Minutes of the 19th meeting of the State Level Expert Appraisal Committee-2 (MMR)
held on 30th September and 1st October 2013 at Maharashtra Water Resources
Regulatory Authority, 9th Floor, Centre 1, World Trade Centre, Cuffe Parade,
Colaba, Mumbai 400005.

The following members were present for the committee meeting:


Shri. R. B. Budhiraja ... Chairman
Ar. Bharat Bhushan … Member
Er. Dnyaneshwar Hadadare … Member 30th September and 1st
Er. B. P. Patil … Member October 2013
Prof. Neelima Naik … Member
Dr. B. N. Patil … Member Secretary

Opening Remarks by the Chairman:


Chairman welcomed the members to the 19th SEAC II Meeting. Member Secretary
informed about the compliance of the projects considered in the previous meeting.

Confirmation of the Minutes:


The minutes of the 18th SEAC II Meeting held on 19th, 20th and 21st September 2013 were
confirmed.

Consideration of the projects for the issue of Environmental Clearance:

Item no 1 Damodar Suruchi Developers Clearance for our Proposed Slum


Rehabiliation Project on Property bearing CTS No.163-A (Part) of Village
Akurli, Kandivali (E) Mumbai.

During discussions, following points emerged:

1) Data submitted was not matching with the presentation. PP to submit the revised
CS as per the presentation document.
2) PP did not attend the meeting and sent his representative, without his
authorisation letter.

In view of above, the proposal is deferred and shall be considered further after the
above observation is addressed and submitted for reconsideration.

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 2 of 86

Item no 2 Application for EC as per Notification dated 14/9/2006 (amended on


4/4/11) for residential cum commercial project (SRD) on plot bearing
S.No.38/1, 38/2, 37/2A at Panchpakhadi, Thane (w) by M/s Sai Krupa
Enterprises

PP requested to postpone the project. Hence the project is deferred and


delisted.

Item no 3 Application for EC as per Notification dated 14/9/2009 (amended on


4/4/11) for Residential and Commercial project “Manav kalyan” at
Goregaon by M/s. Kumar Builders.

PP informed that they have already constructed rehab building having about 18,000 m2 of
built up area without prior EC.

Considering the orders of the Hon’ble High Court having Court order regarding
construction to be undertaken up to 20,000 m2 and the letter dated 29th June 2013 from
Environment department, Committee decided to appraise the project though there is
violation subject to the final decision on the same by SEIAA on the same.

The proposal was discussed on the basis of the presentation made and documents
submitted by the PP. All issues related to environment, including air, water, land, soil,
ecology and biodiversity and social aspects were discussed.

During discussion following points emerged:

1. PP to reuse excess water for air condition in commercial building and submit the
revised water balance chart considering the cooling water requirement to
achieve zero discharge.
2. As rehab building is occupied, PP to connect the same to the STP and ensure
that treated water from STP should be used for proposed construction
activities.
3. PP to ensure that parking should be separate for sale, rehab and banquet hall
components. Accordingly submit plans for the same.
4. PP to submit copy of concession allowing proposed height of the proposed
buildings from competent authority.
5. PP to submit construction & Demolition waste management plan with
quantification.

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 3 of 86

6. PP to submit revised movement/ circulation plan both for parking and fire
tender movement, indicating entry and exit. It should be one way, left in and
left out.
7. It is observed that car parking provided by PP is 190. PP to submit revised car
parking details as per Norms which is 160 as against 190. PP to also ensure that
2-wheeler parking of 143 should not be considered as 4-wheeler parking.
8. PP to ensure that RG area should not be paved.

In view of above, the proposal is deferred and shall be considered further after the
above observations are addressed and submitted for reconsideration.

Item no 4 Kohinoor Planet Construction Pvt Ltd.


Proposed expansion and modernization project "KOHINOOR City" CTS
No.637/B/1A,(pt), 637/B/1B, 637/B/2 to 7, 637/B/1C, 637/C/1 to 4, 640A
to D, 642, 643, 652, 654, 659(pt), 690(A) to D and 691 of Village Kurla,
Tal-Kurla situated at LBS Marg, Kurla (W) Mumbai

Name of Project “Expansion & Amendment - KOHINOOR CITY” at Kurla, Mumbai


Name of Proponent • Name: Mr. Sainath Rajyadhyaksha (Vice President-Regulatory Affairs)
M/s. Kohinoor Planet Constructions Pvt. Ltd.
Name of Consultant Ultra-Tech Environmental Consultants & Laboratory
Type of project: Mixed use development
Location of the project On Plot Bearing C.T.S. No. 637/B/1A,637/B/1B,637/B/1C, 637/B/2 to 7, 637/C/1
to 4, & 640A to D, 642, 643, 652, 654, 659(PT), 690A to D, 691 of Village Kurla -
2, Taluka - Kurla situated at L.B.S. Marg, Kurla (W) Mumbai, State- Maharashtra.
Whether in Corporation / Municipal Corporation of Greater Mumbai (M.C.G.M.)
Municipal / other area
Applicability of the DCR DCR (32) for FSI 1.00 & DCR 34 for (TDR) subject to the regulation in appendix
VII
Note on the initiated work (If Total constructed work (FSI+ Non FSI): 2, 82,181.69 Sq. mt.
applicable) Date and area details in the necessary approvals issued by
the competent authority (attach scan copies):
Environmental Clearance letter dt. 28.06.2006 & 28.09.2010 & 13.08.2013
Consent to Establish dt. 15.03.2011 & Consent to Operate dt. 12.11.2010
LOI / NOC from MHADA / Date and construction area details mentioned in the approved letter : Not
Other approvals Applicable
Total Plot Area 1, 52,286.08 Sq.mt.
Deductions 53,575.12 Sq.mt.
Net Plot area 98,710.96 Sq.mt.
Permissible FSI (including 2,08,413.12 Sq.mt.
TDR etc.)

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 4 of 86

Proposed Built-up Area (FSI & • FSI area (sq. m.): 2, 02,340.42 Sq. mt.
Non-FSI) • Non FSI area (sq. m.): 1,39,643.12 Sq. mt.
• Total BUA area (sq. m.): 3,41,983.54 Sq. mt.

Ground-coverage Percentage 39,832.29 Sq. mt. (40.35 %)


Estimated cost of the project Rs. 624 Crores
No. of building & its Proposed Expansion Remarks
Buildings EC Received
configuration(s) & Amendment
Residential I Four Bldgs with 11 Four Bldgs with 11 No Change
wings wings
Stilt + 7 upper flrs Stilt + 7 upper flrs
each. each.
Residential II One Bldgs with 6 wings One Bldg with 12 wings Increase in 6
wings.
2 B + Stilt + 7 upper 2 B + Stilt + 10 upper
flrs each flrs each Increase in 3
upper flrs.
Residential - III One Bldg with 8 wings One Bldg with 8 wings No Change
Stilt + 7 upper flrs. Stilt + 7 upper flrs
each. each.
Commercial - I One Bldg. One Bldg No Change
2 B + G + 6 upper flrs. 2 B + G + 6 upper flrs.
Commercial II: Four Bldgs. Four Bldgs No Change
2 B + G + 6 upper flrs. 2 B +G + 6 upper flrs.
Educational One Bldg. One Bldg Increase in 3
Complex with B + G + 5 upper flrs. B + G + 8 upper flrs. upper flrs
auditorium &
commercial
(offices)
Hotel with Club One Bldg One Bldg Decrease in 2
B + G + 7 upper flrs B + G + 5 upper flrs upper flrs.
Hospital One Bldg. One Bldg No Change
2 B + G + 5 upper flrs. 2 B+G + 5 upper flrs.
Primary school G + 6 upper flrs. G + 6 upper flrs. No Change
(Marathi School)
Number of tenants and shops Building Details
Residential-I Flats: 420 nos.
Residential-II Flats: 415 nos.
Shops: 15 nos.
Residential-III Flats: 238 nos.
Commercial-I 27505.61 Sq.mt
Commercial II 36374 Sq.mt.
Educational Complex with Auditorium & 67 classroom
commercial (offices)
Hotel with club Room: 100 nos.
Hospital Bed: 150 nos.
Primary school (Marathi school) 33 classrooms

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 5 of 86

Number of expected Total: 31,147 nos.


residents / users
Height of the building(s) Residential - I 26.25 mt. up to terrace level
Residential - II 32.35 mt. up to terrace level
Residential - III 24.50 mt. up to terrace level
Commercial - I 27.50 mt. up to terrace level
Commercial - II: 28.60 mt. up to terrace level
Educational Complex with 33.60 mt. up to terrace level
Auditorium & commercial
(offices)
Hotel 23.90 mt. up to terrace level
Hospital 22.50 mt. up to terrace level
Primary school (Marathi school) 25.80 mt. up to terrace level
Right of way This project plot comprises of one spine road of 13.40 m wide along North to
South.
The plot is abutting 18.30 m wide Kirol road which turns towards LBS Road at
North creating Junction at North Exit of 13.40 m Spine Road.
There is also one 18.30 m wide D P Road perpendicular to Spine road at south, this
corridor.
Will connect to 45 m wide S G Barve road, this Barve road is Major Artery of
Kurla East to West.
Turning radius 9.35 mt. and 13.40 mt. wide
Existing structure(s) All buildings are completed except proposed expansion.
For occupancy except Residential II everything is occupied
Total Water Requirement Dry season:
• Fresh water (CMD): 873
Domestic : From M.C.G.M. : 864
Swimming pool : From tanker water of potable quality: 9
• Recycled water (CMD): 994 (STP Treated sewage)
Flushing : 700
Cooling tower make up : 116
Gardening : 178
Swimming pool make up (CMD): As mentioned above
• Total Water Requirement (CMD): 1867
• Fire fighting (Cum): 1570 m3 (One time requirement)
Wet Season:
• Fresh water (CMD): 873
Domestic : From M.C.G.M. : 250 + From RWH : 614
Swimming pool : From tanker water of potable quality: 9
• Recycled water (CMD): 816 (STP Treated sewage)
Flushing : 700
Cooling tower make up: 116
• Swimming pool make up (CMD): As mentioned above
Total Water Requirement (CMD): 1689
• Fire fighting (CMD): 1570 m3 (One time requirement)
Rail Water Harvesting (RWH) • Level of the Ground water table: 3.0 m below ground surface.
• Size and no of RWH tank(s) and Quantity:
18 rain water harvesting tanks of capacity 841.76 KL

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 6 of 86

• Location of the RWH tank(s): Ground level


• Size, no of recharge pits and Quantity: 45 nos. of recharge pits
• Budgetary allocation (Capital cost and O&M cost)
Capital cost: 219.20 Lac
O & M cost :10.96 Lac/annum
Storm water drainage • Natural water drainage pattern. Excess storm water will be drained to
municipal storm water drain.
Quantity of storm water: 3.12 m3/sec
Size of SWD: Internal SWD Capacity: As per SWD NOC. (3.22 m3/sec)
Sewage and Waste water • Sewage generation ( CMD): 1521
• STP technology: SAFF
• Capacity of STP (CMD):
For Residential I: 1 STP of capacity 300 KL
For Residential II + Primary school: 1 STP of capacity 385 KL
For Residential III: 1 STP of capacity 170 KL
For Commercial I: 1 STP of capacity 230 KL
For Commercial II: 1 STP of capacity 200 KL
For Hotel: 1 STP of capacity 90 KL
For Education Complex: 1 STP of capacity 300 KL
For Hospital : 1 STP of capacity 130 KL
• Location of the STP: Basement and Ground
• DG sets (during emergency):
(Total DG capacity of the project including load of STP.)
4 D.G. sets of capacity 320 kVA each
2 Nos. of D.G. sets of capacity 500 KVA each
1 D.G. set of capacity 250 kVA
9 Nos. of D.G. sets of capacity 625 KVA each
2 D.G. set of capacity 750 kVA each
• Budgetary allocation (Capital cost and O&M cost)
Capital cost: Rs. 591.73 Lacs
O & M cost: Rs. 89.70 Lacs /annum
Solid waste Management Waste generation in the operation Phase:
Dry waste (Kg/day): 3367
Wet waste (Kg/day): 2732
Biomedical waste (Kg/month) ( I f applicable):
Hospital waste:
a. Non Infectious = 32 Kg/ day
b. Infectious= 4 Kg/day
c. Hazardous waste = 2 Kg/day.
d. Total = 38 Kg/day
• STP Sludge (Dry sludge) (Kg/day): 228
Mode of Disposal of waste:
• Dry waste:
Recyclable waste : To recyclers and
Non-recyclable waste: To M.C.G.M.
• Wet waste: Organic Waste Converter (OWC)
• E - waste: To authorized dealers.
• Hazardous waste: To authorized common hazardous waste disposal site
• Biomedical waste (If applicable): To the Biomedical Waste Management

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 7 of 86

Facility of MCGM
• STP Sludge (Dry sludge): Use as manure
Area requirement: Location: Ground Area: 142.00 Sq. mt.
Budgetary allocation (Capital cost and O&M cost):
Capital cost: 18.00 Lacs
(Cost for treatment of biodegradable garbage in OWC)
O & M cost: 26.98 Lacs/annum
(Cost for treatment of biodegradable garbage in OWC)
Green Belt Development RG area under green belt:
RG on the ground (sq. mt.): 16849.18
RG on the podium (sq. mt.): 1741.81
Plantation:
• Number and list of trees species to be planted: 353 nos.
• Number, size, age and species of trees to be cut, trees to be
transplanted:
Retained trees: 226 nos.
Transplanted trees: 179 nos.
Trees already planted: 1546 nos.
• NOC for the Tree cutting / transplantation/ compensatory plantation, if
any: Yes. Received on dated 7.03.2007
Budgetary allocation (Capital cost and O&M cost)
Capital cost: 102.25 Lacs
O & M cost: 4.09 Lacs/annum
Energy Power supply:
• Maximum demand: 23.84 MVA
• Connected load: 38.85 MVA
• Source: Reliance energy
• Budgetary allocation (Capital cost and O&M cost)
Capital cost: 90.00 Lacs (for solar water heater & landscape lighting)
O & M cost: 0.28 Lacs/annum (for solar water heater & landscape lighting)
DG Set:
• Number and capacity of the DG sets to be used:
4 D.G. sets of capacity 320 kVA each
2 Nos. of D.G. sets of capacity 500 KVA each
1 D.G. set of capacity 250 kVA
9 Nos. of D.G. sets of capacity 625 KVA each
2 D.G. set of capacity 750 kVA each
• Type of fuel used: Diesel
Environmental Management Construction phase (with Break-up):
plan Budgetary Allocation • Capital cost:
• O & M cost (Please ensure manpower and other details)
Total cost incurred for EMP

Total cost
Sr. No. Parameter
( In lacs)

1 Water for dust suppression 14.40

2 Site sanitation and safety 5.00

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 8 of 86

3 Environmental monitoring 2.64

4 Disinfection 2.40

5 Health check up 10.80

6 Total cost 35.24

Operation Phase (with Break-up)-


• Capital cost
• O&M cost (Please ensure manpower and other details)
Operational And
Sr. Set up cost Maintenance Cost
Parameter
No. ( Rs. in Lacs) per Annum
(Rs. In Lacs/ yr)

1 STP Cost 591.73 89.70

Rain Water Harvesting


2 (18 tanks of total
841.76 KL capacity) 84.20 4.21

Rain Water Harvesting


3
(45 Nos. of ring wells) 135.00 6.75

MOEF
Environmental
4 approved lab
Monitoring
for monitoring 170.28

Solid waste
5
Management 18.00 26.98

Solar Energy
6
(For Solar lighting)
10.00 0.20

Solar Energy
7 (For Solar Water for
hotel & hospital ) 80.00 0.08

8 Gardening 102.25 4.09

9 BMS -- 0.80

Total Cost 1021.18 303.09


Traffic Management Nos. of the junction to the main road & design of confluence:
Two entry and exit to the main and service vehicle have separate entry and exit.
Parking details:
• Number and area of basement: --
Residential - II: 2 Basements
Commercial - I: 2 Basements
Commercial II: 2 Basements

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 9 of 86

Educational complex: 1 Basement


Hotel: 1 Basement
Hospital: 2 Basement
Number and area of podia: One podium for Residential III
• Total Parking area: 88,676.69 Sq. mt.
• Area per car: 29.83 Sq. mt./car
• 2-Wheeler: Nil
• 4-Wheeler: 2973 nos. ( 2972 nos. for 4W and 1 ambulance for hospital)
• Public Transport: Nil
Width of all Internal roads (m): 9.35 mt and 13.40 mt

PP informed that they have already received prior EC from MoEF for the project on
th
28 June 2006 which is amended on 28th September 2010 and on 13th August, 2013.
Present proposal is for the amendment in the EC due to the fungible FSI. In one of the
residential building 6 wings are added, amendment in residential building by adding 3 floors
and decrease in 2 floors of Hotel building.

The project proposal was discussed on the basis of presentation made documents
submitted by the proponent. All issues related to environment, including air, water, land,
soil, ecology and biodiversity and social aspects were discussed. Present proposal is for the
amendment / expansion.

Committee noted the following changes:

Proposed
Amendment and
Description As per EC received Remarks
Expansion
in EC
2
Total plot area (m ) 1,52,286.08 1,52,286.08 No Change

2
Net Plot (m ) 98, 710.96 98, 710.96 No Change

2 39,777.80 2
Ground Coverage Area (m ) 39,832.29 (40.35 %) Increased by 54.49 m
(40.29%)
2
Total R. G. area (m ) 18,590.99 18,590.99 No Change
2
2
1,89,551.33 2,02,340.42 Increased by 12789.09 m
Built –up Area as per FSI (m )
as per permissible FSI

2 2
NON FSI area (m ) 92,630.36 1,39,643.12 Increased by 47012.76 m

Total Construction Built – up Area 2


2 2,82,181.69 3,41,983.54 Increased by 59801.85 m
(m )

Required Parking(nos) 1865 2194 Increased by 329 nos as per revised

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 10 of 86

planning

Increased by 350 nos as per revised


Parking provision (nos) 2623 2973
planning

Proposed Expansion Remarks Status


Buildings EC Received
& Amendment
Residential I Four Buildings Four Buildings with No Change Completed &
with 11 wings 11 wings Occupied
Stilt + 7 upper Stilt + 7 upper
floors each floors each
Flats : 420 nos. Flats : 420 nos.
Residential II One Building with One Building with 12 Increase in 6 wings. 6 wings completed
6 wings wings Increase in 3 upper floors & 254
2 B + Stilt + 7 2 B + Stilt + 10 flats
upper floors each upper floors each
Flats: 161 nos. Flats: 415 nos.
Shops : 15 nos. Shops : 15 nos.
Residential - III One Building with One Building with 8 No Change Completed &
8 wings wings Occupied
Stilt + 7 upper Stilt + 7 upper
floors each. floors each.
Flats: 238 nos. Flats: 238 nos.
Commercial - I One Building One Building No Change Completed &
2 B + G + 6 upper 2 B + G + 6 upper Occupied
floors floors

Commercial II: Four Buildings Four Buildings No Change Completed &


2 B + G + 6 upper 2 B +G + 6 upper Occupied
floors floors

Educational Complex with One Building One Building Increase in 3 upper floors due to B + G + 5 floors
auditorium & commercial B + G + 5 upper B + G + 8 upper additional Offices and completed &
(offices) floors. floors Auditorium occupied
Classroom : 67 nos Classroom : 67 nos

Hotel with Club One Building One Building Decrease in 2 upper floors Completed &
B + G + 7 upper B + G + 5 upper Occupied
floors floors
Room :126 nos. Room :100 nos.

