STAGE 3

Manhole Rainwater Harvesting Pits RCC Dry Pits (450 x 4


Sl.No Station
Scope Ach Bal Scope Ach Bal Scope
1 SEC-E 5 2 3 2 2 2
2 PRG 13 6 7 4 3 1 5
3 PAR 5 5 0 2 2 0 4
4 RAS 6 6 2 1 1 4
5 PRN 6 6 2 2 5
6 BEG 6 6 2 2 3
Total 41 13 28 14 6 8 23

Secunderabad East
Manholes : 2 completed & covers placed, 1 Excavation done and 2 are balance to sta
RWH Chambers : 1 Reinforcement done, another Excavation done
Escalator Pit : Excavation Done

Parade Ground
Manholes : 6 completed & covers placed, balance 7 are coming in Road towards PRG
RWH Chambers : 3 Pits construction completed, 1 trail pit completed near by Arm 5
Escalator Pit : Pits coming in Arm 5. 1 completed & 1 in progress

Paradise
Manholes : Completed
RWH Chambers : Completed
Escalator Pit : 1 done another to be check

Rasoolpuara
Manholes : 1 excavation done
RWH Chambers : 1 completed & another one reinforcement done
Escalator Pit : Not started

Prakash nagar
Manholes : Not Started
RWH Chambers : 1 boring done, anothe trail pit done 3 times but cables are lying
Escalator Pit : Not started
Begumpet
Manholes : Not Started
RWH Chambers : No front
Escalator Pit : Not started
TAGE 3
RCC Dry Pits (450 x 450) Escalator Drain Pits Bore Wells
Ach Bal Scope Ach Bal Scope Ach Bal
2 1 1 2 2 0
5 2 1 1 4 3 1
4 2 1 1 2 2 0
4 2 2 2 2 0
5 2 2 2 1 1
3 2 2 2 2
0 23 11 2 9 14 10 4

nd 2 are balance to start

g in Road towards PRG interchange station


d near by Arm 5

ables are lying


STAGE 3
3 LPE Median - FPS 3 LPE - Median - PHE
Sl.No Station
Scope Ach Bal Scope Ach Bal
1 SEC-E 126 126 0 136 118 18
2 PRG 49 49 0 18 18 0
3 PAR 116 116 0 6 6
4 RAS 12 12 0 6 6
5 PRN 0 11 11
6 BEG 0 0
Total 303 303 0 177 136 41

Note:
1 Sec East : No front for Yard Hydrant Piping. (Arm 4 - Rain water Harvesting pit open, Arm 2 -
2 30 Mtr RCC Hume Pipe Damaged by Transco in Paradise station, Re-work to be done
3 RAS: Balance Yard hydrant piping pending in Arm 4
STAGE 3
3 LPE - YH RCC Piping Road Crossing
Scope Ach Bal Scope Ach Bal Scope Ach Bal
129 129 65 10 55 1 1 0
24 24 0 315 150 165 0 0 0
36 36 0 150 120 30 1 1 0
120 72 48 30 30 0 2 2 0
151.3 151.3 56 56 0 0 0
0 137 137 0 0 0
460.3 132 328.3 753 310 443 4 4 0

Harvesting pit open, Arm 2 - Materials are lying)


Re-work to be done
Sec East
Median FPS
Dia
FPS PHE Arm1 Arm2 Arm3 Arm4
200 46
150 40 60
100 40 6
80 58 40 55 28
Total 126 118 40 61 0 28

PRG
Median FPS
Dia
FPS PHE Arm5 Arm6 Arm7 Arm4
200
150 49
100
80 18 24
Total 49 18 0 24 0 0

PARADISE
Median FPS
Dia
FPS PHE a&k
200
150 116
100
80 6 36
Total 116 6 0 36 0 0

RASOOLPURA
Median FPS
Dia
FPS PHE Arm 1 Arm2 Arm 3 Arm 4
200
150 12
100
80 6 60 60
Total 12 6 0 60 0 60

PRAKASH NAGAR
Median FPS
Dia
FPS PHE Arm 1 Arm2 Arm 3 Arm 4
200
150
100
80 11 47.4 25.7 38.65 39.55
Total 0 11 47.4 25.7 38.65 39.55