Professional Documents
Culture Documents
: Tf04-CS-O()"PC-016
DEFINITION AND MEASUREMENT
~ GSE&C
-
Rev. No. : 0
OF Page : 10ofl27
CONSTRUCTION WORK Date : 13 Mar. 2009
ground elevation.
The actual ground
elevation upon between
CONTRACTOR and the
SUBCONTRACTOR
according to the survey
record.
An increased quantity due
to a volume change
because ofloose soil shall
not be included.
Extra excavation for the
convenience of
construction, temporary
drains, sump pits, etc.
shall not be included.
Overlaps shall not be
included.
When a structure has two
or more portions of
different depths, the
quantity of each portion
shall be calculated
separately.
When concrete is poured
against soil, the work
quantity shall be
calculated as follows:
Ve = Af xDp
Where,
Ve: The work quantity
of mass concrete
Af: Area offooting
Dp: Depth of mass
concrete
Note: In this case,
unnecessary
DEFINITION AND MEASUREMENT Doc. No. : 7T04-CS-00-PC-016
/:S:~ Rev. No. : 0
L~
" GS E&C
''--'"
OF Page : 12 of 127
CONSTRUCTION WORK Date : 13 Mal: 2009
B.8 Sand and/or Loading and hauling of the The work quantity shall CM
gravel base base material. be calculated as follows:
Spreading and compacting Vg = AgXt
of base materials including
vo id filling. where,
* Unless otherwise
specified, the area of
gravel base shall be
O.lm wider than the
bottom edges ofthe
structure.
DEFINITION AND MEASUREMENT Doc. No. : Tf04-CS-00-PC-016
.{J.S:;~
r...,;;
~~
GS E&C OF
Rev. No.
Page
:0
: 14 of 127
CONSTRUCTION WORK Date : 13 Mar: 2009
removal of form-ties.
B.1l Lean concrete Installation of forms for The work quantity shall CM
(Leveling concrete) leveling concrete. be calculated as stated
below:
Mixing of lean mix
concrete as defined in Item Vl=Alxt
B.6. VVhere,
Hauling, placing, tamping, VI: The work quantity of
and leveling of lean mix leveling concrete (m')
concrete.
AI: Area ofJeveling
Curing.
concrete (m' ) *
Removal of forms.
t: Thickness of leveling
concrete (m)
• Unless otherwise stated,
area of leveling concrete
shall be O.lm wider than
the bottom edges of the
structure.
B.15 Anchor bolt, anchor Supply, setting and . The work quantity shall be Ea
box, sleeve pipe alignment of templates and counted in sets of the
installation their supports. anchor bolts.
(Including anchor
boxes and sleeve Setting and alignment of
pipes) anchor bolts.
-
Rev. No. : 0
(~ GSE&C OF Page : 18 of 127
CONSTRUCTION WORK Date : 13 Mar. 2009
Supply of material.
B.17 Misc. steel (such as, The work quantity shall KG
comer angles, top Fabrication. be the weight of the
steel in sleepers, embedded items after
Installation.
pipe sleeves, and fabrication.
anchor plates, etc.) Alignment.
Welding rods and
Painting or galvanizing, if temporary means required
specified. for handling and
installing the embedded
Relevant work such as, but
items shall not be
not limited to, formwork,
included.
provision of connection
holes, and filling voids
with mortar grout.
Protection of embedded
items before, during and
after concreting.
[~!5GS E&C
Rev. No. : 0
OF Page : 19 of 127
.".- CONSTRUCTION WORK Date : 13 Mar. 2009
C. SE\VERAND DRAINAGE
150(or 6")
150 to 300 D + 600 80
(or 6" to
12")
300 to 900 D + 800 80
(or 12" to
36")
More than D + 1000 100
900
(or 36")
Note: The "C" shall be
considered the same
for the entire length,
even though the pipe
has a larger portion
than its body size,
such as at a coupling,
joint collar or socket,
or spigot portion.
drawings.
C.3 Sand-filling Hauling, placing, and The work quantity shall CM
(for sewer piping) compacting ofthe sand. be the sand volume after
compaction and
Provisions for securing the
consolidation.
pipe locations, joint
tightness, and external The quantity shall be
coating. calculated as follows:
Moisture control. v s = {(Excavation VVidth
x Excavation
Sampling and compaction
Depth) - Vp} x
test.
Pipe Length
VVhere,
V s: VVork quantity of
sand filling (m')
Vp: The quantity
displaced by pipes,
pipe sleepers, etc.
