Professional Documents
Culture Documents
Approved By :
(PM/Delegated)
Note: Attach meeting attandance if more.
Hirarchy Control
Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Requ
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact
Changing hydroulic pump Mechanic, Equipment in motion Fatality, Permanent 4 4 16 ADM 1. Lock out & tag / stop block 1 4 4
Supervisor disability, Long term
absence due to treatment
EL/SUB 2. Stop at level & safe area
Presure in hyd system Permanent disability, Long 4 3 12 EL/SUB 1. Release pressure in hyd system 1 3 3
term absence due to
treatment
EL/SUB 2. Three contact point while embark
& disembark equipment
Hot oil & components Permanent disability, Long 2 3 6 EL/SUB 1. Allowed equipment to cool off 1 3 3 Check temperatur
term absence due to ADM
treatment
PPE 2. Wear PPE
Removing hyd hoses Mechanic, Oil spill Permanent disability, Long 2 3 6 EL/SUB 1. use drip tray to each any oil spill / 1 3 3
Supervisor term absence due to working area not slippery
treatment
EL/SUB 2. Plug all hyd hoses with pump
Feb 2010
PT. Leighton Contractors Indonesia
Approved By :
6 3
(PM/Delegated)
Note: Attach meeting attandance if more.
Hirarchy Control
Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Requ
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact
Fitting hyd pump Mechanic, Heavy Permanent disability, Long 2 3 6 EL/SUB 1. Lift hyd pump with nylon sling / lift 1 3 3
Supervisor term absence due to as a team
treatment
EL/SUB 2. Insert coupling correctly and all
bolts (tigher)
Fit hyd hoses Mechanic, Oil spill, slip point Fatality, Permanent 4 5 20 ENG/SEG 1. Remove cops from hyd loses 2 2 4
Supervisor disability, Long term lifting
absence due to treatment
EL/SUB 2. Secure hyd pipes firmly
Feb 2010
PT. Leighton Contractors Indonesia
Approved By :
20 4
(PM/Delegated)
Note: Attach meeting attandance if more.
Hirarchy Control
Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Requ
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact
Remove lock & tag Mechanic, Unauthorized start Fatality, Permanent 3 4 12 EL/SUB 1. Ensure all worker are in safe 1 4 4
Supervisor disability, Long term position away from equipment
absence due to treatment
EL/SUB 2. All controls in truck
Start of equipment Mechanic, Unauthorized start Fatality, Permanent 3 4 12 ENG/SEG 1. Use hooter to warn all workers 1 4 4
Supervisor disability, Long term close to equipment
absence due to treatment
BHV 2. Good communication between
workers
Inspect hyd pump while engine running Mechanic, Sadden movement Permanent disability, Long 1 3 3 EL/SUB 1. Allow hyd pump to worn up 1 3 3
Supervisor term absence due to
treatment
EL/SUB 2. Do not more equipment while
person is inspecting hyd pump
Feb 2010
am
ols Required By whom By When Status Legal and Other Requirements Reference
Feb 2010
am
ols Required By whom By When Status Legal and Other Requirements Reference
Feb 2010
am
ols Required By whom By When Status Legal and Other Requirements Reference
Feb 2010