarity). Turn on
Using an oscilloscope, a 0 A for 0.5 ms to 0.505
load with the configurations
millisecond-wide current pulse A for 2000 ms in pulse
under “DC Load Setup” below.
can be used to make a useful mode.
Make sure the battery voltage
internal resistance has stabilized and write this
measurement. The approach down as the starting voltage Results
for measuring a “D” size V0. Then trigger the transient
battery's internal resistance is current levels and immediately Using the test setup in Figure
observed in the following. watch the displayed voltage. 9, the stabilization voltage
Note that this is only one of Within two seconds, make (V0) for the measured battery
the practical ways for note of the lowest voltage is 1.496 V. With 0.505 A load,
measuring internal resistance.
There are other methods not
mentioned here.

Approach
Measure the battery's voltage
at two different current loads.
The remote sense capability of
B&K Precision's 8500 DC load
will be used to avoid errors
due to wire resistances. The
test method follows the
recommendation of [1] by
applying a stabilization current
of 5 mA, measuring the
battery's voltage V0, applying
a current of 505 mA, and
measuring the voltage V. The
internal resistance is Figure 8. Circuit Model of Battery and Internal Resistance

9 of 17
the voltage (V) is 1.415 V. series with a resistance Slew Rate
Using equation (4) gives an captures the first order
internal resistance of 0.16 Ω. behavior (see Figure 8). More The slew rate of a DC load is a
complex models have also performance measurement
been used. Using DC loads that determines how quickly a
Batteries are complex like B&K Precision's 8500 DC load can draw current
nonlinear electrochemical series, batteries can be within different ranges of
devices. The two common characterized in a manner current transition. In general,
electrical measurements of which will mirror their the slew rate for low current
batteries used to gauge their application and construct a transitions, say 0 to 0.5 A, is
state are the DC internal model appropriate for the significantly lower than slew
resistance and the AC internal design. rate for current transitions
impedance. In the "old" days, from 30 to 70 A. Generally,
AC characteristics of a battery the appropriate way to test
were not terribly important for PERFORMANCE slew rate is to observe a
DC operation. However,
modern digital electronic
TESTING OF DC portion of the timing during
maximum current transition.
devices can draw sharp LOADS The graph in Figure 10
current spikes from their illustrates this. Between the
power source (e.g., switching 10% and 90% region, the
a cell phone to transmit). In a slew rate can be measured by
1 kW car audio system, observing the steepest slope
currents can exceed 100 A and portion. The indicated
the AC behavior of batteries, Just as it is important to have measured time would be used
stiffening capacitors, and stray a good power supply that will to calculate the slew rate.
inductances can all play a role. perform accurate Hence, the slew rate
DC loads can be useful in measurements under various calculation is simply (rated
helping investigate the test conditions, it is essential max. current – 0 A) / T, where
dynamic behavior of these to have a DC load that is T is the measured time from
systems. robust and perform under 10% to 90% region and rated
required specifications and max. current is the specified
test setups. Some of the most maximum current of each
The simple model of a battery common tests used for load. The following will
as an ideal voltage source in verifying features of a DC load demonstrate how to test the
include trigger delay, switching slew rate of B&K Precision's
Remote sense time, and slew rate. In the 8510 DC Load.
following section, slew rate
+ - testing for the B&K Precision
8510 DC load will be
DC Load
Setting: Immediate Trigger
highlighted. Approach
Mode: CC at 0.005A Disclaimer: The following
Transient: Pulse 0 to 0.505A Set the DC load to transient
sections include general mode and allow it to draw
+ - setups with some settings current from 0 to maximum
specified for the test rated current. Observe
environment. Some details current transition changes and
are ignored, and therefore timing on an oscilloscope.
results may vary and may not
+ D size battery - reflect exactly what is shown
in the following sections. Setup
Figure 9. Test Setup For Battery Three B&K Precision's 1796
Internal Resistance high current power supplies
are connected in parallel.

10 of 17
Figure 11. Connect the BNC
to binding post adapter into a
B&K Precision's 2542
oscilloscope. Follow the setup
below for the DC load and
oscilloscope.

DC Load Setup
1. Setup transient mode
with current levels from
0 A for 0.5 ms to 120 A
for 1000 ms in pulse
mode.
2. Set load to CC mode
3. Turn on input for a
short moment. Turn off
once oscilloscope setup
is complete.

