Surplus generation, Around transmission, Reliable distribution
TSPEA
YADADRI
Hyderabad
K. CHANDRASHEKAR RAO
TELANGANA POWER TRENDS
Message
2
TSPEA
Room No. 237, 1st Floor,
D-Block, Telangana Secretariat.
Phones: 040-23450520(O), 040-23453212
Date: 30-12-2015
You all know coming new year for the Telangana Power Sector is a challenging as
announced by our Hon'ble Chief Minister 9 hours continuous power has to be given to the
farming sector during daytime.
The power sector has now become the flag-bearer of development of economy in our
state. I am hopeful that the utilities will rise to the challenge and efficiency in making
Telangana state an effective state in power sector..
I hope all the Electricity Employees of Telangana State will put their best efforts to
improve efficiency of power utilities and in providing reliable power supply to our Telangana
people and make our State as best in India.
I wish all the office bearers, members of credible & responsible Telangana State Power
Engineers' Association (TSPEA) and their families a Very Happy and prosperous New Year
2016.
3
Telangana State Electricity
TSPEA
Regulatory Commission
11-4-660, 5th Floor, Singareni Bhawan,
Red Hills, Hyderabad - 500 004.
Ph: 040-23397393
Email: iakhan78692@gmail.com
Message
At the outset, I wish everyone a Happy, Healthy and Prosperous New Year.
The State Government has introduced novel initiatives to meet the
electricity requirements of Telangana. Employees of all the electricity utilities of the
State have played an important role in providing electricity supply to the
consumers with minimum interruptions. The tariff is also affordable when
compared to other States.
As electricity is essential for the economic growth and development of the
State, the people of Telangana have high expectations from the electricity
employees to meet the objective of providing quality power supply to every
consumer in the State.
I am sure the Newsletter “Telangana Power Trends” will bring information
symmetry to everyone through this common knowledge dissemination.
Wishing you all the best.
4
TSPEA
TELANGANA STATE
POWER GENERATION CORPORATION LTD.
(Govt. of Telangana Undertaking)
TRANMISSION CORPORATION OF
TELANGANA LTD.
(Govt. of Telangana Undertaking)
D. Prabhakar Rao
Chairman & Managing Director Message
TSGENCO, TSTRANSCO
Wish you and your family A Very Happy and Prosperous New Year, 2016.
Date: 22-12-2015
Dear Colleagues,
At the outset, I wish each one of you and your families a very happy and prosperous
New Year 2016.
As we take stock of our performance in 2015, it is indeed heartening to note that as an
organization our performance is outstanding. In line with the objective of the GoTS, we have
been successful in providing power to all consumers without any load shedding. Metering,
Billing and Collections forms the core of our activities. Energy sales have increased by 2,763
MU corresponding to an increase in input by 2,601 MU. Revenue Collections have improved
and stands at 99.58%, in absolute terms revenue collections have increased by Rs 1,431Cr.
On the operational front, distribution losses has reduced by 0.73% and DTR failure rate has
reduced by 2.82% and 'Power for All' initiative has been signed with GoI.
As we step into the New Year, we should gear up to meet new challenges which would
come our way with renewed vigor and strength. New initiatives such as supply of day-time
9 hrs power to agricultural consumers, network planning and additions for water grid project,
increasing the penetration of solar roof-tops are being planned. TSSPDCL has successfully
run the largest grid connected solar tender across India, for 2,000 MW and 515 MW of solar
addition is already in progress. It is expected that the state would have about 3,079 MW of
solar by FY 2016-17 and TSSPDCL would be playing a lead role in promoting solar capacity
additions under distributed generation mode. On the solar roof-top front, TSSPDCL has
given technical feasibility for 18 MW and 6.5 MW of solar roof-top capacity is already
installed.
I take this as an opportunity to appreciate sincerity, hard work and commitment shown
by all my colleagues and hope the renewed efforts from each one of you will enable
TSSPDCL to achieve greater laurels and would enable it to be placed among the best
performing discoms in the country.
6
(G. RAGHUMA REDDY)
TSPEA
Northern Power Distribution
Company of Telangana Limited
Date: 2-12-2015
Thanking You.
9
Editorial
Respected Senior Engineers, Dear Brother & Sister Engineers,
It gives us immense Pleasure to wish everyone a Very Happy Peaceful and Prosperous New Year 2016
After our dream state formation we completed one memorable year with fruitful results. Like PRC-
2014, Promotions in all cadres and successful synchronization of 600MW unit at KTPP Stage-II with great
leadership of visionary, Engineer Mithra Prabhakar Rao garu, with well support of our KTPP Engineers
along with Director Projects Er. C. Radha Krishna garu and President A. Sudhakar Rao sir too.
Now the people of Telangana State and all industrial sector are enjoying the quality and uninterupted
power throughout day, with the vision and well planning of our management in coordination by govt. of TS
with the same installed capacity in Telangana Power Sector.
First one of the greatest years after our state formation in TSGENCO, TS TRANSCO, TSSPDCL &
TS NPDCL had been successful. It was the greatest because we took a big step in the way to make Bangaru
Telangana imparted by Initiating major projects like Kothagudem Thermal Power Station (1x800 MW),
Bhadradri Thermal Power Station (BTPS 4 x 270MW) ,Yadadri Thermal Power Station (YTPS 5 x 800 MW)
and New 400 kv evacuation lines.
It was the greatest movement for Telangana Engineers as our association TSPEA took another big
step by laying of Foundation stone for our Association Guest House “SHAKTHI BHAVAN” at YADADRI
on Dec 5th 2015 Construction of guest house. In this time, it was quite a great challenge from financial and
Association point of view. Our beloved Dynamic, Dedicated & Determined Engineer Sudhakar garu & team
Centricity, Pivotal and passion to give the best facilities to the members to deliver better hospitality &
accommodation where ever we all.
Change is the only process that never ends. Yes, by virtue of Telangana formation we are all tasting
new positions by getting promotions. This is the other opportunity to prove that we can sustain the smooth
running of our Power sector by innovative thoughts & turned actions.
In the history of Association, since inception, on 27.01.15 TSPEA made prominent job, as being a
responsible Association and team of office bearers has visted KTPP-Stage 2, at Chelpur and observed the
construction activities of the plant. The Office bearers have also interacted with the site Engineers, Staff &
Contractors regarding various concerns the progress of works and the porblems and also submitted the ground
realities to the management.
We thank all the affiliates for believing that Telangana State Power Engineers Association always
strive not just for benefits for today, but also to impart quality power for tomorrow
Lets continue to share our Achievements, experiences, inputs, Technical ideas, through this Telangana
Power trends magazines to help our members to get comfortable exuberance in their daily official works.
We request all the member to contribute this magazine in the form of articles and valued experiences
in endemic field. The information may be sent to email address: tspea2014@gmail.com, ontipuli@yahoo.co.in
Editorial team thanking you all the members for your wonderful understanding and support towards
Association.
Chief Editor
Er. V. SANJEEVA RAO
Mobile: 7382 554 555
Glimpses of Diary 2015 Inauguration at the Institute of Engineers, Hyderabad by
Sri C. Laxma Reddy, Hon’ble Minister for Energy, Govt. of Telangana
DGA or Dissolved Gas it is predicted that there is decomposition of paper
Analysis of Transformer Oil insulation.
Furfural Test or Furfuraldehyde Analysis of
Er. B. Ravindra Transformer Oil
DE/MRT/400kV/Rural/Erragadda/Hyd.
TSTRANSCO Transformer core and winding have mainly paper
insulation. Base of paper is cellulose. The Cellulose
Whenever electrical power transformer goes under has a structure of long chain of molecules. As the paper
abnormal thermal and electrical stresses, certain gases becomes aged, these long chains are broken into
are produced due to decomposition of transformer number of shorter parts. This phenomenon we often
insulating oil, when the fault is major, the production of observe in our home. The pages of very old books
decomposed gases are more and they get collected in become very much brittle. In transformer, the aging
Buchholz relay. But when abnormal thermal and electrical affect of paper insulation is accelerated due to oxidation
stresses are not significantly high the gasses due to occurs in oil. When insulating paper becomes
decomposition of transformer insulating oil will get enough mechanically weak, it can not withstand the mechanical
time to dissolve in the oil. Hence by only monitoring the stresses applied during electrical short circuit and leads
Buchholz relay it is not possible to predict the condition to electrical breakdown.
of the total internal healthiness of electrical power It is therefore necessary to monitor the condition
transformer. That is why it becomes necessary to analyse of paper insulation inside a power transformer.
the quantity of different gasses dissolved in transformer
oil in service. From dissolved gas analysis of transformer It is not possible to bring out a piece of paper
Oil or DGA of transformer oil, one can predict the actual insulation from a transformer in service for testing
condition of internal health of a transformer. It is preferable purpose. But we are lucky enough, that there is a
to conduct the DGA test of transformer oil in routine manner testing technique developed, where we can examine
the condition of paper insulation without touching it.
to get prior information about the trend of deterioration of
The method is called Furfuradehyde analysis of in
transformer health and life.
short Furfural test.
