Professional Documents
Culture Documents
—
P R OTE C TI O N AN D S AFE T Y
—
Emax 2 is the first circuit breaker
with embedded programmable
logic able to manage automatic
transfer switch function.
ABB Emax 2
Emax 2 is the first intelligent circuit breaker
intended for LV microgrids. In just one product,
Emax 2 provides advanced protection, full connec-
tivity and logic capabilities as well as load, gen-
eration and storage management. Emax 2 is the
all-in-one innovation designed to protect, connect
and optimize LV microgrid applications.
Protection
The circuit breaker can fully protect loads and
generators. For example, the connection of a
generator to an LV microgrid or a medium-voltage
(MV) network through a transformer adds specific
protection requirements such as machine protec-
tion and synchronism between generators and
grid. For these, and other requirements, Emax 2
generator protection trip units offer a wide range
of new protection functions and paralleling checks.
01
62 ABB REVI EW PROTE C TION AND SAFE T Y
02
03| 2017 E MA X 2 MIC ROGRID BRE AKE R SOLU TION 63
— Connectivity Management
01 Emax 2, all-in-one
innovation. The network analyzer embedded in the Emax 2 Fast load shedding can support the islanding of
understands power quality and a wide set of the microgrid during the transition from on-grid to
—
02 Ekip Connect 3 electrical measurements. System integration is off-grid or the steady state. Emax 2, using its rate
commissioning tool. guaranteed by full connectivity via communication of change of frequency (ROCOF) function, discon-
protocols such as IEC 61850, Modbus TCP, Modbus nects loads only when an emergency imbalance
RTU, Ethernet IP, Profibus, ProfiNet, DeviceNet, condition arises →4. Emax 2 realizes the load shed-
Ekip Link and openADR. Ekip View and Ekip Control ding logic using digital contacts embedded in the
Panel microScada are also available. breaker or installed externally in DIN rail modules.
Fabio Monachesi
Let’s use the Ekip Connect
web-page picture (Ilaria
has the source file).
64 ABB REVI EW PROTE C TION AND SAFE T Y
From MV switchgear
HM1 HM2
From MV switchgear
From MV switchgear
Intertrip/Interlock
Intertrip/Interlock
Intertrip/Interlock
Intertrip/Interlock
To MV switchgear
To MV switchgear
Alarm Alarm
26 Trip Trip 26
Alarm Alarm
49 Trip Trip 49
71
Alarm Alarm
71
63 Trip Trip 63
Commands
1 1 11
MTS ATS
Manual Automatic
transfer changeover
A C B O OFF ON O
64 11 64
3 S4 S5 S3 S6 3
command
94reset
MTS
ATS
86TA 86TB
51G 5 25 25 51G/I
Reset
94A 94
Set
94B
51G/I 51G/I
27.1 27.2 3
51 51
27.1 ATS/MTS 27.2
51N 51N 3
86 A 86
CB-A
27.B 27.B
CB-B
51
LOC REM ON Off 51N LOC REM ON Off
86C
3 3
50 27.A 27.A
51
03a
switchgear
switchgear
From MV
From MV
Commands
MTS ATS
Manual Automatic
transfer changeover
A C B OFF ON
1
S2 S3 S1 S4
emergency
command
MTS
ATS
CB-A CB-B
LOC REM
S43 S43
CB-C
415 V BUS BAR “A” S43 BUS BAR “B”
03b
—
03 Embedded ATS
Emax 2 has a patented integrated fast load-shed- Microgrid islanded
reduces the number of ding method that exploits the device’s current and When the microgrid is in standalone mode, it
components required for
the transfer switching
voltage measurements to reduce the risk of such is possible to start up other resources, such as
logic. an event. In accordance with the microgrid power backup generators. As described above, Emax 2’s
03a Typical setup.
consumption and frequency measurements, the embedded ATS logic manages the transfer from
adaptive load shedding quickly sheds less critical the main line to an emergency line to minimize
03b With embedded ATS.
