TEC-211200-MET-DoR-001
Name) (Rev No.)
METHOD STATEMENT Issue Date 02 October 2013
Method statement for installation and inspection of fire fighting Rev. Date NA
system. Pages 1 of 9
TABLE OF CONTENTS
1. REVISION RECORD .......................................................................................................................................... 3
2. SCOPE ............................................................................................................................................................... 4
3. PURPOSE .......................................................................................................................................................... 4
4. REFERENCES ................................................................................................................................................... 4
4.1. Contract documents .................................................................................................................................... 4
4.2. Contractors Submittal.................................................................................................................................. 4
5. DEFINITIONS / ABBREVIATIONS .................................................................................................................... 4
5.1. Definition ....................................................................................................................................................... 4
5.2. Abbreviations ............................................................................................................................................... 5
6. QUALITY CONTROL ......................................................................................................................................... 5
7. EQUIPMENTS/ TOOLS / MANPOWER/MATERIALS ....................................................................................... 5
7.1. Materials used .............................................................................................................................................. 5
7.2. Tools & equipment ....................................................................................................................................... 5
8. FIRE FIGHTING SYSTEM DESCRIPTION ........................................................................................................ 6
9. WORK SEQUENCE AND METHODOLOGY ..................................................................................................... 6
9.1. Storage and handling................................................................................................................................... 6
9.2. General Piping Installation Guidelines ....................................................................................................... 6
9.3. Installation of pipes...................................................................................................................................... 7
9.4. Installation of Fire Hose Reel / Fire Hose Cabinets................................................................................... 7
9.5. Threaded Joints............................................................................................................................................ 7
9.6. Offsets and Fittings...................................................................................................................................... 8
9.7. Painting ......................................................................................................................................................... 8
9.8. Flushing: Cleaning of Piping and Equipment ............................................................................................ 9
10. HEALTH AND SAFETY ................................................................................................................................. 9
11. ATTACHMENTS ............................................................................................................................................ 9
11.1. Inspection Checklists .............................................................................................................................. 9
11.2. Inspection Test Plan ................................................................................................................................ 9
11.3. Risk Assessment ..................................................................................................................................... 9
TECHNICAL DEPARTMENT-CIVIL (Replace by the Project Doc. No.
TEC-211200-MET-DoR-001
Name) (Rev No.)
METHOD STATEMENT Issue Date 02 October 2013
Method statement for installation and inspection of fire fighting Rev. Date NA
system. Pages 3 of 9
1. REVISION RECORD
This page is a record of all revisions of the document identified below by number and title. All
previous revisions are hereby superseded and are to be destroyed.
Rev Date By Chkd. Approved Description of Revisions
Signature field
Revision
Revision
Number
Date
2-Oct-13 Prepared by Checked by
Reviewed
By Construction Technical QA/QC MEP Co- Sub-
Manager Manager Engineer HSE Officer ordinator contractor
Approved
By Project
Manager
TECHNICAL DEPARTMENT-CIVIL (Replace by the Project Doc. No.
TEC-211200-MET-DoR-001
Name) (Rev No.)
METHOD STATEMENT Issue Date 02 October 2013
Method statement for installation and inspection of fire fighting Rev. Date NA
system. Pages 4 of 9
2. SCOPE
This procedure covers installation and inspection of Fire Fighting System – 1” Fire Hose Reel System and 1 ½”
Fire Hose System
3. PURPOSE
The purpose of this procedure is to define the method of installation and inspection of Fire Fighting System –
Hose Reel Systems.
4. REFERENCES
4.1. Contract documents
1. Project Specification :- Division 21, Section 211200
2. Contract Drawings :-
6. Shop Drawings
Sr. No. Description Shop Drawings Rev No. Date Remarks
1
2
3
5. DEFINITIONS / ABBREVIATIONS
5.1. Definition
1. Project -(Replace with project name)
2. Client -(Replace with clients name)
3. Developer -(Replace with developers name)
4. Consultant -(Replace with consultants name)
TECHNICAL DEPARTMENT-CIVIL (Replace by the Project Doc. No.
TEC-211200-MET-DoR-001
Name) (Rev No.)
METHOD STATEMENT Issue Date 02 October 2013
Method statement for installation and inspection of fire fighting Rev. Date NA
system. Pages 5 of 9
5.2. Abbreviations
1. Engineer - Representative of “Name of engineering consultancy”
2. ICL - Inspection Check List
3. IR - Inspection Request
4. ITL -Independent Testing Laboratory
5. ITP - Inspection and Test Plan
6. ITR -Inspection & Test Requests
7. MAT - Material Submittal
8. MEP - Mechanical Electrical Plumbing
9. MET - Method Statement
10. MIR - Material Inspection Request
11. MSDS - Material Safety Data Sheet
12. PPE -Personal Protective Equipment
13. PQP -Project Quality Plan
14. PTW -Permit To Work ( Working at Height or enclosed spaces)
15. RA -Hazard Identification and Risk Assessment
16. RFIA - Request for Inspection and Approval
17. SPD - Shop Drawing
18. TBM - Temporary Bench Mark
6. QUALITY CONTROL
1. Quality of installation and materials at site will be ensured by our project team consisting of a Project
Manager, Project Engineers, QA / QC Engineer and the site Foremen. All will be according to the
Specification, NFPA standards and /or local civil Defence authority requirements.
2. Installation of pipe work shall be carried out under conditions satisfactory to the contractor.
3. All work performed and completed must meet the approval of the contractor.
4. Scheduling of work to carry out the installation of pipe work shall be agreed and to the satisfaction of
the contractor and shall be co-coordinated with the work schedules of other trades and disciplines
involved in the overall construction.
5. Install piping neatly, free from unnecessary traps and pockets. Work into place without springing or
forcing. Use fittings to make all changes in direction. Make all connections to equipment using flanged
joints or unions. Make reducing connections with reducing fittings only.
6. Remove dirt, scale and other foreign matter from inside piping before tying in sections, fitting, valves
or equipment.
9.7. Painting
1. All pipes will be cleaned inside and outside for removal of dust and debris before painting.
2. One coat of Approved Red-oxide Primer will be applied of 35 Microns film thickness
3. After drying, one coat of Approved Enamel Paint will be applied of 35 Microns film thickness before
installation of pipe.
4. Finally one coat of Approved Enamel Paint of 35 Microns will be applied after hydraulic test and in the
final stages.
TECHNICAL DEPARTMENT-CIVIL (Replace by the Project Doc. No.
TEC-211200-MET-DoR-001
Name) (Rev No.)
METHOD STATEMENT Issue Date 02 October 2013
Method statement for installation and inspection of fire fighting Rev. Date NA
system. Pages 9 of 9
11. ATTACHMENTS
11.1. Inspection Checklists
11.2. Inspection Test Plan
11.3. Risk Assessment