You are on page 1of 12

 

RESUME 1 of 12

PERSONAL DATA  : 

Name  :  ASWADIMANOR BIN SAFEIE


I/C No.  :  720819‐08‐5619 (A 2194573)
DOB  :  19 Aug 1972 
Age  :  45 years. 
Sex  :  Male 
Religion  :  Muslim 
Marital Status  :  Married 
Height  :  180 cm 
Weight  :  60 kg. 
Place of Birth  :  Taiping, Perak, Malaysia 
Nationality  :  Malaysian 
Driving License  :  B2 & D 
E.P.F. No.  :  12650854 
Income Tax No.  :  SG 5488672‐04 
Int. Passport No.  :  A 30080302 
CIDB Green Card No.  :  W 51240520010004 
Socso No  :  P6803564X 
PMI ID No.  :  1959367 

Address:  Contacts:

Mobile : +60 18 9715237 


No. 59, Jalan USJ 13/1G, 
Email : aswadimanor@gmail.com 
USJ 13, 47630 Subang Jaya, 
Selangor, Malaysia. 

ASWADIMANOR SAFEIE ©®
 

RESUME 2 of 12

SUMMARY OF CAREER 

With comprehensive of 20 years knowledge and working experience of Project Management, Project Control


(Project  Planning  /  Scheduling,  Cost,  Contracts,  Subcontracts),  Quantity  Surveyor,  Engineering  Procurement
Construction/Fabrication  &  Commissioning  (EPCC/EPC/PCC)  and  documentation  for  Oil  and  Gas  (Offshore  &
Onshore) projects, Civil & Buildings Construction projects and last but not least Mechanical & Electrical (Power)
projects. 

AREAS OF EXPERTISE 

Project Control and Planning, Project Management, Risk Management, Project Estimate and Budgeting, Project


Cost Control, Management Plan, Project Reporting, Procedure, Project Integrated and Interfacing. 

EDUCATION BACKGROUND; 

July ’93 ‐ Apr. 97  :  University Science of Malaysia, Pulau Pinang, Malaysia. 


Bachelor Science (Hon’s) of Housing, Building & Planning 
Major: Construction Management 

June ’90 ‐ April ’92  :  Ungku Omar Polytechnic, Ipoh, Perak, Malaysia. 


Certificate of Architecture. 

COMPUTER SKILLS: 

 Primavera Project Management P6. Ver.8 and above.


 Microsoft Office. 
 Microsoft Project. 
 Crystal Ball. 
 SAP System R/3. 
 Oracle. 
 Ripac (Quantity Surveyor Software). 

POSITION OF RESPONSIBILITY: 

 Member of Project Management Institute (PMI)
 Scuba School International (SSI) 
 Committee Member of Offshore Structure Fabricators Association of Malaysia (OSFAM) 
1999 ‐ 2000 
 ISO Committee Member for Stagno Tech Sdn Bhd. (2000 – 2003) 

LINGUISTIC ABILITIES: 

Bahasa Malaysia  :   Good in reading, writing and speaking.


English  :   Fairly good in reading, writing and speaking.

ASWADIMANOR SAFEIE ©®
 

RESUME 3 of 12

COURSE / WORKSHOP ATTENDED 

 ISO 9001: 2008 Awareness (Muhibbah Engineering) – 14th  May 2016 
 Float over: Engineering to Execution (Dockwise): 14th  June 2012. 
 Temana Redevelopment Project Concept Select Workshop (PCSB) – 29 – 30 Mac 2010. 
 Cost Control Process Training (PCSB) – 23 – 26 Mac 2010. 
 BOSIET training (28 – 30 Apr 2009) (Cert # : BEBS170964/09) (Valid : 29 Apr 12) 
 International Standards Workshop for Oil & Gas Industry in Malaysia – 23 – 24 Feb 2009
 Primavera Project Management P6 (PCSB) – 14 – 16 Jul 2008 
 Defensive Driving Training (PCSB) – Apr 2008 
 Project Risk Management (PCSB) – Mac 2008 
 Injury & Incident Free – (Qatar Gas & JMJ) 23rd  July 2006 
 CTJV Safety Induction (CTJV) 7th  July 2006 
 Working at Height (CTJV) 7th  Sept 2006 
 H2S Safety (CTJV) 7th  Sept 2006 
 Emergency Response (CTJV) 7th  Sept 2006 
 CTJV Defensive Driving (CTJV) Feb 2007 
 Defensive Driving (Megamas, Brunei. 2004) 
 ISO 2000 (SIRIM, 2000) 
 TQM (Bovis, In house, 1998) 

CAREER ARCHIVEMENT 

 Achieve 1st  Oil for BADP‐E Revisit 2 on 29th  Jul 2009 (ahead of schedule) and within approve 


budget. 
 Committee for PCSB Planning Department for preparing project planning guideline. 
 Convert existing and new projects schedule to Primavera P6 for Baram and Temana projects. 
 Standardize project management system in term of cost report and reporting. 
 Standardize system & format in term of MTO, Claims, Invoicing and other related to project (in 
software format). 

