Project :
PARTIES ACCEPTANCE VERIFYING RECORDING INSP. & ACCEP.
S. No. ACTIVITY REMARKS
INVOLVED CRITERIA DOCUMENT DOCUMENT SUB MC CN
1.2
Inspection of Condensate pipe & fittings Technical Related Material Material Approval
2.1
as per material submittal
SK/QC Specification Submittal Request (MAR)
H S W
2.2
3.0 INSTALLATION
3.6
4.0 COMMISSIONING
Consultant's
4.1 Flow test CN / QC Approval
Related Drawing W S H