Doc. No.

: Tf04-CS-O()"PC-016
DEFINITION AND MEASUREMENT
~ GSE&C
-
Rev. No. : 0
OF Page : 10ofl27
CONSTRUCTION WORK Date : 13 Mar. 2009

DEFINITIONS AND MEASUREMENTS OF WORK ITEMS

No. Work Item Defmition Measurement

Removal of all piles and


supports including backfill
of voids after removal of
piles, immediately after
completion of its duty.

Layer of clayey silt


B.5 Excavation CM
Excavation and loading of Depths < 3m
soil.
The work quantity shall
Hauling of excavated soil be the soil volume to be
to the designated stockpile excavated.
area and/or fmal disposal
The quantity shall be
area.
calculated as fo llows:
Removal of
VE = AE x DE
contaminating matter from
the material excavated. Where
Grading, sloping, VE: Volume of
compacting, and other Excavation
relevant work for proper DE:Depth of excavation
stockpiling and/or
disposal. AE:Area of excavation,
including the
'Maintaining excavated pit following working
free from debris, water and space fro m the
unsuitable materials until surface of structure
completion of backfilling. and/or structural
Compacting and trimming concrete
of excavated bottom to the
specified elevation. Depth Working Space
If required, shoring or DE :"0 0.5m + 0.2 m
sheeting to maintain the 0.5 <DE :"0 1.0 m + 0.4 m
sides of the excavation 1.0 < DE :"03.0 m + 0.6 m
until backfilling is DE> 3.0 m + 1.2 m
completed to an extent,
which no longer required The sides of excavations
such shoring or sheeting. shall be vertical.
The depth of excavation
(DE) shall be the actual
DEFINITION AND MEASUREMENT Doc. No. : 7T04-CS-00-PC-016
-<~ Rev.No. : 0
~~GSE&C OF Page : 11 ofl27
CONSTRUCTION WORK Date : 13 M .... 2009

DEFINITIONS AND MEASUREMENTS OF WORK ITEMS

No. Work Item Definition Measurement

ground elevation.
The actual ground
elevation upon between
CONTRACTOR and the
SUBCONTRACTOR
according to the survey
record.
An increased quantity due
to a volume change
because ofloose soil shall
not be included.
Extra excavation for the
convenience of
construction, temporary
drains, sump pits, etc.
shall not be included.
Overlaps shall not be
included.
When a structure has two
or more portions of
different depths, the
quantity of each portion
shall be calculated
separately.
When concrete is poured
against soil, the work
quantity shall be
calculated as follows:
Ve = Af xDp
Where,
Ve: The work quantity
of mass concrete
Af: Area offooting
Dp: Depth of mass
concrete
Note: In this case,
unnecessary
DEFINITION AND MEASUREMENT Doc. No. : 7T04-CS-00-PC-016
/:S:~ Rev. No. : 0
L~
" GS E&C
''--'"
OF Page : 12 of 127
CONSTRUCTION WORK Date : 13 Mal: 2009

DEFINITIONS AND MEASUREMENTS OF WORK ITEMS

No. Work Item Defmition Measurement Unit

formwork areas shall


not be included in the
formwork.

B.6 Disposal The work covers Disposal of material CM


(within the site) transportation of surplus arising from excavation
soil, which will not be shall be measured by
used for back-filling volume. Final
and/or banking, from measurement shall be
temporary deposit to quantified when all the
disposal area designated earthwork is completed,
by COMPANY within the by using the following
Site, spreading and formula.
grading soil in the
V=Vex-Vbf
restricted area.
Disposal Same as "within the site", Where:
(outside of site) but the disposal area shall
Vex = All volume of
be outside of the site
excavation based on the
where the license and/or
drawings.
royalty for the disposal
shall be obtained by the Vbf= All volume of
SUBCONTRACTOR. backfilling based on
drawings.