Actually in dissolved gas analysis of transformer
Although by dissolved gas analysis one can predict
oil or DGA of transformer oil test, the gases in oil are
the condition of the paper insulation primarily, but it is
extracted from oil and analyze the quantity of gasses in
not very sensitive method. There is a guide line in IEC-
a specific amount of oil. By observing percentages of
599, where it is told that if the ratio of CO2 and CO in
different gasses present in the oil, one can predict the
DGA results is more than 11, it is predicted that the
internal condition of transformer. condition of paper insulation inside the transformer is
Generally the gasses found in the oil in service are not good. A healthy cellulose insulation gives that ratio
hydrogen (H 2 ), methane(CH 4 ), Ethane (C 2 H 6 ), in a range of 4 to 11. But still it is not a very sensitive
ethylene(C2H4), acetylene (C2H3), carbon monoxide (CO), way of monitoring the condition of paper insulation.
carbon dioxide (CO2), nitrogen(N2) and oxygen(O2). Because CO2 and CO gases also produced during oil
breakdown and sometimes the ratio may misleads the
Most commonly used method of determining the prediction.
content of these gases in oil, is using a Vacuum Gas
Extraction Apparatus and Gas Chronographs. By this When paper is soaked into oil, it is damaged by
apparatus first gasses are extracted from oil by stirring it heat and some unique oil soluble compounds are
under vacuum. These extracted gasses are then realized and dissolved in the oil along with CO2 and
introduced in gas Chronographs for measurement of each CO. These compounds belong to the Furfuraldehyde
group. These are some times called Furfural in short.
component.
Among all Furfurals compounds 2- Furfural is the most
Generally it is found that hydrogen and methane are predominant. These Furfural family compound can only
produced in large quantity if internal temperature of power be released from destructive heating of cellulose or
transformer rises up to 150°C to 300°C due to abnormal paper. Furfuraldehyde analysis is very sensitive as
thermal stresses. If temperature goes above 300°C, because damage of few grams of paper is noticeable
ethylene(C2H4) are produced in large quantity. At the in the oil even of a very large size transformer. It is a
temperature is higher than 700°C large amount of very significant diagnostic test. It is best test for
hydrogen(H2) and ethylene(C2H4) are produced. assessing life of transformer. The rate of rise of
percentage of Furfurals products in oil, with respect to
Ethylene(C2H4) is indication of very high temperature time, is used for assessing the condition and remaining
hot spot inside electrical transformer.If during DGA test life of paper insulation in power transformer.
of transformer oil, CO and CO2 are found in large quantity
ªÇ+»˙sY $TÁ‘·μ
‘Ó\+>±D sêh kÕ<Ûä≈£î&ÉT, ã+>±s¡T ‘Ó\+>±D kÕ«|æï≈£î&ÉT, Á|æj·T‘·eT eTTK´eT+Á‹ l ø£\«≈£î+≥¢
#·+Á<äX‚KsYsêe⁄ >±] ÄX¯j·T kÕ<Ûäq˝À eTT+<äT¬øfi¯óÔqï Ç+»˙sY $TÁ‘· l &ç. Á|üuÛ≤ø£sYsêe⁄ >±s¡T, dæj·T+&ç, C…Héø√
eT]j·TT Á{≤Hé‡ø√ >±]øÏ e÷ Vü≤è<äj·T|üPs¡«ø£ q÷‘·q dü+e‘·‡s¡ X¯óuÛ≤ø±+ø£å\T.
eTq eTTK´eT+Á‹ ø£\«≈£î+≥¢ #·+Á<äX‚KsYsêe⁄ >±s¡T ‘·q $T>∑T\T $<äT´‘·TÔ dü«bÕïìï l Á|üuÛ≤ø£sYsêe⁄
>±] <ë«sê »s¡>±\H˚~ yê] dü+ø£\Œ+. n+#Ó\+#Ó\T>± m~– #Ó’s¡àHé n+&é e÷H˚õ+>¥ &Ó’¬sø£ºsY kÕúsTTì
#˚s¡T≈£îqï ì‘·´ø£èw”e\T&ÉT l ñ‘·ÔeT Á|üuÛ≤ø£s¡T&ÉT, ‘·q qeTàø£yÓTÆq |üì‘·q+˝À Á|æì‡|ü˝Ÿ ôdÁø£≥Ø kÕúsTT n~Ûø±]>±
Á|æj·T‘·eT eTTK´eT+Á‹ >±]#˚ >∑T]Ô+#·ã&çq, $<äT´‘·TÔs¡+>∑ dü«j·T+ Á|üø±•‘·T&ÉT, eTq $<äT´‘·TÔ dü+düú eT]j·TT dü+düú ñ<√´>∑T\ ñqï‹
ø√s¡T≈£îH˚ ñ‘·ÔeTT&ÉT l $<äT´‘·TÔ Á|üuÛ≤ø£s¡T&ÉT, dü«sêh+˝À yÓTT<ä≥>± kÕ~Û+∫q πø{Ï|æ|æ 600MW $<äT´‘·TÔ ñ‘·Œ‹Ô, e#˚à ¬s+&˚fi¯fl˝À¢
6000MW>± eè~∆ #Ó+~+#·T≥¬ø’ nVü≤]ïX¯\T bÕ≥T|ü&˚ l dæ]yÓ\T>∑T\ Á|üuÛ≤ø£s¡T&ÉT, ‘Ó\+>±D $<äT´‘·TÔ ñ<√´>∑\ ñqï‹ø√] Ä]úø£uÛ≤s¡yÓTÆq,
eTTqTô|qï&ÉT »s¡>∑ì |ü<√qï‘·T\ yÓ\T>∑T\ yÓ\T¢e l BÛs¡ Á|üuÛ≤ø£s¡T&ÉT, nqï<ë‘·\ Áã‘·T≈£î˝À¢ yÓT‘·T≈£î|üP\T |üPsTT+#· ø£~*q l ¬s’‘·T
Á|üuÛ≤ø£s¡T&ÉT, |ü]ÁX¯eT\ |üesY Vü‰©&˚dtqT bÕs¡Á<√*q |òüesY|òü⁄˝Ÿ l |üesY Á|üuÛ≤ø£s¡T&ÉT, ø£$T{ŸyÓT+{Ÿ πø πøsê|òt nÁ&Édt‡ e÷ dæ.j·T+&ç l |üdæ&ç
Á|üuÛ≤ø£s¡T&ÉT. `‘Ó\+>±D |üesY Áf…+&é‡
PERFORMANCE OF EXCELLENCE - TS GENCO
TS Genco stood Second among all State Sector Power Utilities with 80.31% PLF for the year 2014-15 against All India
Average PLF of 60.85%.
Kakatiya TPP stood First with 93.75% PLF among all State Sector Thermal Powr Stations in the country for the year
2014-15
EXCELLENCE OF AWARDS - TS DISCOMs
TSSPDCL bagged the prestigious “SKOCH – Smart TSNPDCL bagged the prestigious “SKOCH – Smart
Technology Award 2015” at National Level Skoch Technology Award 2015” at National Level Skoch Summit on
Summit on “Technologies for Growth” held at New Delhi “Technologies for Growth” held at New Delhi during 10-11th
during 10-11th December, 2015. This was awarded for December, 2015. This was awarded for “GPRS Enabled
“Smart Metering infrastructure for Electricity Integrated Spot Billing”, a standalone Smart Metering project
Consumers”, a standalone Smart Metering project implemented at Prakash Nagar, Hyderabad.
implemented at Prakash Nagar, Hyderabad. GPRS Enabled Integrated Sport Billing is an e-governance
The two entries sent by TSSPDCL on “Smart initiative of Northern Powr Distribution Company of Telangana
Metering infrastructure for Electricity Consumers” (TSNPDCL). TSNPDCL reaches out to a population of nearly
and”Automatic Spot Billing through IR/IRDA Meters” were 155.22 lakhs (as per provisional 2011 census) spread across
hamlets, villages and towns spanning an area of 66,860 Square
shortlisted under Skoch Order-of-Merit from numerous
Kilometers.
entries received throughout India in different spheres
8.95 lakh consumers are provided monthly bills under
of business. GPRS Enabled Integrated Spot Billing.
TSNPDCL was the first Discom to introduce the GPRS
Enabled integrated Spot Billing System in March last year in
the erstwhile combined state of Andhra Pradesh. It will soon
rollout more GPRS Enabled integrated Sport Billing infrastrucutre
to cover 25 lakh consumers in domestic and commercial
category.
