You are on page 1of 2

Name of work:-New Construction of BRGF Dist.

Panchayat Conference Hall Office Campus Godhra


Name of Agency: Ashish construction of Godhra
CEMENT CONSUMPTION 3rd R.A.bill
Sr.No Item No. Item of work Qty Unit Rate of cement Per Total cement
as per consumption in consumption
sch-B kg/unit in kg/Unit

1 3 Providing and layhing 58.97 cum 170.00 kg 10024.90


cement concrete 1:4:8
(1cement :4 coarse
2 6 sand :8 machine
Providing and layhing cut 115.60 cum 380.00 kg 43928.00
stone aggregate
controlled cement40mm
nominal
concretesize) M.250 and and curing
3
complete
curing complete excluding cost
7 Providing and laying 12.42 cum 388.00 kg 4818.96
of form
excluding thework in (a)
cost of form
controlled cement
foundation
work and and plinth
reinforcement
concrete M.250 exposed
4
for
work reinforced
with and curing concrete 26.65 cum 388.00 kg 10340.20
8 Providing laying
work in
etc.complete A.foundations,
including
controlled cement
footinhgs,l
the cost of base
formwork of but
concrete M.250 exposed
columns
excluding and mass
the cost of
5 9 work with and
Providing curing laying 76.08 cum 380.00 kg 28909.64
concrete
reinforcement for RCC
etc.compllete
ordinary cement including
concrete
work
the in
cost collumn
of form upto
work
M.200 exposed work with
plinth level the cost of
butexcluding
6 10 curing etc.complete
Providing and laying 142.87 No 380.00 kg 54290.60
reinforcement
includingcement the cost for RCCof form
ordinary concrete
work
work but in (A) beam
excluding plinth
thewith
M.200 exposed work
level
cost of reinforcement for
7 11 curin
P & Letc.complete
Half brick masonary 249.81 sqm 1.20 kg 299.77
RCC
includingwork inb
theburnt (B)
costclay column
of form
in common
all
work floor
butbricks
excluding the
building having
cost
crushingof reinforcement for
12 P & L Halfstrengthnot
brick masonary less 218.96 sqm 14.00 kg 3065.44
RCC
than work
35kg/sqcm in (A) beam all
in common burntinclay
floor
superstructure abovel
building bricks having
plinth level
crushing strengthnot upto
8 13 Providing and laying less 10.28 cum 380.00 kg 3906.40
4.50mt.height
than 35kg/sqcm inincement
controlled cement
mortar 1:6
cement mortar (1cement :6
concree M.200 1:4 for RCC
fine sand)
(1cement with
:4 coarse curing etc.
sand)
9 14 liontel including
Providing and laying the cost 2.47 cum 380.00 kg 938.60
Ground
in floor
of cement
form work
controlled
mortar
but in super
cement
B.conventional
structure above plinth
excludingM.200
concrete the cost forof
level upto
reinforcementy 4.50mt for hight
all
10 15 chajkja notand
Providing exceeding
laying 204.57 Rmt 380.00 kg 77736.60
for
floor ground floor (B)
10mm thickness
controlled cementupto
conventional
floor two level
concrete including
B.convention with
M.200
11
finishing
curing the exposed
etc.complete
16 Providing and laying 87.90 No 380.00 kg 33402.00
surface
includingwith the cement
cost of form
controlled cement
mortar 1:3
work but excluding (1cement :3
concrete M.200 withythe
fine and) to
cost of etc.complete give
reinforcement for a smooth
12 23 curing
Providing 10mm thick 1144.45 6.00 6866.70
and
RCC even
work surface
of cost
any of form
includingplaster
cement the in singloe
centering
thickness and
of slabform work
work on
coat butceiling
excluding for ythe
interior
and curing complete
cost of reinforcement
plastering upto of 10mt for
13 24 Providing
excluding 15mm cost thickhight 2016.57 8.50 17140.85
RCC work
finished plaster up
even and to floor two
cement
reinforcement inl silngle
level
smootyh A.stair case