B.7 Backfilling Selection and loading of The work quantity shall CM


& Compaction backfill material at the be the soil volume after
stockpile area and/or compaction
designated place. consolidation, and
grading.
Hauling of backfill
material from the stockpile The quantity shall be
area and/or designated calculated as follows.
place.
Vb = Ve - Vd
Spreading of backfill Where,
material in layers.
Vb: The work quantity
Compacting of backfill of backfilling
material in layers.
Ve: The work quantity
Moisture control. of excavation
Final grading after V d: The volume
backfilling. replaced by the
DEFINITION AND MEASUREMENT Doc. No. : 7T04-CS-00-PC-016
,.,:':; _~.'~
_.~~' J
Rev. No. :0
l~
'~~~
GS E&C OF Page : 130f127
CONSTRUCTION WORK Date : 13 Mar. 2009

DEFINITIONS AND MEASUREMENTS OF WORK ITEMS

No. Work Item Definition Measurement

Supplemental backfilling constructed


when required due to the structure including
settlement of backfill leveling concrete,
already done. sand and gravel
base if used
Sampling and compacting
test. The calculation shall be
made according to the
Removal of excess backfill
actual backfill top
material to the designated
elevation as specified by
place.
drawings.
Dewatering during
However, the quantity
backfilling.
placed in advance for
future settlement, shall
not be included.

B.8 Sand and/or Loading and hauling of the The work quantity shall CM
gravel base base material. be calculated as follows:
Spreading and compacting Vg = AgXt
of base materials including
vo id filling. where,

Leveling the base top. Vg : The work quantity of


gravel base
Sampling and testing. Ag : Area of gravel base *
Sub-grade preparation for t: Thickness of gravel
receiving the gravel base. base after
compaction

* Unless otherwise
specified, the area of
gravel base shall be
O.lm wider than the
bottom edges ofthe
structure.
DEFINITION AND MEASUREMENT Doc. No. : Tf04-CS-00-PC-016
.{J.S:;~

r...,;;
~~
GS E&C OF
Rev. No.
Page
:0
: 14 of 127
CONSTRUCTION WORK Date : 13 Mar: 2009

DEFINITIONS AND MEASUREMENTS OF WORK ITEMS

~o. VVorkltem Definition Measurement

B.9 Crushed stone F ill materials shall be free CM


Iw compaction from of organic matter,
rubbish debris or other
unsuitable materials and
imported from off-site if
necessary.

B.IO Concrete Sampling and testing of The work quantity shall CM


materials. be the volume of concrete
as for construction
Trial mixing and
drawings.
production test to establish
the proportion. The specified tests and
inspections shall not be
VVeighing and mixing of
included.
ingredients.
Transporting and
discharging of the mixed
concrete.
Sampling and testing of
the concrete as specifIed.
Proper disposal of surplus
concrete.
Supply of admixture.
Preparation and provisions
for receiving concrete.
Hauling, placing,
vibrating, and fmishing of
concrete.
Protection required for
embedded materials.
Removal of laitance.
Provisions required for
construction joints.
Curing and test of
strength.
Filling with mortar into the
cone holes after the
DEFINITION AND MEASUREMENT Doc. No, : IT04-CS-00-PC-016
'-:"~ Rev. No. : 0
~ GS E&C OF Page : 150f127
CONSTRUCTION WORK Date : 13 Mar. 2009

DEFINITIONS AND MEASUREMENTS OF WORK ITEMS

}<o. VVorkltem Defmition Measurement

removal of form-ties.

B.1l Lean concrete Installation of forms for The work quantity shall CM
(Leveling concrete) leveling concrete. be calculated as stated
below:
Mixing of lean mix
concrete as defined in Item Vl=Alxt
B.6. VVhere,
Hauling, placing, tamping, VI: The work quantity of
and leveling of lean mix leveling concrete (m')
concrete.
AI: Area ofJeveling
Curing.
concrete (m' ) *
Removal of forms.
t: Thickness of leveling
concrete (m)
• Unless otherwise stated,
area of leveling concrete
shall be O.lm wider than
the bottom edges of the
structure.

B.12 Rebar Cutting and bending of The work quantity shall KG


(applicable to mild reinforcing bars. be the weight of the bars
steel, high yield Hauling of reinforcing calculated form
steel, wire fabric, bars. construction drawing.
plain round and .
Assembling and installing Splices made for
deformed bars)
of reinforcing bars, SUBCOmRACTOR's
including splicing, and own convenience shall
setting of stairs, spacers, not be included.
chairs and supports.
Loss and wastage shall
VVelding of reinforcing not be included.
bars, if specified.
Any materials used for
Patchting and cleaning of reinforcing bar
reinforcing bar surfaces installation, such as
ior to concrete placing. supports, spacers, chairs,
tie-wires, etc. shall not be
ch-up epoxy coating included.
r damaged part.
Splices shall not be
DEFINITION AND MEASUREMENT Doc" No" : IT04-CS-00-PC-016
/"~
r-""" " Rev.No. : 0
~ GSE&C OF Page : 16 of127
CONSTRUCTION WORK Date : 13 Mal: 2009

DEFINITIONS AND MEASUREMENTS OF WORK ITEMS

No. Work Item Defmition Measurement Unit

included unless otherwise


shown on the construction
drawings.