ASWADIMANOR SAFEIE ©®
 

RESUME 4 of 12

WORKING EXPERINCE: 

Dec ’16 – Mar  GE SINOHYDRO CONSORTIUM


Bintulu, Sarawak 

Position:  Senior Site Planner (Contract Assignment)


Projects:  400 MW Combined Cycle Gas Turbine (CCGT), Tanjung Kidurong, 
Bintulu, Sarawak 

Responsibility / Job Description; 

To  provide  overall  support  to project management of the multi‐discipline  project  control activities
including  but  not  limiting  to  planning,  document  control,  risk  management,  project  cost  control 
(management of change), materials and resource planning. 

Duties and Scope of Works; 

 Support and advise the Project Management team and wider project team on a day to day activities.


 Initiate and facilitate development and maintenance of project schedules for assigned Projects. 
 Support with consolidated data and progress measures for weekly and monthly reporting 
requirements. 
 Produce comprehensive schedules in various formats (Primavera and MS Project) to suit different 
users or audiences. 
 To lead the project control aspects of a number of assigned projects concurrently, maintaining 
dashboards, and progress management reports. 
 Analyse all project activities establishing well defined work activities, and create a detailed and 
properly sequenced project schedule. 
 Monitor actual job progress, compare to contract baseline and report progress against schedule to 
the project manager and client as appropriate. 
 Prepare project invoices as per contractual requirements with supporting documentation. 
 Regular liaison with site and integration teams to understand and report manufacturing and site 
progress for assigned projects. 
 Mitigate risk by adopting recovery strategies for any identified project delays. 
 Escalation of emerging risks to the assigned Project Manager. 
 Prepare "look ahead" schedules and reports for Client. 
 To work in collaboration with the Finance team to provide revenue and cost forecasts throughout the 
life cycle of the project/s. 
 Supporting any new pre‐sales opportunity with the preparation of bid documentation and high level 
planning activities. 
 Attend project team and client meetings as and when required. 
 Any other reasonable duties as delegated by management. 

Apr ’16 – Nov ‘16  MUHIBBAH ENGINEERING (M) BHD


Kota Kinabalu, Sabah 

Position:  Project Control Manager (Contract Assignment)

Projects:  PETRONAS Carigali New 11 Storey Office Building Project. 

Responsibility / Job Description; 

To  manage  a team  of project controls in order to provide overall support  to proposals  and project
management  disciplines  working  on  project  bids  and  projects  in  execution.    Responsible  for  the
management of  the  multi‐discipline project  control activities  including but not limiting  to planning,

ASWADIMANOR SAFEIE ©®
 

RESUME 5 of 12

document  control,  risk  management, project cost control (management  of  change),  materials and
resource planning. Support, mentor and develop the Project Controls staff in accordance with company
policies and procedures. 

Duties and Scope of Works; 

 Lead a team in a multi office organization.
 Oversee the application of the company project reporting standards to the project portfolio. 
 Provide  standardized  project  planning  &  scheduling,  risk  management,  document  control,  Change 
management, materials and resource planning. 
 Ensure that all project services disciplines are aligned with company policies and procedures.  
 Maintain effective interface between all project services related disciplines and the external disciplines 
they support. 
 Maintain appropriate staffing levels in order to adequately support the workload. 
 Ensure consistent and accurate project controls/services related reporting data. 
 Maintain an auditable database and reporting that supports the company stage gate process. 
 Set objectives for project control team members and ensure that those objectives are being met on a 
regular basis. 

Aug ’15 – Mar ‘16  Petrofac (Malaysia‐PM304) Limited


Kuala Lumpur, Malaysia 

Position:  Senior Cost Engineer (Contract Staff)


Project:  Cendor Development Project Phase 2.