in cement
coat on fair side
14
mortar 1:4 (1cement
brick/concrete walls for :4
25 20mm thick double 1620.30 17.00 27545.10
sand) including
interior plastering finishing
klupto
coatsand faced cement
with
1omtahight floating coat aeven
finished neat
plaster on walls lupto
cement
and smooth slurry iin cement
height 10 meters above
mortar 1;4 (1cement
ground level consisting :4 of
sand) including
12mm thick backing coat finishing
with
of cma 1:4 floating
(1cement coat a:4neat
cement
sand) and 8mm thick
finishing coat of cm 1;1
15 26 Providi9ng and fixing of 544.15 10.00 5441.50
heavy duty fully vitrified
floor tiles of first quality of
16 31 NITCO,VARMORA
Providing and layingofright 37.81 10.00 378.10
CITY
edgesbrand (square is used in
cut) rough
floor having
surface non skid thickness of
7.2 mm
caeramic in desired colour
17 32 Providing tiles & fixingin sizewall 170.85 10.00 1708.50
and specified8mm
30cmx30cm size thick of
dado of first quallity
60cmx60cm
approved brandmat in finlilsh
toilet
glazed/matt finished til3es
as approved
flooring laid onby aarchitect
bed of
18 33 of
Providing andin laying 138.82 18.00 2498.76
and engineer
50mm thick cement charge
(VARMORA,SPMMANI,K
granite stone flooring
scratch1:3
mortar hardness
(1cement
AJARIA
over 20mm NITCO (averageor :3
minimum
coarse sand)7 onpointing
Mohs in
JOHNSON)
thick base standard
19 34 Providing
scale with and
white/colour aofdensiltyl
cement
lahyinglof
chemical 306.36 12.50 3829.50
brand
mortar of
1:6 30x45cms
(1cement size
L:6
cement
2.2
grout concrete
to including
2.3 and bonding flooring
curing
approved
coarse sand) colourof :2 and
L.M.
1;2;4
strength (1cement
rubbing cleaning of 250m coarse
kg./sqm
etc.
approved
1:1.5 and pattern
laid over orand
20 35 sand:4
also
Providing graded
chemical and stone
resistance
laying
comp. as
desilgn
jointed set,l
withl
per instruction
ilnl
grey 3mm
cement tile 520.74 11.50 5988.51
aggregate
should
china
of lbe
mosic type
EICadhesive 20mm
meet nominal
ASTM
water &
fixing
slurry including slurry
rubbing
size)
DIN
proofing laid
standards one
treatmentlayer
as per
on
(Latilcrete
and polishing or asian
complete power
finished
manufacture's
tarrace with
including a floating
(a
Total K.G.
grace)
18mm over a min 12mm
thick 343058.63
coat of neat
specification
applying cement
the tile (B) shall
thick
Say 1;4 neatsinglecement coat 343059.00
50mm
be fixed
slurry thick
in
2.75kg/sqm ILPS
cm 1:4 flooring
of
cvementk
M.T. plaster (Male 343.059
(1cement
cement :4 sand)wityh
admixed joint
plaster) with proper line
shouldproofing
water be done with
and level jointscompound shall be
approved
after cleaning grouting,
Cement
filled withl self the
brought bysurface
matching Contractor 349.00 M.T.
materials
(b) laying etc.complete
cement
colour
Cementgrout,l used curing ande 343.06 M.T.
concrete4
cleaning using
with mild brick
oxalic
Balance
bats etc.complete
25 to 100mm as size
5.94 M.T.
acid
with
directed50%by ofEingineer
CM 1:5 in
(1cement
charge :5 coarse sand)
admised with water Deputy Executive Engineer
proofing compound over Panchayat R&B Sub Division
20mm thick layer of cm Godhra
1;5 (1`to required slope
including rounding of
junctions of walls and
slab (C() after two days of
proper curing applying a
second coat of cement
slurryk (d) finisheing ghe
surface withk 20mm thick
cm 1;4 and china mosaic
tilling & finaly finishling
the surface with trowel
with white cement slurry
(e) after finishing thkle
whole tarace shall be
flooded with water for a
period of two weeks.

You might also like