B.13 Form Fabrication, hauling and The work quantity shall SM


installation offorms. be the surface area 0 f the
forms to be in contact
Setting ofform-ties and
with the placed concrete,
chamfers as required.
excluding leveling
Shoring and reshoring. concrete.
Closing up the above- ,Overlapping or extended
mentioned holes. areas shall not be
included.
Cleaning, oiling, and
wetting of inner surfaces Forms required for
of forms. various types of joints
shall not be included.
Removal of forms.
Forms required for
Hauling of removed forms.
providing anchor boxes
shall not be included.
Forms required to
provided holes for
, connecting sewer pipes,
conduit pipes, and
required for installing,
manhole covers, catch
basin covers, etc. , and
required to close up the
holes after the above-
mentioned connection
and installation shall not
be included.

B.14 Grouting Surveying and marking of The work quantity shall eM


elevation and centerline. be the volume of grouted
mortar.
Concrete foundation top
surface preparation.
(chipping and roughening)
Mixing of mortar grout.
DEFINITION AND MEASUREMENT Doc. No. : 7T04-CS-00-PC-016
Rev. No. :0
OF Page : 17ofl27
CONSTRUCTION WORK Date : 13 Mar. 2009

DEFINITIONS AND MEASUREMENTS OF WORK ITEMS

No. Work Item Definition Measurement

Forming, placing, and


fmishing of mortar grout.
Curing.

B.15 Anchor bolt, anchor Supply, setting and . The work quantity shall be Ea
box, sleeve pipe alignment of templates and counted in sets of the
installation their supports. anchor bolts.
(Including anchor
boxes and sleeve Setting and alignment of
pipes) anchor bolts.

Supply and installation of


anchor boxes, and anchor
sleeves, if specified.
Cleaning of anchor bolt
surfaces.
Mortar grouting into
anchor boxes and sleeve
pIpes.
Removal and hauling of
templates to the designated
place after use.
Bolt head and nut
protection and greasing
before, during, and after
concreting.

B.16 ANCHOR BOX · Making hollows in . The work quantity shall be Ea


foundation concrete to counted in sets of the
Receive anchor bolts. anchor boxes.

· Measuring the position,


marking, assembling and
setting box forms

· Removing the box forms


Doc. No. : 7T04-CS-0.O-PC-016
~ DEFINITION AND MEASUREMENT

-
Rev. No. : 0
(~ GSE&C OF Page : 18 of 127
CONSTRUCTION WORK Date : 13 Mar. 2009

DEFINITIONS AND MEASUREMENTS OF WORK ITEMS

No. Work Item Defmition Measurement Unit

after concreting, checking,


rectification if necessary,
employing cover for anchor
holes

. Marking center line and


base line on the
foundation, cleaning
anchor holes, but
excluding mortar filling
after anchor bolts are set.

Supply of material.
B.17 Misc. steel (such as, The work quantity shall KG
comer angles, top Fabrication. be the weight of the
steel in sleepers, embedded items after
Installation.
pipe sleeves, and fabrication.
anchor plates, etc.) Alignment.
Welding rods and
Painting or galvanizing, if temporary means required
specified. for handling and
installing the embedded
Relevant work such as, but
items shall not be
not limited to, formwork,
included.
provision of connection
holes, and filling voids
with mortar grout.
Protection of embedded
items before, during and
after concreting.

B.18 Bituminous coating . Trimming, Cleaning of The work quantity shall be SM


on the surface to be coated the surface area of the
Surface of foundation.
Heating the bituminous
concrete
material
(foundation, M/H,
C/B, etc.) Appling the material on the
surface of the foundation
Protecting the coated
surface
.·n,,, DEFINITION AND MEASUREMENT Doc. No. : 7T04-CS-00-PC-016

[~!5GS E&C
Rev. No. : 0
OF Page : 19 of 127
.".- CONSTRUCTION WORK Date : 13 Mar. 2009

DEFINITIONS AND MEASUREMENTS OF WORK ITEMS

No. VVorkItem Definition Measurement

Filling the joints and cells Openings shall not be


with cement mortar. included.
Finishing the joints.