Responsibility / Job Description; 

Development and execution of the project cost plan and monitor costs and collects cost data to ensure
conformity   with   top   management's   budget   directives,   cost   tracking,   forecasting;   and   financial 
reporting. 

Duties and Scope of Works; 

 Study and understand all relevant project documents relating to the cost management of allocated


project(s). 
 Setting up project/projects within Computerized Cost System to agreed format 
 Establishing project control budgets based on the client approved Project Control Estimate. 
 Assisting Project Management in identifying and gaining approval of Estimates/ Change Requests 
 Perform a variety of cost engineering functions including cost control, budget preparations, 
forecasting and cost reporting under limited supervision. 
 Reviewing cost commitment and expenditure information (for all cost elements), for input to the 
computerized cost control and reporting system on a weekly basis. 
 Producing regular cost reports and advising management of any forecast cost overruns, maintaining 
comprehensive accessible registers of financial approvals, variations and change orders. 
 Establish Cost Breakdown Structure (CBS) and integrate with WBS. 
 Review all PO’s as issued for cost committed. 
 Any other duties appropriate to this position 
 Report turnaround and project actual vs. baseline cost status as required. 
 Report earned value and identify trends that impact the final cost projections. 
 Prepare monthly cost report to management. 
 Review proposed cost changes with project team, client and contractors. 

ASWADIMANOR SAFEIE ©®
 

RESUME 6 of 12

Feb ’15 – Jul ’15  Leadshine Sdn Bhd
Kota Kinabalu, Sabah

Position:  Project Manager (Contract Staff)
Project: 
‐  132kv Transmission Line from MSS Tenom to PMU Nabawan, Sabah. 
‐  33/11kv Line & Substation for Zone 1, BELB Project, Sabah. 
‐  Sugut Solar Hybrid, Kg Gugusan Sugut, Sabah. 

Responsibility / Job Description; 

Primarily responsible for establishing, monitoring, and executing project plans. In charge of delivering
projects that improve a client’s business applications, infrastructure and processes, and doing this 
within time, on budget and to the highest standards. Also involved in building relationships with 
clients, and maintaining liaison with them throughout each project. Support, mentor and develop the
Project staff in accordance with company policies and procedures. 

Duties and Scope of Works; 

 Leading, motivating and managing a team in all aspects of estimating, planning and resource evaluation.


 Controlling the budget for each project, maintaining the agreed levels of expenditure. 
 Maintaining proper documentation (general project plans, action items, timelines, call notes, etc.) on all 
projects. 
 Managing project funding and resources, negotiating project changes, and adjusting resources across 
multiple projects. 
 Developing and managing KPIs to drive improvements and deliver performance. 
 Setting and driving project timelines, ensuring all deliverables are met and completed on time. 
 Coordinating work for and providing direction to staff to complete deliverables. 
 Autonomously devising solutions and taking ownership of situations to ensure a projects success. 

Mac ’14 – Jan ‘15  Misi Setia Oil & Gas Sdn Bhd


Kajang, Selangor 

Position:  Project Control Manager (Contract Staff)

Projects:  EPCC Dalak Pipeline Onshore Facilities Project.


EPCC Sipitang Tee‐off Metering Project. 

Responsibility / Job Description; 

To  manage  a team  of project controls in order to provide overall support  to proposals  and project
management  disciplines  working  on  project  bids  and  projects  in  execution.  Responsible  for  the
management  of  the  multi‐discipline  project  control  activities  including  but  not  limiting  to  planning,
document  control,  risk  management,  project  cost  control  (management  of  change),  materials  and
resource planning. Support, mentor and develop the Project Controls staff in accordance with company
policies and procedures. Support, mentor and develop the Project staff in accordance with company
policies and procedures. 

Duties and Scope of Works; 

ASWADIMANOR SAFEIE ©®
 

RESUME 7 of 12

 Lead a team in a multi office organization.
 Oversee the application of the company project reporting standards to the project portfolio. 
 Provide  standardized  project  planning  &  scheduling,  risk  management,  document  control,  Change 
management, materials and resource planning. 
 Ensure that all project services disciplines are aligned with company policies and procedures.  
 Maintain effective interface between all project services related disciplines and the external disciplines 
they support. 
 Maintain appropriate staffing levels in order to adequately support the workload. 
 Ensure consistent and accurate project controls/services related reporting data. 
 Maintain an auditable database and reporting that supports the company stage gate process. 
 Set objectives for project control team members and ensure that those objectives are being met on a 
regular basis. 

