You are on page 1of 1

LIST OF FIGURES

Figure No. Title Page No.

1.1 Organization Structure of sowparnika projects 03


2.1 Organization chart of Structural Department 10
3.1 Concrete cover blocks 18
3.2 Column Reinforcement 18
3.3 Process of concrete pouring 19
3.4 Reinforcement details is being inspected before pouring of concrete 19
3.5 Screenshot of the Excel Sheet 20
3.6 Invitation for the Seminar 23
3.7 Laying of Electrical pipes 24
3.8 Execution of Reinforcement 24
3.9 Concrete Pouring Equipment 25
3.10 Screenshot of the Excel Sheet 34
3.11 Screenshot of the Excel Sheet 37
3.12 Screenshot of the Excel Sheet 40
3.13 Map locating Sowparnika Tarangini 43
3.14 Elevation of Sowparnika Tarangini 43
3.15 Architectural Drawing of Sowparnika Tarangini 44
3.16 Typical Floor plan of Sowparnika Tarangini E Block 45
3.17 Framing of plinth beams 49
3.18 Framing of ground floor 49
3.19 Area sections 50
3.20 Assigning of slab 50
3.21 Applied load case for different frame sections 51
3.22 View after modeling 51
3.23 Analyzed model view 52
3.24 View after concrete Design 52
3.25 Column Rebar Percentage 53
3.26 Beam Rebar Percentage 53
3.27 Column Support reactions 54
3.28 Shear Force Diagram 54
3.29 Bending Moment Diagram 55
3.30 Axial force Diagram 55
3.31 Footing Detailed Drawing 61
3.32 Structural Engineer inspecting the Reinforcement details at the site 62

vi

You might also like