Providing the openings


and sleeves.
Providing the lintels,
pilasters, and bond beams,
including the reinforcing
bars, forms, and concrete.

Providing the expansion


joints or control joints.

Filling and fmishing the


cement mortar around the
embedded items such as
pipes and boxes.

B.J 9 Dewatering · As defined in Item B.l. The actual site installation LM


"Excavation". between CONTRi\CTOR
and the SUCONTRACTOR
· Riser pipe install
according to the site survey
· Upper pipe connect header record.
pipe line
Overlap shall not be include
· Providing Vacuum
The work quantity shall be
pumpmg
the length of well point and
· Providing discharge hose deep well
· On the discharge of
groundwater
DEFINITION AND MEASUREMENT Doc. No. : Tf04-CS-00-PC-016
p7:'flffJJ"l
Rev. No. : 0
(~
I;~
:
"',~
GS E&C OF Page : 200fl27
CONSTRUCTION WORK Date : 13 Mar. 2009

DEFINITIONS AND MEASUREMENTS OF WORK ITEMS

No. Vforkltem Defmition Measurement

C. SE\VERAND DRAINAGE

C.l Excavation As defmed in Item B.l. The work quantity shall CM


(for sewer piping) "Excavation". be the soil volume to be
excavated.
The excavation width for
various pipe sizes shall be
as shown in the table
below:
The clearances between
the pipe bottoms and
excavation bottoms shall
also be as shown in the
table.
However, if the drawings
indicate excavation
dimensions, the
dimensions shown on the
drawings and/or
specification shall be
applied.
If the pipes are to be laid
underneath the existing
earth dike, the depth of
excavation shall be
measured form the
bottom of the existing
earth dike.
The requirements stated
in Para (4) thru (8) of
Item B.I shall be applied.

Nominal Vfidth Bottom


Pipe Size Clearance
D (mrn) (mrn) (mrn)

Less than D + 400 50


Doc. No. : 7T04-CS-00-PC-016
--:::J:::;I DEFINITION AND MEASUREMENT
l~>\ GS E&C
Rev. No. : 0
OF Page : 21 of127
"-~
'~;~;t
. .
CONSTRUCTION WORK Date : 13 Mar. 2009

DEFINITIONS AND MEASUREMENTS OF WORK ITEMS

No . Work Item Defmition Measurement Unit

150(or 6")
150 to 300 D + 600 80
(or 6" to
12")
300 to 900 D + 800 80
(or 12" to
36")
More than D + 1000 100
900
(or 36")
Note: The "C" shall be
considered the same
for the entire length,
even though the pipe
has a larger portion
than its body size,
such as at a coupling,
joint collar or socket,
or spigot portion.

Extra excavation for pipe


jointing shall not be
included.

C.2 Disposal As defmed in Item B.2 Disposal of material CM


(within the site) ''Disposal'' arising from excavation
shall be measured by
volume. Final
measurement shall be
quantified when all the
earthwork is completed, .
by using the following
formula.
V=Vex-Vbf
Disposal As defined in Item B.2 Where:
(outside of site) "Disposal" Vex = All volume of
excavation based on the
drawings.
Vbf= All volume of
backfilling based on
DEFINITION AND MEASUREMENT Doc. No. : 7T04-CS-00-PC-016
fdl!~ Rev. No. : 0
l~\ GSE&C OF Page : 22 of127
~ Date : 13 Mar. 2009
CONSTRUCTION WORK

DEFINITIONS AND MEASUREMENTS OF WORK ITEMS

1'0. VVorkItem Defmition Measurement

drawings.
C.3 Sand-filling Hauling, placing, and The work quantity shall CM
(for sewer piping) compacting ofthe sand. be the sand volume after
compaction and
Provisions for securing the
consolidation.
pipe locations, joint
tightness, and external The quantity shall be
coating. calculated as follows:
Moisture control. v s = {(Excavation VVidth
x Excavation
Sampling and compaction
Depth) - Vp} x
test.
Pipe Length
VVhere,
V s: VVork quantity of
sand filling (m')
Vp: The quantity
displaced by pipes,
pipe sleepers, etc.
(m')