Hospital One Building One Building No Change Completed &


2 B + G + 5 upper 2 B + G + 5 upper Occupied
floors floors.
Bed : 150 nos. Bed: 150 nos.
Primary school (Marathi G + 6 upper floors G + 6 upper floors No Change Completed &
School) Classroom : 33 nos Classroom : 33 nos Occupied

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 11 of 86

Sr. Description As per EC received Proposed Expansion & Remarks


No. Amendment

1 Total Water Domestic 749 864 Increased by 115 due to increase in flat
Requirement numbers
(KLD)
Flushing 605 700 Increased by 95 due to increase in flat
numbers

Cooling tower 412 116 Reduced by 296 (Actual requirement is


make up considered)

Gardening 178 178 No change

Swimming 7 9 Increased by 2
pool
Total 1951 1867 Overall decreased by 84

2 Sewage generation 1317 1521 Increased by 205 due to increase in flat


(KLD) number

3 STP capacity Total 8 nos of STP’s Total 8 nos of STP’s Increase in STP capacity of Residential II
of total capacity of total capacity 1805 as revised proposal
1590 KL KL For other buildings as per actual site
condition

4 Solid Waste

4.1 Biodegradable 2648 2732 Overall Increased by 84 due to increase in


(Kg/ day) flat numbers for residential

4.2 Non Biodegradable 3362 3367 Overall increased by 5 due t:


(Kg/ day) Reduction in no of rooms of hotels
Consideration of criteria for solid waste
generation as 100gm/person/day for
education institute
Increase in flat nos for residential II
4.3 E-waste (kg/month) 327 327 No change

5 Power Requirement
Maximum demand (MVA) 27.23 23.84 Decreased by 3.39 MVA as per revised
planning

During discussion following points emerged:

1. PP to submit Disaster Management Plan for school.


2. PP to reuse treated water from existing STPs for proposed construction
activities.
3. PP to provide solar panels for hot water generation and accordingly submit
revised energy saving calculations.

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 12 of 86

4. PP to ensure that excess Treated waste water should be used in water cooled
chillers in operation phase.

After deliberation, Committee decided to recommend the proposal for


Environmental Clearance to SEIAA, subject to compliance of above points.

Item no 5 Proposed Residential Project on property bearing S.No. 110, H.No.1 of


village Kausa, Tal & Dist. Thane by M/s Ewar Construction Pvt Ltd.

The PP has informed his inability to attend the meeting; hence the project is
deferred and delisted.

Item no 6 Proposed residential scheme on plot CTS No. 379------381/1 to 3 of village


chakala , Andheri (E), Mumbai by M/s Krishna Developers (New Project)

PP was absent; hence the project is deferred and delisted.

Item no 7 Application for EC for proposed commercial complex on C-68, CTS No. 4207
of village Kolekalyan, Tal. Andheri, Mumbai by M/s JET Airways

Name of Project “Godrej BKC” Expansion of commercial complex at Bandra-Kurla Complex


Name address of Proponent Name: Mr. Prashant Karkhanis.
M/s. Jet Airways (India) Ltd.
Name of Consultant •: M/s. Ultra-Tech Environmental Consultancy & Laboratory
Type of project: Commercial Complex
Location of the project Plot No. C-68, CTS No. 4207 of village Kolekalyan, Tal. Andheri, Mumbai.
Whether in Corporation / Local Planning Authority: Mumbai Metropolitan Region Development Authority
Municipal / other area (MMRDA).
Municipal Corporation: Municipal Corporation of Greater Mumbai (M.C.G.M.).
Applicability of the DCR Bandra – Kurla Notified Area DCR , 1979
Note on the initiated work (If Total constructed work (FSI+ Non FSI): 19,997.00 Sq. Mt.
applicable) • Received Environmental Clearance on 26th July 2007 and extension in the
validity of Environmental Clearance granted on 8th April 2013.
LOI / NOC from MHADA / Date and construction area details mentioned in the approved letter: Not
Other approvals (If applicable) applicable
Total Plot Area (sq. m.) 10309.59 Sq. mt.
Deductions --
Net Plot area 10309.59 Sq. mt.
Permissible FSI (including TDR 76600.00 Sq.mt

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 13 of 86

etc.)
Proposed Built-up Area (FSI & • FSI area (sq. m.): 76593.12
Non-FSI) • Non FSI area (sq. m.): 37261.62
• Total BUA area (sq. m.): 113854.74
Ground-coverage Percentage (%) 5657.51Sq. Mt. (54.87 % of Net Plot Area)
Estimated cost of the project Rs. 1800.60 Crore
No. of building & its EC received Proposed Expansion
configuration(s) One Commercial Building: One Commercial Building:
3 Basements + Ground + 9 upper Lower Basement + Lower Basement
floors Mezzanine + Upper Basement +
Ground + 19 Upper floors
Number of tenants and shops Not applicable

Number of expected residents / 8425 Nos. (Floating population)


users
Height of the building(s) 80.83 Mt. (up to terrace level)
Right of way 30 mt wide
Turning radius Minimum 6. 0 mt
Total Water Requirement Dry season:
• Fresh water (CMD):157 (For Domestic: From M.C.G.M.)
• Recycled water (CMD):293 (STP Treated sewage)
Flushing = 199
Gardening = 11
Cooling tower makeup: 96
From STP treated sewage : 83
From tankers: 13
• Total Water Requirement (CMD):463
• Swimming pool make up (Cum): Not Applicable
• Fire fighting (Cum): 300 (one time requirement)
Wet Season:
• Fresh water (CMD): 157
Domestic: From M.C.G.M. =108 + From RWH = 49
• Recycled water (CMD): 293 (STP Treated sewage)
Flushing = 199
Cooling tower makeup: 96
From STP treated sewage : 94
From RWH:2
• Total Water Requirement (CMD):452
• Swimming pool make up (CMD): Not Applicable
• Fire fighting (CMD): 300 (one time requirement)
Rail Water Harvesting (RWH) • Level of the Ground water table: 1.8 to 3.0 mt.
• Size and no of RWH tank(s) and Quantity: 3 nos. of Rain water collection
tank of total capacity 690 KL
• Location of the RWH tank(s): Basement level
• Size, no of recharge pits and Quantity: Nil
• Budgetary allocation (Capital cost and O&M cost)
Capital cost: Rs. 69.00 Lacs
O & M cost: Rs. 3.45 Lacs/annum
Storm water drainage • Natural water drainage pattern: The drainage pattern of the site is

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 14 of 86

towards Mithi river i.e. towards South –East.


• Quantity of storm water: 0.23 m3/sec
• Size of SWD: 2 internal discharge points of 600mm wide with the slope
of 1:500
Sewage and Waste water • Sewage generation ( CMD): 325
• STP technology: MBBR (Moving Bed Bio-reactor )
• Capacity of STP (CMD): 358 KL
• Location of the STP: Basement level
• DG sets (during emergency):
Total DG capacity of the project including load of STP.
5 nos. of DG sets of capacity 2500 KVA each,
• Budgetary allocation (Capital cost and O&M cost) for STP:
Capital cost: Rs. 63.04 Lacs
O & M cost: Rs. 13.89 Lacs/annum
Solid waste Management Waste generation in the operation Phase:
Dry waste (Kg/day): 675
Wet waste (Kg/day): 168
E - Waste (Kg/month): 689
• STP Sludge (Dry sludge) (Kg/day): 49
Mode of Disposal of waste:
• Dry waste: To M.C.G.M.
• Wet waste: Organic Waste Converter (OWC)
• E - waste: Shall be stored separately and disposed of to the
recyclers authorized by MPCB
• STP Sludge (Dry sludge): Use as manure within the premises for plants.
Area requirement: Location: Ground floor Area: 82.44 Sq. mt.
Budgetary allocation (Capital cost and O&M cost)
Capital cost: Rs. 9.00 Lacs (Cost for treatment of biodegradable garbage in
OWC)
O & M cost: Rs. 2.16 Lacs/annum (Cost for treatment of biodegradable garbage in
OWC)
Green Belt Development RG area under green belt:
• RG on the ground (Sq. mt.): 1041.87
• RG on the podium (Sq. mt.): Nil
Plantation:
•Number and list of trees species to be planted in the ground RG: 124 Nos
NOC for the Tree cutting / transplantation/ compensatory plantation, if
any: Received on dated 05.03.13

Budgetary allocation (Capital cost and O&M cost)


Capital cost: Rs. 17.04 Lacs
O & M cost: Rs. 2.73 Lacs/annum
Energy Power supply:
Connected Load: 10801.30 KW
Maximum Demand: 9330.00 KW
Source: Local Authority
% of saving:15.67 %
• Budgetary allocation (Capital cost and O&M cost)
Capital cost: Rs. 126.00 Lacs (Solar PV panels)

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 15 of 86

O & M cost: Rs. 2.16 Lacs/annum (Solar PV panels)


DG Set:
•Number and capacity of the DG sets to be used:
5 nos. of DG sets of capacities 2500 KVA each
• Type of fuel used: Diesel
Environmental Management plan Construction phase (with Break-up):
Budgetary Allocation • Capital cost
• O & M cost (Please ensure manpower and other details)
Total cost incurred for EMP
Total cost
Sr. No. Parameter
(Rs. In lacs)
1 Water For Dust Suppression 21.60
2 Site Sanitation 5.00
3 Environmental Monitoring 0.96
4 Disinfection 3.60
5 Health Check Up 27.00
Total Cost 58.16

Operation Phase (with Break-up)-


• Capital cost
• O&M cost (Please ensure manpower and other details)

Operational &
Sr. Total set up cost
Parameter maintenance cost
No. (Rs. In lacs)
(Rs. in lacs /Yr.)
1 STP Cost 63.04 13.89
RWH TANKS
2 (3 RWH Tanks of 69.00 3.45
capacity 690 KL)
MOEF approved
Environmental
3 agency for 14.97
Monitoring
monitoring
4 Solar Panels 126.00 2.52
5 Gardening 17.04 2.73
Solid Waste
6 9.00 2.16
Management
Other maintenance
cost (For SWM, E
7 -- 25.20
waste management
Water tanks, DG etc.)
8 BMS 1150 28.00
TOTAL COST 1434.08 92.92
Traffic Management Nos. of the junction to the main road & design of confluence
One entry & One exist to 30.00 mt wide road

Parking details:
• Number and area of basement: Lower basement + Lower basement
mezzanine + Upper basement

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 16 of 86

• Number and area of podia: --


• Total Parking area: 13,967.82 Sq. mt.
• Area per car: 11.86 Sq. mt./car
• 2-Wheeler: 43 Nos.
• 4-Wheeler: 1155 Nos.
• Public Transport: 6 Transport Vehicle + 2 handicapped parking
Width of all Internal roads (m): minimum 6.0 wide

PP informed that they have already received prior EC for the project on 26th July, 2007.
PP also stated that they have applied for revalidation of EC in March 2012 and the EC is
revalidated on 8th April 2013.

The project proposal was discussed on the basis of presentation made documents
submitted by the proponent. All issues related to environment, including air, water, land,
soil, ecology and biodiversity and social aspects were discussed. Present proposal is for the
amendment / expansion.

Committee noted the following changes:

Sr. Description As per EC Proposed Expansion Remarks


No. received
1 Plot area (Sq.mt.) 10,309.54 10,309.59 No change
2 Ground Coverage Area 4,060.00 5,657.51 Increased by 1597.51
(Sq.mt.)
3 R.G. Area (Sq.mt.) 1,040.00 1,041.87 No change
4 Built –up Area as per 25,000.00 76,593.12 Additional 51593.12 as per
FSI(Sq.mt.) allotment letter by MMRDA
5 Total Construction Built 51,831.00 1,13,854.74 Increased by 62,023.74 Sq.
– up Area (Sq.mt.) mt.
6 Parking requirement 215 1147 Increased by 932 Nos
(nos.)
7 Parking Provision (nos.) 400 4W: 1155 Increased as per revised
2W: 43 proposal.
Transport Vehicle : 6
Handicapped Parking: 2

8 Project Proposal One Commercial One Commercial Building: Increase in 10 upper floors
Building: Lower Basement + Lower Basement Mezzanine
3 Basements + + Upper Basement + Ground + 19 Upper
Ground + Floors
9 Upper Floors

Sr. Description As per EC Proposed Remarks


No. received
Expansion

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 17 of 86

9 Domestic 51 157 Increased by 106 due to increase in occupancy.

Flushing 66 199 Increased by 133 due to increase in occupancy.


Water Requirement Gardening 5 11 Increased by 6
KLD
Cooling tower 130 96 Decreased by 34
make up
Swimming pool 15 Nil Not proposed now
10 Sewage generation KLD 105 325 Increased by 220 due to increase in occupancy.

11 STP capacity KL 160 358 Increased by 198 due to increase in sewage


generation
12 Solid waste Biodegradable 206 168 Decreased by 38 (Calculations as per criteria of
(Kg/ day ) 100 gms/ person/ day)
Non Biodegradable 482 675 Increased by 193 due to increase in occupancy.

13 E-waste: (Kg/ annum) 2700 8272 Increased by 5572 as per revised proposal
14 Power Maximum demand 2800 9330 Increased by 6530 as per revised proposal
Requirement(KW)

During discussion following points emerged:

1. PP to ensure that area provided for robotic car should be as per the norms and
submit revised detailed plans.
2. PP to submit permission of HRC.
3. PP to ensure that there should be no paving on garden / RG area.
4. PP to submit detailed Building Management System.
5. PP to participate in Environmental Service Scheme (ESS) for Schools in
consultation with the Environment Department, Government of Maharashtra for
CSR activities.

After deliberation, Committee decided to recommend the proposal for


Environmental Clearance to SEIAA, subject to compliance of above points.

Item no 8 EC for “Kamgar swa-sadan CHS ltd” S.No. 1/2546,1/2541,2/2541,2540,1-2-


3/2544(CS no 2/71) of Parel Sewri Division, situated at Mahadev Palav
marg, Currey Road, Mumbai.by M/s Ratnaraj Blessing Milestone.

The PP has informed his inability to attend the meeting. However, Committee
received a complaint from Mr. Babu Loke dated 28/09/2013 regarding
development permissions and also informing that the matter is subjudice.

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 18 of 86

Item no 9 Crystal Pride Developers Environmental Clearance for our Proposed


Residential Development at plot bearing S No.41 (pt.), CTS No.1A/286 of
village Oshiwara Andheri (W) Mumbai.

Name of Project “Proposed Slum Rehabilitation Scheme” at Andheri, Mumbai.


Name of Proponent • Name: Mr. Mukesh M. Doshi (Partner)
M/s. Crystal Pride Developers
Name of Consultant M/s. Ultra-Tech Environmental Consultancy & Laboratory
Type of project: Slum Rehabilitation Project
Location of the project C.T.S. No. 1A/283,1A/284,1A/285 & 1A/286 of village Oshiwara, near
Laxmi Industrial Estate, Andheri (W), Mumbai-400 053.
Whether in Corporation / Municipal Corporation of Greater Mumbai (M.C.G.M.)
Municipal / other area
Applicability of the DCR 33(14) D
Note on the initiated work (If Total constructed work (FSI + Non FSI): 2185.41 Sq.mt.
applicable) Date and area details in the necessary approvals issued by
the competent authority (attach scan copies):
Received 1st IOA dt. 30th June 2011 & Commencement certificate dt.17th
August 2011
LOI / NOC from MHADA / Date and construction area details mentioned in the approved letter:
Other approvals (If applicable) LOI from SRA: SRA/DDTP/0164/KW/PL/LOI dated:16thMay, 2011
Total Built - Up Area (FSI for the scheme): 13,353.27 Sq.mt.
*Please note construction built-up area is never mentioned in LOI
Total Plot Area (sq. m.) 6289.80 Sq.mt.
Deductions 700.93 Sq.mt.
Net Plot area 5588.87 Sq.mt.
Permissible FSI (including TDR 14,838.30 Sq. mt. (Including fungible FSI)
etc.)
Proposed Built-up Area (FSI & • FSI area (sq. m.): 14,838.30 Sq. mt. (Including fungible FSI)
Non-FSI) • Non FSI area (sq. m.): 7,115.82 Sq.mt.
• Total BUA area (sq. m.): 21,954.12 Sq.mt.
Ground-coverage Percentage (%) 1581.14 Sq.mt. (28.29 %)
Estimated cost of the project Rs. 73.22 Crores

No. of building & its Two Buildings


configuration(s) Composite Building 1 ( Sale + PTC) -
Basement + Upper Ground + 1st Podium + 1st to 19th floors + 20th (part)
floor
Sale Building 2 - Ground floor
Number of tenants and shops Composite building 1( Sale + PTC)
Sale residential: 31 Nos.
PTC: 144 Nos.
Balwadi: 2 Nos.
Welfare Centre: 2 Nos.
Society Office: 1 Nos.

Sale Building 2 - Sale Clinic

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 19 of 86

Number of expected residents / 918


users
Tenant density per hector 323
Height of the building(s) Composite Building 1 : 98.40 mt.(upto terrace level)
Right of way 18.30 mt. wide D.P. road & 27.45 mt. wide D. P. road
Turning radius Minimum 6.00 mt.
Total Water Requirement Dry season:
• Fresh water (CMD): 83
For Domestic: From M.C.G.M.= 80
For Swimming pool : From water tanker of potable quality= 3
• Recycled water (CMD):45 (STP Treated sewage)
Flushing = 41
Gardening = 4
•Total Water Requirement (CMD):128
•Swimming pool make up (CMD):As mentioned above
•Fire fighting (Cum): 100 (One time requirement)

Wet Season:
•Fresh water (CMD):83
Domestic: From M.C.G.M =53+From RWH =27
For Swimming pool : From water tanker of potable quality= 3
•Recycled water (CMD): 41 (STP Treated sewage for flushing)
•Total Water Requirement (CMD):124
•Swimming pool make up (CMD): As mentioned above
•Fire fighting (Cum):100 (One time requirement)
Rain Water Harvesting (RWH) • Level of the Ground water table: Between 6.00 mt. and
6.60 mt. below ground surface
• Size and no of RWH tank(s) and Quantity:
One RWH tank of 130 KL capacity
• Location of the RWH tank(s): Underground
• Size, no of recharge pits and Quantity: Nil
• Budgetary allocation (Capital cost and O&M cost)
Capital cost: Rs.13.00 Lacs
O & M cost: Rs. 0.65 Lacs/annum
Storm water drainage • Natural water drainage pattern: The storm water collected
through the storm water drains of adequate capacity will be discharged in
to the municipal SWD
• Quantity of storm water: 0.12 m3/sec
• Size of SWD: 2 nos. of 450 mm wide with slope 1:300
Sewage and Waste water • Sewage generation ( CMD): 105
• STP technology: MBBR
• Capacity of STP (CMD): 120
• Location of the STP: Basement
• DG sets (during emergency): for essential back-up
(Total DG capacity of the project including load of STP.)
2 DG sets of Capacity 600 kVA each
• Budgetary allocation (Capital cost and O&M cost):
Capital cost: Rs. 59.95 Lacs
O & M cost: Rs. 11.18 Lacs /annum

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 20 of 86

Solid waste Management Waste generation in the operation Phase:


Dry waste (Kg/day): 121
Wet waste (Kg/day): 277
Biomedical waste (Kg/month) ( I f applicable): 23
• STP Sludge (Dry sludge) (Kg/day): 16

Mode of Disposal of waste:


• Dry waste: To M.C.G.M
• Wet waste: Organic Waste Converters (OWC)
• Biomedical waste (If applicable): Bio-medical waste will be handled and
disposed as per Bio-medical waste (Management and Handling Rules
[Amended Rules 2003])
• STP Sludge (Dry sludge): Use as manure within the premises for
plants.
Area requirement: Location: Basement Area: 125 Sq. mt.
Budgetary allocation (Capital cost and O&M cost)
Capital cost: Rs. 9.00 Lacs (Cost for treatment of biodegradable garbage
in OWC)
O & M cost: Rs. 2.16 Lacs /annum (Cost for treatment of biodegradable
garbage in OWC.)
Green Belt Development RG area under green belt:
RG on the ground (sq. m.):1005.71
RG on podium (sq. m.): Nil
Plantation: Total new trees:
Number and list of trees species to be planted in the ground RG: 62 Nos.
Number, size, age and species of trees to be cut, trees to be
transplanted:
Existing trees: 3 nos. (Retained)
• NOC for the Tree cutting / transplantation/
compensatory plantation, if any: Received
Budgetary allocation (Capital cost and O&M cost)
Capital cost: Rs. 2.93 Lacs
O & M cost: Rs. 0.47 Lacs/annum
Energy Power supply:
• Maximum demand: 714 KW
• Connected load: 1954 KW
• Source: Local Authority
% of saving:12.2%
• Budgetary allocation (Capital cost and O&M cost)
Capital cost: Rs.7.20 Lacs (solar water heating)
O & M cost: Rs.1.08 Lacs/annum (solar water heating)

DG Set:
• Number and capacity of the DG sets to be used
2 DG sets of capacity 600 kVA each
• Type of fuel used: Diesel

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 21 of 86

Environmental Management plan Construction phase (with Break-up):


Budgetary Allocation • Capital cost
• O & M cost (Please ensure manpower and other details)
Total cost incurred for EMP
Total cost
Sr. No. Parameter
(Rs. In lacs)

1 Water for dust suppression 21.60

2 Site sanitation and safety 5.00

3 Environmental monitoring 2.16

4 Disinfection 3.60

5 Health check up 27.00

Total cost 59.36

Operation Phase (with Break-up)-


• Capital cost
• O&M cost (Please ensure manpower and other details)
Operational &
Sr. Set Up Cost
Parameter Maintenance Cost
No. Rs. In lacs
(Rs. In lacs/yr )

1 STP Cost 59.95 11.18

2 Rain Water Harvesting 13.00 0.65

MOEF
Environmental approved
2 15.69
Monitoring agency for
monitoring

Solar panels for water


3 7.20 1.08
heating

4 Gardening 2.93 0.47

Cost for Treatment of


5 biodegradable 9.00 2.16
garbage in OWC

Other maintenance
6 cost(for SWM, Water -- 2.17
tanks, DG) etc.

