You are on page 1of 7

CURRICULUM VITAE

Name : Akinfe V. Halliday

Position. : Lead Civil / Structural Engineer

Nationality : Nigerian

E-mail : vaihak@yahoo.com

D.O.B : 14th June 1978

Qualifications : Council for the Regulation of Engineers in Nigeria 2013


: Member, Nigerian Society of Engineers (2010)
: Associate Member American Society of Civil Engineers ASCE 2007
: Bachelor degree in Civil Engineering at University of Port Harcourt
Rivers, Nigeria 1995 – 2000

Telephone : +234 802 652 9032, +234 702 575 5672 (mobile)

Computer experiences: SACS for modelling and analysis of offshore structures such as Fixed
jackets Platforms and FPSO Topsides, STAAD PRO , Mathcad, STAAD
PRO Foundation, AutoCAD , PDMS, Microsoft
Word/Excel/PowerPoint/Project/Access etc.

Training Bridge Design with STAAD PRO V8i e –Seminar, Bentley Institute, 2011

Career Summary
A highly talented, professional and dedicated Civil / Structural Engineer
(Offshore and Onshore) with Twelve years working structural design
experience (Greenfield and Brownfield) for Petrochemical Facilities,
FPSO’s, fixed platforms, topsides, jackets, for clients such as Chevron,
Total, Shell, NNPC, Addax and ExxonMobil Nigeria.
Proven structural design ability in Conceptual, FEED and Detailed design
of offshore Fixed Jacket Platform, FPSOs and Petrochemical plants with
a demonstrated ability to work with multicultural structural design teams.
Familiar with international codes and Standards including API RP2A,
AISC, ACI, BS, Eurocodes, Shell DEPs, Total GS and ExxonMobil GPs.
Perform Stress analysis using SACS and STAAD PRO. In-place, Tow,
Transportation, Jacking and Lifting.

Work experience
2015 --Present AMAZON ENERGY LIMITED

Kwale Gas Flaredown Project(NAOC)


(May. 2015 – Present)
Position: Lead Civil / Structural Engineer
Location: Amazon office, Lagos
Activities:
 Generated the Structural Design Brief
 Review of FEED Document
 Development of Civil / Structural technical specifications
 Analysis & Design of the pile foundation for equipments using
STAAD PRO
 Design & Analysis of the Pipe Support/Piperack
 Participated in the Kick off meeting

Etim/ Inim Life Extension Project Phase II (MPN)

Position: Lead Structural Engineer


Location: Amazon office, Lagos
 Generated the Structural Design Brief
 Review of AS built Drawings and mark up for Modification
 Development of Civil / Structural technical specifications
 In-place Analysis & Design of flare boom using SACS
 Lifting Analysis & Design of Flare Boom
 Participated in the Kick off meeting / Bi-weekly meetings
 Coordinated Team Members to meet schedule close out date.

Work experience
2013 –2015 CRESTECH/TECHNIP (A Technip Company in Nigeria)
Egina Buoy Project for Total Producing Nigeria (TEPNG)
(Dec. 2014 – Present)
Position: Senior Civil / Structural Engineer
Location: Crestech office, Lagos
Activities:
 Generated the Structural Design Brief
 Analysis & Design of the Monorail using STAAD PRO
 Analysis & Design of the Fairlead structure using STAAD PRO
 Design & Analysis of the Pipe Support
 Participated in the Kick off meeting

Ikike Field Development Project for Total Producing Nigeria


(TEPNG)
(Mar. 2014 – Dec. 2014)
Position: Senior Civil / Structural Engineer
Location: Crestech office, Lagos
Activities:
 Review of all Civil Structural Deliverables (Calculation Reports
and Drawings) of designers and other engineers within the team.
 Develop designs to satisfy technical specifications.
 Lead design reviews, risk assessments from a technical
standpoint.
 Preparation of technical specifications in liaison with client and
project team (Discipline Procedure, Design basis).
 Ensure quality of design documentation throughout the design
process.
 In-place Analysis of AMD2 Module
 Lift Analysis of AMD2 Module
 Transportation Analysis of AMD2 Module
 Riser Guard Design
 AMD2 Jacket In-place Analysis
 Design of Members and Joints/connections design
 IKD1 On Bottom stability Analysis
 IKD1 Jacket In-place Analysis