It has helped in raising revenue and improving overall
efficiency with drastic reduction in bill related desputes.
Er. G. Raghuma Reddy, CMD receiving Award from SKOCH Er. K. Venkata Narayana, CMD receiving Award from SKOCH
drawn from the same system.
Reactive Power - Reactive Ideal way of reactive power compensation is at load
Power Compensation terminals. In Case of agriculture loads, which are highly
inductive, providing compensation at the load terminals
Er. M. Narender is a difficult task. The next best thing that can be done
ADE/ Stores /Mahabubnagar to improve voltage in these areas and reduce losses is
to adopt high voltage distribution system and provide
What is Reactive Power ? shunt capacitors on the low voltage side of the
Almost all bulk electric power is generated, distribution transformers.
transported and consumed in alternating current (AC) The more the reactive power generator supplies the
networks, elements of AC system supply and consume less is its capability to deliver active power.
two kinds of power : Real power and Reactive . Real The ill effects of uncompensated system feeding
power accomplishes useful work (e.g. Runs motors and inductive loads are:
lights lamps) . Reactive power supports the voltage that (1) Poor voltage regulation due to low power factor.
must be controlled for system reliability. (2) Increased losses and reduction in efficiency.
Reactive power is an inherent part of the generation, (3) Burdening of lines, cables, transformers due to
transmission and distribution of electricity. Inductance higher currents.
and capacitance are inherent properties of the electric In order to increase the active power supplied by
power system elements such as transmission lines, the generator the reactive power the generated has to
transformers and capacitors. Inductance consumes be kept at minimum. .
reactive power and capacitance supplies Reactive Further to improve efficiency, voltage regulation and
power. reduce burden on lines and transformers, it is necessary
Most of the electric power loads are inductive in that reactive power compensation is provided by
nature. Induction Motors and transformer consumes connecting capacitors in the system. These capacitors
reactive power.Common Examples of application of supply reactive power requirement of loads.
induction motors include air conditioners, house hold Voltage level at the load end is increased.
applicances mining industrial equipment and
manufacturing processes. Underground and Overhead % voltage rise =KVAR of capacitor x % Impedance(Z)
transimission lines have inductance and capacitance and KVA of transformer
can either supply reactive power or consumes reactive
power depending on the line loading. Generators can 2000 x 11
= = 4.4%
supply or consumes reactive power within limits. 5000
Why we need Reactive power compensation?
i.e., the rise in voltage at the load end is from 10.5KV to
Maintaining frequency and the voltage with in the
10.96KV.
prescribed limits is the statutory obligations of the power
Calculation of MVAR required
utilities. For voltage control, reactive power management
Where MVAR rating of size of the capacitor bank
(VAR control) plays very important role.
Voltage control (keeping voltage within defined limits) needed, Average power drawn ( MW )= 3 MW
in an electric power system is important for proper cos ∅ old = 0.72 tan δ old = 0.96
operation of electric power equipment to prevent damage cos ∅ new = 0.96 tan δ new=0.29
such as over heating of generators and motors, to reduce
transmission losess and to maintain the ability of the MVAR = MW (tan δ old – tan δ new)
system to withstand disturbances and prevent voltage = 3 (0.96 – 0.29)
collapse. = 2 MVAR
Inadequate reactive power supply lowers voltage; Benefits of Power Factor Improvement
as voltage drops, Current must increase to maintain the I2 R power losses are reduced in the system due to
power supplied, causing the lines to consume more increasing of PF from 0.72 to 0.96.
reactive power and the voltage to drop further. If current % Power loss = 100 (1- (0.72/0.96) 2) = 43.75%
increases too much, transmission lines trip. i.e., 43.75% of existing power loss can be reduced.
Hence, Reactive power is to be compensated in a way Metering must be in place and maintained to capture
to ensure sufficient amounts are being produced to meet actual reactive consumption at various points.
demand so that electric power system can be efficient. Transmission and Distribution planners must
Types of Reactive Power Compensation: determine in advance the required type and location
1. Series compensation 2. Shunt compensation of reactive correction.
Series compensation: Series capacitors are used for Reactive power devices must be maintained and
improvement of transimission capacity of an existing line. functioning properly to ensure the correct amount
Shunt Compensation: Shunt capacitors are used for of reactive compensation.
supplying the reactive power required by the lines and Distribution reactive loads must be fully
inductive loads. Shunt capacitors alleviate the excess compensated before transmission reactive
loading of system and enable further active loads to be compensation is considered.
Telangana Engineers Day Celebrations at Warangal
It is to submit that the final allocation of employees is recruitment shall be considered for allotment to the two
to be completed as early as possible to make the employees States in the Bifurcation process.
to concentrate on their works to improve the performance All the Engineers shall be allotted to the two States
recruitment of Engineers and other employees in the Power on their Nativity, irrespective of existing cadre strength duly
Sector of united Andhra Pradesh. The strength of Engineers sanctioning required number of posts where ever
belonging to Telangana is not adequate in all the cadres necessary in the two states.
and not inline with the spirit of Presidential Order’1975, The spouse working Engineers, both Native of a
G.O.No.610, etc,. particular state shall not be given a choice for allotment to
These Associations are very much disappointed with other state on this ground.
the Guidelines issued by the General Administration (SR) There shall be no exemption to any other set of
Department for permanent allotment of State Government Engineers for allotment to other than native state.
employees to the two States of Telangana and Andhra Guideline for Bifurcation of Employees between TSGENCO
Pradesh and submit the following views & suggestions for & APGENCO
your kind consideration for bifurcation of employees of All the Engineers of State / Multi Zonal / Zonal level
Power Sector. recruitment shall be considered for allotment to the two
Further, there is lot of disturbance at the time of States in the Bifurcation process.
Telangana and Samaikyandhra movements and all the All the Engineers shall be allotted to the two States
employees are psychologically separated based on their based on their “Nativity” as per service register supported
nativity. with necessary documentary evidence only.
It is pertinent to note that, all the employees who are The Engineers of all cadres shall be allotted based
locals of Telangana area but originally native of on their Nativity, irrespective of existing cadre strength duly
Seemandhra area have participated in Samaikyandhra sanctioning required number of posts where ever
movement and vice-versa and also developed affection necessary in the two states.
towards their native state and animosity against the other
The spouse working Engineers, both Native of a
state.
particular state shall not be given a choice for allotment to
The friendly atmosphere between the employees other state on this ground.
belonging to Telangana and Seemandhra area is totally
There shall be no exemption to any other set of To communicate the Cadre wise posts of Engineering
Engineers for allotment to other than native state. Service as on 01-06-2014 allocated to all the Companies /
Guideline for Bifurcation of Employees between TS Corporations of Power Sector based on A.P. Reorganisation
DISCOMs & AP DISCOMs Act, 2014.
All the Engineers of State / Multi Zonal / Zonal level Finally, we once again request the Management of
recruitment shall be considered for allotment to the two TSTRANSCO, TSGENCO & TS DISCOMs to consider above
States in the Bifurcation process. genuine suggestions and arrange to issue guidelines at
All the Engineers shall be allotted to the two States the earliest for bifurcation of employees between the
based on their “Nativity” as per service register supported two states for smooth transition and better functioning
with necessary documentary evidence only. for overall development of the two States.
The Engineers of all cadres shall be allotted based Secretary General General Secretary
on their Nativity, irrespective of existing cadre strength duly (TSPEA) (TSEAEA)
sanctioning required number of posts where ever necessary Secretary General General Secretary
in the two states. (TPDEA) (TVEA)
The spouse working Engineers, both Native of a REPRESENTATION Dt. 05/05/2015 & 12/05/2015
particular state shall not be given a choice for allotment to Hon’ble Chief Secretary, Govt. of Telangana
other state on this ground. Sub: Electricity Department - Bifurcation of Power Sector
There shall be no exemption to any other set of employees between the states of Telangana and Andhra
Engineers for allotment to other than native state. Pradesh before 02.06.2015 – Requested – Regarding.
The employees of erstwhile APCPDCL which has the
jurisdiction of 7 Districts i.e, 5 from Telangana (Hyderabad, With reference to the permanent allocation of
Rangareddy, Mahabubnagar, Medak, & Nalgonda) and 2 employees of Power Sector to Telangana & Andhra Pradesh
from Andhra Pradesh, (Kurnool & Ananthapur) will any way under AP Reorganisation Act’2014, the above Associations
have to be considered for permanent allocation between would like to submit the following for taking immediate
the DISCOMs of two States. necessary action.