Total Cost 92.08 33.40


Traffic Management Nos. of the junction to the main road & design of confluence: One entry &
One exit.

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 22 of 86

Parking details:
• Number and area of basement: One basement
• Number and area of podia: Nil
• Total Parking area: 906.69 Sq.mt.
• Area per car: 7.31 Sq.mt
• 2-Wheeler: Nil
• 4-Wheeler: 124 Nos.
• Public Transport: Nil
• Width of all Internal roads (m): Minimum 6.0 mt. wide

PP informed that they have already constructed about 2185 m2. PP also stated that the
further expansion is due to extra FSI obtained by fungible FSI.

Considering the orders of the Hon’ble High Court having Court order regarding
construction to be undertaken up to 20,000 m2 and the letter dated 29th June 2013 from
Environment department, Committee decided to appraise the project though there is
violation subject to the final decision on the same by SEIAA on the same.

The proposal was discussed on the basis of the presentation made and documents
submitted by the PP. All issues related to environment, including air, water, land, soil,
ecology and biodiversity and social aspects were discussed.

During discussion following points emerged:

1. PP to provide justification for 124 car parking as against requirement of 66 with


relevant provisions in DCR and submit the same.
2. PP to provide the soil layer of adequate depth on top of the podium to enable
plantation (1-1.5 m)
3. PP to ensure that RG on ground should be unpaved.
4. PP to provide Biomedical Waste (BMW) collection & storage facilities as per the
Biomedical Waste rules.
5. PP informed that excess 50 CMD treated water will be given to Swami Samarth
Garden. PP to submit Commitment letter for the same.

After deliberation, Committee decided to recommend the proposal for Environmental


Clearance to SEIAA, in view of the Court orders allowing construction up to 20,000
m2 and the letter dated 29th June 2013 from Environment department subject to
compliance of above points.

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 23 of 86

Item no 10 Application for EC for proposed SRA scheme on plot bearing CTS No. 9A,
9A/1 to 57, 123A of village Bandongri at Malad (E), Mumbai

Name of the Project RESIDENTIAL PROJECT FOR ALAMGIR ALI MOHAMMAD MALKANI
Name of the Proponent 1.Aalamgir Ali Mohammed Malkani
2.Nazma Haroon Malkani
Name of the Consultant M/s. S.D.Engineering services pvt. ltd., .
Type of Project: SRA Project Under DCR 33 (10)
Location of the project CTS No 9A,9A/1 to 57,123A,123B,of village Bandongri at Malad (E),Mumbai
Whether in Corporation/ SRA
Applicability of the DCR DCR Sections 33(10)
Note on the initiated Mentioned as below:
work (if applicable)

LOI/NOC from Date and construction area details mentioned in the approved letter:
MHADA/ other BUILDING 1
approvals (If Applicable) IOA: -Dated 30 November 1998
OC: Dated 13 may2000
BUILDING 2
IOA: Dated 8 may 2003
CC: Dated 8 may 2003
BUILDING 3
IOA: Dated 16 dec 2004
CC: Dated 12 Jan 2005
OC: Dated 14 dec 2012
BUILDING 4
IOA: Dated 16 dec 2004
CC: Dated 12 Jan 2005
OC: Dated 14 dec 2012
BUILDING 5
IOA: Dated 8 April 2003
CC: Dated 7 July 2004
OC: Dated 5 Dec 2007
BUILDING 6
IOA: Dated 8 April 2003
CC: Dated 7 July 2004
OC: Dated 5 Dec 2007
BUILDING 8
IOA: Dated 7 Feb 2005
CC: (plinth) Dated 21Jan2013
BUILDING 9
IOA: Dated nov 2012
Total plot area (sq.m.) 14163.10 sq m
Deductions Deductions
Net Plot Area a. Dp Road area : 4858.15,
b. RG Reservation : 462.94,
c. Existing masjid to be retained : 200.00
d. Net plot area : 8642.01

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 24 of 86

Permissible FSI 2.5/ 3.0


(including TDR etc.)
Proposed Built Up FSI Area 37787.91sq. m.
Area(FSI & Non FSI)
Non FSI AREA: 12848.6sq.m
Total Construction Area : 50636.51 sq.m
Ground Coverage Area 49%
Estimated Cost of the Rs. 110 Cr.
project

Number of Buildings & Building 1-6 (gr+ 7 floors) , Building No 7 ( Existing masjid to be retained) Building 8
configuration(s) (Gr+22 floors) Building 9 (Gr+ 23 floors)
Number of tenants and 729 Number of residential tenements (rehab+Resi clubbed)
shops 258 Number of residential tenements (Sale)
18 Numbers of Commercial tenements (Sale)
22 Numbers of R/C tenements
1 Number of existing religious structure
07 Numbers of balwadi
07 Numbers of welfare centre
07 Numbers of society office
Number of expected 2565 Persons
residents/users
Tenant density per 432
hectare
Height of Building(s) Building 1-6 -23.93Mts
Building 8 – 69.65 Mts
Building 9 - 69.90 Mts
Right of way 18.30 Wide DP road
Turning radius 6m
Existing Structure(s) Building 1-6 -OC Granted
Building No.7 (Existing Masjid) = To be retained (200 sq.m)
Details of the demolition Approvals obtained from MCGM.
with disposal
Total Water Fresh water & source: Construction Phase: 50 KLD
Requirement Operational Phase 460 KLD from MCGM
Recycled water : 247 KLD
Total Water Requirement : 707 KLD
Rain Water Harvesting Level of the ground water table – 3.0 m
(RWH) Tank Capacity required :
Building 1-6 32 cu.m
Building 8 6 cu.m
Building 9 rehab 14 cu.m , Sale 10 cu.m
Tank dimensions:
Building 1-6 3.5 M x 3.6 M x 2.5 M
Building 8 2 M x 1.5 M x 2 M
Building 9 rehab 2 M x 2.8 M x 2.5 M
Building 9 sale 2 M x 2 M x 2.5 M
Budgetary allocation (capital cost and O&M cost)

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 25 of 86

For Rainwater harvesting –


Capital cost: Rs. 12.5 lakhs
O & M Cost : Rs. 1.5 lakhs
Sewage & Waste Water Total Sewage generation: 483 KLD
STP Technology: MBBR Technology
Capacity of STP : 483 KLD
Location of the STP: Below Ground Floor(blgd 1-8) Below Basement(bldg 9)
Budgetary allocation:
Capital Cost: Rs. 135 lakhs
O&M Cost: Rs. 7 lakhs
Solid Waste Disposal of the construction way debris: As per Debris Management Plan approved by
Management MCGM. Scrap material sold to authorised vendor
Waste generation in the operation phase:
Dry waste : 3785 Kg/day
Wet waste: 2522 Kg/day
Mode of Disposal of Waste:
Dry waste: segregated/sale/Collection by local authority
Wet Waste: Will be processed converted to manure by processing in Organic Waste
Convertors.
Area Requirement:
Location(s) and total area provided for the storage and treatment of the solid waste:
Ground floor - 75 Sq.m x 2 Nos + 55 Sq.m x 2 Nos.

Green Belt Development Total R.G. Area:


RG area under green belt: 1170.34 sq.m.
Number and list of trees species to be planted in the ground RG: 432 Nos.
Tree species Nos.
Neem 50
Ashoka 200
Palm 150
Plumeria 50
Existing no of trees : 0 Nos.
Trees to be retained : 0 Nos.
Budgetary allocation (Capital cost and O&M cost)
For Landscaping :
Capital Cost: Rs 2 Lakhs
O & M Cost: Rs. 0.5 lakh
Energy Power Supply:
Maximum Demand: 6527 KVA
Connected Load: 13054 KVA
Source: Reliance Energy Ltd.

Budgetary allocation (capital cost and O&M cost) –


For Solar Energy system :
Capital Cost:Rs. 21 lakhs
O & M Cost: Rs. 1.5 lakhs
DG Set:
Number and capacity of the DG sets to be used: Type of fuel used: 4 DG set of 500
KVA.

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 26 of 86

Environmental
N Particulars Capital O&M
Management plan
o. Cost (in Cost
Budgetary Allocation
Lakhs) (in Lakhs)

1. Sewage Treatment Plant 135 7

2. RWH System 12.5 1.5

3. Solid Waste Management 42 11.5

4. Solar Energy System 21 1.5

5. Landscaping 2 0.5

Total Cost 212.5 22

Traffic Management Nos. of the junction to the main road & design of confluence:
Parking Details:
Parking required as per rule for proposed building : 118
Total parking provided for proposed building : 120
Area available per Car: 2.5 m x 5.5 m

PP informed that they have already constructed about 15,000 m2 without prior EC. PP also
stated that Building No. 1 to 6 are completed and occupied.

Considering the orders of the Hon’ble High Court having Court order regarding
construction to be undertaken up to 20,000 m2 and the letter dated 29th June 2013 from
Environment department, Committee decided to appraise the project though there is
violation subject to the final decision on the same by SEIAA on the same.

The proposal was discussed on the basis of the presentation made and documents
submitted by the PP. All issues related to environment, including air, water, land, soil,
ecology and biodiversity and social aspects were discussed.

During discussion following points emerged:

1. PP to submit Certificate from SRA regarding construction completed till date.


2. PP to construct STP for existing buildings first and use treated water from the
same for construction activities.
3. PP to provide dual plumbing in building No. 1 to 6 for recycling the treated water
to achieve net zero discharge.
4. PP to connect sewer line from the project site to the sewer line existing on
Datt mandir road.

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 27 of 86

After deliberation, Committee decided to recommend the proposal for Environmental


Clearance to SEIAA, in view of the Court orders allowing construction up to 20,000
m2 and the letter dated 29th June 2013 from Environment department subject to
compliance of above points.

Item no 11 Proposed SRA scheme on plot bearing CTS No. 80 & 81, 86(pt),86/23 to
32, 87, 87/1 to 23. 88, 91, 91/1 to 30, 201,202,202/1 to 32 of village
Mogara at Andheri (E) by M/s Hari Developers.

PP informed that they have already constructed about 17,907.12 m2 (Sale-4790.15 m2 and
Rehab: 13,116.97 m2) without prior EC.

Considering the orders of the Hon’ble High Court having Court order regarding
construction to be undertaken up to 20,000 m2 and the letter dated 29th June 2013 from
Environment department, Committee decided to appraise the project though there is
violation subject to the final decision on the same by SEIAA on the same.

The proposal was discussed on the basis of the presentation made and documents
submitted by the PP. All issues related to environment, including air, water, land, soil,
ecology and biodiversity and social aspects were discussed.

During discussion following points emerged:

1. PP to ensure that constructed area is certified by SRA and copy of the same to be
submitted.
2. PP to revise ground coverage on net plot area and submit.
3. PP to construct STP for rehab first and use the excess treated water 151 Kld from
the same for construction activities of sale building.
4. PP to provide dual plumbing in existing building for recycling the treated water to
achieve net zero discharge.
5. PP to re-examine the Rain Water Harvesting component as depth of Ground water
table is only 2m. PP to provide storage tanks/ trenches instead of recharge pits and
increase the storage capacity of rain water harvesting tanks considering the
average rainfall for 2 days storage utilization capacity and submit revised the RWH
and water budget calculations.
6. PP to revise per car area as per NBC Norms and submit revised parking statement.
7. PP to submit details of fire fighting measures and equipments along with internal
Circulation plan for fire tender movement.

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 28 of 86

8. PP to submit revised energy saving statement with detailed calculations considering


all equipments in common area
9. PP to provide list of Fire fighting statement equipments to be installed in the
buildings.
10. PP to install Organic Waste Converter immediately for existing occupants.
11. PP to ensure that tree plantation should be initiated simultaneously.

In view of above, the proposal is deferred and shall be considered further after the
above observations are addressed and submitted for reconsideration.

Item no 12 Proposed air port SRA Project on a land CTS No. 16 & 17 of village Chakala,
and CTS No. 232 and 233 of village Mulgaon, Taluka Andheri (k/e ward) ,
Mumbai by M/s HDIL

PP was absent; hence the project is deferred and delisted.

Item no 13 EC for Redevelopment under SRA scheme on plot bearing CTS no


557,558,559(pt), 1832(pt),1833,29&31 of village Chembur , near Tilak
Nagar Police Chowki, M ward, Mumbai by M/s Priya Construction

PP was absent; hence the project is deferred and delisted.

Item no 14 EC for proposed Housing scheme (EWS/LIG)AT sector no. 36, Kharghar,
Navi Mumbai by M/s CIDCO

The project proposal was discussed on the basis of presentation made on compliance
points and documents submitted by the proponent. It was noted that the proposal was
earlier discussed in the 13th SEAC II meeting. PP has submitted EIA report as per the ToR
issued. All issues related to environment, including air, water, land, soil, ecology and
biodiversity and social aspects were discussed.

During discussion following points emerged:

1. Number of offices to be shown in plan and submit.


2. CIDCO to provide dedicated STP in the scheme and provide dual plumbing system
for flushing in toilets and horticulture purposes.

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 29 of 86

3. CIDCO to maintain environmental infrastructure including STP, Solid Waste M.


4. PP to review water requirements and restrict it to 90+ 45 LPCD (max. 135 lpcd).
Accordingly submit revised water balance charts.
5. Since there is excess treated water available in Kharghar STP, arrangement should
be made to utilize this water for construction, flushing of toilets and horticulture
purposes. if necessary, by providing a dedicated duel pipeline.
6. PP to ensure use of excess treated waste water in the nearby public gardens /
plantation / construction activities / road washing etc. and submit.
7. PP to provide Solar panels / heaters / stand alone solar lighting in common areas
and submit revised energy saving calculations.
8. PP to submit revised EMP and water budget accordingly.

In view of above, the proposal is deferred and shall be considered further after the
above observations are addressed and submitted for reconsideration.

Item no 15 Application for EC of proposed redevelopment of residential cum


commercial project on property bearing CTS No. 3, of village valnai
situated on Shankar Lane Extn Malad (w), Mumbai by M/s Lotus
Logistics & Developers P L

Name of Project LOTUS SKY GARDENS


Name of Proponent Name : Shri Ashok Agarawal Director
M/S LOTUS LOGISTICS & DEVELOPERS PVT LTD
Name of Consultant Name : M/s. S D Engineering Services Pvt Ltd.
Type of project: SRA scheme
Location of the project S.NO.- 40, H. NO.3, CTS NO. 3, VILLAGE VALNAI, TALUKA
BORIVALI, MALAD(W)
Whether in Corporation / M.C.G.M
Municipal / other area
Applicability of DCR M.C.G.M / S.R.A. 33(10) & 33(14)
Note on the initiated Work Total Constructed Work (FSI and Non FSI): 9269.08 sq mt
(if applicable) Date and Area details in the necessary approvals issued by the
competent authority (attach scan copies):
SRA/ DDTP/0146/PN/PL/LOI dated 31st March 2010
SRA/ DDTP/559/PN/PL/AP dated 4th Nov. 2011
LOI/NOC from MHADA/ Other approvals Date & construction area details in the approved letter :
if applicable SRA/ DDTP/0146/PN/PL/LOI dated 31st March 2010
SRA/ DDTP/559/PN/PL/AP dated 4th Nov. 2011
Total Plot Area 9714.4 sq. m.
Deductions For setback area: 1556.36 sq.m.
Garden reservation : 708.13 sq.m.
25% Maternity home & dispensary reservation :27.89 sq.m.
Retail market reservation: 1241.15 sq. m.

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 30 of 86

40% public housing reservation: 876.27 sq. m.


