You are on page 1of 3

TABLE OF CONTENTS

Chapter No. Title Page No.


Acknowledgement i
Declaration ii
Executive Summary iii

Table of contents iv

List of Figures vii

List of Tables ix

1 ABOUT THE COMPANY

1.1 Company Profile 01


1.2 Brief History 01
1.3 Organization Structure 03
1.4 Various Projects Undertaken 03
1.4.1 Completed Projects 03
1.4.2 Ongoing Projects 04

2 STRUCTURAL ENGINEERING DEPARTMENT


2.1 Introduction 07

2.2 Department of Structural Engineering 07


2.3 Organization chart of Structural Department 09
2.4 Roles and Responsibilities 09
2.4.1 Senior Structural Consultant 09
2.4.2 Structural Engineer 10
2.4.3 Architect 11
2.4.4 Design Engineer/Draftsman 12
2.4.5 Site Engineer 13

3 TASKS PERFORMED

3.1 Schedule of Works 15


3.2 Site Visit for Sowparnika SANVI Phase-2 project 16

i
TABLE OF CONTENTS
3.3 Design of Isolated Footing 19
3.4 Checking of reinforcement detailed drawings sheets 21
3.5 Seminar 22
3.6 Site Visit for Sowparnika Purple Rose project 23
3.7 Column Scheduling using ETABS Software 24
3.8 Work of grouping of IS codes for Structural Members 24
3.9 Grouping of IS 456 28
3.10 Group of clauses required to design column member 30
3.11 Design of one way slab 32
3.12 Design of two way slab 35
3.13 Design of Footing with pedestal 38
3.14 Description of Project 42
3.15 Assigned Data 44
3.15.1 Material Specification 44
3.15.2 Frame Sections 44
3.15.3 Cover to Reinforcement 44
3.16 Design Criteria 45
3.16.1 Dead Loads 45
3.16.2 Live Loads/ Imposed Loads 45
3.16.3 Seismic Loads 45
3.16.4 Load Combinations 46
3.16.5 Calculation of loads 46
3.17 Introduction on STAAD.Pro 47
3.18 Modelling of Structure 47
3.19 Application of Loads 49
3.20 Analysis of Structure 50
3.21 Design of Structure 51
3.22 Results 55
3.22.1 Column Main Reinforcement 55
3.22.2 Example for a Detailed Reinforcement Design of Column 60
3.22.3 Example for a Detailed Reinforcement Design of Beam 62
3.23 Site Visit for Sowparnika SANVI Phase-2 project 68
3.24 Site Visit for Sowparnika Purple Rose project 69

4 REFLECTION NOTES

ii
TABLE OF CONTENTS
4.1 Experience and Assessment 71
4.2 Benefits of Internship 71
4.3 Improving Practical Technical knowledge 71
4.3.1 Use of IS code books 72
4.3.2 Column Positioning 72
4.3.3 Exposure to software 72
4.3.4 Bar tying and placing of Beams 72
4.3.5 Site Inspection 73
4.3.6 Calculations & Results 73
4.4 Non-Technical Aspects 74
4.4.1 Improving practical skill 74
4.4.2 Upgrading the theoretical knowledge 74
4.4.3 Upgrading interpersonal communication skill 74
4.4.4 Improving Team Playing Skill 75
4.4.5 Improving Leadership Skill 75
4.4.6 Work Ethics and related issues 75
4.4.7 Entrepreneurship Skill 76
4.5 Overview 76

REFERENCES 78

ii
i

You might also like