C.4 Backfilling As defmed in Item B.3 The work quantity shall CM


(for sewer piping) "Backfilling" . be the soil volume after
compaction and
Provisions for securing the
consolidation as follows:
pipe locations, joint
tightness, and external Vb = Ve- Vs- Vp
coating. VVhere,
Vb: The work quantity of
backfilling (m')
Ve : The work quantity of
excavation (m')
Vs : The work quantity of
sand filling (m')
Vp: The quantity
displaced by pipe,
pipe sleeper, etc.
(m')
Doc. No. : Tf04-CS-00-PC-016
DEFINITION AND MEASUREMENT
Rev.No. : 0
GSE&C OF Page : 23 of 127
CONSTRUCTION WORK Date : 13 Mar. 2009

DEFINITIONS AND MEASUREMENTS OF WORK ITEMS

No. Work Item Defmition Measurement Unit

The calculation shall be


based on the top elevation
ofthe actual backfilling.
However, the quantity
placed in advance for
future settlement shall not
be included.

c.s Sewer piping Preparation of excavated The work quantity shall LM


(applicable to all trench bottom. be the length of pipelines.
types of piping such
Provision of sleepers. The length of pipes and
as concrete pipes,
fittings required to
cast iron pipes, steel Prefabrication.
connect the cleanouts and
pipes, PVC pipes,
Loading and hauling. funnels shall not be
etc.)
included.
Installation, jointing, and
alignment of pipes and The length of pipelines
fittings. shall be measured along
their centerlines.
Welding, bolting, caulking,
and/or sealing, including Unless it is significant,
supply of sealing material. the inclination of the
pipelines shall not be
Painting and/or coating of
considered in the
pipe external surfaces.
calculation.
Water filling test, if
specified.
Drying and cleaning.
Cleaning.

C.6 Drain hub Prefabrication. The work quantity shall Ea


be counted in sets for
Installation, alignment,
each type and size.
and jointing of funnels and
fittings, including supply
of accessories.
Welding, bolting, caulking,
and/or sealing.
Painting and/or coating
Doc. No. : 7T04-CS-00-PC-016
DEFINITION AND MEASUREMENT
·~~ Rev. No. : 0
~ GSE&C OF Page : 240f127
CONSTRUCTION WORK Date : 13 Mar. 2009

DEFINITIONS AND MEASUREMENTS OF WORK ITEMS

No. Work Item Defmition Measurement Unit

external surfaces of pipes.


Water filling test, if
specified.
Installation and removal of
temporary caps.
Cleaning.

e.7 Cleanout Prefabrication. The work quantity shall Ea


be co unted in sets for
Installation, alignment,
each type and size.
and jointing of cleanouts
and fittings, including
accessones.
Welding, bolting, caulking,
and/or sealing.
Painting and/r coating of
cleanout surfaces.
Water filling test, if
specified.
Cleaning.

e.s Manhole/catch Installation of cover The work quantity shall Ea


basin cover frames including be counted in pieces for
formwork, concrete work, each type and size.
and/or mortar grouting as
set forth in items B.6, B.9,
and B.1O, respectively.
nstallation of covers.
Painting and/or coating.
Cleaning.
Water test, if specified.

C.9 . Grating cover Fabrication of grating The work quantity shall SM


(for open ditches) covers and frame. be the area of grating
cover.
Installation of frame into
DEFINITION AND MEASUREMENT Doc. No. : 7T04-CS-00-PC-016
Rev. No. : 0
GSE&C OF Page : 25 of127
CONSTRUCTION WORK Date : 13 Mar. 2009

DEFINITIONS AND MEASUREMENTS OF WORK ITEMS

No. Work Item Defmition Measurement

concrete wall of ditch


including formwork,
concrete work and/or
mortar grouting as set
forth in Items B.6, B.9,
and B.IO, respectively.
Painting or galvanizing, if
specified.
Cleaning.

C.IO Membrane liner Preparation for applying The work quantity shall SM
(waterproo f) membrane sheets. be the surface area of
earth surface or similar
Surface preparation of area
surface to be covered
where sheeting is to be
with the sheeting.
applied.
Overlapping sheets shall
Cutting and pre-forming of
not be included.
sheets.
Handling, hauling, and
applying primer and/or
adhesive.
Laying or applying sheets
as specified, including
overlapping.
Curing and protection.
Leak test and/or water
filing test.
C.1I Waterproofmg Preparing the base Work quantity shall be SM
surfaces to form the the surface area to be
gradients and cants, waterproofed.
including leveling courses.