Total Deduction : 4409.80 sq. m.
Net Plot Area 8621.09 sq. m.
Permissible FSI (including 2.5 / 3.0
TDR etc.)
Proposed Built-up Area Sale Rehab Reservati Total
(FSI & Non-FSI) (sq. m.) (sq. m.) on (sq. m.) (sq. m.)
FSI area 13680.21 9350.91 23031.12
Non –FSI 23710.48 6819.35 2464.14 32993.97
area
Total 56025.09 sq. m.
construction
area
Ground coverage 42.35%
Percentage (%)
Estimated cost of the Rs. 150 Cr.
Project
No. of buildings & its Sale building : Gr + 1st to 2nd Podium + E-lvl + 4th to 38th flr
configuration Rehab Building: Basement+Gr + 1st to Part 23rd flr
Reservation building : Gr + 1st to 4th flr
No. of tenants & shops Sale Building tenements 199

Rehab Building tenements 136 + 177 (PTC)


(313)
Reservation Building 1(MHDH)+39(R.M.)+
(PH/HD) 8(PH/HD)
TOTAL TENEMENTS 520
No. of expected residents /users 2671
Height of the building (s) Sale building : 120.85 m
Rehab building : 74.9 m
Reservation building : 24.20 m
Right of the way 18.3 M wide D.P. Rd
Turning radius 6m
Existing structure (Trees) 52 no. of existing trees
8 Nos. of the existing trees will be cut
44 Nos. will be retained
41 Nos. trees to be planted.
Total Water Requirement For Sale building :
Fresh Water : 92 KLD
Source: M.C.G.M
Recycled Water:- 75.7 KLD
Total Water Requirement:- 167.7 KLD
For Rehab& Reservation Building:
Fresh Water : 128.6 KLD
Source: M.C.G.M
Recycled Water:- 69.1 KLD
Total Water Requirement:- 197 KLD

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 31 of 86

Rain Water Harvesting (RWH) Level of Ground Water Table : below 5 m


Budgetary allocation (Capital cost and O&M cost)
Capital cost O&M cost
(Rs in lakhs) (Rs in lakhs)
Rainwater 20 1
harvesting

Storm Water Drainage Natural water drainage pattern


The natural drainage system will not be altered in proposed
development. The plot is in urban area of Mumbai so SWD will
be in conformity with MCGM norms.
Size of SWD : The SWD is sized as per design max rainfall
intensity of 125 mm/hour
Sale building : Total discharge from plot : 448.5 m3/hr. Total
discharge capacity from 2 no. of trench 751.35 m3/hr. Hence
trench design is safe.
Rehab & Reservation Buiding : Total discharge from plot :
273.3m3/hr. Total discharge capacity from 2 no. of trench
443.57 m3/hr. Hence trench design is safe.
Sewage and Waste STP technology:- SAFF Technology
water FOR SALE BUILDING:
I. Sewage generation : 122.5 KLD
II. Capacity of STP:- 125 KLD
III. Location of STP :- Ground floor
FOR REHAB & RESERVATION BUILDINGS:
I. Sewage generation : 196.6 KLD
II. Capacity of STP:- 180 KLD
III. Location of STP :- Basement
V. Budgetary allocation (Capital cost and O&M cost):-
Capital cost O&M cost
(Rs. ) (Rs.)
Sewage 1 Cr. 10 lakhs
treatment plant

Solid waste Management Sale building Waste Generation in Operation Phase


Dry waste :- 264 Kg/day
Wet waste:- 396 Kg/day
Rehab & Reservation building Waste Generation in Operation
Phase
Dry waste:- 63 Kg/day
Wet waste:- 94.5 Kg/day
Mode of Disposal of Waste :-
Dry waste: - segregation and sale of recyclables, inerts to
landfill site approved by MGCM.
Wet waste :- biodegradable waste composting by OWC
Biomedical Waste : As per Biomedical Waste (Management and
Handling) Rules, 1998
STP Sludge (Dry sludge) : mix with wet waste and compost
Area Requirement : Location and Total area provided for the

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 32 of 86

treatment and storage of solid waste :– utility area


OWC of Sale Building at Ground floor level of 50 sq. m
OWC of Rehab & Reservation Building at Ground floor level of
50 sq. m.
Budgetary allocation (Capital cost and O&M cost)
Capital cost O & M cost
(Rs in lakhs) (Rs in lakhs)
Solid waste 11 2
management

Green Belt RG area other than greenbelt (please specify for playground
Development etc) (sq. m.):- Garden reservation : 708.13 sq.m.
Plantation
Number & list of Tree species to be planted in the ground RG :
41 new trees
Tree species existing & to be retained: 52 existing trees & 44
to be retained. 8 no. of trees to be cut.
IV. Budgetary allocation (Capital cost and O&M cost)
Capital cost O&M cost
( Rs in lakhs) (Rs in lakhs)
Green belt 7 1
Energy Source: Tata Power
Power supply :
Maximum Demand: 100 KW Construction phase
Operation phase Connected Maximum
Load (KW) Demand (KW)

Sale Building 3082 1409.30


Rehab & Reservation 3265 1457.60
Building
% of saving:
Sale building :16.53 %
Rehab & Reservation Building : 16.6 %
Budgetary allocation (Capital cost and O&M cost)
Capital cost O&M cost
(Rs ) (Rs)
Energy Saving 1.5 Cr. 10 lakhs
Devices
DG Set:
Number and capacity of DG sets to be used :
Sale building : 1x 250 KVA D.G. Set
Rehab & Reservation Buildings : 1x 250 KVA D.G. Set

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 33 of 86

Environmental
Management plan No. Particulars Capital Cost Annual O&M cost
Budgetary (Rs.) (Rs.)
Allocation 1 STP 1 Cr. 10 lakhs
2 RWH System 20 lakhs 1 lakh
3 SWM 11 lakhs 2 lakhs
4 Solar Energy 1.5 Cr. 10
System
5 Landscaping 7 lakhs 1 lakh
Total 2.88 Cr. 24
Traffic Management Parking Details :
Number & area of basement: 1 nos. in Rehab building of
1405.62 sq. m.
Number & area of podium : 3 podium in Sale building of
10146.35 sq. m.
Total parking required as per rule : 267 nos.
Total parking provided : 269 nos.
Sale Bldg Rehab Bldg Reservation
Bldg
4 wheeler 168 40 8
parking
Visitor 41 10 2
parking
Area per car: 27 sq. m.
Public Transport: --
Nearest Railway station : Malad
Width of all Internal roads: - 6 m

PP informed that they have already constructed about 9269.08 m2 without prior EC.

Considering the orders of the Hon’ble High Court having Court order regarding
construction to be undertaken up to 20,000 m2 and the letter dated 29th June 2013 from
Environment department, Committee decided to appraise the project though there is
violation subject to the final decision on the same by SEIAA on the same.

The proposal was discussed on the basis of the presentation made and documents
submitted by the PP. All issues related to environment, including air, water, land, soil,
ecology and biodiversity and social aspects were discussed.

During discussion following points emerged:

1. Re-examine the water requirement for domestic purposes and for flushing
purposes. There seems to be some calculation mistakes. Submit correct details.

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 34 of 86

2. PP to provide storage tanks instead of recharge pits as water table is 5m and


increase the storage capacity of rain water harvesting tanks considering the
average rainfall for 2 days storage utilization and submit revised the RWH and
water budget calculations.
3. PP to explore possibility to transplant 8 trees which are to be cut.
4. PP to ensure use of excess treated waste water in the nearby public gardens /
plantation / construction activities / road washing etc. and submit.

After deliberation, Committee decided to recommend the proposal for Environmental


Clearance to SEIAA, in view of the Court orders allowing construction up to 20,000
m2 and the letter dated 29th June 2013 from Environment department subject to
compliance of above points.

Item no 16 Hiranandani Constructions Pvt Ltd. Environmental Clearance for


Reappraisal of Residential Complex Bearing CTS No.13/A, 13/A/1 to 13
of village Poisar

PP was absent; hence the project is deferred and delisted.

Item no 17 Application for EC for SRA scheme project at plot bearing CTS No 1025(p)
& 1120 (p) at kopari by M/s. Balalji Developers.

Name of the project: Proposed SRA project on plot bearing T.P.2 C.T.S Nos. 1025/(P) atKopari,
Thane (E)
Name of Proponent: Name:Mr. Anil Khursija

Name of Consultant: Name : M/s s d engineering services pvt.ltd


Type of the project: Proposed Residential cum Commercial project.
Location of Project C.T.S. No. 1025Aof Village Chendani, Kopri, Thane (E)
Whether in Corporation / The proposed project falls in limits of TMC
Municipal / Other area:
Applicability of the DCR Development control regulation forTMC
Note on the initiated work No construction work initiated at the site under reference
LOI/NOC from MHADA/ LOI obtained
Other approvals (if applicable)

Total plot area 5850.05sqm


Deductions 349.93m
Net plot area 5500.12 sqm

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 35 of 86

Permissible FSI (including TDR 2.5


etc.)

Proposed Built up area FSI Area: 11857.59sqm


(FSI & Non- FSI ): Non FSI area: 12714.09sqm
Total BUA: 24571.68sqm
Ground Coverage Percentage 2229.66sqm
(%) 38.12%.
Estimated cost of the project: Approx. Rs. 36 Cr.

No. of Buildings and its 4Nos. :


configuration Rehab buildings No. 1, 2 and 3=St (pt)+Gr. (pt) +19(pt)
andSale Bldg 1= LOWER STILT+STILT(pt)+GR.(pt)+1st(pt) +1st(pt)
PODIUM+2 PODIUM+7

No. of tenant and Shops 404 (residential) + 26 (Commercial)

No. of Expected 2365


residents/users
Tenant density per hectare 690

Height of building 58.15m

Right of way 20.00 m wide D.P road

Turning radius 7.00 m

Existing Structures Occupied by slum Dwelling unites 369 nos

Details of the demolition with Recyclable scrap with be sold to authorized dealers
disposal Debris generated will be disposed off as per municipal norms while some
will be used for site leveling.
Total water requirement Dry Season:
• Fresh water (CMD): 195& Source: (for domestic use from TMC)
• Recycled water (CMD): 103(STP Treated water)
• Total Water Requirement (CMD): 298.00
• Swimming pool make up (Cum):nil
• Fire fighting (Cum): 150 (2 Nos)

Wet Season:
• Fresh water (CMD): 195 & Source: (for domestic use from TMC)
• Recycled water (CMD): 100
• Total Water Requirement (CMD): 295
• Swimming pool make up (CMD): NIL
• Fire fighting (Cum): 150 (2 Nos)
Rain water Harvesting Level of the Ground water table:1-3 mbelow ground level
Size and no of RWH tank(s) and Quantity: 2 Nos
Rehab Building :
Capacity: 40 CUM
3 Mts Deep + IL
Sale Building
Capacity : 30 CUM

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 36 of 86

2.5 Mts Deep + IL


Location of the RWH tank(s): Under ground
Budgetary allocation (Capital cost and O&M cost)
Capital cost: Rs 12.0Lacs
O & M cost: Rs 0.50 Lac/annum
Storm water drainage Natural water drainage pattern :
The arrangement for disposal of SW through and from the plot as per the
remarks of SW departmentTMC.
Quantity of storm water:0.262m3/sec
Size of SWD:600 x 0125 mm( 2No)
Sewage and Wastewater •Sewage generation (CMD): 261 m3/ day.
• STP technology : MBBR/SAFF
• Capacity of STP (CMD) :261
• Location of the STP:suitable location
Treated water generated :234.93 m3/day
• DG sets (during emergency) :1 No. of D.G 415 kVA
• Budgetary allocation (Capital cost and O&M cost)
Capital cost :55.00Lacs
(O & M) cost :6.50Lacs
Solid Waste Management Waste generation in the operation Phase:
• Dry waste (Kg/day): 534
• Wet waste (Kg/day): 606
• STP Sludge (Dry sludge) (Kg/day): 15
Mode of Disposal of waste:
• Dry waste: Handed over to TMC
• Wet waste: Composting through OWC & used at site/
as manure.
• STP Sludge (Dry sludge): Used as manure within thepremises for plants
at maximum extents.
Area requirement: 1. Location: Underground near rehab building
Area provided for collection, segregation, storage and OWC:35.00 sq m
Budgetary allocation (Capital cost and O&M cost)
Capital cost :8.00 Lacs
(O & M) cost :0.80 Lacs/annum
Green Belt Development Total RG area:Provided 811.75 sq m, as per the requirement of DCR
550.00 sq m is required.
RG on podium :356.85 sq m
RG area under green belt:454.90 sq m
Total RG area : 811.75 Sq m ( required 550.00 sq m )
Plantation:
• Number of trees to be planted in theGround RG: 18 Nos. +69 Nos.
around building and plot periphery. Total 87 no’s trees will be planted .
• Number, size, age and species of trees to be cut, trees
to be transplanted :No trees exist on the plot.
• Budgetary allocation (Capital cost and O&M cost)
Capital cost :6.0Lacs
(O & M) cost :2.00Lacs/annum

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 37 of 86

Energy Power supply:


• Maximum demand 1254kVA
• Connected load :2150 kW
• Source :MSEB
• Budgetary allocation (Capital cost and O & M cost)
Capital cost: Rs6.0 Lacs
O & M cost: Rs0.50 Lacs/annum.
DG Set:
• Number and capacity of the DG sets to be used:01(500KVA)
• Type of fuel used: HSD.
Environmental Management Plan Construction Phase (with Break-up):
Budgetary Allocation
Sr. Parameter Total Cost
No. (Rs. In Lacs)
Water for Dust Suppression 4.50
Site Sanitation 1.00
Environmental Monitoring 3.75
Disinfection 2.50
Health Check up 2.25
Total 14.00
Operation Phase (with Break-up)-

Capital Cost O & M Cost


Sr. No Parameter
(` In lacs ) (`In lacs/yr
1 STP 55.00 6.00
2 Rain water harvesting 12.00 0.50
(1nos of RWH tank)
3 Environmental MOEF 1.55
Monitoring approved lab
4 Gardening 6.00 2.00
5 Solar Energy System 12.00 1.50
Cost for Treatment 8.00 0.80
6 of biodegradable
garbage in OWC
7 Solar lighting 6.00 0.5
Total Cost 99.00 12.85
Traffic Management Nos. of the junction to the main road & design of confluence : two
Parking details:
• Number and area of basement: nil
• Number and area of podia : 1
• Total Parking area : 4053.95 sq m
• Area per car 17.50sq m
• 2-Wheelar:440Nos.
• 4-Wheeler :78Nos

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 38 of 86

The proposal was discussed on the basis of the presentation made and documents
submitted by the PP. All issues related to environment, including air, water, land, soil,
ecology and biodiversity and social aspects were discussed.

During discussion following points emerged:

1. PP to increase the storage capacity of rain water harvesting tanks considering the
average rainfall for 2 days storage utilization and submit revised the RWH and
water budget calculations.
2. PP to provide stand alone solar lighting in common areas and submit revised energy
saving calculations.
3. PP to ensure that traffic movement should be one way following left in and left out
mode and submit.
4. PP to realign storm water drainage of suitable site taking in consideration run off
from the surrounding catchment area.
5. PP to explore possibilities to reuse treated water in nearby Thane railway station /
nearby public gardens / plantation / construction activities / road washing etc. and
submit.

After deliberation, Committee decided to recommend the proposal for


Environmental Clearance to SEIAA, subject to compliance of above points.

Item no 18 Application for EC of proposed residential project located on plot bearing


survey no. 199/7 , opposite to Suraj water park, Ghodbunder road,
Kavesar , Thane by M/s Jangid Constructions

Name of the Project ‘Jangid Galaxy’-Proposed Residential & Commercial Project (hotel), at
Plot Bearing S. No 199/7 at Kavesar, Thane

Name of the Proponent Name: Mr. Omprakash L. Jangid


M/s. Jangid Construction
Name of the Consultant M/s. Enviro Analysts & Engineers Pvt. Ltd.
Type of Project : Residential & Commercial Project (hotel building)
Location of the project Plot Bearing S. No 199/7 At Kavesar, Thane

Whether in Corporation/ municipal Thane Municipal Corporation (TMC)

Applicability of the DCR DCR 1994 municipal corporation of Thane.


Note on the initiated work (if applicable) Work has been initiated on site as per CC granted for the project by
Thane Municipal Corporation vide letter no. V.P.NO. 2005/101
TMC/TDD/060 dated 1st June, 2011.
Current status of site : The total constructed area till date is

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 39 of 86

12168.74 sq.mtr. (Less than 20,000 sq. mtr.)

LOI/NOC from MHADA/ other approvals Not Applicable


(If Applicable)
Total plot area (sq.mt.) 1 Area of plot (as per Add. 10800 Sq. Mtrs
Deductions Collector. Annexure-II )
Net Plot Area 2 Deduction for

A Deduction for D.P. Road 470.37 Sq. Mtrs


3 Balance Plot Area (1-2) 10329.63 Sq. Mtrs

4 Deduction for R.G if applicable 1549.44 Sq. Mtrs

5 Net plot area 8780.19 Sq. Mtrs


Permissible FSI (including TDR etc.) 1.8

Proposed Built Up Area (FSI & Non FSI) Sr. Description Area of Building
No. (Sq.mt.)

1 FSI 17026.76
3 Non FSI Area
15808.17
4 Total BUA
32834.93

Ground Coverage Area (percentage of plot Ground coverage = 52 %


not open to sky)
Estimated Cost of the project Rs. 121 Crores
Number of Buildings & configuration (s) Proposed Building details:
Sr. Building. Type Configuration
No

1 Building no.1 Lower ground below


podium + Stilt/ podium +
16 floor
2 Building no.2 Lower ground below
podium + Stilt/ podium +
16 floor
3 Building no.3 Lower ground below
podium + Stilt/ podium +
16 floor
4 Bungalow no.1 G+1
5 Bungalow no.2 G+1
6 Bungalow no.3 G+1
7 Commercial Building Basement+ G+ 6 floors
(hotel)
Number of tenants and shops Residential = 192 flats
Hotel & Restaurant = 56 rooms
Number of expected residents/users 1419 nos.
Tenant density per hectare 230

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 40 of 86

Height of Building(s) Building Nos. Height (mtr)


Residential buildings nos. 50.75 (up to terrace level)
1,2,3
3 bungalows (G+1) 6.6
Hotel 26 (up to terrace level)
Right of way Ghodbandar road (60 m wide)
Turning radius Minimum 7.5 mt.

Existing Structure(s) Not Applicable


Details of the demolition with disposal (If Existing bungalows were demolished & the demolition waste is used
applicable) within the site for levelling.
Total Water Requirement Dry Season:
Fresh water & source: 111 KLD from TMC
Domestic Water : 111 KLD
Flushing water : 58 KLD
Swimming pool make up: 3 KLD
Landscape water : 7 KLD
Car Wash : 2 KLD
Total Water Requirement: 181 KLD
Recycled water: 65 KLD-From STP-(34 KLD sent to municipal drain.)
+40 KLD

Wet Season:
Fresh Water & Source: 111 KLD
Domestic Water : 111 KLD
Flushing water : 58 KLD
Swimming pool make up: 3 KLD
Landscape Water : Nil
Vehicles Wash: 2 KLD
Total Water Requirement: 177 KLD
Recycled Water: 58 KLD-From STP-(41 KLD sent to municipal
drain.)+40 KLD
Rain Water Harvesting (RWH) Level of the Ground water table : 3-4.5 mtr
Size and no of RWH tank (s) and Quantity:
For residential 88 KLD (1 nos.) & for hotel building 48 KLD (1 nos.)
Location of the RWH tank(s): Lower Ground
Size and no. of recharge pits: NA
Budgetary allocation (Capital cost & O&M cost):
Capital Cost: Rs. 33 Lakhs
O & M Cost per Annum: Rs. 2 Lakhs
Strom water drainage Natural water drainage pattern: The natural slope for drainage is
from south to north & West to east
Quantity of storm water: 0.074 cum/sec
Size of SWD: B: 0.30 mt & D:0.30 mtr

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 41 of 86

Sewage & Waste Water Sewage generation : Residential : 125 KLD & hotel: 25 KLD
STP technology : MBBR
Capacity of STP : Residential:130 KLD & Hotel : 30 KLD
Location of the STP : Lower Ground
DG sets (during emergency): 1x 125 KVA & 1 x 320 KVA
Budgetary allocation (Capital cost and O&M cost):
Capital Cost: Rs. 41 Lakhs
O&M Cost per Annum: Rs. 8 Lakhs/Year
Solid Waste Management Waste generation in the operation Phase:
Dry waste : 363 kg/day
Wet waste : 266 kg/day
Total waste: 629 kg/day
STP Sludge (Dry Sludge) : 15 kg/day
Mode of Disposal of waste:
Wet waste: Biodegradable waste will be processed in OWC and
manure so obtained will be used for landscaping and replacement for
saw dust in OWC.
Dry waste: Will be handed over to local recyclers.
STP Sludge (Dry sludge): Will be used as manure.
Area requirement:
1. Location(s): On Ground.
2. Total area provided for the storage & Treatment of the solid
waste: 24 sq.mt.
3. Budgetary allocation (Capital cost and O&M cost)
Capital Cost : Rs. 9 Lakhs
O & M Cost : Rs. 3 Lakhs
Green Belt Development RG area under green belt:
RG Area on ground = 2625.82 Sq.mt.
Plantations:
Number and list of trees species to be planted in the RG: 143 nos.
Number, size, age and species of trees to be cut, trees to be
transplanted: As per tree NOC
3) NOC for the tree cutting/ transplantation/ compensatory
plantation, if any: Tree NOC from TMC dated 6/11/2007
Budgetary Allocation: (Capital cost and O&M cost)
Capital Cost: Rs. 12 Lakhs
O & M Cost: Rs. 3 Lakhs
Energy Power Supply:

Sr. POWER REQUIREMENT


No.

