You are on page 1of 37

1/13/2017 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam ­ Full | ERPPrep

SAP ERP Production Planning and Manufacturing (PP)
Certifications Practice Exam ­ Full

You got 79 of 80 possible points.
Your score: 99 %

Question Results

Question: Score 1 of 1 

In production order processing, for which of the following objects can you enter a
confirmation?
There are 3 correct answers to this question.

Response:

Work Center

Operation / Suboperation

Trigger Point

Individual Capacity

Order

Question: Score 1 of 1 

Which information is contained in production versions for selecting routings and
bills of material?
Please choose the correct answer.

Response:

The explosion date on which the validity of the routing and bill of material is checked

All the control parameters for selecting routings and bills of material

http://www.erpprep.com/node/872/take 1/37
1/13/2017 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam ­ Full | ERPPrep

The plant for which the routing and BOM have to be created

The routing and BOM alternatives to be used for production

Question: Score 1 of 1 

What functions can you use for sub operations?
There are 2 correct answers to this question.

Response:

Production/Resource tools allocation

Material component allocation

Capacity planning

Costing

Question: Score 1 of 1 

What are the names of the objects for process integration of production orders?
There are 2 correct answers to this question.

Response:

PI sheets

Control instructions

Work instructions

Control recipes

Question: Score 1 of 1 

You want to use the function "Read PP master data" in the production order.
However, while calling the function you receive an error message. What could be

http://www.erpprep.com/node/872/take 2/37
1/13/2017 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam ­ Full | ERPPrep

the reason?
Please choose the correct answer.

Response:

The material availability check has been performed.

Order papers have been printed.

The production order has been released.

Goods movements have been posted.

Question: Score 1 of 1 

Which of the following requirements is supported by using process orders?
Please choose the correct answer.

Response:

Documentation of the production using an electronic batch record

Use of production/resource tools

Linkage of documents to orders

Use of reference operation sets

Question: Score 1 of 1 

Which of the following aspects characterize repetitive manufacturing in a
manufacturing plant?
There are 3 correct answers to this question.

Response:

Production without using production orders and without status management

Automatic line loading by capacity limits across all production lines

Continuous material consumption, production flow and output

http://www.erpprep.com/node/872/take 3/37
1/13/2017 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam ­ Full | ERPPrep

Shop fabrication

Period­based planning of the quantities to be produced

Question: Score 1 of 1 

A final assembly process takes place at three work centers, one after the other.
The routing, which consists of three associated operations (10, 20 and 30), plans
for a specific BOM component to be installed during operation 30 and not before.
The component should therefore only be requested at the start of operation 30.

What sequence do you follow in master data maintenance in SAP ECC to make this
component available in line with operations during final assembly?

Please choose the correct answer.

Response:

1. Create BOM 2. Create work centers 3. Create routing 4. Carry out component
assignment in work center

1. Create routing 2. Create work centers 3. Create BOM 4. Carry out component
assignment in BOM or routing

1. Create BOM 2. Create work centers 3. Create routing 4. Carry out component
assignment in BOM or routing

1. Create work centers 2. Create routing 3. Create BOM 4. Carry out component
assignment in work center

Question: Score 1 of 1 

An enterprise wants to use SAP ECC requirements planning together with the
NETPL procedure (net change planning in the planning horizon). The planning
horizon should be set equally for all materials by default. However, some
materials need to have a different planning horizon.
Which procedure do you recommend for setting the planning horizon?
Please choose the correct answer.

Response:

Set the planning horizon in the MRP groups and assign deviant entries via the plant
parameter settings in Customizing.
http://www.erpprep.com/node/872/take 4/37
1/13/2017 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam ­ Full | ERPPrep

Set the planning horizon in the plant parameters in Customizing and store deviant
entries in the 
material masters for corresponding materials.

Set the planning horizon in the MRP groups in Customizing and store deviant entries in
the material masters for the corresponding materials.

Set the planning horizon in the plant parameters in Customizing and assign deviant
entries via the MRP groups for the corresponding materials.

Question: Score 1 of 1 

In which of the following objects can you activate backflushing of components if
you want to use this functionality during order confirmation?
There are 3 correct answers to this question.

Response:

Routing

Material Master (Finished Product)

Work Center

Production Scheduling Profile

Material Master (Component)

Question: Score 1 of 1 

A user of the SAP ECC system wants a rolling planning time fence (firming type =
1) to be set up for a material; in other words, new planned orders are firmed
within a planning time fence. When an unforeseen production failure occurs, it
can happen that such firmed planned orders are not being processed because
time passes. What solution would automatically delete firmed planned orders?
Please choose the correct answer.