OFON Phase 2 Project for Total Producing Nigeria (TEPNG)


(November 2013 –March 2014)
Position: Senior Civil / Structural Engineer
Location: Crestech office, Lagos
Activities:
 Update the existing OFD5 In-place File using the latest, weight
control report WCR, Equipment List/Layout.
 Update the beam properties where necessary.
 Run the updated OFD5 In place Sacs File.
 Prepare/update the existing OFD5 In place Analysis Report.
 Update the existing OFD5Miscellaneous Design Calculation to
reflect the changes in the design forces as result of changes in
Equipment.
 Update the Structural Part of the global WCR using the latest
Structural drawings.
 Carry out any other functions as assigned by the Lead Engineer
 Bridge - Analysis
 Local Design of Clamps
 Pipe Support Design

Erha North Phase 2 Project for Mobil Producing Nigeria (MPN)


(June 2013 –January 2014)
Position: Senior Civil / Structural Engineer
Location: Crestech office, Lagos
Activities:
 Specification – Structural Material Selection
 Material Requisition & Scope of Supply for Structural Steel for
Topside
 Material Requisition & Scope of Supply for Structural Steel for
Miscellaneous Items
 Material Requisition & Scope of Supply for Skid Mounted
Equipment Structural Steel
 Material Requisition & Scope of Supply for Structural Steel for
Pipe Support
 Deck Extension Sacs In-place Analysis
 Deck Extension Sacs lifting Analysis
 Developed the structural design report for the Pig Launcher skid
 Developed the structural design report of the Pipe support
 Pipe Support Design Calculations

Work experience
2005-2013 NNPC (Nigerian National Petroleum Cooperation)

Chevron Pig Traps Modification Project (Jan. 2012 – Jul. 2013)


Position: Intermediate Civil / Structural Engineer
Location: NETCO Office, Lagos
Activities:
 Global Structural Analysis of Deck extensions
 Design of Additional piles to Replace failed jacket legs
 Padeye Design
 Design of Members and Joints/connections design
 Perform In-place, and Lifting Analysis Deck Extensions
 Preparation of Design Reports
 Review of all structural drawings
 Preparation of MTOs

Chevron Utonana Fire Water Project (Sept. 2012 – Nov. 2012)


Position: Senior Civil / Structural Engineer
Location: NETCO Office, Lagos
Activities:
 Global Structural Analysis of Bridge Design
 Design of Additional piles to Replace failed jacket legs
 Perform In-place, and Lifting Analysis Decks
 Design of Members and Joints/connections design
 Design of Floating Suction Box
 Preparation of Design
 Review of all structural drawings

Bonga South West/Aparo Project for Shell (Feb. 2012 – May. 2012)
Position: Senior Civil / Structural Engineer
Location: NETCO Office, Lagos
Activities:
 Populated the Wind Pressure Data Sheet for the In-place,
Transport and Fabrication Calculation
 In-place Analyses – Water flood and Laydown Module with report
 Lifting Analyses – Water flood and Laydown Module with report
 Vessel Transportation Analyses – Water flood and Laydown
Module –with report
 Planned and reviewed Topsides module and Pedestal Layouts
 Miscellaneous Design
 Material Take-Off
 Coordinated and reviewed 3rd Party (Deltafrik) FM1, FM2, GCF
and IGG Modules design analyses (In-place, lifting and vessel
transportation),
 Coordinated and reviewed 3rd Party (Deltafrik) MTOs and
drawings

Twenty (20) Well Slots Flow lines & Support Project for Mobil,
MPNU, (Mar. 2012 – May. 2012)
Position: Senior Civil / Structural Engineer
Location: NETCO Office, Lagos
Activities:
 OGGS RP-A Helideck with report
 Bonny Platform Helideck with report
 Forcados CLP Helideck with report
 Estuary Helideck with report
 Afremo- A Platform Helideck with report