1 Source of power supply : MSEDCL

Connected Load 1782 KW


Demand Load 1150 KW

3 DG set (standby) 1 x 125 KVA for


residential building

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 42 of 86

& 1 x 320 KVA for


Hotel

Budgetary allocation (Capital cost and O&M cost)


Capital Cost: Rs. 72Lakhs
O & M Cost: Rs.6 Lakhs
Environmental Management plan Operation Phase (with Break-up)-
Budgetary Allocation Capital cost: rs.167 Lakhs
O & M cost (please ensure manpower and other details): rs. 22
Lakhs
Annual
Setting-Up Maintenance &
Sr.
Method Adopted Cost Operational
No.
(In Rs. Lakhs) Cost (In Rs.
Lakhs)
Rain Water
1 Harvesting & drain 33 2
channel
Solid Waste
2 9 3
Management
3 STP 41 8

4 Solar Energy System 72 6

5 Landscape 12 3

Total 167 22
Traffic Management Nos. of the junction to the main road & design of confluence:
Ghodbander road is abutting to plot on the West
Parking Details :
Number and Area of Basement : NA
Number and Area of Podium: 1 nos.
Total Parking Area: 8060 sqm
Parking required: 259 nos.
Parking provided: 260 nos.
Area per car provided: 30 sqm
Public Transport: Not Applicable
Width of all internal roads (m): 6 m wide.

PP informed that they have already constructed about 12,168.74 m2 without prior EC.

Considering the orders of the Hon’ble High Court having Court order regarding
construction to be undertaken up to 20,000 m2 and the letter dated 29th June 2013 from
Environment department, Committee decided to appraise the project though there is
violation subject to the final decision on the same by SEIAA on the same.

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 43 of 86

The proposal was discussed on the basis of the presentation made and documents
submitted by the PP. All issues related to environment, including air, water, land, soil,
ecology and biodiversity and social aspects were discussed.

During discussion following points emerged:

1. PP to not to give possession till the sewer line completed in the proposed project.
2. PP to provide central cooling facility for hotel and excess treated water should be
used for chilling / cooling purpose.
3. PP to ensure that 60% common area should be on solar PV panels (7 Kw electricity
equivalent)
4. PP to submit undertaking for construction undertaken till date.
5. PP to install Regenerative type lifts and submit revised energy calculation.

After deliberation, Committee decided to recommend the proposal for


Environmental Clearance to SEIAA, in view of the Court orders allowing construction
up to 20,000 m2 and the letter dated 29th June 2013 from Environment department
subject to compliance of above points.

Item no 19 Trishul Reality Infra Pvt.Ltd. Environmental Clearance for Proposed


Commercial project on plot No.4 sector-15, CBD Belapur Navi Mumbai

Name of the Project “Trishul Gold Mine” - Proposed Commercial Building.


Name of the Proponent Name Mr. Khimji K Patel.
M/s Trishul Realty Infra Pvt. Ltd
Name of the Consultant Name M/s. Enviro Analysts & Engineers Pvt. Ltd.

Type of Project: Commercial Project


Location of the project Plot No. 4, Sector – 15, CBD-Belapur, Navi Mumbai.

Whether in Corporation / Navi Mumbai Municipal Corporation.


municipal / other area
Applicability of the DCR NMMC DCR 1975 (Amended Up to 2006)
Note on the initiated work NA
LOI/NOC from MHADA / NA
other approvals
Total plot area (Sq.m.) Sr. no Particulars Area in Sq.mt
Deductions 1 Area of Plot 5300.51
Net Plot Area 2 Deduction (If any) --
3 Total Deduction --
4 Net Plot Area 5300.51

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 44 of 86

Permissible FSI (including 1.50


TDR etc.)
Proposed Built Up Area(FSI FSI Area Non-FSI Area Total BUA Area (Sq.mt)
& Non FSI) (Sq.mt) (Sq.mt)
7749.66 28656.22 36,405.88
Ground Coverage Area 3768.09 Sq.mt (71 %)
Estimated Cost of the Rs. 85 Crores.
project

Number of Buildings &its Building Configuration


configuration(s) Commercial building Gr. + 1st floor Showroom + 2nd to 6th Parking Level + 7th
Amenity Area + 8th to 11th Office floors.
Number of tenants and shops Showrooms 16
Offices 64
Total 80
Number of expected 820 No’s
residents/users
Tenant density per hector 150 / hector

Height of Building(s) 46.60 m

Right of way 30.00 m Palm Beach road at South direction of Project site.
15.00 m L. G Mukadam marg at North direction of Project site.
Turning radius 6.00 m
Existing Structure(s) Vacant Plot.
Total Water Requirement Dry Season:
Fresh water: 22 KLD &source: NMMC
Recycled water : 27 KLD (From STP)
Total Water Requirement : 49 KLD
Swimming pool make up (Cum): NA
Fire fighting (UG Tanks): 200 cum

Wet Season:
Fresh Water: 22 KLD & Source: NMMC & RWH.
Recycled Water : 21 KLD (STP water)
Total Water Requirement : 43 KLD
Swimming pool make up : NA
Fire fighting (UG Tanks): 200 cum
Rain Water Harvesting Level of the ground water table: 2.0 – 3.0 m
(RWH) Size and no of RWH tank(s) and quantity: 1No of Tank.
Building Size of the tank Capacity of the tank

Commercial Building 6.5 m x 5.5 m x 2.5 m (D) 79 cum

Location of the RWH tanks(s): Ground level.


Size, no. of recharge pits and quantity: NA

Budgetary allocation (capital cost and O&M cost)


Capital cost: Rs. 17 lakhs

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 45 of 86

O & M Cost : Rs. 1 lakhs


Strom water drainage Natural water drainage pattern: The storm water collected through the storm water drains
of adequate capacity will be discharged in to the municipal sewer line.
Quantity of storm water: 1.5 m3/min
Size of SWD: 400 mm wide X 300 mm Deep.
Sewage & Waste Water Sewage generation: 36 KLD
STP Technology: MBBR
Capacity of STP: 40 KLD
Location of the STP- Ground Level.
DG Sets (during emergency): 1 No of 380 Kva DG set will be provided for the entire
Project.
Budgetary allocation (capacity cost and O&M cost):
Capital cost : Rs. 11 lakhs
O & M Cost : Rs. 2 lakhs
Solid Waste Management Waste generation in the operation phase:
Dry waste: 144 Kg/ day
Wet waste: 62 Kg/ day
Total Solid waste: 205 Kg/ day
STP sludge: 4 Kg / day.

Mode of Disposal of Waste:


Dry waste: Will be hand over to NMMC.
Wet Waste: Will be processed in the OWC & manure will be utilize for landscaping /
gardening
STP Sludge (Dry Sludge): Used as a manure

Area Requirement:
# Waste Collection OWC Plant Area Location
/ Bin Area /
Curing area.
Commercial 7 Sq.mt 12 Sq.mt Ground level
Building

Budgetary allocation (capital cost and O&M cost)


Capital Cost : Rs. 4 lakhs
O & M Cost : Rs. 1 lakhs
Green Belt Development RG on the podium: 1192.21 Sq.mt (7th Level).
Plantation:
Number and list of trees species to be planted on the ground RG: 53 Nos. of trees
Number and list of shrubs and bushes species to be planted in the basement RG: 256 Nos.

Budgetary allocation (Capital cost and O&M cost)


Capital Cost: Rs. 8 lakhs
O & M Cost: Rs. 1 lakh
Energy Power Supply:
Maximum demand: 355 Kw
Connected Load: 479 Kw
Source: MSEDCO
Details calculations & % of saving: 8 %

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 46 of 86

Budgetary allocation (capital cost and O&M cost) –


Capital Cost : Rs 76 lakhs
O & M Cost : Rs. 11 lakhs
DG Set:
Number and capacity of DG sets to be used: 1 No of 380 Kva DG set will be provided for
the entire Project.
Type of fuel used: HSD.
Environmental Management
plan Sr. Method Adopted Setting-up Annual Maintenance and
Budgetary Allocation No. Cost Operational Cost
(Rs. in lakhs) (Rs. in lakhs)

1. Sewage Treatment 11 2
Plant
2. Rain water 17 1
Harvesting
3. Landscaping 8 1

4. Solar Energy 13 1

5. Electrical 76 11

6. Solid waste 4 1
management
Total 129 17

Traffic Management No of the junction to the main road & design of confluence:
Entries & Exits : 2 Vehicular Entries & Exits
Roads: 30 m wide Palm beach road at south & 15.00 m L. G Mukadam marg at North
direction of Project site.
Parking Details:
Parking level Car Number Area
Ground Level 13 381.5 Sq.mt
st
1 Level 32 932.16 Sq.mt
2nd to 5th Level 312 9925.16 Sq.mt
th
6 Level 30 905 Sq.mt

Total Parking area: 12,143.82 Sq.mt


Area per car: 30 Sq.mt
2-Wheelar: 40 Nos.
4-Wheeler: 387 Nos.
Public Transport: NA

Width of all Internal roads (m): 6.00 m wide internal roads.

PP proposed one commercial building with G+ 11 floors with the height of 46.60 m.
Further, PP reported that proposed plot area is not in CRZ regulations.

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 47 of 86

The proposal was discussed on the basis of the presentation made and documents
submitted by the PP. All issues related to environment, including air, water, land, soil,
ecology and biodiversity and social aspects were discussed.

During discussion following points emerged:

1. PP to provide facility for transit storage of e-waste and submit e-waste


management and disposal plan.
2. PP to explore the possibility for Central AC and use excess treated water use for
cooling tower.
3. PP to install Regenerative type lifts and solar water pumps and accordingly submit
revised energy calculation.
4. PP to submit revised parking statement as per NBC Norms.

After deliberation, Committee decided to recommend the proposal for


Environmental Clearance to SEIAA, subject to compliance of above points.

Item no 20 Proposed Residential Project on plot bearing F.No. 1074, Mahim Division
T.P.S.IV Mahim, Mumbai by M/s Everest Construction.

Construction of Proposed Redevelopment of Residential


Name of Project
Project at Prabhadevi

Name of Proponent Name: Mr. Vijay Dedhia M/s. Everest Construction Co.

Name of Consultant Name: Dr. D. A. Patil Mahabal Consultancy

Type of project: Residential

Proposed Redevelopment of Residential Project on plot bearing


Location of the project
F. No. 1074, Mahim Division, T.P.S.IV Mahim, Mumbai.

Whether in corporation / Municipal / Municipal Corporation of Greater Mumbai


Other area

Applicability of the DCR D.C. Reg.33 (15), 1991

Note on the initiated work (if


No work has been initiated.
applicable)

Total Plot Area 5837.83 m2

Deductions 489.83 m2

Net plot area 5348 m2

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 48 of 86

3.19
Permissible FSI
( Area: 16,909.39 m2)
(Including TDR etc.)
Area of Existing Building: 3533.77 m2

Proposed Built Up Area(FSI & Non FSI Area (including fungible


18,057.08 m2
FSI) area)

Non FSI Area 27065.92 m2

Total Construction Area 45123.00 m2

Ground coverage percentage 50.45%

1 Residential Building: 2 Basement + Ground + 8 podium levels +


No. of Buildings & its configuration
service/ girder floor + 34 typical floors + fire check floor

Number of tenants and shops Rehab : 150 Nos. Sale: 66 Nos.

Number of expected residents /


1,080 Nos.
users

Height of the building(s) Maximum: 160.93 m

The project site is accessed by 18.30 m wide RB Anant Desai


Right of way
Marg and 39.55 m wide D.P Road.

Turning radius min 6 m.

Total Water Dry Season


requirement

Fresh water (KLD) 97

Source MCGM

Recycled Water (KLD) 51

Total water requirement (KLD) 146

Swimming pool make up (cum) 4

Fire fighting (cum) As per NBC Norms

Wet Season

Fresh water (KLD) 78

Source MCGM

Recycled Water (KLD) 49

Total water requirement (KLD) 146

Swimming pool make up (cum)

Fire fighting (cum) As per NBC Norms

Rain Water Harvesting Level of ground water table


(RWH)

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 49 of 86

Size and No. of RWH tanks and quantity RWH tank of 50 m3 will be provided

Location of RWH tank Basement

Budgetary allocation Capital Cost: 9 Lakh


O & M Cost: 1 Lakh

Storm Water Drainage Natural water drainage pattern Towards east side of plot

Quantity of storm water 875.67m3/hr

Size of SWD 300 mm dia pipe

Sewage and waste Sewage generation (CMD) 136 KLD


water

STP Technology MBBR Technology

Capacity of STP (CMD) 150 KLD

Location of the STP Basement

DG sets (during emergency)


DG sets will be provided as alternate supply for essential services such as STP, Fire Fighting, and Lift etc.
DG set provided: 1000 kVA

Budgetary allocation Capital Cost: 22 Lakh


O & M Cost: 4.5 Lakh

Solid waste Waste generation in the pre construction and construction phase
management

Disposal of the construction way debris


The construction debris will be disposed as per the “Construction and Demolition and Desilting Waste
(Management and Disposal) Rules 2006.

Waste generation in the Operation phase

Dry Waste (kg/d) 324

Wet Waste (kg/d) 216

STP Sludge (dry sludge) (kg/d) 1.5 KLD

Mode of Disposal of Waste

Dry Waste Dry garbage will be segregated & disposed


off to recyclers

Wet Waste Wet garbage will be composted using


Mechanical Composting Technology and used
as organic manure for landscaping.

STP sludge (dry sludge) Sludge use as manure for gardening

Budgetary allocation Capital Cost: 9 Lakh


O & M Cost: 4.5 Lakh

Green Belt Total RG Area 403.65 m2


Development

RG area under green belt 403.65 m2

Budgetary allocation Capital Cost: 10 Lakh


O & M Cost: 1 Lakh

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 50 of 86

Energy Maximum demand 3.8 MW

Source BEST

Budgetary allocation Capital Cost: 20 Lakh


O & M Cost: 2 Lakh

DG set Number and capacity of the DG sets to 1000 kVA


be used

Type of fuel used Diesel

Environment Management Plan Budgetary Allocation

Capital Cost O & M Cost


Component
(Rs. In Lakhs) (Rs. In Lakhs/Year)
STP (Tertiary) 22 4.5
Solar Lighting 20 2
Rainwater Harvesting 9 1
Solid Waste Composting Plant 9 4.5
Landscape 10 1
Total Cost 70 13

Traffic Nos. of the junction to the main road & design of confluence: 2 Junctions
Management

Parking details

Number & area of basement 2 Basement with area 5126.4m2

Number & area of podia 8 Podium with area 8652.0m2

Total Parking Area 6896 m2

4-Wheeler 258 nos.

PP informed that old existing building will be retained and proposed construction will be
undertaken on the remaining portion of the same plot by using the FSI of the entire plot.

The proposal was discussed on the basis of the presentation made and documents
submitted by the PP. All issues related to environment, including air, water, land, soil,
ecology and biodiversity and social aspects were discussed.

During discussion following points emerged:

1. PP to submit copy of HRC permission for the proposed height.


2. PP shall provide 15 % RG on ground for the portion of the proposed development
and remove extra 16 car parking and submit revised plans for the same.
3. PP to restrict parking to 243 instead of 258. Back to back parking is not
permissible. By reducing the extra parking, convert the area in to green/ play
area for children.

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 51 of 86

4. PP to correct internal circulation pattern left in and left out and submit.

After deliberation, Committee decided to recommend the proposal for


Environmental Clearance to SEIAA, subject to compliance of above points.

Item no 21 Residential & Commercial development at plot of lands bearing S.No


124/2/3 & 125/3/1 situated at village Kavesar, Ghodbunder Road, Thane
(w) by M/s. Uma Enterprises.

Name of Project Proposed construction of Residential and Commercial Project

Name of Proponent Name: Manoj Khetwani Uma Enterprises

Name of Consultant Name: Dr. D. A. Patil Mahabal Enviro Engg. Pvt. Ltd.

Type of project: Residential Project and Commercial Project.

Plot bearing S.No.124/2/3, 125/2,125/3/1, 125/3/2, 125/4, 125/5 at village


Location of the project
Kavesar , Thane (W).

Whether in corporation /
Thane Municipal Corporation
Municipal / Other area

Applicability of the DCR TMC DCR-1994

Note on the initiated work (if The construction for Bldg-1 is completed and plinth of Bldg-2 is constructed.
applicable) Total Constructed area is 805.41 m2

Total Plot Area 11,310.00 m2

Net plot area 9,236.18 m2

Permissible FSI
17,929.06 m2
(Including TDR etc.)

Total
FSI Area Non FSI Area
Description 2 2 Construction
m m 2
Area m

Blg-1 318.00 80.59 398.59

Blg-2 4971.09 1910.33 6881.42


Proposed Built-up Area (FSI &
Non-FSI) Blg-3 4324.56 1595.67 5920.23

Blg-4 3522.00 1676.06 5198.06

Blg-5 4319.04 1606.71 5925.75

Blg-6 414.90 119.06 533.96

Upper Ground 5,277.32 5,277.32

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 52 of 86

Club House 218.98 218.98

Total 17,869.59 12,484.72 30,354.31

Ground coverage percentage 48.15%

Estimated cost of the project Rs.72 Crore

Building Details Floors

Bldg. - 1 St+2FL

Bldg. - 2 Gr(PT)+21FL
No. of Buildings & its
configuration Bldg. - 3 Gr+U.G+18FL

Bldg. - 4 Gr+U.G+18FL

Bldg. - 5 Gr+U.G+18FL

Bldg. - 6 Gr(PT)+2(PT)FL

Number of tenants and shops Total flats proposed: Flats: 298 Nos. & Shops: 7 Nos.

Number of expected residents /


1511 Nos.
users

Maximum height 63.15 m (upto terrace floor)


Height of the building(s)

Right of way 25 m wide D.P road on East side

Turning radius Minimum turning radius is 8m

Total Water requirement Dry Season

Fresh water (CMD) 134

Source TMC

Recycled Water (CMD) 82

Total water requirement (CMD) 202

Fire fighting (cum) As per NBC.