Apr ’13 – Feb ‘14.  PETRONAS LNG Train 9
Yokohama, Kanagawa, Japan

Position:  Project Control Manager (Contract Staff)

Projects:  LNG Train 9 Complex

Responsibility / Job Description; 

To  manage  a team  of project controls in order to provide overall support  to proposals  and project
management  disciplines  working  on  project  in  execution.  Responsible  for  the  management  of  the
multi‐discipline project control activities including but not limiting to planning, document control, risk
management, project cost control (management of change), materials and resource planning. Support,
mentor  and develop  the  Project  Controls  staff  in  accordance  with company  policies  and  procedures
for PETRONAS LNG 9 project. And as support, mentor and develop the Project staff in accordance with
company policies and procedures. 

Duties and Scope of Works 
 Lead a team in a multi office organization.
 Oversee the application of the company project reporting standards to the project portfolio. 
 Provide  standardized  project  planning  &  scheduling,  risk  management,  document  control,  Change 
management, materials and resource planning. 
 Ensure that all project services disciplines are aligned with company policies and procedures.  
 Maintain effective interface between all project services related disciplines and the external disciplines 
they support. 
 Maintain appropriate staffing levels in order to adequately support the workload. 
 Ensure consistent and accurate project controls/services related reporting data. 
 Maintain an auditable database and reporting that supports the company stage gate process. 
 Set objectives for project control team members and ensure that those objectives are being met on a 
regular basis. 

i.   Develop the Work Breakdown Structures (WBS) and prepare Control Estimate & Project Schedule.


 Work breakdown structure detailed out at Control level.
 Project Control Estimate. 

ii.  Develop Cost Breakdown Structure (CBS) and Organization Breakdown Structure (OBS) based on WBS.


 Cost Breakdown structure
 Common Code Account assigned to each cost item 
 Organization Breakdown Structure with specific individual name 
 Manpower/Staffing Plan 

ASWADIMANOR SAFEIE ©®
 

RESUME 8 of 12

iii. Develop and prepare the Project Control Plan to outline the process that will be used to measure
progress, control cost & schedule and analyze variances. 
 Project Control Plan outlining the progress that will be used to measure progress, control
cost & schedule, change control, reporting and analyze variances. 

iv. Prepare and update the Total Project Cost against Estimate. Responsible to controlling and monitoring


the details of the actual commitment, expenditures, trends and forecast in comparison to the approved 
budget. 
 Budget Performance (Calendar Year & Financial Year)
 AFE (inclusive Structure) 
 Cost variance analysis 
 Forecast cost (Annual & Total) 
 Annual Budgeting (WPB) 
 Trend Register & Change Management. 

v.  Update and analyze Project Schedule and Cost, highlight cost variance/issues, Critical path and make


recommendations to the Project Managers on effective mitigation. 
 Earned Value Analysis
 Productivity analysis of Productivity Index

Sept ’11 – Mac’ 13.  PETRONAS Carigali Schlumberger Alliance


Samarang Project Management Team (SPMT).
Kuala Lumpur 

Position:  Senior Project Controller (Contract Staff)

Projects:  Samarang Field Development Phase 2,


Field Improvement Project (FIP), 
Production Enhancement, Workovers Projects. 

Responsibility / Job Description 

Responsible for all aspects of cost control, planning, management plan, project interfacing and co‐
ordination, budgeting, financial reviews, project reporting and cost appraisals for a major EPCC / EPC
and offshore installation for Samarang field. 

Duties and Scope of Works 

i.   Develop the Work Breakdown Structures (WBS) and prepare Control Estimate & Project Schedule.


 Work breakdown structure detailed out at Control level.
 Project Control Estimate. 

ii.  Develop Cost Breakdown Structure (CBS) and Organization Breakdown Structure (OBS) based on WBS.


 Cost Breakdown structure
 Common Code Account assigned to each cost item 
 Organization Breakdown Structure with specific individual name 
 Manpower/Staffing Plan 

iii. Develop and prepare the Project Control Plan to outline the process that will be used to measure


progress, control cost & schedule and analyze variances. 
 Project Control Plan outlining the progress that will be used to measure progress, control 
cost & schedule, change control, reporting and analyze variances. 