Applying the
waterproofmg system,
including fasteners,
flashlngs, and sealants.

D. ROAD AND PAVEMENT


DEFINITION AND MEASUREMENT Doc. No. : 7T04-CS-00-PC-016
/~ Rev. No. : 0
\~GSE&C OF Page : 26 of 127
CONSTRUCTION WORK Date : 13 Mar. 2009

DEFINITIONS AND MEASUREMENTS OF WORK ITEMS

No. Work Item Defmition Measurement Unit

D.I Concrete pavement Formwork as defmed in The work quantity shall SM


ItemB.9. be the top surface area of
the concrete slab.
Reinforcing bar work as
defmed in Item B.8. The inclination of
concrete pavement, unless
Placing waterproof paper
it is significant, shall not
prior to pouring concrete.
be considered in the
Concrete work as defmed calculation.
in Item B.6.
The area occupied by
Surface fmishing. other structures such as
foundation pedestals,
Installation of various
pump plinths, manholes,
types of joints, including
catch basing, pits, or
those around structures in
cable trenches shall not
the paved area.
be included.
Sealing of expansion
The following work
joints.
quantity shall be
Curing and protection. measured independently
and other minor work
Sampling and testing of
include pavement work.
concrete pavement.
a) Expansion joint &
sealing
b) Contraction joint
c) Polyethylene film
d) Dowel bar
e) Welded wire fabric

D.2 Sub-grade Excavation as defmed in The work quantity shall SM


item B.I. be the area of sub-grade.
Scarifying, grading, and The inclination of the
ompacting of sub-grade. sub-grade, unless it is
significant, shall not be
mpling and compaction
considered in the
test.
calculation.
Removing unsuitable
The area occupied by
materials.
structures such as
manholes, catch basins,
Doc. No. : 7T04-CS-00-PC-016
DEFINITION AND MEASUREMENT
Rev. No. : 0
,GSE&C OF Page : 27 ofl27
CONSTRUCTION WORK Date : 13 Mar. 2009

DEFINITIONS AND MEASUREMENTS OF WORK ITEMS

No. Work Item Defmition Measurement Unit

pits, or ditches shall not


be included.

D.3 Sub-base Course Loading aud hauling. The work quautity shall SM
be the area of sub-base
Spreading aud compacting course.
of material specified.
Inclination of the grauular
Spraying of Gravel sub-base, uuless it is
materiaL significant, shall not be
Trimming aud leveling of considered in the
grauular sub-base top. calculation.

Moisture controL The area occupied by


structures such as
Sampling aud compaction manholes, catch basins,
test. pits, or ditches shall not
be included.

D.4 Welded wire fabric As defmed in Item B.8 The work quautity shall SM
"Reinforcing Bar". be the area to be covered
by welded wire fabric.

Overlaps shall not be


included .

D.5 Control joint . Trausportating, cleaning, . The work quantity shall be LM


surface preparation, the length of control
pouring asphalt into slit. joint.

. Dummy joint, construction


joint shall not be included
in this JOINT WORK
which shall be included in
the CONCRETE WORK.
DEFINITION AND MEASUREMENT Doc. No. : 7T04-CS-00-PC-016
. 4'~
Rev. No. :0
~ GSE&C OF Page : 28 of 127
CONSTRUCTION WORK Date : 13 Mar. 2009

DEFINITIONS AND MEASUREMENTS OF WORK ITEMS

No . Work Item Defmition Measurement Unit

D.6 Expansion joint . Transportating, setting slip The work quantity shall LM
bars (including esiliant be the length of
rubber, steel pipes, grease expansion joint.
asphalt coating)

Cleaning, surface
preparation, pouring
asphalt into slit.
Contraction joint

. Dummy joint, construction


joint shall not be included
in this JOINT WORK
which shall be included in
the CONCRETE WORK.

Concrete paving shall be


kept isolated from
foundation with and piers
by isolation joint filled
with jont filler and sealant
around contacted surface
thickness shall be
a. 12mm THK Joint;
around foundations
supporting structures
and static equipment
b. 25mm THK Joint;
around foundations
supporting heavy
. • ,.' _~ ,,;,.l\ .,.I vibrating equipment

~
• ~y -

. . ..
(:.0"2.
,- '

)i'"oJ!"
"", .
D , I bars for expansion
Joint shall be provided with
~,\o. 4 expansion cap and coated
with debonding compound
or grease.