Response:

http://www.erpprep.com/node/872/take 5/37
1/13/2017 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam ­ Full | ERPPrep

In the material master, an MRP type is used in which the roll­forward mechanism is
activated (Customizing for requirements planning).

Firmed planned orders can only ever be deleted manually because of the header data
firming.

The demand adjustment activated in the Customizing for demand adjustment is used.

Question: Score 1 of 1 

What data can be posted directly via the Plant Data Collection (PP­PDC) interface?
Please choose the correct answer.

Response:

Maintenance notifications

Goods receipts

Goods issues

Confirmations

Question: Score 1 of 1 

You are using MRP controllers in an SAP ECC system.

Which of the following statements concerning MRP controllers are correct?

There are 2 correct answers to this question.

Response:

In multilevel single­item planning, materials are selected using the MRP controller.

An employee responsible for the planning of materials can be assigned to multiple MRP
controllers.

The MRP controller is a central selection criterion for evaluating material requirements
planning.

http://www.erpprep.com/node/872/take 6/37
1/13/2017 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam ­ Full | ERPPrep

The MRP controller is maintained in production versions.

Question: Score 1 of 1 

Which of the following master data can be used with process orders?
There are 3 correct answers to this question.

Response:

Production versions

Serial numbers

Master recipes

Resources

Production/resource tools

Question: Score 1 of 1 

Which repetitive manufacturing options can you use to carry out line loading in
the SAP ECC system, and thus generate run schedule quantities (RSQ) from
normal planned orders?
There are 3 correct answers to this question.

Response:

Automatic selection of the production version by applying quota arrangement records
in material requirements planning (MRP)

Automatic selection of the production line assigned to the MRP group used during
material requirements planning (MRP)

Automatic selection of the production version in material requirements planning (MRP)
using the selection methods setting

Manual assignment of planned production quantities in a planning table

A planning algorithm from capacity planning

http://www.erpprep.com/node/872/take 7/37
1/13/2017 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam ­ Full | ERPPrep

Question: Score 1 of 1 

A user you advise wishes to transfer variable process instructions for automated
processing directly to certain work centers and machines in the production
department (for example, feed speed, pressing pressure, dry temperature).

The user also wishes to receive variable as­is messages (such as actual quantities,
actual times) from these work centers and machines and to process these
messages for feedback concerning production orders.

Which of the following options would you recommend to implement these
requirements?

Please choose the correct answer.

Response:

Plant data collection (PP­PDC) interface

SAP Application Link Enabling (ALE)

Execution Steps (XSteps) and process messages

SAP Business Intelligence (BI)

Question: Score 1 of 1 

In your company planning strategies are used in the SAP­ECC demand
management that are based on consumption. Which of the following statements
about consumption is true?
There are 2 correct answers to this question.

Response:

A consumption situation is dynamic and is always restructured with the planning run.

Consumption always takes place on the material level between the planned
independent requirements and the planned orders.

The consumption parameters (consumption mode and consumption interval) can be
set in the material master or in the MRP group.

Consumption can also take place between order reservations and planned independent
requirements, depending on the strategy.

http://www.erpprep.com/node/872/take 8/37
1/13/2017 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam ­ Full | ERPPrep

Question: Score 1 of 1 

In your enterprise, a planning strategy is used in SAP ECC that enables joint
planning of all MRP scheduled assemblies for a finished product to trigger
procurement of these assemblies.

It is important to ensure that the finished product is only produced when there is
a customer order present.

When a customer order is received, production of the finished product should be
triggered in the form of make­to­order planning and production.

Which planning strategy covers this scenario?

Please choose the correct answer.

Response:

Planning with final assembly (strategy 40)

Planning with make­to­stock (strategy 10)

Planning at the assembly level (strategy 70)

Planning without final assembly (strategy 50)

Question: Score 1 of 1 

Which objects can you use in the production order for a material component to
propose the storage location in its reservation?
There are 3 correct answers to this question.

Response:

Routing

Work center

Production version

Material master (component)

Material master (product)

http://www.erpprep.com/node/872/take 9/37
1/13/2017 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam ­ Full | ERPPrep

Question: Score 1 of 1 

The master data for a logistical process is to be stored in the SAP ECC system. In
this context, you require the production versions for subsequent planning and
production. You know a mass maintenance transaction that you could use here.
Where else in the SAP ECC system could you define production versions?
Please choose the correct answer.