Now with the advent of formation of Telangana State, As per the section 82 of the A.P. Reorganisation Act,
the 2 Districts of Ananthapur and Kurnool which are in 2014, the Managements of concerned Corporations shall
APCPDCL are transferred to APSPDCL which is hither to determine the modalities for distributing the personnel
having jurisdiction of 6 Districts (Chittoor, Ongole, Nellore, of Public Sector undertakings between the two
Kadapa, Krishna & Guntur) with Headquarter at Tirupathi. successor states within a period of one year from
Further certain No. of posts from APCPDCL Corporate office 02.06.2014.
and all the posts in Ananthapur and Kurnool Districts were In this connection, it is to submit that lot of injustice
allocated to APSPDCL. It is worried that the employees of was done to the people of Telangana in respect of
erstwhile APCPDCL are proposed to be allocated between recruitment of Engineers and other employees in the Power
TSSPDCL and APSPDCL only. Sector of united Andhra Pradesh. The strength of Engineers
Hyderabad city being the Headquarter of the united belonging to Telangana is not adequate in all the cadres
Andhra Pradesh State, many of the employees from all the and not inline with the spirit of Presidential Order’1975,
23 Districts have opted to work in APCPDCL during the G.O.No.610, etc,.
process of unbundling of erstwhile Andhra Pradesh State Further, there is lot of disturbance at the time of
Electricity Board (APSEB) into six Corporations/Companies Telangana and Samaikyandhra movements and all the
i.e., APTRANSCO, APGENCO, and 4 DISCOMs (APCPDCL, employees are psychologically separated based on their
APNPDCL, APSPDCL and APEPDCL) in the year 2002. nativity.
The choice of allotment of Non-Telangana employees
The friendly atmosphere between the employees
working in TSSPDCL (earlier APCPDCL) to any one of the belonging to Telangana and Seemandhra area is totally
two DISCOMs in Andhra Pradesh i.e., APSPDCL or disturbed and there is no possibility of commitment and
APEPDCL based on their native place shall be considered. dedication to work for the development, if some of the
employees are allotted to other than their native States.
The employees in TSNPDCL (earlier APNPDCL) who
Further there is every possibility of non-cooperation to the
belongs to Seemandhra area shall be given a choice to opt
employees of the allotted state and leads to rupture among
either APSPDCL or APEPDCL for allotment to Andhra
the employee community.
Pradesh State, based on their Native place.
We strongly feel that no employee shall be denied of
The employees belonging to Telangana area but
allotment to his/her native state on account of non availability
working in the DISCOMs of Andhra Pradesh (APSPDCL & of sanctioned posts. As such, we request that the request
APEPDCL) shall be given an opportunity to opt either of employee for allotment to his own native state is to be
TSSPDCL or TSNPDCL based an their native place for considered invariably duly sanctioning additional/
permanent allotment to Telangana State. supernumerary posts if necessary in a particular cadre.
In this connection, it is also requested: In view of the above, and as a common solution to all
To communicate the final cadre wise Seniority lists of the problems, it is requested to arrange for allotment of
Engineering Service in All Companies/Corporations of all the employees to the two States based on their
Power Sector as on 01-06-2014 duly indicating their Nativity “Nativity” only duly sanctioning required number of posts
(Telangana or Andhra Pradesh). where ever necessary.
There can be common guidelines to two state level 23 Districts have opted to work in APCPDCL during the
corporations in the Power Sector i.e., APTRANSCO, process of unbundling of erstwhile Andhra Pradesh State
APGENCO for allotment of employees between the two Electricity Board (APSEB) into six Corporations/Companies
states i.e., APTRANSCO & TSTRANSCO and APGENCO & i.e., APTRANSCO, APGENCO, and 4 DISCOMs (APCPDCL,
TSGENCO. APNPDCL, APSPDCL and APEPDCL) in the year 2002.
As far as the Distribution Companies of united Andhra The choice of allotment of Non-Telangana employees
Pradesh are concerned, i.e., APCPDCL, APNPDCL, working in TSSPDCL (earlier APCPDCL) to any one of the
APSPDCL and APEPDCL, they are confined to certain areas two DISCOMs in Andhra Pradesh i.e., APSPDCL or
of the state but needs to be considered for allotment of APEPDCL based on their native place shall be considered.
employees between the four DISCOMs of the two States. The employees in TSNPDCL (earlier APNPDCL) who
Guidelines for Bifurcation of Employees between belongs to Seemandhra area shall be given a choice to
TSTRANSCO & APTRANSCO and TSGENCO & APGENCO opt either APSPDCL or APEPDCL for allotment to Andhra
All the Engineers of State / Multi Zonal / Zonal level Pradesh State, based on their Native place.
recruitment shall be considered for allotment to the two The employees belonging to Telangana area but
States in the Bifurcation process. working in the DISCOMs of Andhra Pradesh (APSPDCL &
All the Engineers shall be allotted to the two States
APEPDCL) shall be given an opportunity to opt either
based on their “Nativity” as per service register supported TSSPDCL or TSNPDCL based an their native place for
with necessary documentary evidence only. permanent allotment to Telangana State.
The Engineers of all cadres shall be allotted based
Finally, we request the Government of Telangana and
on their Nativity, irrespective of existing cadre strength duly Management of TSTRANSCO, TSGENCO & TS DISCOMs
sanctioning required number of posts where ever necessary to consider above genuine suggestions and arrange to
in the two states. bifurcate the employees between the two states as per
The spouse working Engineers, both Native of a
their Nativity before the time frame mentioned in AP
particular state shall not be given a choice for allotment to Reorganisation Act’2014 i.e., 02-06-2015 for smooth
other state on this ground. transition and better functioning of Power utilities in the
There shall be no exemption to any other set of
two States.
Engineers for allotment to other than native state. Secretary General General Secretary
Guidelines for Bifurcation of Employees between TS (TSPEA) (TSEAEA)
DISCOMs & AP DISCOMs Secretary General General Secretary
All the Engineers of State / Multi Zonal / Zonal level
(TPDEA) (TVEA)
recruitment shall be considered for allotment to the two REPRESENTATION Dt. 16.06.2015
States in the Bifurcation process. Chairman & Managing Director
All the Engineers shall be allotted to the two States
APTRANSCO & APGENCO
based on their “Nativity” as per service register supported Sub: TSPEA –Bifurcation of Power Sector Employees
with necessary documentary evidence only. between States of Telangana & Andhra Pradesh –
The Engineers of all cadres shall be allotted based
Resolving of the issue - Requested - Reg.
on their Nativity, irrespective of existing cadre strength duly Ref: 1. Lr. No.686/HR.A1/2015 Dt.06.06.2015 of Energy
sanctioning required number of posts where ever necessary
Dept, Govt. of Telangana.
in the two states.
2. T.G.O.O.No.92/CGM(A,IS&ERP)/2015
The spouse working Engineers, both Native of a
Dt.10.06.2015.
particular state shall not be given a choice for allotment to
other state on this ground.
Telangana State Power Engineers’ Association is a
There shall be no exemption to any other set of
main Association of Telangana State Power Sector
Engineers for allotment to other than native state.
(successor entity of APSEB Engineers’ Association of
The employees of erstwhile APCPDCL which has the
combined state) and representing all the Engineers from
jurisdiction of 7 Districts i.e, 5 from Telangana (Hyderabad,
the cadre of Assistant Engineers to Chief Engineers
Rangareddy, Mahabubnagar, Medak, & Nalgonda) and 2
working in TSTRANSCO, TSGENCO, TSSPDCL &
from Andhra Pradesh, (Kurnool & Ananthapur) will any way
TSNPDCL. This Association is representing in respect of
have to be considered for permanent allocation between
bifurcation of employees with the both state power utilities
the DISCOMs of two States.
since the separation of the states. This Association strongly
Now with the advent of formation of Telangana State,
opines that if the employees are allotted to their own states,
the 2 Districts of Ananthapur and Kurnool which are in
they will work with much interest, dedication and with
APCPDCL are transferred to APSPDCL which is hither to
renewed vigour for the development of their own State.
having jurisdiction of 6 Districts (Chittoor, Ongole, Nellore,
Hence, the efficiency of the Power Sectors will be improved
Kadapa, Krishna & Guntur) with Headquarter at Tirupathi.
Further certain No. of posts from APCPDCL Corporate office substantially.
and all the posts in Ananthapur and Kurnool Districts were It is pertinent to note that the process of final allocation
allocated to APSPDCL. It is worried that the employees of of employees between Telangana & Andhra Pradesh States
erstwhile APCPDCL are proposed to be allocated between is abnormally delayed beyond the deadline of 2nd June,
TSSPDCL and APSPDCL only. 2015 without any sincere and concrete steps. This has
Hyderabad city being the Headquarter of the united
resulted in unrest among the employees of Telangana state
Andhra Pradesh State, many of the employees from all the and even the employees of Andhra Pradesh native.