Mobil Producing Nigeria (MPN) ESA II Pigging And Facilities


Upgrade Phase 5 (Dec. 2011 – Jan. 2012)
Position: Senior Civil / Structural Engineer
Location: NETCO Office, Lagos
Activities:
 Global Structural Analysis of Ubit GA fixed jacket leg platforms
which includes checking the jacket legs to carry additional load
for a deck extension using SACS
 Design of Steel Pancake Deck extension for fixed offshore
platform
 In-place, and Lifting Analysis
 Design of Members and Joints/connections design
 Review of all structural drawings

Shell Petroleum Development Company SPDC SOKU NAG


Compression Slim Feed and Detail Project (Nov. 2010 – Dec. 2011)
Position: Senior Civil / Structural Engineer
Location: NETCO Office, Lagos
Activities:
 Steel Pipe rack Design using STAAD PRO
 Steel Integrity Checks for Pipe racks
 Calculation Reports for foundation and structural design
 Foundation design for Separator, Pipeline and other equipments
 Design of CFA piles
 Checking of Civil and Foundation General arrangements, Plans
and elevations drawings and maintaining quality control of
documents
 Providing input for weight control report

Bonga North Field Project for Shell (March. 2010 – June. 2011)
Position: Senior Civil / Structural Engineer
Location: NETCO Office, Lagos
Activities:
 In-place Analyses of Bonga North Water Mini Injection Module
 Lifting Analyses of Bonga North Water Mini Injection Module
 Transportation Analyses of LDHI Mini Injection Module
 In-place Analyses of LDHI Mini Injection Module
 Lifting Analyses of LDHI Mini Injection Module
 Transportation Analyses of LDHI Mini Injection Module
Generated on the Analysis Report
BRASS LNG Project-Detail Engineering Proposal (Sep. 2010 – Nov.
2010)
Job Scope: Civil / Structural Engineer
Location: NETCO Office, Lagos
Activities:
 Prepare Structural Disciple WBS
 Prepare Structural Disciple CTRs
 Prepare Structural Disciple Execution plan
 Prepare Structural Disciple Schedule

TOTAL- OML 99 AMENAM Oily Water treatment Project Proposal


(Nov. 2009 – Jul. 2010)
Job Scope: Civil / Structural Engineer
Location: NETCO Office, Lagos
Activities:
 Prepare Structural Disciple WBS
 Prepare Structural Disciple CTRs
 Prepare Structural Disciple Execution plan
 Prepare Structural Disciple Schedule

TOTAL-EGINA FPSO Project (Aug. 2009 – Mar. 2010)


Position: Civil / Structural Engineer
Location: NETCO Office, Lagos
Activities:
 Modeling of Module P1 and P4 Topside in SACS
 Perform Structural Analysis of FPSO Topsides P1 and P4
 Calculation of Structural, Equipment, Piping, Mechanical and
Electrical loads of Modules P1 and P4
 In-service (In-place, Jacking and Damaged) Analysis of FPSO
Modules P1 and P4 using SACS
 Pre-service (Towing and Lifting) Analysis of FPSO modules P1
and P4
 Design of Members and Joints/connections design
 Checking of Structural General arrangements, Plans and
elevations drawings
 Providing input for weight control report

STRUCAD CONVERSION TO SACS (Jul. 2009 – Aug. 2009)


Position: Civil / Structural Engineer
Location: NETCO Office, Lagos
Activities:
 Conversion of StruCAD files to SACS
 In-place Analysis, Lifting, Towing of existing platforms
 Prepared Handover Report indicating the conditions of the SACS
files

ADDAX ANTAN Field Development Project (Oct. 2008 – Jun.2009)


Position: Civil / Structural Engineer
Location: NETCO Office, Lagos
Activities:
 Lifting Analysis using SACS for Jacket Structure
 Preparation of Material Take-Off (MTO)
 Reviewed Structural General arrangements and elevations
 Reviewed Structural Framing Plan Details and Sections