loads to maintain power balance and avoid black- problems caused by faulty conditions in the public
outs. As it is possible to add or lose power sources network or MV grid. ABB’s embedded ATS is a
after the islanding event – eg, a backup gener- high-performance energy automation system
ator starting or an inverter with anti-islanding that is easy to install and program. The ATS takes
advantage of the new capabilities provided by the
— Ekip Connect 3 commissioning software tool →2
and the Emax 2 to deliver a compact and reliable
The ABB AbilityTM Electrical solution →3. The embedded ATS solution is as com-
Distribution Control System is a pact as the Emax 2 because nothing needs to be
added apart from internal trip units and Ekip Link
cloud-based platform that can communication. If required, Ekip Synchrocheck
monitor and analyze the flow of modules can be installed to handle synchronism
during paralleling.
power within any facility.
49 —
The network analyzer embedded
Frequency (Hz)
48
in the Emax 2 understands power
47
quality and a wide set of electrical
measurements.
Microgrid reconnection
With load shedding The ability to resynchronize the microgrid with the
Without load shedding
grid when it is in a steady-state condition is one of
0 Emax 2’s integral features.
0 0.5 1.0 1.5 2.0 2.5 3.0
Time (s)
Neither an external synchrocheck relay nor syn-
chronizing equipment is required for the parallel-
04a ing operation. Voltage sensors at the microgrid
side are integrated into the Emax 2 circuit breaker,
so only one single-phase transformer is needed
at the main grid side.
Main
grid
Using the Ekip Synchrocheck cartridge module,
Emax 2 monitors the most important reconnecting
parameters and adapts the microgrid voltage and
frequency to those of the grid. The secondary reg-
Gensets Renewables
ulation of the local generator controllers is realized
by Ekip Signaling contacts so that synchronization
G
can be reached. The circuit breaker automatically
EMAX 2, all-in-one
with load shedding recloses when it understands that the synchro-
nism is achieved using Ekip Synchrocheck together
with the integrated closing coil →5.
ATS
Microgrid grid-connected
Because any power peaks can mean higher bills,
and demand response applications need to control
the power flowing at the PCC, the Emax 2 has a
patented embedded power management algorithm
that performs a slow load and generator disconnec-
tion or power modulation. The algorithm is based
Not-priority loads Priority loads on the limit of the average power flow towards the
microgrid according to the power-handling capabil-
ities of the transformer, on the contractual power
04b
or on the signal received for demand response
strategies. For this last case, Emax 2 leverages
the openADR protocol to communicate with load
aggregators or utilities as a virtual end node.
03| 2017 E MA X 2 MIC ROGRID BRE AKE R SOLU TION 67
—
04 Load shedding
protects the microgrid
from a rapid frequency Cloud platform
drop. The plant remains
live and can work in
standalone mode with
priority loads always
supplied.
—
06 Synchro-reclosing
function enables
microgrid reconnection
to the main grid without
external synchronizer.
05
Emax 2 can help the microgrid manager in many As microgrids continue to proliferate, ABB’s
other ways too. For example, the cloud-based Emax 2 intelligent circuit breaker will enable
platform, ABB Ability Electrical Distribution Control operators to lower their costs and increase their
System, allows authorized persons to monitor, op- capabilities. Protection, control, monitoring and
timize and control the microgrid from anywhere. All management can all be handled with a single
that is needed is a cartridge-type communication device to ensure microgrid loads and generators
module, the Ekip Com Hub, to be installed on the work in a controlled fashion, whether the micro
terminal box to establish the cloud connection →6. grid is connected to the grid or is operating
in a standalone mode. l
This cloud architecture has been developed to-
gether with Microsoft to enhance performance
and guarantee the highest reliability and security.
For the first time, intelligent circuit breakers can
provide extensive monitoring and management in
widespread LV networks.
50.00
Frequency (Hz)
49.75
49.50
49.25
Microgrid
49.00
Distribution grid
48.75
6 8 10 12 14 16 18 20 22 24
Time (s)
1.1
Voltage (p.u)
1.0
0.9
0.8 Microgrid
0.7 Distribution grid
0.6
6 8 10 12 14 16 18 20 22 24