Oscilloscope Setup
1. Set to single run.
2. Adjust trigger level
Figure 10. Slew Rate Measurement Graph
until waveform trace is
Since each supply can output simplify the same setup and captured.
maximum of 50 A, it can reduce the temperature from
3. Adjust vertical and
produce enough current for heat dissipation. Since high
horizontal scale and the
B&K Precision's 8510 DC load current will be drawn, it is
trigger level and run
to draw at its maximum range important to note here that
once again.
(0-120 A). A handful of shunt heavy gauge wires should be
resistors rated at 5 W 0.22 ΩJ used to connect the power 4. Repeat steps 2 and 3
are connected in parallel and supplies to each other and to until a good sampled
are connected to a BNC-to- the load. Connect the power trace is captured.
binding post adapter. A larger supply to the DC load and
shunt can also be used to shunt resistors as illustrated in
Results
Observe the trace on the
oscilloscope and compare it to
Power supply Oscilloscope Figure 10. Use the scope's
+ - Mode: Single Trigger
cursors to approximate the
10% and 90 % mark.
Power supply Observe the steepest slope in
between the cursor lines. A
+ - rough estimate can be made
DC Load
Mode: CC by taking the difference of the
Power supply Shunt Transient: 0 A to 120 A two cursor lines. Since this
+ - Resistance setup tests a current transition
+ -
from 0 A to 120 A, slew rate
can be calculated by dividing
Figure 11. Slew Rate Test Setup the change in current over the

11 of 17
change in time; that is the rates of B&K Precision's 8500 conducting current and, thus,
difference of the cursors. For DC load. This load can it may jump past a low
B&K Precision's 8510 DC load, measure with a millivolt current setting. Thus, please
slew rate is measured to be 1 resolution before indicating an test this fuse application
A/μs. overrange. Refer to the carefully before using it to
section for detailed protect valuable circuitry.
information on setting up and
OTHER DC LOAD running the software
application.
APPLICATIONS

SOFTWARE
Fuse EXAMPLES
DC loads can be very The application described in
resourceful for various tests this section is to demonstrate
and applications. Sometimes, how to use a DC load as a fuse
they may even act as a in a circuit. Under program
different type of test control, the load can shut off The following sections include
instrument for measurement. when either current, voltage, the source codes for all
A good example would be a or power measured exceeds a software based applications
voltmeter. Other practical set value in the load. This is a and examples previously
applications that will be basic application for a fuse, mentioned. If not done
mentioned in this section is a and due to some delays from already, please read the
fuse. DC loads can also act as the software control, it is not documentation provided from
a fuse in a circuit for recommended for use if fast B&K Precision's website at:
monitoring current thresholds responses are required. The http://www.bkprecision.com/p
to help prevent possible program codes to run this roducts/categories/sub_catego
damage from overcurrent or application can be found in the ries/models/?
overpower. “Software Examples” section model=8500#software for
under “Fuse Application”. successful installation of the
Details of usage and operation python libraries. This must
are provided in the same be setup correctly prior to
Voltmeter section. using any of the source codes
provided in this note. Be sure
In any design or test to also read the instructions
Setup
environment, a voltmeter is under each software examples
required in one way or another Connect load in series with a for correct usage.
for measurements. It is one circuit. Be sure that remote
of the most useful test tool sense is off. Run the program
today. For this reason, it is to monitor current. Threshold
often convenient to have a DC value is set in the program.
load that can read voltages
when a voltmeter is not
around. For simplicity, a test Note: The DC load does not
program script has been behave like a pure resistance.
provided under “Software For this fuse application, it
Examples” at the end of the may be hard to test low
note under section labeled currents in the few mA range.
“Voltmeter Reading” to For B&K Precision's 8500 load,
perform simple voltage there is a turn-on threshold
measurements and reading voltage of around 0.1 volts
before the load starts

12 of 17
Battery Discharge Test

The objective of this program is to characterize the discharge curves of common household
batteries. It can be used to monitor and log data when a battery is discharged by one of B&K
Precision's 8500 series DC loads.

