Professional Documents
Culture Documents
Client
Taylor’s University SDN.BHD.
Mr. Emmanuel as client representative
Budget
Rm1,500,000.00 (not inclusive of professional fees)
Requirements:
Design Considerations:
What sets Mah Sing apart from other developers is its product offerings and
the ability to cater to the diverse buyers and market segments. Unlike many
other firms who only execute, the Group strongly believes in the co-
existence and harmony of their buyers' needs, the environment around the
property, and the community surrounding it. One of the Group's strong
commitments can be seen in their charity arm, the Mah Sing Foundation - to
Project Management [ARC 3612] 6
aid and benefit the less privileged.T Development Sdn. Bhd.
2.1 Organization Chart
CLIENT
Taylor’s University SDN.BHD.
Mr. Emmanuel as client representative
PROJECT MANAGER
AA GROUP
TAY JIT YING
Project
Manager
Main
Lead Contractor,
Consultant Specialist
and other Standing Supervision Contractors
Consultants and Supplies
Contractual relationship
Functional relationship
Cost
1. Careful planning to attain lowest cost.
2. Clear communication within consultants
especially QS.
COST 3. Architecture that is sustainable and requires
low maintenance
Budget 1.5m
Time
To ensure the project is on schedule:
1. Regular monitoring and on-site
inspection is crucial.
2. Clear communication between
consultants and contractors.
3. Follow the Gantt chart at all time
QUALITY to ensure smooth completion.
Scope
SCOPE TIME 1. Managing risk properly.
Recreational Station One Year Duration 2. Quality Control.
3. On-site safety & precaution.
Strong Leadership
Clear Communication
Especially Project
Among Project Members
Manager To Lead
The Team
Inception Stage
Develop Project Brief
Advice on cost to
project schedule impact
Pre-tender/Tender
Stage
Advise client on
contracting strategy
Construction Stage
Manage Contractors’
Pre-opening Stage
works on Site Building Commissioning
Planning & Scheduling Obtain Building
Monitoring Construction Certificate of
Progress Completion and
Compliance
General Framework
SUSTAINABILITY
This design aims to reduce the energy consumption of the building, to promote a liveable yet energy saving
structure. We implement the active and passive design strategies to the design as it allows users within the building
to enjoy the natural resources provided by the environment and strives the cost efficiency by reducing the huge
amount of maintaining and operating cost.
SOCIAL CULTIVATION
To realize the objective of the client to the extent, the Recreational District will also serve as a public realm, which
provides a pleasing environment for leisure activities and resting, enlighten the character of the site, and enhances
the chances of social activities within the site.
OASIS
To control and refine the negative impacts by the large parking, our intention is to create an oasis on the site with
serious desert effect. Greeneries are selected as the key element, to soften the hard bare land, and reduce the
heat during the hot sun. They are also used as boundaries which forms a pleasant view that fits in the surrounding,
and functions as the redirection of the circulation.
Adjacent to the main circulation Dark during night time results in A potential breakout space that Close to the waste water pool
of Taylor’s University, providing absence of sense of secure. connects both human flow from which results in unpleasant
it higher chances of exposure to Syopz mall and DK Senza. smell.
the people.
Nice vista to the site. Untreated ground with poor Neighbouring to parking area. Big portion of bare land stores
condition. and reflects the heat under the
hot sun.
Connecting the flow with two Elevate up the solid for visual Orientation responds to sun and
Massing
entrances permeability wind
Non-place to be designed as Refining the orientation to Fencing and shrubs are Greeneries and water feature
public realm frame possible views positioned to secure site are used to enlighten the space
Advantages
Simple build, very few parts and planning needed
Cost-efficient for container builds
Suitable for the soil type of location
Raises the container which allows for ventilation and prevents
condensation forming underneath container
Containers are self-bearing and are meant to handle Malaysian weather exposes the containers to corrosion and
heavy loads by themselves. Assembly of the overall rust daily, so to ensure the longevity of the containers,
structure can be carried out by simply welding the protective coating is needed to ensure the structure is safe and
containers together after installing it into the sound. The use of metal frames to hold containers together
foundation. The base of the container is welded with and load-bearing for multiple floors.
reinforced steel bars before laid into concrete base for
hardening.
After the openings for doors and windows are cut, the openings are framed with a steel section. This
ensures a clean finish as well safety measures.
Malaysia is a tropical climate country. Solar energy harvesting become an advantage to the projects.