In this context, Telangana State Power Sector has of Telangana State Power Sector i.e, Telangana State
formulated the guidelines which were approved by Govt. of Electricity Assistant Engineers’ Association, Telangana
Telangana for final allocation of employees and also acted Power Diploma Engineers’ Association & Telangana Vidyut
accordingly, by relieving all the Andhra Pradesh native Engineers’ Association. The above Joint Committee has
employees to report to Andhra Pradesh Power Sector. This deliberated thoroughly on the issue of bifurcation of
facilitates the employees to work for their “Native States” of Engineers in Power Sector between Telangana & Andhra
Telangana and Andhra Pradesh. Pradesh States and submitted the suggestions & views
As the employees of Andhra Pradesh native were several times to the State Governments and Managements
already relieved from Telangana Power Sector, the of Power utilities.
Association requests you to kindly accept their joining report Now the matter is reached to Govt. of India and hence,
in Andhra Pradesh Power Sector as most of these Home Secretary is holding a meeting on the above subject
employees are also willing to work in Andhra Pradesh state. with Chief Secretaries, Energy Secretaries, and CMDs of
Further, it is also requested to relieve all the Telangana power utilities of both states on 31-July. We would like to
Employees forthwith as they are willing to work in Telangana submit the facts and views prior to the above meeting for
state so that the managements of Telangana Power sector taking amicable decision. Hence it is humbly requested to
shall have to accept them. kindly give an opportunity to the main office bearers of all
In this connection, the Association earnestly requests Associations in the Joint Committee by giving your
you to accept the joining reports of Andhra Pradesh native esteemed appointment at the earliest.
relieved employees and also relieve all the Telangana (A. SUDHAKAR RAO)
employees to resolve the unrest among all the employees. President
So that they can focus on the development of Power Sectors REPRESENTATION Dt. 31.7.2015
of both the States. Hon’ble Union Minister of Home Affairs Rajnath Singh
(G.SAMPATH KUMAR) Sub: Telangana - Electricity Department – Bifurcation
Secretary General of Power Sector employees between the states of
REPRESENTATION Dt. 17.07.2015 Telangana & Andhra Pradesh – Views & Suggestions of
Hon’ble Union Minister of Home Affairs Joint Committee of four major Engineers’ Associations -
Shri Rajnath Singh ji Regarding.
Sub: TSPEA- Electricity Department – Bifurcation of Ref: Ministry of Home Affairs letter F.No. 12012/12/2014-
Power Sector Employees between the states of Telangana SR, dt.xx/07/2015
& Andhra Pradesh as per AP Reorganization Act’ 2014 –
Appointment requested to submit facts, views & suggestions The Joint Committee of TSPEA, TSEAEA, TSPDEA and
–Regarding. TVEA, as major Associations of Engineers in Telangana
State Power Sector would like to submit the following views
The Telangana State Power Engineers’ Association and suggestions on the subject referred above.
represents all the Engineers from the cadre of Assistant It is pertinent to note that the delay in final allocation of
Engineer to Executive Director working in the Power Sector Engineers/ Employees among the two states has resulted
of Telangana State i.e., TSGENCO, TSTRANSCO, and two in great unrest among them and drastically affecting the
Discoms TSSPDCL and TSNPDCL. performance of the Power Sector in two states. Friendly
The TSPEA is the successor entity of “APSEB Engineers’ atmosphere between employees belonging Telangana and
Association” which has represented all the Engineers in Seemaandhra is totally disturbed due to prolonged
Power sector of united Andhra Pradesh State from the year approach of such a sensitive and sentimental issue.
1956 to 1st June’2014. The injustice done to the Telangana region employees
It is to submit that the bifurcation of employees in Power since last 60 years period and unimaginative damage done
sector is abnormally delayed, which is causing unrest due to violation of the Mulki Rules (held valid by Supreme
among the employees and affecting the efficiency of Power Court in 1972), Six-Point formula evolved in 1973,
sector. In this regard as a lead role player, TSPEA has formed Presidential Order issued in 1975, G.O. No. 610 dated 30/
Joint Committee with other major Engineers’ Associations 12/1985 and Girglani Commission report in 2004 is very
much evident to all, by the deliberations of Telangana
Employees in all these years.
The true spirit of Presidential Order in recruitment of
Engineers with Zonal System is not followed in Power
Sector over all these years which has resulted in over
dumping of Andhra Region Engineers, depriving the
employment opportunities of Telangana Region Engineers.
The Zonal system in recruitment of Engineers in Power
Sector has just began in the year 2009.
Section 82 of AP Reorganization Act-2014 mandates
the Corporations to determine the modalities for
distributing the personnel between two successor States
within a period of one year from the appointed day i.e.,
before 02.06.2015.
There is no appropriate response from APTRANSCO
for determining the modalities in terms of section 82 by the Important ORDERS pertaining to recruitment
stipulated date. procedures in combined Andhra Pradesh
APTRANSCO in their letter dated 18.03.2015 A) Mulki Rules held valid by the Supreme Court, October
communicated the Kamalnathan committee guidelines – 1972. To give preference to the local candidates in
which are not suitable to Corporations especially to the employment etc.,
Power Sectors due to the reasons mentioned above, instead B) Six Point Formula evolved on 21.09.1973
of formulating the suitable modalities and hence deviated To have certain fixed level of recruitment with local
the provisions of Section 82 of the Act. Kamalanathan
candidates should be preferred and this policy should be
Committee guidelines are meant for state government
followed even in promotion giving preference to the local
employees where recruitment is made based on Zonal
candidate. This has given a way for zonal system.
system and in spirit of Presidential Order.
This is not followed in power sector of erstwhile Andhra
As the specified time limit of one year has been expired,
to create congenial atmosphere among the employees, the Pradesh state since 1973. Contrary to formula - local
Telangana State Power utilities combinedly formulated the candidates employment opportunities were denied.
modalities in the interest of Telangana Power Sector and C) Presidential Order -1975
same were approved by the Government of Telangana vide The president may by order made with respect of the
proceeding dated 06/06/2015. state of Andhra Pradesh provided having regard to the
Accordingly 1252 employees working in Telangana are requirement of each State, for equitable opportunities and
relieved on NATIVITY BASIS to report to AP Power Utilities. facilities for the people belonging to different parts of such
Thus, the procedures adopted by Telangana State Power State, in the matter of public employment and in the matter
Utilities is justified. of education and different provisions may be made for
There are about 400 employees, who are NATIVE of various part of States. The spirit of presidential orders was
Telangana region working in AP power Utilities. But the not implemented in Power Sector since 1975.
managements of AP Power Utilities are not relieving them D) G.O.No.610, dated: 30.12.1985
in spite of repeated requests by the managements of G.O. deals with the alleged violation in implementation
Telangana Power Utilities and Employees themselves. of Six Point formula in zones and orders issued for
We strongly feel that no employee shall be denied rectification of the same.
of the request in allotting to his/her NATIVE state on any E) Girglani Commission – 2004
pretext. Majority of employees of AP NATIVE who are relieved Sorted out the anomalies, Irregularities and rectification
from TELANGANA are willing to work in their OWN NATIVE of debits in implementation of G.O. Ms. No.610 and
state. All the employees of TELANGANA Region working in presidential orders and also suggested remedial actions.
AP Power utilities are also willing to work in their NATIVE It is very much evident with that, all the above
Telangana State. Hence the decision taken by Telangana background history, the spirit of presidential orders, and
Managements to relieve all Andhra Native Employees to AP special provision of article 371D are gravely violated and
state is very much genuine and appreciated. injustice is done to the employees of Telangana region.
As per the employees data, excess number of
Important Points regarding Bifurcation of Power Sector
employees over and above the sanction posts are existing
Employees between Two States
in some cadres in both Telangana and Andhra Pradesh
1. Section 82 of the Act mandates the Corporation to
States. The Telangana Managements are willing to accept
determine the modalities for distributing the personnel
the excess employees duly sanctioning additional posts
wherever required. If Andhra Pradesh Power Utilities are between two successor States within one year period from
also do the same, the problem will be solved amicably. the appointment day i.e., before 02.06.2015.
In view of the above, we request the following. There is no appropriate response from APTRANSCO
1. With reference to the communication received from for determining the modalities in terms of section 82.
Ministry of Home Affairs vide letter F.No. 12012/12/2014- 2. APTRANSCO in their letter dated 18.03.2015
SR, dt.xx/07/2015, it is requested to advise the communicated just Kamalnathan committee guidelines
Governments of Andhra Pradesh & Telangana and which are not valid to Corporations, instead of formulating
Power Utilities of both states to finalize the permanent the modalities suitable to Corporations and deviated the
allocation of employees on NATIVITY basis only and provisions of Section 82.
settle the issue amicably at the earliest. 3. Since the dead line specified in section 82 i.e.,
2. To direct the managements of AP Power Utilities to one year period is completed Power utilities of Telangana
accept the 1532 AP NATIVE employees relieved from State have formulated the guidelines. Telangana State
Telangana Power utilities. Government has also given concurrence vide proceedings
3. To direct the managements of AP Power Utilities to dated 06.06.2015.
relieve around 400 Telangana NATIVE employees 4. Thus, the procedures adopted in notifying the
working in AP Power Utilities. modalities and acting in terms of the said modalities is
Finally, we thank your kind authority for considerate justified.
audience on the subject and look forward for favorable 5. Hence the relieving of 1252 employees working
orders to resolve the issue permanently. in Telangana, but native of Andhra Pradesh State is perfectly
Assuring our best cooperation at all the times. justified which is based on “Natural justice”.