Instructions
There are two settings that can be modified in the code to cater particular test settings. These
two settings are the interval between each reading, defined as “interval_s” in beginning of the
program, and baudrate, defined as “baudrate” at the end of main(). By default, interval_s = 1
and baudrate = 38400.
To run the command, lets use the example given previously.
python battery.py 5 cc 0.5 0.5 aa_test 78deg F
The above command is in a specific order, which is read as port 5, CC mode, 0.5 A in CC mode,
0.5 V cut off voltage, filename to save data as “aa_test.dat”, and extra strings added at the end of
each record is “78deg F”. Refer to Table 2 below for detailed instructions.
Note: The program will NOT overwrite any existing data files.
Run command Python file Port # Mode: Decimal value Cut off voltage Filename of Any string to
name for constant recorded data attach at end of
mode each line
python Name of the COM port # cc: constant Any value set Decimal value Files are saved Any strings of
python program used to connect current for the of cut off in same folder text can be
to PC cv: constant respective voltage to end as the python added for
voltage mode. (i.e. 0.5 program program file reference
cp: constant in cc mode is with .dat
power 0.5 A, 2 in cv extension
cr: constant mode is 2 V)
resistance

Table 2. Instructions on Command for Battery Discharge Test Script

battery.py
Data file: msg = '''Usage: %(name)s port mode value cov filename [docstring]
Header info: Test a battery with a DC load until the specified cut-off voltage is reached.
# Command line Arguments are:
# Date and time for start of test port
Entry info: COM port that the load is at.
time voltage current power mode
cc for constant current
time is in seconds since start of test cv for constant voltage
Other measurements are in V, A, and W cp for constant power
cr for constant resistance
We talk to a DC load using COM. value
''' Decimal value of desired constant mode value.
cov
import sys, dcload Cut-off voltage in volts.
from win32com.client import Dispatch filename
from string import join Data will be stored in filename.dat.
from time import time, sleep docstring
from msvcrt import kbhit, getch Any further text is just logged to the data file.
out = sys.stdout.write ''' % locals()
nl = "\n" print msg
interval_s = 1 # Interval between readings exit(1)

def Usage(): def ProcessCommandLine():


name = sys.argv[0] if len(sys.argv) < 6:

13 of 17
Usage() log("# Command line: %s\n" % join(sys.argv[1:]))
port = int(sys.argv[1]) 'log("# %s\n" % version)'
mode = sys.argv[2] msg = "# Test start time = " + load.TimeNow() + nl
value = float(sys.argv[3]) LogMsg(msg)
cov = float(sys.argv[4]) Set("Turn load on", load.TurnLoadOn())
filename = sys.argv[5] + ".dat" voltage, current, power = GetCurrentVoltagePower(load)
docstring = "" start_time = time()
if len(sys.argv) > 6: while voltage >= cov:
docstring = join(sys.argv[6:]) voltage, current, power = GetCurrentVoltagePower(load)
# Check values current_time = time() - start_time
assert(port >= 0) LogMsg("%9.2f %9.4f %8.4f %9.4f\n" % \
assert(mode in ("cc", "cv", "cp", "cr")) (current_time, voltage, current, power))
assert(value > 0) sleep(interval_s)
assert(cov > 0) if kbhit():
from os.path import exists c = getch()
assert(not exists(filename)) if c == "Q":
out("Mode = %s\n" % mode) break
out("Value = %s\n" % value) Set("Turn load off", load.TurnLoadOff())
out("cov = %s\n" % cov) LogMsg("# Test finish time = " + load.TimeNow() + nl)
out("filename = %s\n" % filename) load.SetLocalControl()
return port, mode, value, cov, filename, docstring
def main():
def Set(task, error_message): port, mode, value, cov, filename, docstring = ProcessCommandLine()
if error_message: load = Dispatch('BKServers.DCLoad85xx')
out("Error on task '%s':\n" % task) baudrate = 38400
out(error_message) load.Initialize(port, baudrate) # Open a serial connection
exit(1) log = open(filename, "w").write
RunTest(log, load, mode, value, cov)
def SetModeAndValue(load, mode, value):
# Set mode and value. Also check that the maximum setting is at main()
# least the value we want.
Set("Set to mode %s" % mode, load.SetMode(mode))
if mode == "cc":
max_current = float(load.GetMaxCurrent())
if max_current < value:
out("Max current setting is less than desired value" + nl)
exit(1)
Set("Set to value %g" % value, load.SetCCCurrent(value))
elif mode == "cv":
max_voltage = float(load.GetMaxVoltage())
if max_voltage < value:
out("Max voltage setting is less than desired value" + nl)
exit(1)
Set("Set to value %g" % value, load.SetCVVoltage(value))
elif mode == "cp":
max_power = float(load.GetMaxPower())
if max_power < value:
out("Max power setting is less than desired value" + nl)
exit(1)
Set("Set to value %g" % value, load.SetCWPower(value))
else:
Set("Set to value %g" % value, load.SetCRResistance(value))

