From To,
Sri M. SubbaRao, B.Tech., M/s Varma Consultancy Services,
Chief Engineer (R&B) Flat No G1, Plot No 1159,
COT, J. Bldgs& RSW, Ayappa Society Office,
A Block, Anjaneya Towers, Madhapur, Hyderabad - 81
Ibrahimpatnam – 521 456
Andhra Pradesh
Respected Gentlemen,
- @@@ -
With reference to the above, the lowest rate quoted infixed lumpsum
inclusive of all taxes, by you for the above subject work towards professional
fees for Rs. 36,00,000/- (Rupees Thirty Six Lakh only) is accepted.
You are requested to proceed with the work immediately and follow the
SCHEDULE FOR COMPLETION OF PROJECT as per Clause 9
IMPLEMENTATION SCHEDULE of RFP.
Time Period
Particular (No of days
from kickoff
Issue of work order to Consultants Kickdate)
off date
Submission of Stamp paper for signing of Agreement 3 Days
Submission of survey, Layout, preliminary plans with 10 Days
contours & SBC Report
Submission of approved preliminary layout plan 14 Days
Submission of detailed designs & Drawings including 30 Days
sections and elevations for estimate and bid document
Preparation and submission of Working drawings / As- After
built Drawings completion
You are also requested to furnish the name, qualification and consent
letters of the technical persons to be employed by you for the above work on
your behalf along with proof of qualification held by them.
Sd/-19.08.2017
CHIEF ENGINEER (R&B)
COT, J Bldgs. & RSW,
Roads and Buildings Department
Government of Andhra Pradesh,
IBRAHIMPATNAM – 521456