Mobil Producing Nigeria (MPN) ESA II Pigging And Facilities


Upgrade Phase 3 (Aug. 2007 – Oct.2008)
Position: Civil / Structural Engineer
Location: NETCO Office, Lagos
Activities:
 Lifting Analysis of Deck Extension Pancake
 Design of Members and Joints/connections design
 Preparation of Material Take-Off (MTO)
 Reviewed Structural General arrangements and elevations
 Reviewed Structural Framing Plan Details and Sections

CHEVRON Olokola NLNG Project (Oct 2007 – Dec 2007)


Job Scope: Civil / Structural Engineer
Location: Technip Office, France
Activities:
 Facilities to be installed in the camps include:
 Electrical networks (power generation and distribution)
 Water treatment plant including networks
 Sewage treatment plant including networks
 Medical clinic
 VIP hotel
 Catering/Mess halls and Laundries
 Rain water drainage
 Fire fighting & detection system and equipment
 Telephone networks
 Accommodation buildings
 Roads
 Mini markets
 Recreation and sport buildings/pitches

 Structural detailing and design of generator shelter
 Structural detailing and design of residential buildings
 Structural detailing and design of Foundations
 Preparation of job specification / deliverable list
 Preparation of sections and detailed drawings for generator
shelters, Foundations and camp layout.

CHEVRON MADU AND TUBU Development Concept Study (Feb


2007 – May 2007)
Job Scope: Civil / Structural Engineer
Location: NETCO Office, Lagos
Activities:
 In-place Analysis of 3 and 4 legged fixed jacket platform
 Preparation of Material Take-Off (MTO)
 Reviewed Structural General arrangements and elevations
 Reviewed Structural Foundation Details

EXXON_ MOBIL, ETIM, INIM AND UTUE (EIU)- SHE Upgrade Project
(May. 2006- Dec. 2006)
Position: Civil / Structural Engineer
Location: NETCO Office, Lagos
Activities:
 Steel Connection Design
 Secondary Steel Design
 Preparation of Material Take-Off (MTO)
 Reviewed Structural General arrangements and elevations
 Reviewed Structural Foundation Details

Train 5 Condensate Stabilization Unit for NLNG


(Oct. 2006 – Feb .2007)
Position: Civil / Structural Engineer
Location: NETCO Office, Lagos
Activities:
 Preparation of structural drawings for Pipe rack, Foundations
 Preparation of MTO’s for Civil & Structural Members
 Detailing of Foundation & Structural Members
 Design of Pipe rack, support using STAAD PRO Design of
Foundation
CHEVRON AGBAMI FPSO Project (Oct. 2005- Dec. 2005)
Job Scope: Civil / Structural Engineer
Location: NETCO Office, Lagos
Activities:
 Design of Pipe supports using STAAD PRO and Spread sheet
 Assessment of secondary steel drawings of 1P, 3S, 7P and 6S
 Reviewed PDMS model
 Preparation of Material Take-off (MTO)

2003 – 2005 Gitto Constructions Nig.Ltd. - Nigeria


Job Scope: Civil / Structural Site Engineer
Activities:
 Daily activity report, manpower Evaluation,
 Progress reporting, Machine hour’s evaluation,
 Costing of phases of work and General Expenses Control.
 Interpretation of architectural & civil drawings to evaluate
quantities
 Preparation of structural working drawings
 Analysis of structures
 Preparations of detail structural AS BUILT
 Drawings using AutoCAD software
 Preparation of Bill of Quantities & MTO

2001 – 2002 F.K.Constructions Nig.Ltd. - Nigeria


Job Scope: Civil / Structural Site Engineer
Activities:
 Building Construction and maintenance
 Design, construction of stores and renovation works for stadium
 Grading and maintenance of existing roads
 Preparations of detailed structural drawings using AutoCAD.
Specific work done include:
 Foundation layout
 Foundation reinforcement detail
 Bar bending schedules
 Civil/structural quantities

Details of Course included:

i. Design of Fixed Offshore Platforms (2009)


ii. Design of Floating offshore Platforms (2009)

 General Design and Construction Considerations

UNPUBLISHED RESEARCH

 N/A

References

 Available on Request

You might also like