def GetCurrentVoltagePower(load):
def get_value(f):
value, unit = f.split()
return float(value)
s = load.GetInputValues()
fields = s.split("\t")
voltage = get_value(fields[0])
current = get_value(fields[1])
power = get_value(fields[2])
return voltage, current, power

def RunTest(log, load, mode, value, cov):


def LogMsg(msg):
out(msg)
log(msg)
load.SetRemoteControl()
SetModeAndValue(load, mode, value)

14 of 17
Voltmeter Reading

In this section, the codes provided below are used for the “voltmeter” application using the DC
load. It provides a convenient and remote way to collect voltage readings into a data file to serve
its purpose.

Instructions
Two settings must be configured correctly to run the script. They are port and baudrate. In the
code of voltmeter.py, they are declared at the beginning as “port = 5” and “baudrate = 38400” by
default. Please change the values to match the port and baudrate settings used to interface on
the PC. Note: The DC load must have the same baudrate configurations as in the code, and port
number has to match the COM port on the PC used to connect to DC load.

voltmeter.py
import sys, dcload
from time import time
from win32com.client import Dispatch
from msvcrt import kbhit

port = 5
baudrate = 38400

load = Dispatch('BKServers.DCLoad85xx')
load.Initialize(port, baudrate) # Open a serial connection
load.SetRemoteControl()
of = open("fast.dat", "w")
start = time()
count = 1
while True:
msg = "%6d %8.2f s %s\n" % (count, time() - start, load.GetInputValues())
of.write(msg)
if kbhit():
break
count += 1
finish = time() - start
load.SetLocalControl()
of.write("\nReading rate = %.1f readings/second\n" % (count/finish))
print "\nReading rate = %.1f readings/second\n" % (count/finish)

Fuse Application

A practical feature in most DC loads is the overpower, overcurrent, and overvoltage protection.
With this, a DC load can behave like a fuse in a circuit, monitoring current, voltage, or power from
exceeding design specifications of the circuit. An excellent way to demonstrate this application is
to use a program. Provided in the following is an example python script for monitoring current
using B&K Precision's 8500 DC load.

Instructions
Two settings must be configured correctly to run the script. They are port and baudrate. In the
code of voltmeter.py, they are declared at the beginning as “port = 5” and “baudrate = 38400” by

15 of 17
default. Please change the values to match the port and baudrate settings used to interface on
the PC.
Here's an example to run the command:
python fuse.py 5
The value “5” represents the fuse value to set. In this example, it is 5 A. With slight
modifications to the script, the program can also monitor voltage and power.

fuse.py
import sys, dcload
from time import time
from win32com.client import Dispatch
from msvcrt import kbhit

port = 5
baudrate = 38400

def ReadCurrent(load):
fields = load.GetInputValues().split("\t") # Split on tab characters
current = float(fields[0].split()[0]) # Remove the "A"
return current

def main():
# Check the command line
if len(sys.argv) != 2:
print "Usage: %s fuse_value_in_A" % sys.argv[0]
exit(1)
# Get the desired fuse value from the command line
fuse_value_A = float(sys.argv[1])
assert(fuse_value_A) > 0
# Establish a load connection
load = Dispatch('BKServers.DCLoad85xx')
load.Initialize(port, baudrate) # Open a serial connection
load.SetRemoteControl()
load.SetMode("cc") # Set to constant current mode
load.SetCCCurrent(fuse_value_A) # We won't exceed this value
load.TurnLoadOn()
current = ReadCurrent(load)
while current < fuse_value_A:
if kbhit(): break
current = ReadCurrent(load)
load.TurnLoadOff()
load.SetLocalControl()

main()

Reference

[1] http://data.energizer.com/PDFs/BatteryIR.pdf A technical bulletin on internal resistance.

16 of 17
© 2009 B&K Precision Corp.

17 of 17