Wet Season Fresh water (CMD) 97

Source TMC

Recycled Water (CMD) 68

Total water requirement (CMD) 202

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 53 of 86

Fire fighting (cum) As per NBC

Rain Water Harvesting (RWH) Level of ground water table 6m

Size and No. of RWH tanks and 2 RWH tank with total 90 m3 capacity
quantity

Location of RWH tank Below ground

Budgetary allocation Capital Cost: 12 Lakhs


O & M Cost.1 Lakhs

Storm Water Drainage Natural water drainage pattern Towards East Side

Quantity of storm water 1193.5 m3/hr

Size of SWD 600 mm wide channel

Sewage and waste water Sewage generation (CMD) 182

STP Technology SAFF

Capacity of STP (CMD) 200

Location of the STP Below Ground

DG sets (during emergency) 380 kVA (For bldg. 3,4 & 5)


320 kVA (For bldg. 2)

Budgetary allocation Capital Cost: 30 Lakhs


O & M Cost: 6 Lakhs

Solid waste management Waste generation in the pre construction and construction phase

Waste generation in the Operation phase

Dry Waste (kg/d) 749 kg/d

Wet Waste (kg/d) 300 kg/d

STP Sludge (dry sludge) (kg/d) 2 m3/d

Mode of Disposal of Waste Dry Waste Recyclers

Wet Waste Mechanical composting

STP sludge (dry sludge) Used as manure

Budgetary allocation Capital Cost:20 Lakhs


O & M Cost: 6 Lakhs

Green Belt Development Total RG Area 2,726.63 m2 Attached as Annexure I

RG area under green belt 2,726.63 m2

Budgetary allocation Capital Cost: 32 Lakhs


O & M Cost: 3 Lakhs

Energy Power supply

Maximum demand 1,470.36 kW

Connect load 3,430.30 kW

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 54 of 86

Source MSEDCL

Energy saving by non-conventional method : 16 %

Detail calculations & % of saving 16%

Budgetary allocation Capital Cost: 40 Lakhs


O & M Cost:4 Lakhs

DG set Number and capacity of the DG 380kVA x 1(For bldg. 3,4 & 5)
sets to be used 320kVA x 1(For bldg. 2)

Type of fuel used Diesel

Environment Management Plan Budgetary Allocation

Capital Cost O & M Cost


Component (Rs. In (Rs. In Monitoring Frequency
Lakhs) Lakhs/year)
Continuous O & M
Environment Monitoring: Monthly,
STP (Tertiary) 30 6 STP outlet water quality for pH, BOD,
COD, SS and O & G
Solar Lighting and
40 4 Weekly
Solar Hot water
During rainy season (cleaning of UG
Rainwater
12 1 tanks and filtration units before rainy
harvesting
season)
Continuous O & M
Solid Waste
20 6 Environment Monitoring: Monthly to
Composting plant
assess the compost quality

Landscape 32 3 Daily

Total Cost 134 20

Traffic Management Nos. of the junction to the main road & design of confluence

Parking details Number & area of basement -

Number & area of podia Upper ground: 5,277.32 m2

Total Parking Area 8,686.26 m2

Area per car 26.80 m2

2-Wheeler 308 Nos.

4-Wheeler 324 Nos.

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 55 of 86

PP informed that they have already constructed Building no. 1 and plinth of Building no. 2.
The total built up area constructed is about 805.41 m2 without prior EC. The building no. 1
is occupied.

Considering the orders of the Hon’ble High Court having Court order regarding
construction to be undertaken up to 20,000 m2 and the letter dated 29th June 2013 from
Environment department, Committee decided to appraise the project though there is
violation subject to the final decision on the same by SEIAA on the same.

The proposal was discussed on the basis of the presentation made and documents
submitted by the PP. All issues related to environment, including air, water, land, soil,
ecology and biodiversity and social aspects were discussed.

During discussion following points emerged:

1. PP to provide dual plumbing system in the existing completed buildings and connect
the buildings to the STP. PP to reuse treated water from STP for construction
activities.
2. PP to ensure that RG provided 2726.63 m2 should not be paved.
3. PP to provide fire tender movement on ground without comprising RG.

After deliberation, Committee decided to recommend the proposal for Environmental


Clearance to SEIAA, in view of the Court orders allowing construction up to 20,000
m2 and the letter dated 29th June 2013 from Environment department subject to
compliance of above points.

Item no 22 “Shree Sai Seva Krupa CHS Ltd & Varsha Adarsh CHS Ltd” plot bearing
CTS No. 4 (pt) & 6 (pt) village Kurla I, at Nehru Nagar, Kurla (E) by M/s
Neeta Developers

Name of the Project Proposed Slum Rehabilitation Scheme of Shree Sai Seva Krupa CHS Ltd., Varsha
Adarsh CHS Ltd. & Santaji Dhanaji SRA CHS (Prop)
Name of the Proponent Name: Mr. Diwakar Shetty
Address: M/s.Neeta Developer
Name of the Consultant M/s. Enviro Analysts & Engineers Pvt. Ltd.

Type of Project: Residential Commercial Project under SRA Scheme


Location of the project CTS No. 6 (pt) Kurla II & CTS No.4C & 4C/1 to 4 C/22 of village Kurla-III at
Nehru Nagar, Kurla (E), Mumbai.

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 56 of 86

Whether in Corporation/ Municipal Corporation of Greater Mumbai, ‘L’ Ward


municipal/other area
Applicability of the DCR DCR 1991 33 (10)
Note on the initiated work (if Total constructed work (FSI + Non FSI): 19281.91sq.m.
applicable) Date and area details in the necessary approvals issued by the competent
authority (attach scan copies)
CC copies
1.SRA/ENG/469/L/MHL/AP dated 1-10-2001
2.SRA/ENG/1469/L/ MHL/AP dated 11-2-2008
3. SRA/ENG/469/L/MHL/AP dated 27-7-2011
IOA copies
1.SRA/ENG/469/L/MHL/AP dated 11-08-1999
2. SRA/ENG/1469/L/MHL/AP/Com. Bldg. 2 dated 4-10-2005
3.SRA/ENG/469/L/MHL/AP dated 1-6-2011
LOI/NOC from MHADA/ Date and construction area details mentioned in the approved letter:
other approvals (If LOI From SRA:
Applicable) SRA/ENG/270/L/MHL/LOI Dated 10-08-1999
SRA/ENG/1720/L/MHL/LOI Dated 04-12-2008
SRA/ENG/1720/l/MHL/LOI Dated 20-05-2010
SRA/ENG/1720/L/MHL/PL/LOI Dated 31-08-2013

Total plot area (sq.m.) Total Plot Area=7,320.37 sq.m.


Deductions Net Plot Area after Deductions = 4,837.47 sq.m.
Net Plot Area

Permissible FSI (including 3.00


TDR etc.)
Proposed Built Up Area(FSI & FSI Area Non FSI Area Total construction Area
Non FSI) 20,682.43sq. m 11,864.16 sq.m 32,546.59 sq. m

Ground Coverage Area Total Ground Coverage area = 2,428.28 sq. m


Percentage of Ground coverage = 50.19 %
Estimated Cost of the project Rs. 60 Crores
Number of Buildings & No. of Buildings Configuration
configuration(s)
2 Nos. Building No. 1 ( Composite Building)
Wing A, B, C G+7 up
Wing D, E, F, G G+16 up
Wing H, I G+10 up
Building No. 2
Hotel Lodge G+7 up

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 57 of 86

Number of tenants and shops Rehab Sale Hotel Lodge TOTAL

No. of Tenements (in 390 266 656


Nos.)
No. of Shops (in Nos.) 8 23 - 31

No. of R/C 04 04

No. of Units (in Nos.) 13 13

Other (BWS) 16

Number of expected Rehab Sale Hotel Lodge TOTAL


residents/users
Residential (in Nos.) 1950 1330 - 3280

R/C (in Nos.) 20 20

Commercial (in Nos.) 24 72 - 96

Hotel Lodge (in Nos.) 39 39

Other (BWS) 145 145

TOTAL 2119 1422 39 3580

Tenant density per hector 1364 Nos./Hectare

Height of Building(s) No. of Buildings Configuration Height in m

2 Nos. Building No. 1 ( Composite Building)


Wing A, B, C G+7 up 23.70
(Rehab)
Wing D, E, F, G G+16 up 49.80
(Rehab)
Wing H, I G+10 up 32.40
(Sale)
Building No. 2
Hotel Lodge G+7 up 23.95

Right of way 18.30 m wide D.P. Road


Turning radius 6m
Existing Structure(s) Construction of buildings is completed as below:-
Building Configuration Contructed
Area in sq.m.
Building No. 1 ( Composite Building)
Wing A, B, C G+7 up 4596.03
Wing D, E, F, G G+16 up 11164.20
Wing H, I G+10 up 3521.68
Building No. 2
Hotel Lodge G+7 up --
TOTAL 19281.91

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 58 of 86

Details of the demolition with Demolition waste will be disposed by covered trucks at authorised site as per
disposal (If applicable) MCGM.
Total Water Requirement Dry Season:
Fresh water (KLD) & source: Composite Bldg. = 251 KLD, Sale Bldg. = 49 KLD,
Hotel Lodge= 1 KLD , Total = 301 KLD
Recycled water (KLD): Composite Bldg. = 129 KLD, Sale Bldg. = 25 KLD,Hotel
Lodge= 1 KLD,Landscape = 2 KLD, Total = 157 KLD
Total Water Requirement (KLD): Composite = 380 KLD, Sale = 74 KLD, Hotel
Lodge=2 KLD, Landscape = 2KLD, Total = 458 KLD
Fire fighting (Cum): UG Tanks- Composite= 100 Cum, Sale = 100 cum,
OH Tanks- Rehab = 25 cum, Sale =25 cum
Wet Season:
Fresh water (KLD) & source: Composite = 193 KLD, Sale = 20 KLD,Hotel Lodge=
1 KLD, Total = 214 KLD + 87 KLD from RWH Tanks
Recycled water (KLD): Composite= 129 KLD, Sale = 25 KLD, Hotel Lodge= 1 KLD,
Total = 155 KLD
Total Water Requirement (KLD): Composite = 322 KLD, Sale = 45KLD, Hotel
lodge = 2KLD, Total = 369 KLD + 87 RWH Tank
Fire fighting (Cum): UG Tanks- Composite = 100 cum, Sale = 100 cum,
OH Tanks- Composite= cum KLD, Sale =25 cum
Rain Water Harvesting (RWH) Level of the ground water table: 1.5 m
Size and no of RWH tank(s) and quantity: 1 for Composite Bldg.=116 KLD, 1 for
Sale Bldg. =58 KLD
(2 days capacity)
Location of the RWH tanks(s):Below level
Size, no. of recharge pits and quantity: NA
Budgetary allocation (capital cost and O&M cost)
Capital Cost- ` 20 Lakhs
O & M Cost – ` 01 Lakhs
Strom water drainage Natural water drainage pattern: West to East
Quantity of storm water: 0.078 m3/sec
Size of SWD: B =0.3 m, D = 0.3 m

Sewage & Waste Water Sewage generation: Composite =342 KLD , Sale = 67 KLD, Total = 409 KLD
STP Technology: MBBR
Capacity of STP (KLD): Composite =345 KLD , Sale = 70 KLD, Total = 415 KLD
Location of the STP
Below Ground level
DG Sets (during emergency): DG set backup will be provided for STP during
emergency.
For Composite Bldg. = 100KVA, For Sale Bldg.=125 KVA
Budgetary allocation (capacity cost and O&M cost):
Capital Cost – ` 99 Lakhs
O & M Cost –` 05 Lakhs
Solid Waste Management Waste generation in the operation phase:
Dry waste (Kg/day): Composite = 592 Kg/Day, Sale = 110 Kg/Day, Hotel Lodge=7
Kg/Day, Total = 709 Kg/Day
Wet waste (Kg/day): Composite = 846 Kg/Day, Sale = 162 Kg/Day, Hotel
Lodge=03 Kg/Day, Total = 1011 Kg/Day

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 59 of 86

STP sludge (Dry sludge) (Kg/Day): Composite = 34 Kg/Day, Sale = 06 Kg/Day,


Total = 40 Kg/Day
Garden Waste: 02 Kg/Day
Mode of Disposal of Waste:
Dry waste: Will be handed over to Dealers
Wet Waste: Will be processed in the Organic Waste Converter. Manure so
obtained will be used for landscaping and rest will be used for replacing saw dust
in OWC.
STP Sludge (Dry Sludge): Will be mixed with biodegradable waste and
processed in OWC.
Area Requirement:
For Composite Bldg. = 57 sq.m.
For Sale Bldg. =23 sq.m.
Budgetary allocation (capital cost and O&M cost)
Capital Cost –` 19 Lakhs
O & M Cost –` 8 Lakhs
Green Belt Development RG on the ground (sq.m.): 431.78 sq.m. Paved RG
RG on the podium (sq.m.): NA
Total : 431.78 sq.m..
Plantations:
Number and list of trees species to be planted in the ground RG: 50 Nos.
NOC for the tree cutting/transplantation/ compensatory plantation, if any: No
Budgetary allocation (Capital cost and O&M cost)
Capital Cost – ` 2.0 lakhs
O & M Cost –` 0.2 Lakhs
Energy Power Supply:
Connected load: 2898 KW
Maximum demand: 1813KW
Source: Reliance Energy
Budgetary allocation (capital cost and O&M cost)
Capital Cost – `56 Lakhs(Electrical) + 51 Lakhs (Solar)
O&M Cost- ` 8 Lakhs(Electrical) + 6 Lakhs (Solar)
DG Set:
Number and capacity of the DG sets to be used: For Composite Bldg. = 100KVA,
For Sale Bldg.=125 KVA
Type of fuel used: 5 drum of HSD having capacity of 200 Liters
Environmental Management
Annual Maintenance
plan
Sr. Setting-Up Cost Operational Cost &
Budgetary Allocation Method Adopted
No. ( In Lakhs) Manpower
( In Lakhs)

1 STP 99 20

2 RWH 20 1

3 MSW 19 8

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 60 of 86

4 Solar Energy 51 6
System

5 Electrical 65 10

6 Landscaping 2 0.2

Total 256 45.2

Traffic Management Nos. of the junction to the main road & design of confluence:
Smooth Entry and Exit
6 m wide internal road
Stilt, Open parking provided
Parking Details:
Number and area of Basement: NA
Number and area of Podia: NA
Stilt area: 389.26 sq.m.
Total parking area: 835.93sq.m.
Area per Car: 30.96 sq.m
4-wheelers: 27 Nos.
2-wheelers: NA
Public Transport: NA

III. Width of all Internal roads (m): 6 m wide road

PP informed that they have already constructed about 19,281.91 m2 without prior EC.

Considering the orders of the Hon’ble High Court having Court order regarding
construction to be undertaken up to 20,000 m2 and the letter dated 29th June 2013 from
Environment department, Committee decided to appraise the project though there is
violation subject to the final decision on the same by SEIAA on the same.

The proposal was discussed on the basis of the presentation made and documents
submitted by the PP. All issues related to environment, including air, water, land, soil,
ecology and biodiversity and social aspects were discussed.

During discussion following points emerged:

1. PP to submit certification from competent authority (SRA) about the construction


undertaken till date.
2. PP to restrict ground coverage to 51%.
3. PP to ensure that 8-9 % RG should be unpaved by leaving out fire tender movement
area.

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 61 of 86

4. PP to ensure use of excess treated waste water in the nearby public gardens /
plantation / construction activities/ road washing etc. and submit the details of the
efforts made for the same.

After deliberation, Committee decided to recommend the proposal for


Environmental Clearance to SEIAA, subject to compliance of above points.

Item no 23 Expansion of “TATVA” residential project under located at plot bearing


CTS No. 68A, S.No. 132 (pt) at Magathane, Borivali (E) Mumbai by M/s.
Geetanjali Gems ltd.

Name of the Project ‘TATVA’ - Residential Project.


Name of the Proponent Name: Mr. Sailesh Goyal
M/s. Gitanjali Gems Ltd
Name of the Consultant M/s. Enviro Analysts & Engineers Pvt. Ltd.
Type of Project : Residential Project
Location of the project Plot bearing CTS No. 68A, S.No. 132(pt) at Magathane, Borivali (E), Mumbai,
Maharashtra.
Whether in Corporation/ Municipal Corporation of Greater Mumbai (MCGM)
municipal/other area
Applicability of the DCR MCGM DCR- 1991(as Amended)
Note on the initiated work (if There are structures on the plot constructed as per previous EC.
applicable) Construction done on site till date: B + S + 2P +3 Floors

LOI/NOC from MHADA/ other Not Applicable


approvals (If Applicable)
Total plot area (sq.mt.) Sr. No. Particulars Details
Deductions (sq.m.)
Net Plot Area 1 Area of plot 7938

2 Deduction for:
5 % Amenity Open space 396.89
3 Deduction for:
Recreation Ground (15%) 1131.14
4 Net Area of Plot 6409.77
Permissible FSI (Basic FSI 1+ 1 TDR + 35% incentive)

Proposed Built Up Area (FSI & Sr. Description Area of Building


Non FSI) No. (sq.m.)
1 FSI Area 19,081.30

3 Non FSI Area 25,090.36

4 Total Built-Up Area 44,171.66

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 62 of 86

Ground Coverage Area Ground coverage = 49 %


Estimated Cost of the project ₹ 150 Crores.
Number of Buildings &
Bldg. Configuration
configuration(s)

Wing A B + Stilt+ 3P(Common for Both


Wings) + 1st to 22 Floors

Wing B B + Stilt+ 3P(Common for Both


Wings) + 1st to 22 Floors
Number of tenants and shops Residential Tenements 158

Number of expected
Population 790
residents/users

Tenant density per hectare


Tenement Density 200

Height of Building(s) Building Nos. Height in M.


Wing A 94.05
Wing B 94.05

Right of way 18.30 M wide D.P. Road


Turning radius Minimum 9 mt.

Existing Structure(s) There are structures on the plot constructed as per previous EC.
Construction done on site till date: B + S + 2P +3 Floors
Total Water Requirement Dry season:
 Source : MCGM
 Fresh water : 71 KLD
 Recycled water : 46 KLD
 Total Water Requirement : 117 KLD
 Swimming pool make up : 0.005 KLD
 Fire Fighting : 250 KLD

Wet Season:
 Source : MCGM
 Fresh water : 71 KLD
 Recycled water : 36 KLD
 Total Water Requirement : 107 KLD
 Swimming pool make up : 0.005 KLD
 Fire Fighting : 250 KLD
Rain Water Harvesting (RWH)  Level of the Ground water table : 1.5 -3.0 m
 Size and no of RWH tank (s) and Quantity: NA
 Location of the RWH tank(s): 1 No.
Size and no. of recharge Pits : 2 Nos. Each having
3m x 3m x 3m )
 No. Of Percolation pits: 17 Nos.

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 63 of 86

 Capacity of RWH Tank: 72 KL


 Budgetary allocation (Capital cost & O&M cost):
Capital Cost: ₹ 23 Lakhs
O & M Cost per Annum: ₹ 1.15 Lakhs
Strom water drainage  Natural water drainage pattern:
 Quantity of storm water:
 Size of SWD: 0.6 x 0.6 mt.

Sewage & Waste Water  Sewage generation : 94 KLD


 STP technology : SAFF
 Capacity of STP : 100 KLD
 Location of STP : Ground Level
 DG sets (during emergency): 1 no. X 320 KVA
Budgetary allocation (Capital cost and O&M cost):
1) Capital Cost: ₹ 28.8 Lakhs
2) O&M Cost per Annum: ₹ 1.15 Lakhs
Solid Waste Management Waste generation in the operation Phase:
 Dry waste : 158 kg/day
 Wet waste : 237 kg/day
 Total waste: 395 kg/day
STP Sludge (Dry Sludge) : 9.4 kg/day

Mode of Disposal of waste:


 Dry waste:. Will be handed over to recyclers.
 Wet waste: Biodegradable waste will be processed in OWC and
manure so obtained will be used for landscaping and in OWC
 STP Sludge (Dry sludge): Will be used as manure.
Area requirement:
1. Location(s): Below Ground
2. Budgetary allocation (Capital cost and O&M cost)
Capital Cost : ₹ 8 Lakhs
O & M Cost : ₹ 0.92 Lakhs
Green Belt Development RG Area on ground = 1936.26 sq.m.
 Plantations:
Number and list of trees species to be planted in the RG: 100 nos.
Budgetary Allocation: (Capital cost and O&M cost)
Capital Cost: ₹ 11.5 Lakhs
O & M Cost: ₹ 0.23 Lakhs
Energy  Power Supply:
Sr. POWER REQUIREMENT
No.