Photovoltaic system, also known as PV system or solar power system is power system using photovoltaic to generates and supply
solar power. The system converts sun radiation into usable electricity to power up the lighting fixtures and electronics in the
building. PV system usually consists of solar panels to absorb and convert the sunlight, a solar inverter to change electric current
from DC to AC and several mounting and cabling to set up the work system.
Photovoltaic system offers range from small, rooftop- mounted or building- integrated system to large utility- scale power stations.
Photovoltaic system is possible to apply into our project due to the price are rapidly declined in recent years with the exponential
growth of photovoltaic usage.
The Photovoltaic System applied in the project are grid connected system. Grid connected system is connected to a larger
independent grid and send energy directly into the grid. This energy may be shared by a residential or commercial building before
or after the revenue measurement point.
8.2.3 Component
. External Pump – Pump the water by displacement. The gear in pump rotate and separate the intake side of the pump, creating a
void and suction which filled by water. The water is carried by gears to discharge side of the pump
. Fountain Filter – filtering the water to protect the pump from dirt, fur, drool and debris which will cause the clogging in the pipes
and gears
. Jet Nozzle – the part which spray the water exits and is shaped to achieve particular aesthetic effect
. Auto-Fill Valve – maintain the water level in the pond to ensure the fountain nozzle function correctly
8.2.4 Supplier
Founded in 2010 by Mr Wong. The company was built based on the working experience of Mr Wong and is now well-known as a
fountain specialisation company. The company provide professional advice for fountain customisation according the client’s
requirement.
3. LED T8 tube light 1200mm 4. Hex 780x Solar Wall Light .6W
. 18 W . LED
. LED . Wall Light
. Ceiling Mounted Light . Lifespan 50,000 hours
. Life span 50,000 hours . Warm white
. Cool white . Dimmable
. Dimmable Space: outdoor lounge
Space: Game Hub, Quantity: 11
Cafeteria, Lounge 8.4 Switches
Quantity: 18 Mikro one-way switch
Quantity: 4
Quantity: 4
7. LAP 13A 2G SP
Switched with USB port
Quantity: 10
. 72mm X 72mm
. Lifespan of 50 years
. 65% lighter than cast iron
. High corrosion resistance
8.6.2 Supplier
. 150mm X 100mm
. Lifespan up to 50 years and Marley Alutec is part of Aliaxis, a multi-
more national group of companies. Present in over
40 countries, the group is known for its market
. Interchangeable with cast iron leading plumbing and drainage systems.
. High corrosion resistance Dedicated to quality and innovation, Marley
Alutec offers solutions in three distinct
. Flow rate up to 5.5 litre per areas: rainwater systems, fascia and soffit,
second and roof and shower outlets. Made from
marine grade aluminium, Alutec’s products
offer the very best in terms of durability,
lasting 50 years or more. Thanks to the latest
fade resistant paint technology, the period is
virtually maintenance free.
Project Management [ARC 3612] 59
8.6 Active Fire Protection
Active fire protection system is a group of systems that require some amount of action or motion in order to work efficiently in the
event of a fire. Actions may be manually operated, like a fire extinguisher or automatic, like a sprinkler, but either way they require
some amount of action. These systems play an important role in protecting property and lives of the tenants.
Timber Platform
Materials: high quality pvc + rice husk. Outdoor Garden Benches
LAND TITLE:
Open car park beside the tennis court
at Jalan Taylor’s, 47500 Subang Jaya,
Selangor, Malaysia.
PROPERTY TYPE:
Taylor’s University’s car park
LAND TYPE:
Freehold
LAND STATUS:
Open carpark
TOTAL 75,460.10
17 S1: sofa set (2+3 sofa, coffee table) no. 1 900.00 900.00
TOTAL 91,834.80
TOTAL 356,830.45
TOTAL 144,342.00
TOTAL 20,535.65
TOTAL 220,200.00
TOTAL` 172,748.57
TOTAL 909,203.00
TOTAL 154,564.51
1 Construction 909,203.00
TOTAL 1,081,951.57
Construction Cost
9% 10%
24%
39%
2%
16%
Architectural Civil & Structure Mechanical & Electrical Lanscape Labour Preliminary
350000
300000
250000
200000
RM
150000
100000
50000
0
Consultaion Material goods and Perimirary Authority cost Labour Landscape M&E C&S Architectural
Fee wastage service tax cost