Response:

In the repetitive manufacturing profile in Customizing.

In the line routing.

In the material master.

In the work center.

Question: Score 1 of 1 

Which of the following functions occur when a production order is created?
There are 3 correct answers to this question.

Response:

Calculating the lead time for the production order

Copying a document that is assigned to the material master for the product to be
produced

Calculating the quantity to be produced on the basis of the available material stocks

Selecting and copying a bill of material

Selecting and copying a routing

Question: Score 1 of 1 

In the SAP ECC system, a material is produced using production orders. The
planning table for repetitive manufacturing should be used to plan line loading
for this material. On the initial screen of the planning table, you select this

http://www.erpprep.com/node/872/take 10/37
1/13/2017 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam ­ Full | ERPPrep

material and then receive a message informing you that you cannot use the
planning table for this material.

Planning Table Initial Screen: Change Mode

Planning Table

No elements exist for the selection MF50 t37tdc00 INS

What could be the reason?

Please choose the correct answer.

Response:

There is no valid production version for this material.

There are no requirements present.

The repetitive manufacturing indicator has been set.

There are no planned orders or production orders present.

Question: Score 1 of 1 

Which of the following master data do you always have to make available for
material replenishment using the KANBAN procedure?
There are 2 correct answers to this question.

Response:

Production supply areas

Product cost collector

Control cycles

Production versions

Rate routings

Question: Score 1 of 1 

http://www.erpprep.com/node/872/take 11/37
1/13/2017 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam ­ Full | ERPPrep

Which of the following properties about the planning functions available in SAP
ECC applies?
Please choose the correct answer.

Response:

Master production scheduling (MPS) refers to preferred planning of important
materials.

In demand management (DM) material shortage situations are identified and
corresponding receipt elements are created.

Long­term planning (LTP) is a long­term form of forecasting.

Material requirements planning (MRP) includes automatic capacity leveling.

Question: Score 1 of 1 

The company you are advising uses a plant data collection system from company
XYZ and would like to distribute production orders to the terminals on this system
and enter feedback using these terminals. 
Which integration possibilities would you recommend so that as little work as
possible is required for the customer to implement this?
Please choose the correct answer.

Response:

The plant data collection interface (PP­PDC)

SAP Manufacturing Integration and Intelligence (SAP MII)

Execution Steps (XSteps)

The process control system interface PI­PCS

Question: Score 1 of 1 

After a material has been included in a NETCH material requirements planning run
you change its BOM (bill of materials).
Which of the following planning file entries for this material are set by the
system?
Please choose the correct answer.
http://www.erpprep.com/node/872/take 12/37
1/13/2017 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam ­ Full | ERPPrep

Response:

The BOM explosion indicator

The BOM explosion and the NETPL planning indicator

The NETCH and NETPL planning indicators

The BOM explosion, the NETCH, and the NETPL planning indicators

Question: Score 1 of 1 

Where in the SAP ECC system can you define production versions?
Please choose the correct answer.

Response:

In the work center

In the bill of material

In the material master

In the routing

Question: Score 1 of 1 

What options for selecting a routing exist when creating a production order?
There are 3 correct answers to this question.

Response:

Automatic selection, controlled via settings in Customizing

Manual selection

Selection on the basis of the production control profile

Selection on the basis of the routing number in the material master for the material to
be produced

http://www.erpprep.com/node/872/take 13/37
1/13/2017 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam ­ Full | ERPPrep

Question: Score 1 of 1 

Which of the following organizational units does the manufacturing, planning, and
execution process use?
There are 2 correct answers to this question.

Response:

Plant

Purchase Organization

Storage Location

Sales Area

Question: Score 1 of 1 

The master data for an in­house production process is to be set up in the SAP ECC
system. To do this, you should create a suitable routing that plans for five
operations in an initial sequence (10, 20, 30, 40, 50).

There should be an option of relocating operations 30 and 40 to a second
sequence on other work centers if there are capacity bottlenecks.

What sequence type would you use to create the second sequence in the system?

Please choose the correct answer.

Response:

Parallel sequence

Alternative sequence

Standard sequence

Substitute sequence

Question: Score 1 of 1 

Which of the following structural elements does a process order have?
There are 3 correct answers to this question.

http://www.erpprep.com/node/872/take 14/37
1/13/2017 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam ­ Full | ERPPrep

Response:

Phases

Characteristic­based process instructions

Relationships

Item data

Parallel sequences

Question: Score 1 of 1 

Where can you define the valid receivers for production order costs?
Please choose the correct answer.