1 Source of power supply : Reliance Energy

2 Maximum Demand 1061.95 KVA

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 64 of 86

3 DG set as Power Back – up 1 no. X 320 KVA


during operation phase

 Budgetary allocation (Capital cost and O&M cost)


Capital Cost: ₹ 23 Lakhs
O & M Cost: ₹ 0.75 Lakhs
Environmental Management plan Sr. Method Setting-Up Cost Annual Maintenance
Budgetary Allocation No. Adopted ( In Lakhs) & Operational
Cost(In Lakhs)
1 Rain Water 23 1.15
Harvesting

2 Solid Waste 8 0.92


Management
3 STP 28.8 1.15
4 Energy 23 0.75
Conservation
5 Landscape 11.5 0.23
Total 94.3 4.2
Traffic Management Nos. of the junction to the main road & design of confluence: Site is abutting
to 18.3 m road and 10 m wide D. P. Road on North side & having 9 m. wide
internal road.
Parking Details :
 Number and Area of Basement: 1 No.
 Number and Area of Podia: 2 Nos.
 Total Parking Area: 11,987.49 sq.m.
 Parking required: 395 nos.
 Parking provided: 397 nos.
 Area per car provided: 30 sq.m.
 Public Transport: Not Applicable.

Width of all internal roads (m): NA

PP informed that they have already received prior EC for the project on 18 th October
2011.
The project proposal was discussed on the basis of presentation made documents
submitted by the proponent. All issues related to environment, including air, water,
land, soil, ecology and biodiversity and social aspects were discussed. Present
proposal is for the amendment / expansion.

Committee noted the following changes:

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 65 of 86

th
Description As per EC Obtained dt. 18 October 2011 Proposed Expansion Remark

Plot Area 7,938 sq.m. 7,938 sq.m. No Change

Total Built-up area 34,112.71 sq.m. 44,171.66 sq.m. + 10,058.95 sq.m.

FSI Area 13,944.50 sq.m. 19,081.30 sq.m. + 5,136.8 sq.m.

Non-FSI area 20,168.21 sq.m. 25,090.36 sq.m. + 4,922.15 sq.m

1 Building : 1 Building :
Building 1 Podium and 1 Floor is
Wing A: B+S+2P+21 F Wing B: B+S+2P+21 Wing A: B+S+3P+22 F
Configuration added.
F Wing B: B+S+3P+22 F

No. of Tenements 172 Nos. 158 Nos. - 14 Nos.

Cost of the Project Rs. 72 Crores Rs. 150 Crores + 78 Crores

Total water req: 126 KLD Total water req: 117 - 9 KLD
Domestic water: 78 KLD KLD - 7 KLD
Water Requirement
Flushing water: 39 KLD Domestic water: 71 KLD - 3 KLD
Flushing water: 36 KLD

As per EC Obtained dt.


Description th Proposed Expansion Remark
18 October 2011
Sewage Generation 101 KLD 94 KLD - 7 KLD
Capacity of STP 115 KLD 100 KLD - 15 KLD
Dry waste : 137.6 kg/day Dry waste : 158 kg/day +20.4 kg/day
Solid waste Generation
Wet Waste : 206.4 kg/day Wet Waste : 237 kg/day +30.6 kg/day

Landscape area:
Green Belt Development Landscape area: 1936.26 sq.m. No change
1936.26sq.m.

Ground Coverage 49% 49% No Change

No of Recharge Pits: 2
No of Recharge Pits: 2 Nos. Nos.
Rain Water Harvesting Size: 3m x 3m x 3m Size: 3m x 3m x 3m No Change
No. of Percolation pits: 17 Nos. No. of Percolation pits: 17
Nos
Parking Required: 395
Nos.
Traffic Management Parking Provided: 283 Nos. +114 Nos.
Parking Provided: 397
Nos.

Max Demand: 1957 KW Max Demand: 1061.95 KVA


Energy Requirement ----
D.G.: 2 Nos. X 125 KVA D.G.: 1 Nos. X 320 KVA

Capital cost: Rs. 94.3


Capital cost: Rs. 76.5 Lakhs + 17.8 Lakhs
EMP Cost Lakhs
O & M cost: Rs. 3.65 Lakhs. + 0.55 Lakhs
O & M cost: Rs. 4.2 Lakhs.

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 66 of 86

After deliberation, Committee decided to recommend the proposal for


Environmental Clearance to SEIAA, for above proposed changes.

Item no 24 Proposed redevelopment of residential, Commercial project at plot CTS


No. 5987, village Ghatkopar, Kirol , Mumbai by M/s Mishal Construction
P L

Name of Project Proposed Redevelopment of Residential & Commercial project

Name: Mr. Ajit Jain


Name of Proponent
Mishal Construction Pvt. Ltd.

Name of Consultant Name: Dr. D. A. Patil

Type of project: Residential & Commercial Project

Plot bearing F.P. No. 6 of TPS-III Ghatkopar & CTS No. 5987
Location of the project
of Village Ghatkopar (E), Mumbai

Whether in corporation / Municipal / Municipal Corporation of Greater Mumbai


Other area

Applicability of the DCR DCR 32+ DCR 34 + DCR 35 (4)

Note on the initiated work (if applicable) No work has been initiated

Total Plot Area 5469.1 m2

Deductions --

Net plot area 5469.1 m2

Permissible FSI
14,590.26 m2
(Including TDR etc.)

FSI Area 14,525.85 m2


Proposed Built-up Area (FSI & Non-FSI)
Non FSI Area 15,754.38 m2

Total Construction Area 30,280.23 m2

Ground coverage percentage 72.95 %

Estimated cost of the project Rs. 60 Crore

Wing A- B + G(pt) + ST(pt)+ P+3 to 13 Floor + 14(pt) floor


Wing B- B + ST+ P+3 to 13 Floor + 14(pt) floor
No. of Buildings & its configuration Wing C- B + G(pt) + ST(pt)+ 1st (PT) + P+3 to 13 Floor + 14(pt)
floor
Shops & Offices : G + 1 Upper Floors

Number of tenants and shops Flats : 145, Shops & Offices :49

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 67 of 86

Number of expected residents / users Population: 872 Nos.

Tenant density per hector 355

Height of the building(s) 52.18 m

27.4 m wide Barister Nath Pai Road from South side, 18.3 m
Right of way wide Tilak Road from east and 18.3 m wide Ratilal Mehta Road
from North side.

North: 4.5 m
South: 6 m
Turning radius
East: 4.5 m
West: 7m

Existing Structure Yes, 5 existing buildings

Details of the demolition with disposal (if No demolition carried out.


applicable) Debris Quantity: 3300 m3

Total Water Dry Season


requirement

Fresh water (KLD) 67

Source MCGM

Recycled Water (KLD) 42

Total water requirement (KLD) 104

Swimming pool make up (cum) --

Fire fighting (cum) As per NBC

Wet Season

Fresh water (KLD) 52

Source MCGM

Recycled Water (KLD) 37

Total water requirement (KLD) 104

Swimming pool make up (cum) --

Fire fighting (cum) As per NBC

Rain Water Harvesting Size and No. of RWH tanks and RWH : 1 tank will be provided with
(RWH) quantity total capacity 45 m3

Location of RWH tank Basement

Budgetary allocation Capital Cost: 6 Lakh


O & M Cost: 0.5 Lakh

Storm Water Drainage Natural water drainage pattern Towards east side of the plot

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 68 of 86

Quantity of storm water 509.66 m3/hr

Size of SWD

Sewage and waste Sewage generation (CMD) 98 KLD


water

STP Technology MBBR

Capacity of STP (CMD) 110 KLD

Location of the STP basement

DG sets (during emergency) DG sets will be provided

Budgetary allocation Capital Cost: 17 Lakh


O & M Cost: 3.5 Lakh

Solid waste Disposal of the construction way debris


management The construction debris will be disposed as per the “Construction and
Demolition and Desilting Waste (Management and Disposal) Rules 2006.

Waste generation in the Operation phase

Dry Waste (kg/d) 235 kg/day

Wet Waste (kg/d) 157 kg/day

STP Sludge (dry sludge) (kg/d) 1 m3/day

Mode of Disposal of Waste

Dry Waste : Dry garbage will be segregated & disposed off to recyclers

Wet Waste
Wet garbage will be composted using Mechanical Composting and used as organic manure for landscaping.

STP sludge (dry sludge) Sludge use as manure for gardening

Location and total area provided for the storage and treatment of the solid waste
Location: Basement

Budgetary allocation Capital Cost: 10 Lakh


O & M Cost: 4.0 Lakh

Green Belt Development Total RG Area 1093.82 m2

RG area under green belt 1093.82 m2

RG on Podium 1093.82 m2

Trees to be cut: 25 Nos.

Budgetary allocation Capital Cost: 12 Lakh


O & M Cost: 1.0 Lakh

Energy Maximum demand 2 MW

Source Reliance

Energy saving by non-conventional method

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 69 of 86

% of saving 20.58 %

Budgetary allocation Capital Cost: 14 Lakh


O & M Cost: 1.5 Lakh

DG set Number and capacity of the DG sets Capacity of DG Set: 300 kVA
to be used

Type of fuel used Diesel

Environment Management Plan Budgetary Allocation

O & M Cost
Capital Cost
Component (Rs. In Lakhs / year)
(Rs. In Lakhs)

STP (Tertiary) 17 3.5

Solar System 14 1.5

Rainwater harvesting 6 0.5

Solid Waste Composting plant 10 4.0

Landscape 12 1.0

Total Cost 59 10.5

Traffic Management Nos. of the junction to the main road & design of confluence

Parking details

Number & area of basement 1 basement:


4264.65 m2

Number & area of podium 1 Podium:


3989.53 m2

Total Parking Area Net Parking Area: 6,046.87 m2

Area per car 17.47 m2 (Stack Parking)

2-Wheeler ----.

4-Wheeler 346 Nos.

The proposal was discussed on the basis of the presentation made and documents
submitted by the PP. All issues related to environment, including air, water, land, soil,
ecology and biodiversity and social aspects were discussed.

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 70 of 86

It was observed that total ground coverage is 73% and PP was asked by the committee to
reduce the ground coverage and propose RG on the ground. PP agreed to modify the plan
and shall remove ramp on area admeasuring 510 m2 on the west side of the project to
reduce the ground coverage.

During discussion following points emerged:

1. PP to submit revised layout plan indicating the changes to reduce the ground
coverage.
2. PP to provide bio filter for ventilation system of solid waste and STPs.

After deliberation, Committee decided to recommend the proposal for


Environmental Clearance to SEIAA, subject to compliance of above points.

Item no 25 Amendment in prior EC for residential project on plot S.No. 35/4,35/8----


----85/1 of village Panchapakhadi, Thane (w) by M/s Sheth Developers

PP informed that they have received clearance from SEIAA. Hence the
project is delisted.

Item no 26 EC of MIG-5 : Proposed residential building on plot CTS No. 629(PT), of


village Bandra (E), Mumbai by M/s Kalpataru Properties P L

PP requested to postpone the project for the next meeting. Hence, the
project is deferred.

Item no 27 “Laxmi Nagar CHS (Proposed )”on plot CTS No. 1A (PT), plot No. B-3 and
B-4 of village Pahadi of Goregaon off New Link road, Goregaon (west)
by M/s Reliable Builders & Developers.

Name of the Project Laxmi Nagar CHS - proposed SRA Scheme


Name of the Proponent  Name- Mr. Sadanand Shetty & Mr. Shakil Shaikh
M/s. Reliable Builders & Developers
Name of the Consultant M/s. Enviro Analysts & Engineers Pvt. Ltd
Type of Project: SRA Scheme
Location of the project CTS No. 1A (pt), S. No. 161 (pt) of Village Pahadi Goregaon, plot No. B-3 & B-4
at Off. New Link Road, Goregaon (W), Mumbai – 400 0104

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 71 of 86

Whether in Corporation/ Municipal Corporation of Greater Mumbai (MCGM)


Applicability of the DCR MCGM DCR 1991 33(10)
Note on the initiated work Not applicable

LOI/NOC from MHADA/ LOI Ref No. SRA/ENG/1929/PS/PL/LOI dated 2 Aug 2012
other approvals
Total plot area (sq.m.) Sr. No. Area Details (Sq. m)
Deductions
Net Plot Area 1 Area of the plot 8166.50

2 Deductions for

a) Road set back area 396.00

3 Balance Plot Area (1-2) 7770.50

4 Deduction for R.G if applicable -

5 Net plot area 7770.50

Permissible FSI (including 3.0 + Fungible (35%)


TDR etc.)
Proposed Built Up FSI Area: 24499.50 Sq. m
Area(FSI & Non FSI) Fungible FSI Area: 8541.65 Sq. m
Total FSI Area: 33041.15 Sq. m
Non FSI Area: 28471.91 Sq. m
Total BUA : 61513.06 Sq. m
Ground Coverage Area Net plot area Ground coverage Ground coverage
(percentage of plot not (Sq. m) area (Sq. m) area (%)
open to sky) 7770.50 4097.85 52 %

Estimated Cost of the Rs. 20 Crores


project
Number of Buildings & Bldg. Type No of Configuration of buildings
configuration(s)
Buildings

Rehab 1 (3 wings) G + 16 Floors

Sale 1 (2 Wings) G(pt)& St (pt) + 4P + 19 Floors

Total 2

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 72 of 86

Number of tenants and Rehab Sale


shops
Residential tenements: 220 No’s Residential tenements: 222 No’s
No. of PAP: 169 No’s Shops: 59 No’s
Balwadi: 4 No’s
Welfare Centre: 4 No’s
Society Office: 4 No’s
Number of expected 3260 No’s
residents/users
Tenant density per hector Rehab: 1472
Sale: 432
Height of Building(s) Rehab: 50.6 m
Sale: 69.90 m
Right of way 18.30 m wide DP road
Turning radius Turning Radius : minimum 6 m

Existing Structure(s) The site is occupied by slums.

Details of the demolition Existing slums will be demolished and debris will be disposed off as per MCGM
with disposal debris management plan.

Total Water Requirement Dry season:


 Fresh water : 269KLD & Source: MCGM
 Flushing water: 138 KLD
 Water for landscape: 3 KLD
 Recycled water : 141 KLD
 Total Water Requirement: 410 KLD
 Swimming pool make up (Cum): NA
 Fire fighting: 500 KLD
Wet Season:
 Fresh water: 207 KLD & Source: MCGM
 Water from RWH Tanks: 62 KLD
 Flushing water: 138 KLD
 Recycled water: 138 KLD
 Total Water Requirement: 407 KLD
 Swimming pool make up (cum): NA
 Fire fighting: 500 KLD
Rain Water Harvesting  Level of the ground water table: 2 – 3m BGL
(RWH)  Size and no of RWH tank(s) and quantity:Rehab:66 cum & Sale: 58 cum
(considering two days holding capacity)
 Location of the RWH tanks(s): Ground level (Underground)
 Size, no. of recharge pits and quantity: Nil
 Budgetary allocation (capital cost and O&M cost)
For Rainwater harvesting –
Capital cost: Rs.23Lakhs

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 73 of 86

O & M cost: Rs. 1Lakhs

Strom water drainage  Natural water drainage pattern:


 Quantity of storm water: 0.076 cum/sec
 Size of SWD: Rehab: B= 0.30m, D= 0.30 m
Sale: B= 0.30m, D= 0.30 m
Sewage & Waste Water  Sewage generation: Rehab: 240 KLD, Sale: 125 KLD
 STP Technology: MBBR
 Capacity of STP: Rehab: 240 KLD, Sale: 125 KLD
 Location of the STP: Ground level
 DG Set (during emergency): Rehab: 180 KVA, Sale: 200 KVA
 Budgetary allocation:
Capital Cost: Rs. 84Lakhs
O&M Cost: Rs 5Lakhs
Solid Waste Management Waste generation in the operation phase:
 Dry waste (Kg/day): 643 kg/day
 Wet waste (Kg/day): 898 kg/day
 STP sludge (Dry sludge): 35 Kg
Mode of Disposal of Waste:
 Dry waste: will be sold to local vendors.
 Wet Waste: Will be processed in the Organic Waste Converter.
 STP Sludge (Dry Sludge): Use as a manure
Area Requirement:
Location: Ground level
Area: Rehab: 46 Sq. m, Sale: 33 Sq. m
Budgetary allocation (capital cost and O&M cost)
For Solid waste management :
Capital Cost: Rs. 19Lakhs
O & M Cost: Rs. 7Lakhs
Green Belt Development Total R.G. Area:
RG on Ground: 622.79 Sq. m (8%)
 Number and list of trees species to be planted in the ground RG: 70
 Budgetary allocation (Capital cost and O&M cost)
For Landscaping :
Capital Cost: Rs. 8Lakhs
O & M Cost: Rs. 0.5Lakhs
Energy  Power Supply:
 Connected Load: 3422 KW
 Maximum Demand: 2166 KW
 Source: Reliance Energy
 Budgetary allocation (capital cost and O&M cost) –
For Solar Energy system :
Capital Cost: Rs. 75Lakhs
O & M Cost: Rs 8Lakhs
DG Set:

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 74 of 86

DG set will be provided for backup power to emergency facilities.


 Number and capacity of the DG sets to be used:
Rehab: 180 KVA, Sale: 200 KVA
 Type of fuel used: HSD
Environmental Management
plan Sr. Method Adopted Setting-Up Annual Maintenance And
Budgetary Allocation No. Cost Operational Cost
( In Lakhs) ( In Lakhs)

1 Rain Water 23 1
Harvesting

2 MSW 19 7

3 STP 84 5

4 Solar Energy 75 8
System

5 Electrical 76 11

6 Landscaping 8 0.5

Total 285 32.5


Traffic Management Nos. of the junction to the main road & design of confluence:
Parking Details:
 Number and area of Basement: Nil
 Number and area of podia: 4 podia for parking
 Total parking area: 8891 Sq. m.
 Area per Car: 30 Sq. m
 4-wheelers: 294 No’s
 2- wheelers: Nil
 Public Transport: Nil
Width of all internal roads (m): 9 m

The proposal was discussed on the basis of the presentation made and documents
submitted by the PP. All issues related to environment, including air, water, land, soil,
ecology and biodiversity and social aspects were discussed.

PP reported that project under consideration is not affected by CRZ regulations. Further
it was informed that LOI issued by SRA on industrial plot for SRA development is as per
the SRA Norms.

During discussion following points emerged:

1. PP to ensure that physical RG on ground shall not be paved.

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 75 of 86

2. PP to install Regenerative lifts & solar water pumps and submit revised energy
saving calculations.
3. PP to explore the possibility of providing solar panels for common area lighting.

After deliberation, Committee decided to recommend the proposal for


Environmental Clearance to SEIAA, subject to compliance of above points.

Item no 28 EC for residential project with SRA scheme on plot bearing CTS No.53
(pt), 2/292, 4/292, 5/292, 6/292, 7/292, 9/292, 11/292,
17/292,19/292,318,320,323,324,345,346,347,348,349,350,1/350,1/396,
398,401,402,1/402,1/406,408,413,414&416 of Matunga Division located
at SMD Road, Wadala (E), Mumbai by M/s Dosti Realty Ltd.

