You are on page 1of 2

M&E-CL1

Checklist For Samples to be submitted


(Electrical Services)
Project :

No. Description Brand /Spec. *Sample sub. *Catalog sub. Status Remark
Electrical Services
1 Switched Socket Outlet HAGER 10088 YES YES APPROVED
2 Switches HAGER 10088 YES YES APPROVED
3 UPVC Conduit
4 UPVC Junction Box
5 HDPE Corrugated Double Wall for U/G
Cables
6 Cables MEGA KABEL YES YES APPROVED To Submit latest SIRIM Cert
7 Metering Panel
9 ELCB/MCB SCHRACK YES YES APPROVED
10 Consumer DB Box SCHRACK YES YES APPROVED
11 Surge Protection Device (SPD) SCHRACK YES YES APPROVED
12 RCD SCHRACK YES YES APPROVED
13 Inspection Chamber For Earth Electrode
System
14 Copper Rod
Others (Pls Specify)

*
1. Please highlight in the box if the sample/catalog has been submitted, if not applicable, pls state.
2. Contractor is to indicate on the checklist if the sample submitted is different from the contract offer.

Submitted by : 1. Contractor's rep. Name: Ms Soo Hoo Submission No: 1


Date: 19-Dec-2017

Submitted by : 2. Consultant's rep. Name: SYAFIQ Remark :


Date: 22-Dec-2017
M&E-CL2
Checklist For Samples To Be Submitted
(Telephone & MATV Services)
Project :

No. Description Brand /Spec. *Sample sub. *Catalog sub. Status Remark
Telephone AND MATV Services
1 Telephone Socket Outlet
2 HDPE Ducts For U/G Cables
3 Underfloor Telephone Pit

4 UPVC Conduit

5 Telephone Grey Cable


6 Fibre Termination Box (FTB)
7 Fibre Wall Socket (FWS)
8 RG6 Coaxial Cable (SAT)
9 Fiber Cable
10 SMATV Socket Outlet
11 CAT5e UTP Cable
12 Alarm System Cable
13 Alarm Keypad IDX X - SERIES CURVE Yes Yes Approved
14 Alarm Control Panel IDS X64 Yes Yes Approved
15 Conceal Magnetic Sensor CCM-2 Yes Yes Approved
16 Surface Magnetic Sensor MC-1008 Yes Yes Approved
17 Vibration Sensor M5 Adj Yes Yes Approved
18 External Siren Box AZ-28 Yes Yes Approved
19 Others (Pls specify)

*
1. Please highlight in the box if the sample/catalog has been submitted, if not applicable, pls state.
2. Contractor is to indicate on the checklist if the sample submitted is different from the contract offer.

Submitted by : 1. Contractor's rep. Name: Ms. Soo Hoo Submission No: 1


Date: 19-Dec-2017

Submitted by : 2. Consultant's rep. Name: Syafiq Remark :


Date: 22-Dec-2017

You might also like