D.7 PE Film (0. 15mm) . Supplying, cutting, laying The work quantity shall SM
(two layer of O.lmm), be the area to be covered
making lapping joint byPEFilm.
Doc. No. : 7T04-CS-00-PC-016
DEFINITION AND MEASUREMENT
Rev.No. : 0
OF Page : 29 of 127
CONSTRUCTION WORK Date : 13 Mar. 2009

DEFINITIONS AND MEASUREMENTS OF WORK ITEMS

No. VVorkltem DefInition Measurement

(overlapping 100 nnn) Overlaps shall not be


taking the necessary included.
protection measures not to
damage to the sheet.

D.8 Asphalt pavement Cleaning of area where The work quantity shall SM
asphalt concrete is to be be the top surface area of
placed. the asphalt paving.
Application of prime coat The area occupied by
or tack coat. structures such as
manho les, catch basins,
Mixing, hauling,
pit, or ditches shall not be
spreading, leveling, and
included.
compacting of material
specifIed.
Curing and protection.
Sampling and testing of
asphalt concrete.
D.9 Prime Coating Surface protection of The work quantity shall SM
Earth structure such as be the area to be covered
asphalt concrete road. by Prime coating.

· Supplying material, cleaning


and preparation of base
course surface spraying
asphalt.

. Checking the fmishing


surface and repairing the
surface if necessary.

D.IO Tack Coating · Surface protection of binder The work quantity shall SM
course such as asphalt be the area to be covered
concrete road. by Tack coating.

· Supplying material, cleaning


and preparation of binder
course surface spraying
asphalt.

· checking the fmishing


DEFINITION AND MEASUREMENT Doc. No. : 7T04-CS-00-PC-016
Rev. No. : 0
OF Page : 30 of 127
CONSTRUCTION WORK Date : 13 Mal: 2009

DEFINITIONS AND MEASUREMENTS OF WORK ITEMS

No. Work Item Defmition Measurement Unit

surface and repairing the


surface if necessary.

D.ll Gravel surfacing: Loading and hauling. The works quantity shall be CM
base-course volume to be calculated from
Sub-grading including
drawing.
scarifying, grading, and
compacting.
Spreading and grading of
gravel or crushed stone,
including void filler, if
specified.
Sampling and compact ion
test (density test)

D.12 Sub-base Course Loading and hauling. The works quantity shall be CM
volume to be calculated from
Spraying of gravel sand or
drawing.
fme sand material.
Compacting of material
Leveling of sub-base.
Sampling and testing.

D.!3 Curb stone-l Excavation as defmed in The work quantity shall LM


(Cast - in situ) ItemB.I. be the total length of the
curb stone measured at
Backfilling as defmed in the side of the road.
Item B.3.
The inclination of the
Leveling concrete as curbstone, unless it is
defmed in Item B. 7. significant, shall not be
~ considered in the
Concrete work as defmed
in Item B.6. calculation.
The length replaced with
Reinforcing bar work as structures such as
defmed in Item B.8. foundation pedestals or
Mortar plastering, if pits shall not be included.
specified.
Doc. No. : 7T04-CS-00-PC-016
DEFINITION AND MEASUREMENT
Rev. No. : 0
OF Page : 31 of 127
CONSTRUCTION WORK Date : 13 Mar. 2009

DEFINITIONS AND MEASUREMENTS OF WORK ITEMS

No. Work Item Defmition Measurement

D.14 Curb stone-2 Excavation as defmed in As defmed in Item D.3 LM


(pre-cast) ItemB.l. "Curb Stone-I"
Backfilling as defined in
itemB.3.
Leveling concrete as
defmed in item B. 7.
Formwork, if required, as
defmed in Item B.9.
Hauling, installation, and
alignment of pre-cast
concrete curbstone blocks.
Joint mortaring.
Concrete work as defmed
in ItemB.6.

E. EARTHWORK FOR UNDERGROUND PIPING

E.l Excavation As defined in Item B.l As defmed in Item C.l. CM


(for underground "Excavation ll

piping)

E.2 Disposal (within the As defined in Item B.2 Disposal of material CM


site) IIDisposal" . arising from excavation
shall be measured by
volume. Final
measurement shall be
quantified when all the
earthwork is completed,
by using the following
formula.