Secretary General General Secretary 6. There are about 400 employees, who are NATIVE
(TSPEA) (TSEAEA) of Telangana region working in AP power Utilities. But the
Secretary General General Secretary managements of AP Power Utilities are not relieving them
(TPDEA) (TVEA)
in spite of repeated requests by the managements of employees and Diploma Engineers will resort to one day
Telangana Power Utilities and Employees themselves. token strike / work boycott as a mark of protest, on the day
7. Majority of employees working in the both state of placing the Electricity (Amendment) Bill 2014 in either
Power utilities are willing to work in their Own NATIVE state. house of parliament.
Hence, no employee shall be denied to work in his/her own Inview of the above, it is requested to Government of
state. India through State Government to drop the idea of
8. Telangana state Power utilities are willing to create enactment of such one sided Bill intended to cope up with
supernumerary posts, if excess employees opt for their Own the profit greed of corporate business houses.
NATIVE Telangana state. If AP also do the same, the problem Finally, it is to inform that as per the directive of
will be solved amicably. NCCOEEE and All India Power Engineers’ Federation, the
9. Lot of hardships caused to the employees as the members of this Association will resort to work-boycott and
promotions are stopped and recruitment is delayed for want demonstrate as a mark of protest, on the day of placing the
of finalization of employee bifurcation. Electricity (Amendment) Bill 2014 in either house of
Final request parliament.
1. With reference to the communication received from (G. SAMPATH KUMAR)
Ministry of Home Affairs vide letter F. No. 12012/12/2014- Secretary General
SR, dt.xx/07/2015, it is requested to advise the Governments REPRESENTATION Dt. 05/10/2015
of Andhra Pradesh & Telangana and Power Utilities of both Chairman & Managing Director, TSTRANSCO
states to finalize the permanent allocation of employees on Sub: Electricity Department – Bifurcation of Power
NATIVITY basis only and settle the issue amicably at the Sector Employees between the states of Telangana &
earliest. Andhra Pradesh as per AP Reorganization Act’ 2014 –
2. To direct the managements of AP Power Utilities to Protest against joining of Andhra Pradesh native relieved
accept the 1532 AP NATIVE employees relieved from employees - Regarding.
Telangana Power utilities. Ref: 1. Our letter dated:25.03.2015
3. To direct the managements of AP Power Utilities to 2. Our discussion held with CMD/Transco on
relieve around 400 Telangana NATIVE employees working 09.04.2015.
in AP Power Utilities. 3. Our letter dated:25.04.2015
REPRESENTATION Dt. 27/07/2015
Chairman & Managing Director, TSTRANSCO In continuation to the representations submitted jointly
Sub: TSPEA – Enactment process of Electricity by the above Engineers Associations of Telangana State
(Amendment) Bill 2014 – Protest - Regarding. Power Sector, the following views are submitted.
Ref: National Co-ordination Committee of Electricity All the Engineers of Telangana Power Sector are
Employees & Engineers Letter Dt.01/07/2015 addressed emotional and sentimental on the subject of bifurcation of
to Hon’ble Prime Minister of India. employees on “Nativity Basis” and are in total unrest as the
issue is being prolonged for such a long duration and
The Telangana State Power Engineers’ Association resulted as detrimental to the prosperities of Telangana
(TSPEA) is a constituent of All India Power Engineers Engineers.
Federation (AIPEF) which is National Level Body The Managements of Telangana State Power utilities
representing all the Power Engineers in the Country. have taken an appropriate step by relieving all Andhra
The AIPEF and other major Federations of Electricity Pradesh native employees from Telangana Power utilities,
employees and Diploma Engineers have met on 25 th but could not conclude the issue to its logical end. Moreover,
June’2015 at New Delhi under the banner of National Co- the Telangana employees working in Andhra Pradesh
ordination Committee of Electricity Employees & Engineers Power utilities have not been brought to Telangana State
(NCCOEEE) to discuss the situation in the Power Sector so far. Many Telangana employees working in Andhra
and the implications of enactment of Electricity Pradesh are facing lot of hardship and humiliation in Andhra
(Amendment) Bill 2014 initiated in the Loksabha on 19th Pradesh Power Sector since separation of the State.
December’2014 alongwith the report of Parliamentary Added to this unrest, recent court orders have created
Standing Committee on Energy. much more disturbance in the cadres. It was submitted
The NCCOEEE has unanimously decided to oppose several times that the relations and atmosphere between
the enactment of Electricity (Amendment) Bill 2014 due to Telangana and Seemandhra Native employees are badly
its awful and ruinous consequences on the Power Utilities, effected and working together may lead to many
Consumers, State Governments, employees and the Sector complications and may also result in damage to the
as a whole. interests of Telangana State Power Sector as a whole.
The NCCOEEE has submitted a Memorandum to The matter has been thoroughly deliberated by all the
Hon’ble Prime Minister of India on 1st July’2015 for which above Engineers Associations and resolved the following
AIPEF is a signatory with a demand to cancel the process of unanimously.
enactment of the Electricity (Amendment) Bill 2014 duly a) Not to accept the joining reports of all the relieved
explaining the reasons for the same (copy enclosed). Andhra Pradesh native employees under any
It is also informed in the Memorandum that all Power circumstances.
Engineers of State Power Utilities alonwith the members of b) If unwarranted, payment of salaries to the extent
other major organisations representing electricity of 42% without accepting joining reports may be examined.
c) The issue of bifurcation of employees shall be employees bifurcation and also due to overload of work. If
completed in full shape before the end of November’2015. the promotions are further delayed, the situation may lead
d) Promotions to all the eligible Telangana engineers to uncontrollable stage for which the responsibility squarely
shall be taken up immediately as they are deprived of the lies with the management.
same since 02.06.2014 and even prior to that. Hence, the Association requests the Managements to
In this connection, we, the Engineers Associations address the above issues immediately, else the Association
jointly request the managements of TSTRANSCO, will be compelled to declare further course of action for
TSGENCO, TSSPDCL and TSNPDCL, not to accept the redressal of the above issues.
joining of Andhra Pradesh Native relieved employees under Thanking you, and assuring our best co-operation at all
any circumstances and arrange to implement the above the times.
resolutions forthwith. (G. SAMPATH KUMAR)
Further, we strongly request the managements to Secretary General
conclude the bifurcation of employees on the basis of REPRESENTATION Dt. 27/10/2015
“Nativity” only before the end of November’2015 in the interest Chairman & Managing Director, TSTRANSCO
of employees of Telangana and of Telangana Power Sector Sub: TSPEA – Issuing of promotions to Telangana
as a whole. Employees in TS Power Utilities –Regarding.
Thanking you and assuring the best Co-operation at The Association expresses its gratitude to the
all the times. managements of TS Power Utilities and Government of
Secretary General General Secretary Telangana for giving promotions to Telangana Employees
(TSPEA) (TSEAEA) as fruits of newly formed State of Telangana.
Secretary General General Secretary TSPEA cherishes this historical moment and assures you
(TPDEA) (TVEA) to reciprocate appropriately with renewed vigor and
REPRESENTATION Dt. 14.10.2015 dedication from all the Engineers to achieve the huge
Chairman & Managing Director, TSTRANSCO, TSGENC, mandate given by Hon’ble Chief Minister to make “Bangaru
TSNPDCL & TSSPDCL Telangana”.
Sub : TSPEA-Electricity Department-Bifurcation of Thanking you and assuring best Co-operation at all the
Power Sector Employees between the state of Telangana times.
& Andhra Pradesh as per AP Reorganization Act’2014- (G. SAMPATH KUMAR)
Joining of Andhra Pradesh native relieved employees- Secretary General
Certain Demands- Regarding. REPRESENTATION Dt. 26/11/2015
Ref : 1. Discussions with Managements held on Chairman & Managing Director, TSTRANSCO
13-10-2015 Sub: TSPEA –Bifurcation of employees between
TSTRANSCO & APTRANSCO – Guidelines to be issued -
With respect to the discussions held by the Managements Regarding.
with this Association on 13/10/2015 regarding implementing Ref: 1) Guidelines for Final Allocation of State cadre
of the Court orders on employee bifurcation and issuing employees under AP Reorganisation Act, 2014 Dt.29-10-
promotions to the Telangana Employees in all the Telangana 2014 by Govt. of India.
