GRIHA ASSESSMENT

S.NO CRITERIA NAME MAXIMUM POINTS S.NO CRITERIA NAME MAXIMUM POINTS
AWARDED ACHIEVED AWARDED ACHIEVED
POINTS POINTS
SITE SELECTION AND SITE PLANNING 18 REDUCE VOLUME, WEIGHT AND TIME OF CONSTRUCTION BY ADOPTING 4 2
EFFICIENT TECHNOLOGY (SUCH AS PRECASTE SYSTEMS, READY MIX
1. SITE SELECTION CONCRETE
• Site selected in Dwaraka sector 19, New Delhi ; in a residential zone with all • Pre cast construction
amenities in a proximity of 2 km radius. 1 1 • Rat – trap bond
2. PRESERVE AND PROTECT LANDSCAPE DURING CONSTRUCTION 19 USE LOW ENERGY MATERIALS IN INTERIORS 4 3
• Very sparse vegetation prevailed on site ; top soil was covered with debris, • Low VOC paints and adhesives in the interiors
reclamation of top soil ; incorporating new landscape element studying the native 5 4
vegetation pattern of Delhi. WASTE MANAGEMENT
3. SOIL CONSERVATION ( POST – CONSTRUCTION) 20 REDUCTION IN WASTE DURING CONSTRUCTION 1 1
• Top soil preservation and reclamation 2 1
21 EFFICIENT WASTE SEGREGATION 1 1
4. DESIGN TO INCLUDE EXISTING SITE FEATURES
• On site collection, segregation and storage of waste in different coloured
• Existing water supply. Gas , electricity , and drainage is used. 4 2
bins
5. REDUCE HARD PAVING ON SITE
22 STORAGE AND DISPOSAL OF WASTE 1 1
• Vehicular access restricted to a particular part of the site ; the rest pedestrian 2 2
being pervious pavers.
23 RESOURCE RECOVERY FROM WASTE 2 1
6. PLAN UTILITIES EFFICIENTLY AND OPTIMIZE ON SITE CIRCULATION EFFICIENCY • Kitchen waste can be used as manure for plants .
• The parking is accommodated by a MLCP and thus the on - site vehicular 3 2
movement is restricted thus achieving an efficient site circulation pattern HEALTH AND WELLBEING
WATER MANAGEMENT 24 PROVIDE ATLEAST MIN LEVEL OF SAFETY FACILITES FOR CONSTRUCTION 2 2
WORIERS
7. REDUCE LANDSCAPE WATER REQUIREMENT
• Use of native vegetation and tree types ; xeriscaping techniques adapted in 3 2 25 REDUCE AIR POLLUTION DURIN CONSTRUCTION 2 1
terrace gardens.
26 USE OF LOW VOC PARTS / ADHESIVE / SEALANT 3 2
8. REDUCE BUILDING WATER USE 2 1
• low water fixtures 27 MINIMIZE OZONE DEPLETING SUBSTANCES 1 1
• Water meters installed
28 ENSURE WATER QUALITY 2 2
9. EFFICIENT WATER USING DURING CONSTRUCTION 1 1
29 ACCEPTABLE NOICE LEVELS 2 1
10. WASTE WATER TREATMENT 2 2
• Site level installed STP ; recycled water used for landscape purpose . 30 TOBACCO AND SMOKE CONTROL 1 1

11. WATER RECYCLE AND REUSE 5 3 31 UNIVERSAL ACCESSIBILITY 1 1


• Optimization of usage ; installation of STP ( Sewage Treatment Plant)
BUILDING OPERATION AND MAINTENANCE
ENERGY OPTIMIZATION 32 ENERGY AUDIT AND VALIDATION
12 ENHANCE OUTDOOR LIGHTING SYSYEM EFFICIENCY AND USE RENEWABLE ENERGY 3 2 33 OPERATION AND MAINTENANCE PROTOCOL FOR ELECTRICAL AND 2 1
• Reduce night sky pollution ; downward acing lights MECHANICAL EQUIPMENT
• Street lights powered by the energy acquired from the solar panels installed on
site ; roof of surface parking . INNOVATION
13 OPTIMIZE BUILDING DESIGN TO REDUCE CONVENTIONAL ENERGY DEMAND 8 6 34 INNOVATION (BEYOND 100) 4 1
• Optimum orientation • Earth air tunnel
• Self shading ; shading devices alternatives
• Optimum orientation, position and size of fenestrations
14 OPTIMIZE ENERGY PERFORMANCE OF BUILDING WITHIN SPECIFIED COMFORT 16 13
• Building made cooler in summer ; de humidification in monsoons ; warmer in
winters

15 RENEWABLE ENERGY UTILIZATION 5 3


• solar power
• Building integrated photo voltaic cells
16 RENEWABLE ENERGY BASED HOT WATER SYSTEM 3 2
• Solar water heaters
Total awarded point – 71

SUSTAINABLE BUILDING MATERIALS Maximum points – 100


17 UTILIZATION OF FLYASH IN BUILDING STRUCTURE 6 2
Thus the project achieves a 3 star rating