The proposal was discussed on the basis of the presentation made and documents
submitted by the PP. All issues related to environment, including air, water, land, soil,
ecology and biodiversity and social aspects were discussed.

During discussion following points emerged:

1. School building should be near to the playground. PP to interchange health centre


and school building locations and provide dedicated access to the school and also
ensure that there will not be any traffic congestion for the same.
2. PP shall realign and redesign sewer lines, storm water drainage etc. if necessary
during the development of the project.
3. PP to submit concrete proposal with quantification for reuse / recycling of 396 KLD
during dry season and 401 KLD during rainy season. Revise water balance chart
accordingly.

In view of above, the proposal is deferred and shall be considered further after the
above observations are addressed and submitted for reconsideration.

Item no 29 Proposed project on plot bearing CTS No. 442/A/3/1D, 458 of village
Pahadi, Goregaon (east), Mumbai by M/s Yash Developers

PP informed that public parking proposal is yet to be approved by the State Government.

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 76 of 86

During discussion following point emerged:

1. PP to submit the proposal after the approval of public parking by the State Govt.
And revert.

In view of above, the proposal is deferred and shall be considered further after the
above observation is addressed and submitted for reconsideration.

Item no 30 “Kurla Jaihind Buddha Vikas SRA CHS (Ltd)” plot bearing CTS No. 4 (pt) &
6 (pt) village Kurla I, at Nehru Nagar, Kurla (E) by M/s Neeta Developers

The PP has informed his inability to attend the meeting; hence the project is
deferred and delisted.

Item no 31 Proposed SRA scheme on plot bearing CTS No. 86/14A, 86/14B, 86/15A,
86/15B at bandra (west), Dr. Ambedkar road, Khar (west), Mumbai by M/s
Lok shelters Ltd. (New SRA Project)

PP informed that SRA has approved SRA project with 2.5 FSI and proposal for 4
FSI is yet to be approved.

During discussion following point emerged:


1. PP to revise the proposal as per the approved FSI in hand and revert.

In view of above, the proposal is deferred and shall be considered further after the
above observation is addressed and submitted for reconsideration.

Item no 32 Siddhi Krish Developers


Appln. For EC for residential project at Old S.no.73/17,75/5…83/3(pt) of
village Balkum,Tal. & Dist.Thane

Name of the Project “Highland Heaven”

Name of the Proponent Name: Mr. Jayendra Gala


Siddhi Krish Developers

Name of the Consultant M/s. Enviro Analysts & Engineers Pvt. Ltd.

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 77 of 86

Type of Project: Residential cum Commercial Project


Location of the project Plot bearing old S. no 73/17pt, (New S. no 150/17A,
150/17B,150/17C,150/17D,), old S. no 75/5 to 75/8 (New S. no 152/5 to
152/8), old S. no 80/1 (New S. no 160/1), old S. no 82 (New S. no 159),
old S. no 81/3 (New S. no 158/3), old S. no 83/1/1, 83/1/2, 83/1/3(pt),
83/1/3pt, 83/2, 83/3pt, 83/3pt (New S. no 160/1A, 160/1B, 160/1C,
160/1D. 160/2, 160/3B, 160/3C)of village Balkum at Thane (West)
Whether in Corporation/ Thane Municipal Corporation

Applicability of the DCR TMC, DCR 1994


Note on the initiated The project was appraised in 7th SEAC II meeting & termed as technical
work (if applicable) violation. Environment Dept issued Showcause Notice dated 15/04/2013,
after personal hearing vide letter date on 17/05/2013 the show cause
notice was withdrawn and the project was recommended in front of the
committee.
LOI/NOC from NA
MHADA/ other
approvals (If Applicable)

Total plot area (sq.m.) Total Plot Area : 38920 Sqmt


Deductions Total Plot Area considered for FSI : 38895.51 Sqmt
Net Plot Area Net Plot Area : 18603.34 Sqmt
Permissible FSI 1.00+ 80 % (TDR)
(including TDR etc.)
Proposed Built Up Sr. PARTICULARS AREA (sq.m.)
Area(FSI & Non FSI) No.
1 FSI Area 32813.49

2 Non FSI Area 33331.51

3 Total Construction Area 66145.00

Ground Coverage Area Percentage of Ground Coverage: 52%


(percentage of plot not
open to sky)
Estimated Cost of the Rs 180 Cr.
project

Number of Buildings & The above ground structures will comprise of: The proposed construction
configuration(s) comprises 8 building.

Sr no. Building no. Configuration Height in


meter
1 Bldg.no 1&2 G/St + P + 19 63.40
Floors
2 Bldg.no 3&4 St + P + 20 66.30
Floors
3 Bldg.no St + P + 19 63.40
5,6,7&8 Floors

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 78 of 86

4 Club House G + 2 Floors 7.35

Number of tenants and Particulars Total


shops No. of Tenements (in Nos.) 592

No. of Shops (in Nos.) 16

Number of expected Total


No of Users
residents/users
2960 No’s
Residential
48 No’s
Shop
3008 No’s
TOTAL

Tenant density per 318 tenants per hectare


hector
Height of Building(s) Buildings Height in m
Bldg.no 1&2 63.40

Bldg.no 3&4 66.30

Bldg.no 5,6,7&8 63.40

Club House 7.35

Right of way 20m wide road on north & west side of the plot
& 15m wide D.P road on south & east side of the plot
Turning radius 7.00 mt radius
Existing Structure(s) Encroachment of ten slum units

Details of the demolition Encroachment of ten Slum units which has to be demolished.
with disposal
Total Water Dry Season:
Requirement  Fresh water (KLD) & source: 271 KLD
 Recycled water (KLD): 166 KLD
 Total Water Requirement (KLD): 537 KLD
 Swimming pool make up (Cum): 5 KLD
 Fire fighting (Cum): UG Tanks = 600 Cum, OH Tanks = 80 Cum
Wet Season:
 Fresh Water (KLD) & Source: 169 KLD from TMC & 102 KLD
from RWH
 Recycled Water (KLD): 133 KLD
 Total Water Requirement (KLD): 404 KLD ( Including water
from RWH Tank )
 Swimming pool make up (KLD): 5 KLD
 Fire fighting (Cum): UG Tanks =600 Cum, OH Tanks = 80 Cum

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 79 of 86

Rain Water Harvesting  Level of the ground water table – 2.4 to 3.5 m
(RWH)  Size and no of RWH tank(s) and quantity: 2 Nos. tank
of 102 m3 capacity
 Location of the RWH tanks(s): Ground Level
 Size, no. of recharge pits and quantity: No recharge pits
provided since water table is 2.4 to 3.5m
Total rain water harvested: 90 cum

 Budgetary allocation (capital cost and O&M cost)


Capital cost: Rs. 55 lakhs
O & M Cost : Rs. 7.0 lakhs
Strom water drainage  Natural water drainage pattern: South to North & West
to east
 Quantity of storm water: 0.354 m3/sec
 Existing SWD Capacity: 23.76 m3/sec
Thus considering the existing drain carrying capacity it can be
concluded that the project strom water discharge is much less than
that of the existing SWD capacity
Size of SWD: 450 mm wide drain channel slope 1:300
Sewage & Waste Water  Sewage generation: 374 m3/day
 STP Technology: MBBR
 Capacity of STP: 2 Nos. of STP of total Capacity 375 KLD (STP 1 for
Bldg. 1-4 = 190 KLD,STP 2 for Bldg. 5-8 = 185 KLD)
 Location of the STP- Ground Level
DG Sets (during emergency):
DG set will be provided for backup power to emergency facilities.
Budgetary allocation (capacity cost and O&M cost):
Capital cost :105 lakhs
O & M Cost : 15 lakhs
Solid Waste Waste generation in the operation phase:
Management  Bio-degradable (Kg/day)
Total- 892 Kg/Day
 Non Biodegradable (Kg/day): 600
Total Domestic Waste – 1492 Kg/Day
 STP sludge:19 kg/day
 Garden Waste: 24 Kg/Day
Mode of Disposal of Waste:
 Non Biodegradable : Will be handed over to recyclers
 Biodegradable: Composting by OWC. Manure produced will be
used at site as manure for green area and rest will be used in
OWC in place of saw dust.
 STP Sludge (Dry Sludge): Use as a manure
Area Requirement:
 Location(s) and total area provided for the storage and
treatment of the solid waste: OWC and Solid waste
management room: area is 75.00 sq.mt
 Located on ground
 Garbage collection room: 8nos (1for each building)
Budgetary allocation (capital cost and O&M cost)

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 80 of 86

Capital Cost : Rs. 12 lakhs


O & M Cost : Rs. 5 lakhs

Green Belt Development  RG area under green belt:


 RG on the ground (sq.m.): 1,543.92 sq.m.
 RG on the podium (sq.m.): 5,118.17sq.m
Total RG provided: 6,662.09sq.m
 Plantations: 444
Budgetary allocation (Capital cost and O&M cost)
Capital Cost: Rs. 50 lakhs
O & M Cost: Rs.3 lakhs
Energy Power Supply:
Construction Phase: 100KW
Operation Phase:
Sr. Description Source
No.
1 Maximum 3700 KW MSEDCL
demand
2 Connected load 7000KW
2 D.G sets (for 6 Transformers -
essential 990 KVA
services) 2 DG Sets of
380KVA each

SUMMARY

Total Power Saving 65570.4 KWH

Total Power Saving 613.424 KW

Total Demand Load 3700 KW

% Power Saving 16.30%

Budgetary allocation (capital cost and O&M cost) –


For Solar Energy system :
Capital Cost :Rs.110 lakhs
O & M Cost :Rs. 11 lakhs

Environmental
Management plan
Budgetary Allocation

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 81 of 86

Annual Maintenance
Setting-Up
Operational Cost &
Sr.No. Method Adopted Cost
Manpower
( In Lakhs)
( In Lakhs)

Rain Water
1 55.0 7.0
Harvesting

2 MSW 12 5

3 STP 105 15

Solar Energy
4 110 11
System

5 Landscaping 50 3.00

TOTAL 332 41

Quantum and generation of Corpus fund and commitment:

 After occupancy, Co-Op societies will be formed.


 The Operation and Maintenance of Environmental Management
Facilities (EMF) shall be taken care by the developers till the
society is formed.
 Afterwards, EMF shall be handed over to Society.

Traffic Management Nos. of the junction to the main road & design of confluence:
Entries & Exits : 1 Vehicular Entries & Exits
Roads:18.30 m wide D.P. Road, 9 m wide existing road, 6 m wide internal
road

Parking Details:
Number and area of Basement: NA
Number and area of podia:
Lower stilt Parking area = 13909.74 sq.m.
Area per Car: 23.00sq.m.(Stack Parking)
Residential 4-wheelers: 620 Nos.

Public Transport: NA

Width of all Internal roads (m): 7.00 m wide internal roads


CRZ/RRZ Clearance The project has been appraised & cleared in 84th meeting of MCZMA
obtain, if any (Item No. 15)

Distance from Protected Sanjay Gandhi National Park : Around 5.3 Kms aerial distance
Area/Critically Polluted Thane Creek :Around 0.39 km aerial distance
area/Eco-sensitive areas Mangroves: Around 0.35 km aerial distance
/inter-State boundaries

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 82 of 86

PP informed and placed before the orders issued by the Environment department vide
letter dated 17/05/2013, on violation in the instant matter. Since, action on violation as
stipulated in the OM dated 12/12/2012 is completed, committee decided to appraise the
project for Environmental Clearance.

The project proposal was discussed on the basis of presentation made on documents
submitted by the proponent. It was noted that the proposal was earlier discussed in the
7th SEAC II meeting. All issues related to environment, including air, water, land, soil,
ecology and biodiversity and social aspects were discussed.

PP informed that they have received NOC from CRZ point of view to proposal in 84th
MCZMA meeting.

During discussion following points emerged:

1. PP to ensure that 50 m buffer zone from mangroves and no construction should be


undertaken in CRZ area of the plot.
2. PP to provide regenerative lifts, solar water pump etc. and submit revised energy
saving calculations.
3. Possession / occupation should be given only after providing sewer lines connectivity
to the municipal sewer.

After deliberation, Committee decided to recommend the proposal for


Environmental Clearance to SEIAA, subject to compliance of above points.

Item no 33 Residential Cum Commercial Slum Rehabilitation Scheme under 33(14) F on


plot bearing C.T.S. Nos. 39, 40(pt.), 284(pt.) & 285 of Village Bandivali,
Jogeshwari(W), Mumbai by M/s Khan Estates

Name of the Project Chandiwala complex


Name of the Proponent Name: M/s. Malkani Construction Co., Chandiwala Enterprises

Name of the Consultant M/s. S.D.Engineering services pvt.ltd., .


Type of Project SLUM PROJECT/SRA
Location of the project C.T.S. no.39,39/1 to 5, 40(pt.) 40/37, 284 (pt.) 284/16 to 23 ,285 285/1 to 2 of
village Bandivali, Jogeshwari (west) 400102, Mumbai.
Whether in Corporation/ MCGM/SRA
Applicability of the DCR DCR 33(14)

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 83 of 86

Note on the initiated work (if Work has been initiated on site.
applicable)
LOI/NOC from MHADA/ Date and construction area details mentioned in the approved letter:
other approvals (If Applicable) Building 3
Plinth CC -23 april 1997
LOI– 31 march 2006
Building 2
Initial CC 25 november 2010
Building 3
Initial CC 29 november 2012
Total plot area (sq.m.) Total plot area - 15521.67M²
Deductions Deductions a. DP road -4285.80 b. Setback – 324.70
Net Plot Area 5% amenity area – 545.56
10% RG area – 1036.56
Net plot area – 9329.05 sq.m
Permissible FSI (including 2.50
TDR etc.)
Proposed Built Up Area(FSI & FSI area: 34848.87M²
Non FSI)
Non-FSI area :15717.56 Sq.m
Total construction area= 50566.43 M²
Ground Coverage Area 36%
Estimated Cost of the project Rs. 110 Cr.
Number of Buildings & 3 Buildings
configuration(s) Building 1 (Gr+ 1 podium + 23 storeys)
Building 2 (Lower Ground + upper Ground+ Gr+ 10 storeys)
Building 3 ( A wing –Gr+17 , Bwing Gr+17 , Cwing gr+19 +shops (only ground floor)
Number of tenants and shops
REHAB SALE
277 – Residential Tenements 378 – Residential Tenements
3 - Balwadi 12- Sale shops
3 – Welfare Center 4 - Offices
3 – Society office
Number of expected 3398
residents/users
Tenant density per hectare 545

Height of Building(s) Building 1 – 69.75 Mtrs


Building 2- 36.85Mtrs.
Building 3
A wing& B wing 52.95 Mtrs
C wing 58.75Mtrs
Shops – 3.50 Mtrs
Right of way 13.41 m D. P Road to the North&36.6 m wide D.P. Road to the South
Turning radius 6m
Existing Structure(s) NIL
Details of the demolition with Approvals obtained from MCGM.
disposal (If applicable)

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 84 of 86

Total Water Requirement Fresh water & source: Construction Phase: 50 KLD (STP Water)
Operational Phase 308.3 KLD from MCGM (Domestic water)
Recycled water : 174.8 KLD (flushing)
Total Water Requirement : 483.1 KLD
Rain Water Harvesting (RWH) Level of the ground water table – 3.0 m
Tank Capacity required :
Building 1 – 20 cu.m
Building 2 - 24 cu.m
Building 3 - 39 cu.m
Tank dimensions:
Building 1 – 2 M x 4 M x 2.5 M
Building 2 - 2 M x 4.8 M x 2.5 M
Building 3 -3.9M x 4M x 2.5 M
Budgetary allocation (capital cost and O&M cost)
For Rainwater harvesting –
Capital cost: Rs. 16lakhs
O & M Cost: Rs. 2.0lakhs
Sewage & Waste Water Total Sewage generation:366.78 KLD
STP Technology: MBBR Technology with ozonation system
Capacity of STP : 230 x 1 + 160 x 1 KLD
Location of the STP:Ground Floor
Budgetary allocation:
Capital Cost: Rs. 100 lakhs
O&M Cost: Rs. 4.75 lakhs
Solid Waste Management Disposal of the construction way debris: As per DebrisManagement Plan approved
by MCGM.Scrap material sold to authorised vendor
Waste generation in the operation phase:
Dry waste :1310Kg/day
Wet waste:1965 Kg/day
Mode of Disposal of Waste:
Dry waste: segregated/sale/Collection by local authority
Wet Waste: Will be processed converted to manure by processing in Organic
Waste Convertors.
Area Requirement:
Location(s) and total area provided for the storage and treatment of the solid
waste: Ground floor & 50 sq.mx 3
Green Belt Development Total R.G. Area:
RG area under green belt: 829.25sq.m.
Number and list of trees species to be planted in the ground RG: 50Nos.
Tree species Nos.
Neem 20 Nos.
Ashoka 30 Nos.
NOC for the tree cutting/transplantation/ compensatory plantation, if any:NA
Budgetary allocation (Capital cost and O&M cost)
For Landscaping :
Capital Cost: Rs1.5 Lakhs
O & M Cost: Rs. 0.25 lakh

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 85 of 86

Energy Power Supply:


Maximum Demand: 3550 KVA
Connected Load: 7100 KVA
Source: Reliance Energy Ltd.
Budgetary allocation (capital cost and O&M cost) –
For Solar Energy system :
Capital Cost:Rs. 27 lakhs
O & M Cost: Rs. 2lakhs
DG Set:
Number and capacity of the DG sets to be used: Type of fuel used: 3 DG set of 320
KVA.
Environmental Management
N Particulars Capital O&M
plan
o. Cost (in Cost
Budgetary Allocation
Lakhs) (in Lakhs)

1. Sewage Treatment Plant 100 4.75

2. RWH System 18.3 2

3. Solid Waste Management 42 8.2

4. Solar Energy System 27 2

5. Landscaping 1.5 0.25

Total Cost 188.8 17.2

Traffic Management Nos. of the junction to the main road & design of confluence:
Parking Details:
Parking required as per rule for proposed building : 174
Total parking provided for proposed building : 259
Area available per Car: 2.5 m x 5.5 m

PP informed that they have already constructed about 12,600 m2 without prior EC.

Considering the orders of the Hon’ble High Court having Court order regarding
construction to be undertaken up to 20,000 m2 and the letter dated 29th June 2013 from
Environment department, Committee decided to appraise the project though there is
violation subject to the final decision on the same by SEIAA on the same.

The proposal was discussed on the basis of the presentation made and documents
submitted by the PP. All issues related to environment, including air, water, land, soil,
ecology and biodiversity and social aspects were discussed.

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.
Page 86 of 86

During discussion following points emerged:

1. PP to construct STP first for the buildings occupied (building no 3 and 1) and use
the treated water for the proposed construction activities.
2. PP to provide adequate RG for sale as well as PTC components and submit the plan
for the same.
3. PP to provide solar PV panels for common area lighting and accordingly submit
revised energy saving calculations as well as EMP budget.
4. PP to explore the possibility of installing regenerative lifts.

After deliberation, Committee decided to recommend the proposal for Environmental


Clearance to SEIAA, in view of the Court orders allowing construction up to 20,000
m2 and the letter dated 29th June 2013 from Environment department subject to
compliance of above points.

Signed by:

(Dr. B. N. Patil) (Ravi B. Budhiraja)


Member Secretary Chairman
SEAC (MMR) SEAC (MMR)

Minutes of the 19th meeting of the SEAC - 2 (MMR) held on 30th September and 1st October 2013.