Power utilities, the Association would like to submit the 2) This Association Letter Dt.01-08-2014 regarding
following. views & Suggestions on guidelines for final allocation of
The Association has conducted its emergency CEC employees.
meeting on 14/10/2015 and deliberated on the above issues. 3) This Association Letter Dt.03-11-2014 regarding
The CEC has unanimously resolved to putforth the following final allocation of employees between TSTransco &
demands before the management for favorable APTransco.
consideration. 4) Lr.No.CMD/Addl.Secy/Bifurcation Cell/F.No:02/2014,
(a) To issue promotions to Telangana Engineers dt.19.02.2015
immediately against all the existing vacancies
including the posts vacated by the AP native relieved This Association expresses its sincere thanks to the
Engineers before joining of the relieved employees. Management for initiating the process of Bifurcation of
(b) The AP native relieved employees shall not be given employees and for declaring the list of region wise
regular postings and shall not be allotted to same Engineers of Telangana and Andhra Pradesh States
Plants/Circles to avoid disturbances in working working in TSTRANSCO, TSGENCO, TSSPDCL and
atmosphere. TSNPDCL.
(c) To take further necessary action in order to complete In this connection, it is to inform that this association
the process of employee bifurcation in full shape by all the times requesting to arrange for guidelines for
the end of Novermber’2015. bifurcation of Power Sector Engineers between Telangana
(d) To speedup the promotions to Telangana Engineers State and Andhra Pradesh State based on “NATIVITY” only.
against the additional posts also in all the power Further the Association feels that a discussion is
utilities. essential to deliberate on several factors related to
Further, it is to submit that all the Engineers / Employees of bifurcation of Engineers in all the utilities of Power Sector
TS Power Sector are in unrest and infuriated mood because of Telangana State. The process need to be completed at
of stagnations in promotions due to abnormal delay in the earliest to make the employees to concentrate on their
works with improved performance and achieve the huge NCCOEEE representatives objected to the mandatory
targets in the Power Sector. provision of the Bill towards splitting of distribution business
into carriage and content. Contention of the Ministry narrating
In view of the above reasons, we request the the concerned clause was the same is an enabling
management to convene a meeting with this Association provision, not a mandatory one. States will have to submit a
for discussing on the bifurcation issue within a week so Road Map for preparation of transfer scheme within a span
that appropriate guidelines can be worked out and complete of five years after promulgation of the Act. Any state may
the bifurcation process in most befitting way. adopt it as a pilot project covering one district or they may
indicate in the Road Map their intention to make it within a
(G. SAMPATH KUMAR)
span of 50 or 100 years. There would not be any time
Secretary General stipulation.
NATIONAL COORDINATION COMMITTEE OF ELECTRICITY NCCOEEE leadership cited the probable inconvenience
EMPLOYEES & ENGINEERS of low end consumers, when they will be isolated due to
B.T.RANADIVE BHAWAN, 13-A, ROUSE AVENUE, NEW cherry picking of the supplier. Power Ministry ascertained
DELHI -110 002, Tel fax.011-23219670 25 December, 15 that they have removed the clause. All consumers
CIRCULAR irrespective of their voltage profile and quantity of
Note on discussion of NCCOEEE leadership with Shri consumption will be treated at par. Besides that there will
Piyush Goyal, Hon’ble Minister Power, Coal and N & RE, be a cap on tariff to protect different category of consumers.
Govt. of India. In respect of eligibility of supplier state owned / public
sector as well private sector will have the similar opportunity.
On 1st December, 2015 NCCOEEE leadership decided
If any State Government desire they will have the scope
to postpone the one day power strike called on 8 th
more than one state owned utilities in the same
December on assurance of Secretary (L & E) towards
geographical area in order to have competitive environment.
amicable settlement of the pending issues. The meeting Until the transfer scheme is prepared and implemented as
took place on 21st December at 4.30 PM in the conference per Road Map of the state concerned the present Discom
room of MOP at Shram Shakti Bhawan. NCCOEEE was will serve the consumers.
represented by Shailendra Dubey (AIPEF), Prasanta N In respect of cross subsidy for economically weaker
Chowdhury (EEFI), P Ratnakar Rao (AIPEF), Subhas Lamba section of consumers cross subsidy will be in vogue.
(EEFI), Mohan Sharma (AIFEE), Kuldeep Kumar (INEWF), Relevant clause towards elimination of cross subsidy has
G K Vaishnav (AIFOPDE) & Ramesh Sharma (AIPF), been modified to that effect.
Government of India was represented by Hon’ble Power Salient points of discussion are as under:
Minister & Officials of Power & Labour Ministry including Clause related to splitting of carriage and content will
Central Labour Commissioner. be an enabling provision not a mandatory one. States
At the outset Shri Piyush Goyal briefly recapitulated the will have its own ambit of implementation.
points he mentioned in the meeting of Kochi on 6 th Scope of private participation will be there but choice of
November, 2015. He referred to the points of concern of consumer / geographical area will not be earmarked
Electricity Employees and consumers. He reiterated that for private utilities. State owned utilities will have equal
employees need not be worried about on their service opportunity to make business in all the area within the
conditions. Which will remain same as it is now. Object of state or in other state also.
the Amendment of the Act is to provide quality and State will make their Road Map for implementation of
uninterrupted Power at cheaper cost through competition the provision of the Act partly, progressively or totally at
in the market. He mentioned the proposed UDAY scheme a time as indicated in the Road Map.
towards reduction of loss, improvement of efficiency with Department of Power, GOI is open to have further
the object of all round development of the country, as power discussion with the workers, employees and engineers
is required for all the spheres of economic growth. He also before moving the Bill in the parliament. Object of these
stressed upon co-operation of all concerned. He mentioned discussions will be to minimize the gap.
that as Power generation is closely related to coal Minister invited further clause wise clarification, opinion
production, he had discussion with trade unions in Coal and views on the modified Bill in black & white. Power
sector with the view of growth in Coal production. Shri Goyal Ministry officials will examine those and revert back their
mentioned that he has already taken up the points of view points in the next meeting. NCCOEEE delegation will
concern of Electricity employees. Some modification of the submit their further observation, clarification within a
proposed Bill has been done. The Power department fortnight. Next course of discussion will take place by the
middle of January, 2016.
officials present in the meeting will let the delegation be
In brief, the outcome of the meeting is as under:
apprised on the changes. Any further suggestion /
1. Electricity Amendment Act shall be enabling provision
improvisation will be welcome and considered for
& not mandatory on states.
incorporation. Hon’ble Minister assured the delegation that 2. No cherry picking will be allowed & all power supply
no hasty decision will be taken. If necessary further course companies including pvt shall have universal power
of discussion will take place. He solicited co-operation from supply obligation.
the unions. 3. State Govts will have option to go with only Govt Supply
NCCOEEE representatives expressed their grievances Companies for power supply, no compulsion for pvt
over the attitude of the Parliamentary Standing Committee, supply companies.
who has unilaterally taken for granted the views of houses 4. State Govts have to notify their road map in 5 yrs time
of industry and commerce. They were considered as only after enactment of Act for segregation of carriage &
stake holder, where as views of all the National Federations content without any time limit for implementation.
of Power Sector employees and engineers as well 20 nos. 5. Detailed meeting of NCCOEEE with Ministry of Power
of state Governments objected to different provisions of the officials and later with Power Minister will take place in
Electricity (Amendment) Bill, 2014 were disdainfully Jan 2016.
disregarded. Shri Goyal mentioned that the Parliamentary 6. Power Minister will attend General Body Meeting of
Committee is not under his control. He is open to all for NCCOEEE in Feb 2016 to listen to our view points and
discussion and exchange opinions. address the Electricity Employees and Engineers.
REPRESENTATION Dt. 30/12/2015 account of above situation and needs special attention to
Chairman & Managing Director, TSTRANSCO complete the process of the bifurcation at the earliest.
