AVAILABILITY
INTERMEZO
PRODUKSI
PRODUKTIVITAS
PRODUKTIVITAS
PRODUKSI
SCHEDULED
HOURS
WAKTU TUNDA
(DELAY TIME)
• MENUNGGU ALAT ANGKUT
TIDAK SESUAI (BUCKET GANTUNG BERMUATAN)
• MERAPIKAN MATERIAL
SIKLUS) (RESIZING MATERIAL)
• MENDORONG MATERIAL DALAM VESSEL ANGKUT
(MAKSIMALKAN MUATAN)
MECHANICAL AVAILABILITY (MA)
𝑊𝑂𝑅𝐾𝐼𝑁𝐺 𝐻𝑂𝑈𝑅𝑆
𝑀𝐴 % = × 100%
𝑊𝑂𝑅𝐾𝐼𝑁𝐺 𝐻𝑂𝑈𝑅𝑆 + 𝑅𝐸𝑃𝐴𝐼𝑅 𝐻𝑂𝑈𝑅𝑆
• REPAIR HOURS
– ACTUAL REPAIR
– WAITING FOR REPAIR
– WAITING FOR PART
PHYSICAL AVAILABILITY (PA)
• STANDBY HOURS
– CONTROL
– UNCONTROL
USED OF AVAILABILITY (UA)
𝑊𝑂𝑅𝐾𝐼𝑁𝐺 𝐻𝑂𝑈𝑅𝑆
𝑈𝐴 % = × 100%
𝑊𝑂𝑅𝐾𝐼𝑁𝐺 𝐻𝑂𝑈𝑅𝑆 + 𝑆𝑇𝐴𝑁𝐷𝐵𝑌 𝐻𝑂𝑈𝑅𝑆
• TUJUAN:
– APAKAH OPERASI BERJALAN EFISIEN?
– APAKAH PENGELOLAAN ALAT BERJALAN BAIK?
EFFECTIVE UTILIZATION (EU)
𝑊𝑂𝑅𝐾𝐼𝑁𝐺 𝐻𝑂𝑈𝑅𝑆
𝐸𝑈 % = × 100%
𝑆𝐶𝐻𝐸𝐷𝑈𝐿𝐸 𝐻𝑂𝑈𝑅𝑆
MASA SIHHHHH
𝐸𝑈 % = 𝑃𝐴 × 𝑈𝐴 ?????
BUKTIKAN !!!