ASWADIMANOR SAFEIE ©®
 

RESUME 9 of 12

iv. Prepare and update the Total Project Cost against Estimate. Responsible to controlling and monitoring


the details of the actual commitment, expenditures, trends and forecast in comparison to the approved 
budget. 
 Budget Performance (Calendar Year & Financial Year)
 AFE (inclusive Structure) 
 Cost variance analysis 
 Forecast cost (Annual & Total) 
 Annual Budgeting (WPB) 
 Trend Register & Change Management. 

v.  Update and analyse Project Schedule and Cost, highlight cost variance/issues, Critical path and make


recommendations to the Project Managers on effective mitigation. 
 Earned Value Analysis
 Productivity analysis of Productivity Index

Sept ’07 – Aug ‘11.  PETRONAS CARIGALI Sdn Bhd.


Development Division. 
Kumang Baram Development Project (DKB).
Kuala Lumpur 

Position:  Senior Project Controller (Contract Staff)

Projects:  BADP‐E Revisit 2, BAJT‐H Revisit 1, Temana Redevelopment, 
Kumang Development Phase 1 

Responsibility / Job Description 

Responsible for all aspects of cost control, planning, management plan, project interfacing and co‐ordination,


budgeting, financial reviews, project reporting and cost appraisals for a major EPCC / EPC and offshore 
installation for Kumang and Baram Development projects. 

Duties and Scope of Works 

i.   Develop the Work Breakdown Structures (WBS) and prepare Control Estimate & Project Schedule.


 Work breakdown structure detailed out at Control level.
 Project Control Estimate. 

ii.  Develop Cost Breakdown Structure (CBS) and Organization Breakdown Structure (OBS) based on WBS.


 Cost Breakdown structure
 Common Code Account assigned to each cost item 
 Organization Breakdown Structure with specific individual name 
 Manpower/Staffing Plan 

iii. Develop and prepare the Project Control Plan to outline the process that will be used to measure
progress, control cost & schedule and analyze variances. 
 Project Control Plan outlining the progress that will be used to measure progress, control
cost & schedule, change control, reporting and analyze variances. 

iv. Prepare and update the Total Project Cost against Estimate. Responsible to controlling and monitoring


the details of the actual commitment, expenditures, trends and forecast in comparison to the approved 
budget. 
 Budget Performance (Calendar Year & Financial Year)
 AFE (inclusive Structure) 
 Cost variance analysis 

ASWADIMANOR SAFEIE ©®
 

RESUME 10 of 12

 Forecast cost (Annual & Total)


 Annual Budgeting (WPB & CPB) 
 Trend Register & Change Management.

v.  Update and analyse Project Schedule and Cost, highlight cost variance/issues, Critical path and make


recommendations to the Project Managers on effective mitigation. 
 Earned Value Analysis
 Productivity analysis of Productivity Index

vi. Prepare project reports and performance review inclusive of all packages including status, major
highlights and cost control reports to Management. 
 Cost Report of each month.

May ’06 – Aug’07.  Technip Corporation France

Secondment to:  Chiyoda Technip Joint Venture ‐ QCS.


Subcontracts Dept., Ras Laffan, Qatar.

Position:  Subcontracts Administrator (Contract Staff)

Project:  QG 3 & QG4 LNG Onshore Facilities Project


Qatar Liquefied Gas Company Limited 3 & 4.
Ras Laffan Industrial City, Qatar. 

Job Description; 

 Formalise roles & responsibilities and line of communication for all who participate in the Contract /


Subcontract execution and where applicable, review and recommend Contractor sub‐contracting and
procurement procedures. 
 Review and verify Subcontractor progress payment certificate and invoice and ensure that the payment
is  correctly  charged  to  the  Contract  whilst  monitoring  expenditure  (including  commitments)  against
the ACV (Approve Contract Value) and initiate approval requests. 
 Resolve  disputes; handle  claims  by/against  with  the  Subcontractor  in  liaison  with  Company  Site
Representative and Company Representative. 
 Prepare, evaluate & recommend subcontract. 
 Prepare  tender  document,  tender  evaluation  and  recommendation.  Prepare  service  agreement.
Prepare financial report to management. 

Oct ’03 – Apr ’06.  Malaysia Marine Heavy Engineering Sdn Bhd


Formerly known as Malaysia Shipyard & Engineering Sdn. Bhd. 
Engineering Division / PMT, 
Brunei Site Office, Kuala Belait, Brunei. 

Position:  Cost & Contracts Engineer (Permanent staff)

Project:  Champion West Phase III – EPF Project


Negara Brunei Darussalam 
Job Description 

 Formalise roles & responsibilities and line of communication for all who participate in the Contract


execution  (Company  &  Contractor)  and  where  applicable,  review  and  approve  Contractor  sub‐
contracting and procurement procedures. 