(m')
C.IO Membrane liner Preparation for applying The work quantity shall SM
(waterproo f) membrane sheets. be the surface area of
earth surface or similar
Surface preparation of area
surface to be covered
where sheeting is to be
with the sheeting.
applied.
Overlapping sheets shall
Cutting and pre-forming of
not be included.
sheets.
Handling, hauling, and
applying primer and/or
adhesive.
Laying or applying sheets
as specified, including
overlapping.
Curing and protection.
Leak test and/or water
filing test.
C.1I Waterproofmg Preparing the base Work quantity shall be SM
surfaces to form the the surface area to be
gradients and cants, waterproofed.
including leveling courses.
Applying the
waterproofmg system,
including fasteners,
flashlngs, and sealants.
D.3 Sub-base Course Loading aud hauling. The work quautity shall SM
be the area of sub-base
Spreading aud compacting course.
of material specified.
Inclination of the grauular
Spraying of Gravel sub-base, uuless it is
materiaL significant, shall not be
Trimming aud leveling of considered in the
grauular sub-base top. calculation.
D.4 Welded wire fabric As defmed in Item B.8 The work quautity shall SM
"Reinforcing Bar". be the area to be covered
by welded wire fabric.
D.6 Expansion joint . Transportating, setting slip The work quantity shall LM
bars (including esiliant be the length of
rubber, steel pipes, grease expansion joint.
asphalt coating)
Cleaning, surface
preparation, pouring
asphalt into slit.
Contraction joint
~
• ~y -
. . ..
(:.0"2.
,- '
)i'"oJ!"
"", .
D , I bars for expansion
Joint shall be provided with
~,\o. 4 expansion cap and coated
with debonding compound
or grease.
D.7 PE Film (0. 15mm) . Supplying, cutting, laying The work quantity shall SM
(two layer of O.lmm), be the area to be covered
making lapping joint byPEFilm.
Doc. No. : 7T04-CS-00-PC-016
DEFINITION AND MEASUREMENT
Rev.No. : 0
OF Page : 29 of 127
CONSTRUCTION WORK Date : 13 Mar. 2009
D.8 Asphalt pavement Cleaning of area where The work quantity shall SM
asphalt concrete is to be be the top surface area of
placed. the asphalt paving.
Application of prime coat The area occupied by
or tack coat. structures such as
manho les, catch basins,
Mixing, hauling,
pit, or ditches shall not be
spreading, leveling, and
included.
compacting of material
specifIed.
Curing and protection.
Sampling and testing of
asphalt concrete.
D.9 Prime Coating Surface protection of The work quantity shall SM
Earth structure such as be the area to be covered
asphalt concrete road. by Prime coating.
D.IO Tack Coating · Surface protection of binder The work quantity shall SM
course such as asphalt be the area to be covered
concrete road. by Tack coating.
D.ll Gravel surfacing: Loading and hauling. The works quantity shall be CM
base-course volume to be calculated from
Sub-grading including
drawing.
scarifying, grading, and
compacting.
Spreading and grading of
gravel or crushed stone,
including void filler, if
specified.
Sampling and compact ion
test (density test)
D.12 Sub-base Course Loading and hauling. The works quantity shall be CM
volume to be calculated from
Spraying of gravel sand or
drawing.
fme sand material.
Compacting of material
Leveling of sub-base.
Sampling and testing.
piping)
V=Vex- Vbf
Disposal (outside of As defmed in Item B.2 Where: CM
the site) "Disposal" .
Vex = All volume of
excavation based on the
drawings.
Doc. No. : 7T04-CS-00-PC-016
r'~
,f~i§) _ DEFINITION AND MEASUREMENT
Rev. No. : 0
~~ GS E&C OF Page : 32 of 127
CONSTRUCTION WORK Date : 13 Mal: 2009
applied.
V=Vex-Vbf
F.5 Sand-filling Hauling and filling of the The work quantity shall CM
(for concrete and sand into the trenches. be the sand vo lume after
direct buried type compaction and
Compaction and leveling
trenches) conso lidation.
of filled sand.
Sand volume displaced
by cables shall not be
included.
F.6 Red & Green- Mixing, placing, and The work quantity shall SM
colored concrete vibrating of red colored be the top surface area of
concrete or mortar. the duct bank to be
DEFINITION AND MEASUREMENT Doc. No. : 7T04-CS-00-PC-016
$~~
Rev. No. :0
(~GS
~"
E&C OF Page : 34of127
CONSTRUCTION WORK Date : 13 Mar. 2009
H. STRUCTURAL .STEEL