Sub: TSPEA – Resolving of certain long pending Hence, the Association requests the management to
issues – Requested– Reg. take all necessary steps for allotting all the AP Native
The Central Executive Committee of TSPEA has met Employees to their State and arrange to issue orders for
on 12.12.2015 and deliberated thoroughly on the following joining of the Engineers/Employees of the Telangana Native
long pending issues which are to be resolved by but working in AP Power utilities at the earliest. The
Managements. Association stands by the Managements in all the steps
1. Sanction of Additional Posts: The Association is taken in this connection.
requesting since long time for approval of the proposals
4. Medical Policy: The issue of revision of medical policy is
on Additional posts in the Engineering cadre submitted to
being discussed by the Association since past several years
the Government by TSGENCO, TSTRANSCO, TSSPDCL &
TSNPDCL long back. as the employees are facing difficulty due to insufficient
It is to submit that the work load on the Engineers has provisions in the medical policy. In this connection, it is to
increased in many folds in view of the huge programmes submit that the Association has taken lead role in deciding
like Generation addition, Transmission Evacuation and 9 the contribution premium from the members so that
hours day time power supply to agricultural sector etc., maximum help can be extended to the deceased member
Apart from these programmes in Power Sector, the work and even then the suffering of the members could not met
load has increased in connection with the State Government to the full extent.
programmes like Lift Irrigation Schemes, Water Grid and Hence, the Association requests the Managements to
TS-I PASS policy etc,.
review the present policy and formulate a new policy inline
Hence, the Association requests the Management to
obtain approval for the sanction of additional posts from with State Government Health Scheme and issue cashless
the Government which are submitted as per old norms credit cards to meet the actual expenditures in total incurred
and requirements to meet with the above work load and to by sufferer with the support of contribution of employees.
complete the above programmes successfully. 5. Recruitment of Assistant Engineers: While thanking the
2. Providing of Pension facility on par with State Managements and Govt. for taking up recruitment of AEs in
Government Employees: The Government is extending of big way, the Associations requests the Managements to
Pension facility to the employees working in all the take all necessary steps to recruit the AEs to full notified
Departments of State Government, who are recruited before numbers without leaving any of single post vacant in all the
2004. The Association is also requesting to extended the
utilities as the AEs are essentially required at this moment
same facility to the Engineers recruited between 1999 to
of time to commensurate with heavy workload.
2004 by conversion of EPF to GPF since long time. The
issue is pending in the Government for approval with minor 6. Issuing of promotions to Assistant Engineers to fillup
queries. the balance vacancies in ADE cadre: The Association
In this connection the Association submits that the appreciates the management for issuing the promotions
Engineers recruited between 1999 to 2004 who are covered in various Engineering cadres recently in a big way to
in this issue are presently playing vital roles in the all the eligible Telangana Engineers. But a few of the vacancies in
Power Utilities. Hence the Association feels that the above ADE cadre are still left over. The Association requests the
requests is very much reasonable, genuine and hence management to issue promotions to all the eligible Assistant
requests for getting approval from the Government by using Engineers to fill up the balance vacancies in ADE cadre
your good offices to provide above facility to the Employees
and arising vacancies in other cadres.
recruited between 1999 to 2004 on par with State
Government Employees. Finally, the Association earnestly requests the
3. Bifurcation of Employees: The Association appreciates Managements to consider the above long pending issues
the Managements for taking initiation and bold steps favorably and issue orders accordingly to boost the morale
regarding bifurcation of employees between Two States. of the Engineers at this crucial time so that fullest output
This being a sensitive and sentimental issue need to be can be execrated for achieving the huge mandate of the
completed with in minimum time. But the issue is not Telangana Power Sector.
resolved totally and the Association feels that the attention Thanking you and assuring the best co-operation at all
and efficiency of the employees is being diverted on the the times.
(G. Sampath Kumar) Secretary General
TSPEA President Er. A. Sudhakar Rao and other Central Office Bearers also protrayed above long pending issues
with Chief Minister Sri K. Chandrasekhar Rao garu, Minister for Energy Sri G. Jagadish Reddy garu.
REPRESENTATION Dt. 17/12/2015 The MOU between the two neighbouring states and
Chairman TSERC between the Government utilities is more transparent and
beyond any doubt/controversy. CSERC is a statutory body
Sub: Telangana State Power Engineers Association–
and the tariff to be decided is expected to be very reasonable
Purchase of1000MW power from Chattisgarh State by
and beyond any speculation.
TSDISCOMs – Certain Views & Suggestions - Submitted –
The MOU method adopted for this PPA is one of the
Reg.
Long Term Power Procurement Processes and adopted
by GoTS for procurement of power after thorough
Telangana State Power Engineers’ Association (TSPEA) discussion duly carrying out brainstorming sessions with
is a main Association of Telangana State Power Sector which various energy experts.
is a successor entity of APSEB Engineers Association It is clearly stipulated in the PPA that the agreement is
working since 1956 in Power Sector representing all the Coterminous with the approval of Transmission Corridor
Engineers from the cadre of Assistant Engineers to Chief by PGCIL. Hence, alleged by some objectors, paying of
Engineers / Executive Director working in TSTRANSCO, fixed charges for contracted capacity without utilizing the
TSGENCO, TSSPDCL & TSNPDCL. power due to non-availability of Transmission Corridor is
TSPEA, being a responsible and constructive role purely hypothetical and baseless.
playing association in the TS Power Sector, would like to As there are constraints of corridor from N E W grid to
submit the following for your kind perusal. South grid, there is no guarantee for Telangana State
It is a known fact that, the new state of Telangana was DISCOMs for getting inexpensive power through competitive
facing acute Power Shortage at the time of formation. Added bidding process due to huge competition for corridor. SERC
to the crisis, Government of Andhra Pradesh has gone back is competent authority to approve either negotiated tariff or
in scheduling/sharing the Power on the existing PPAs in to adopt competitive bidding process as per the provisions.
contrary to the provisions of Andhra Pradesh Re- As there is lot of competition among the Southern
Organisation Act - 2014. States for booking the Transmission Corridor, priority will
Thereafter, Government of Telangana has plunged into be given to the DISCOMs having long term PPAs. Hence
action to tackle the power crisis and initiated several steps TS DISCOMs having opted for long term PPA with
on short, medium and long term basis. Chattisgarh State DISCOMs, will have an added advantage.
Further, Government of Telangana has introduced The initiative of Government of Telangana to develop/
gigantic programmes of supplying immediate power to procure power through public sector has been appreciated
industries under TS-iPASS Policy, 9 hours Power Supply to by one and all. The terms and conditions of PPA are framed
agriculture sector, Telangana Water Grid Project, Lift on purely commercial and business standards.
Irrigation Schemes and providing uninterrupted 24x7 Supply In this connection, the Association strongly feels that
through Power For ALL (PFA) scheme to all categories of there is no irregularity or deviation of any regulations /laws
consumers etc. in entering PPA for purchase of 1000MW power from
TSGENCO has started construction of new Power Chattisgarh State by TS DISCOMs and whole process is
plants and optimised its generation through increased PLF. under the bounds of Electricity Act-2003 and Electricity
Govt of Telangana has been pursuing regularly to get extra Reforms Act-1998.
power from the quota of un-allocated power from Central Hence, the Association requests the Honorable
Generating Stations. Apart from above, the TSDISCOMs Commission to expedite the approval for the proposal at
have been carrying out precise power planning and the earliest in the interest of TS Power Sector and the
procuring power on short and long term basis through people of Telangana as a whole.
competitive bidding procedure through open tenders. (G. Sampath Kumar)
With the unstinted support from State Government, able Secretary General
guidance of Honourable TSERC and concerted efforts of all
engineers, TS Power utilities have overcome the hurdles
and have been able to supply reliable and quality power
supply to all categories of consumers without any power
cuts/restrictions from more than one year.
TSDISCOMs have been utilising every opportunity to
provide quality and reliable power to all categories of
consumers, as adequate and reliable power holds the key
for industrial promotion as well as sustainable agricultural
development in the new State of Telangana.
Keeping in view the various public welfare schemes
initiated and carrying out thorough discussions & taking
suggestions from the various stake holders including our
prestigious association TSPEA, TSDISCOMs/Government
of Telangana have decided to purchase Power from
Chattisgarh State and entered into MOU with state of
Chattisgarh for purchase of 1000 MW Power from upcoming
Power plant at Marwa. Chattisgarh State GENCO is having
PPA with Chattisgarh State DISCOM for sale of power with
the rate to be decided by Chhattisgarh State Electricity
Regulatory Commission (CSERC).
TELANGANA STATE FIRST FORMATION DAY CELEBRATIONS BY TSPEA
Bike rally Inaugurated by Er. Mithra Prabhakar Rao garu, CMD on 6.6.2015
TSPEA Greets Honourable CM Sri KCR garu on the occasion of State Formation Day at Campus Office
Union Minister for Power Sri Piyush Goel Meeting with National TSPEA advisors inviting Dr. Prabhakar Rao, CMD garu
Coordination Committee of Electricity Employees & Engineers at Yadadri
Laying of Foundation Stone for Our Association Guest House “Shakthi Bhavan” at YADADRI
TSPEA
On 5th December, 2015 by G. Jagadish Reddy Hon'ble Minister for Energy, Govt. of Telangana
TELANGANA POWER TRENDS
32 Printed and published by : Er. V. Sanjeeva Rao, Chief Editor on behalf of Telangana State Power Engineers’ Association,
D.No. 6-3-663, Somajiguda, Hyderabad - 82. Phone & Fax : 040-40204241, www. tspea.org. e-mail: tspea2014@gmail.com
Printed at Om Sai Graphics, Narayanguda, Hyd.