ASWADIMANOR SAFEIE ©®
 

RESUME 11 of 12

 Review and verify Contractor progress payment certificate and invoice and ensure that the payment is


correctly charged to the Contract whilst monitoring expenditure (including commitments) against the
ACV and initiate approval requests. 
 Initiate  any  requirement  for  Changes,  Extension,  and/or  Amendments  to  the  Contract  and  obtain
necessary approvals together with the tender holder. Issue Request For Quotation, Preliminary Change
Order & Change Order and maintain up‐to‐date registers of the changes to contract. 
 Resolve  disputes;  handle  claims  by/against  with  the  Contractor  in  liaison  with  Company  Site
Representative, Contract Holder, Company Representative, Tender Holder, and Legal Advisor. 

Aug ’00 – Sept 03.  Stagno Tech Sdn. Bhd.


Contract Dept. / Project Dept.

Position:  Cost & Contracts Engineer. (Contract staff)

Project:  Proposed Construction and Completion of SW1 project for Putrajaya


Holdings. 

Job Description 

Pre‐qualification & evaluation of contractors, cost checking development, measurement & estimating


for tender estimates, preparation of contract documents, cost control during the progress of works,
preparation  of  interim  valuation,  preparation  of  variation  order,  preparation  of  cost  report  upon
alternative  construction  methods, financial progress  monthly  report.  Prepare  project financial  report
and budget. 

Aug’99 – Jul ’00.  Boustead Penang Shipyard Sdn. Bhd. (Oil & Gas) 


Formerly known as Penang Shipbuilding & Construction Sdn. Bhd. 
Oil & Gas Division 

Position:  Technical Executive. (Permanent staff)

Project:  Jana Manjung Power Plant, Manjung, Perak (Steel  Structure for Boiler
House) 

Job Description 
Pre‐qualification & evaluation of contractors, cost checking development, measurement & estimating
for tender estimates, preparation of contract documents, cost control during the progress of works,
preparation  of  interim  valuation,  preparation  of  variation  order,  preparation  of  cost  report  upon
alternative construction methods, financial progress monthly report. Prepare project financial report
and budget. 

Jun ’97 – Jul ’99.  KPK Quantity Surveyor (M) Sdn Bhd.


KLIA, Sepang, Selangor. 

Position:  Quantity Surveyor.

Project:  Kuala Lumpur International Airport (KLIA), Ground Support Facilities,


Sepang, Malaysia. 

Job Description 

Pre‐qualification & evaluation of contractors, cost checking during design development, 


measurement & estimating for pre‐tender estimates, preparation of contract documents, cost

ASWADIMANOR SAFEIE ©®
 

RESUME 12 of 12

control during the progress of works, preparation of interim valuation, preparation of variation


order, preparation of cost report upon alternative construction methods, financial progress 
monthly report, update database, project management and others which related to project. 

Apr ’96 ‐ Jul ’96.  Sikap Murni Sdn. Bhd.


Kuala Perlis, Perlis. 

Position:  Quantity Surveyor (Practical Trainee)

Job Description  Assisted Project Co‐coordinator in doing costing, estimation, post


contract, administration, supervise of a few project, 

Project:  Construction of Malaysia/Thailand International Boundary Wall from Kedah


to Perlis. 

Apr ’92 ‐ May ’93.  I.Z.A. Construction Co. Sdn Bhd


Jalan Lapangan Terbang of Jalan Gopeng,
Ipoh, Perak. 

Position:  Site Agent

Job Description  Site co‐ordination, management & supervision, prepare progress claim,


supervision of sub‐contractor’s contract works etc. 

Project  Projek Komplek Kraftangan Malaysia,
Kepala Batas, Alor Setar, Kedah. 

Expected Salary: 

To be discuss 

Availability: 

Immediately 

REFERENCE: 

David Baker  Ahmad Rashidi Sabudin
Manager QA & QC,  Owner 
MUHIBBAH ENGINEERING (M) SDN BHD  Apex Business Solutions 
4th Floor, East Wing, Wisma 2020,  Kuala Lumpur 
No. 18, Jalan Belia, Karamunsing, 
88100 Kota Kinabalu, Sabah.  Tel No.: +60 12 202 7505
Email : ahmad.rashidi@gmail.com 
Tel No.:  +60 10 945 0379 
Email : bdavid988@yahoo.com 

ASWADIMANOR SAFEIE ©®

You might also like