You are on page 1of 10

PROGRAM STUDI PERTAMBANGAN

FAKULTAS TEKNIK
UNIVERSITAS LAMBUNG MANGKURAT
BANJARBARU
2017

PEMINDAHAN TANAH MEKANIS


(HTKB510)
KARINA SHELLA PUTRI, S.T., M.T.
KETERSEDIAAN ALAT

AVAILABILITY
INTERMEZO
PRODUKSI

PRODUKTIVITAS
PRODUKTIVITAS

PRODUKSI

JAM KERJA APA BEDANYA


EFEKTIF
?????
SCHEDULED HOURS – WAKTU TERJADWAL

SCHEDULED
HOURS

WORKING REPAIR STANDBY


HOURS HOURS HOURS

WAITING WAITING ACTUAL


CYCLE TIME DELAY TIME CONTROLS UNCONTROL
FOR REPAIR FOR PART REPAIR

PRODUKTIVITAS EFFECTIVE UTILIZATION


EFISIENSI KERJA 𝐶𝑡
𝐸𝑓𝑓 = × 100%
𝐶𝑡 + 𝐷𝑡
WAKTU KERJA
EFEKTIF (WORK KETERANGAN:
TIME) Ct = CYCLE TIME (WAKTU SIKLUS)
Dt = DELAY TIME (WAKTU TUNDA
 SESUAI SIKLUS

WAKTU TUNDA
(DELAY TIME)
• MENUNGGU ALAT ANGKUT
 TIDAK SESUAI (BUCKET GANTUNG BERMUATAN)
• MERAPIKAN MATERIAL
SIKLUS) (RESIZING MATERIAL)
• MENDORONG MATERIAL DALAM VESSEL ANGKUT
(MAKSIMALKAN MUATAN)
MECHANICAL AVAILABILITY (MA)

𝑊𝑂𝑅𝐾𝐼𝑁𝐺 𝐻𝑂𝑈𝑅𝑆
𝑀𝐴 % = × 100%
𝑊𝑂𝑅𝐾𝐼𝑁𝐺 𝐻𝑂𝑈𝑅𝑆 + 𝑅𝐸𝑃𝐴𝐼𝑅 𝐻𝑂𝑈𝑅𝑆

• WORKING HOURS / OPERATING HOURS


– PENCATATAN PADA OPERATION TIME CARD / TIME SHEET
– HOUR METER ALAT MEKANIS

• REPAIR HOURS
– ACTUAL REPAIR
– WAITING FOR REPAIR
– WAITING FOR PART
PHYSICAL AVAILABILITY (PA)

𝑊𝑂𝑅𝐾𝐼𝑁𝐺 𝐻𝑂𝑈𝑅𝑆 + 𝑆𝑇𝐴𝑁𝐷𝐵𝑌 𝐻𝑂𝑈𝑅𝑆


𝑃𝐴 % = × 100%
𝑆𝐶𝐻𝐸𝐷𝑈𝐿𝐸 𝐻𝑂𝑈𝑅𝑆

• SCHEDULE HOURS (WAKTU TERJADWAL)


– WORKING HOURS
– REPAIR HOURS
– STANDBY HOURS

• STANDBY HOURS
– CONTROL
– UNCONTROL
USED OF AVAILABILITY (UA)

𝑊𝑂𝑅𝐾𝐼𝑁𝐺 𝐻𝑂𝑈𝑅𝑆
𝑈𝐴 % = × 100%
𝑊𝑂𝑅𝐾𝐼𝑁𝐺 𝐻𝑂𝑈𝑅𝑆 + 𝑆𝑇𝐴𝑁𝐷𝐵𝑌 𝐻𝑂𝑈𝑅𝑆

• AVAILABLE HOURS (WAKTU TERSEDIA)


– WORKING HOURS
– STANDBY HOURS

• TUJUAN:
– APAKAH OPERASI BERJALAN EFISIEN?
– APAKAH PENGELOLAAN ALAT BERJALAN BAIK?
EFFECTIVE UTILIZATION (EU)

𝑊𝑂𝑅𝐾𝐼𝑁𝐺 𝐻𝑂𝑈𝑅𝑆
𝐸𝑈 % = × 100%
𝑆𝐶𝐻𝐸𝐷𝑈𝐿𝐸 𝐻𝑂𝑈𝑅𝑆

MASA SIHHHHH
𝐸𝑈 % = 𝑃𝐴 × 𝑈𝐴 ?????

BUKTIKAN !!!
TERIMAKASIH