V=Vex- Vbf
Disposal (outside of As defmed in Item B.2 Where: CM
the site) "Disposal" .
Vex = All volume of
excavation based on the
drawings.
Doc. No. : 7T04-CS-00-PC-016
r'~
,f~i§) _ DEFINITION AND MEASUREMENT
Rev. No. : 0
~~ GS E&C OF Page : 32 of 127
CONSTRUCTION WORK Date : 13 Mal: 2009

DEFINITIONS AND MEASUREMENTS OF WORK ITEMS

No. Work Item Defmition Measurement

Vbf = All volume of


backfilling based on
drawings.

E.3 Sand-filling As defmed in Item C.3 As defmed in Item C.3. CM


(for underground "Sand-filling".
piping)

E.4 Backfilling As defmed in Item C.4 . As defmed in Item C.4. CM


(for underground "Backfilling".
piping)

F. CABLE TRENCH AND CABLE DUCT BANK

F.l Excavation-l As defmed in Item B.I . As defmed in Item B.l. CM


(for concrete "Excavation".
trenches and duct
banks)

F.2 Excavation-2 As defmed in Item B.I The work quantity shall CM


(for concrete type "Excavation". be the so il vo lume to be
trenches) excavated.
The width and depth used
for the calculation shall
be the dimensions shown
on the drawing.
Additional space for
convenience shall not be
included.
If the trench is to be
constructed underneath
the existing earth dike,
the depth of excavation
shall be measured form
the bottom ofthe existing
earth dike.
The requirements
specified in Para (4) thru
(8) ofItem B.I shall be
DEFINITION AND MEASUREMENT Doc. No. : 7T04-Cs..OO-PC-016
.'c-7.lt;sI Rev. No. : 0
f
' ~1fi'\
~.
\."~i'> '
~..,

GS E&C OF Page : 33 of 127


CONSTRUCTION WORK Date : 13 Mar. 2009

DEFINITIONS AND MEASUREMENTS OF WORK ITEMS

No. Work Item Defmition Measurement Unit

applied.

F.3 Disposal As defined in Item B.2 Disposal of material CM


(within the site) IIDisposal ". arising from excavation
shall be measured by
volume. Final
measurement shall be
quantified when all the
earthwork is completed,
by using the following
formula.

V=Vex-Vbf

Disposal As defmed in Item B.2 Where: CM


(outside of the site) "Disposal" .
Vex = All volume
of excavation based on
the drawings.

Vbf= All volume


of backfilling based on
drawings.

FA Backfilling As defined in Item B.3 As defmed in Item B.3 CM


(for concrete and "Backfilling". "Backfilling" .
direct buried type
trenches and duct
banks)

F.5 Sand-filling Hauling and filling of the The work quantity shall CM
(for concrete and sand into the trenches. be the sand vo lume after
direct buried type compaction and
Compaction and leveling
trenches) conso lidation.
of filled sand.
Sand volume displaced
by cables shall not be
included.

F.6 Red & Green- Mixing, placing, and The work quantity shall SM
colored concrete vibrating of red colored be the top surface area of
concrete or mortar. the duct bank to be
DEFINITION AND MEASUREMENT Doc. No. : 7T04-CS-00-PC-016
$~~
Rev. No. :0
(~GS
~"
E&C OF Page : 34of127
CONSTRUCTION WORK Date : 13 Mar. 2009

DEFINITIONS AND MEASUREMENTS OF WORK ITEMS

~o. VVorkItem Defmition Measurement

Surface finishing. covered with red-colored


concrete.
Curing.

G. CO~CRETE PIT ~ PO~

G.I Brick lining Surface preparation of The work quantity shall SM


(applicable to all concrete where brick be the area of the
types of brick) lining is to be applied. concrete surface to be
lined with brick.
Hauling, handling, and
moisture control of brick.
Mixing and hauling of
specified joint mortar.
Installation of brick lining.
Mixing, hauling, and
plastering of specified
mortar onto brick wall.
Installation of wire mesh,
if required.
Curing.

H. STRUCTURAL .STEEL

H.I Structural steel Erecting the structural VVork quantity shall be as


steel, handrails, ladders follows:
and floor plates. KG
(a) Structural steel
Final coating as specified. (b) Handrails KG
Assembling, installing, (c) Ladders KG
and aligning.
(d) Checker Plates SM
olting or welding the
fi d connections. VVeight of safety cages
J and gates shall be
ad liner plate. included in the above
item (b).
VVeight of painting and
galvanizing shall not be