Response:

In the production scheduling profile

In the settlement profile

In the costing variant

In the valuation variant

Question: Score 1 of 1 

What are the consequences of a confirmation of an operation?
There are 2 correct answers to this question.

Response:

Serial numbers are assigned for the confirmed quantity.

The produced and confirmed quantity is automatically posted to the warehouse stock
as a receipt.

The operation's capacity requirements are reduced.

http://www.erpprep.com/node/872/take 15/37
1/13/2017 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam ­ Full | ERPPrep

Actual costs are posted for the production confirmed.

Question: Score 1 of 1 

Which statement regarding lot size procedures is correct?
Please choose the correct answer.

Response:

If a make­to­order production strategy is in use, a lot for lot (exact) lot size is always
determined for the corresponding procurement element.

The procurement quantity of a lot size procedure can be specified using a safety time
period profile.

If a long­term lot size is in use, procurement is conducted with a long­term
perspective.

The lot size quantity can be influenced using a minimum quantity and the rounding
profile.

Question: Score 1 of 1 

What could be a consequence of confirming an operation?
Please choose the correct answer.

Response:

The capacity requirements are updated

The actual costs are settled

The planned costs are updated

The production order is rescheduled

Question: Score 1 of 1 

http://www.erpprep.com/node/872/take 16/37
1/13/2017 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam ­ Full | ERPPrep

In the task list, there is the possibility to work with suboperations. What can you
do in more detail by using suboperations?
There are 2 correct answers to this question.

Response:

Scheduling

Material component allocation

Capacity planning

Costing

Question: Score 1 of 1 

During the implementation of SAP ECC material requirements planning, the
project team defines MRP controller numbers in Customizing under the entry
"Define MRP Controller" that can be assigned to the planners responsible for the
material.
Which of the following statements are correct concerning these MRP controllers?
There are 2 correct answers to this question.

Response:

A planner responsible for a material can have multiple MRP controller numbers.

The MRP controller number is a central selection

In multilevel single­item planning, materials are selected using the MRP controller
number.

The MRP controller number is assigned using the production version.

Question: Score 1 of 1 

Which of the following requirements for a manufacturing plant can be supported
by using process manufacturing?
There are 3 correct answers to this question.

Response:

http://www.erpprep.com/node/872/take 17/37
1/13/2017 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam ­ Full | ERPPrep

Material requirements planning for production resources.

Master recipe­based manufacturing.

Variable calculation of material quantities (product output, material usage).

Manufacturing without orders.

Manufacturing in charge quantities.

Question: Score 1 of 1 

Which production order function can no longer be carried out after the order is
released?
Please choose the correct answer.

Response:

Posting a goods receipt from production to stock.

Posting a goods issue from stock to the production order.

Switching sequences.

Read PP master data.

Question: Score 1 of 1 

A project team member analyzes the following situation in SAP ECC in the
stock/requirements list for a finished product: there is only one customer order
and one fixed planned order with a similar quantity amount.

The customer order and the planned order both have deadlines on work days but
not on the same work day; the planned order has a later deadline.

The project team member cannot find a rescheduling message referring to this
deadline misalignment in the stock/requirements list. What reasons could there
be for the missing message?

There are 2 correct answers to this question.

Response:

http://www.erpprep.com/node/872/take 18/37
1/13/2017 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam ­ Full | ERPPrep

The elements are linked to each other via fixed pegging.

Requirement planning has not yet been carried out to update the rescheduling
message.

The requirement coverage element is outside the rescheduling horizon.

The time misalignment falls within the tolerance window defined in Customizing.

Question: Score 1 of 1 

Which of the following elements can be used in a process order?
There are 3 correct answers to this question.

Response:

Relationships

Process instructions

Phases

Suboperations

Parallel sequences

Question: Score 1 of 1 

Which of the following possible errors would lead to the message shown?
There are 2 correct answers to this question.

Response:

There are no valid routings or no routings available on the explosion date.

The Customizing for the order type is set to manual routing selection and a valid
routing exists.

The material master (product) is set to manual routing selection and valid routing
exists.

http://www.erpprep.com/node/872/take 19/37
1/13/2017 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam ­ Full | ERPPrep

In the material master, plan selection was set to production version. A production
version was created and it is faulty.

Question: Score 1 of 1 

Which one of the following scheduling types cannot be assigned as default to an
order type (production order)?
Please choose the correct answer.

Response:

Midpoint

Backward

Forward

Only capacity requirements

Question: Score 1 of 1 

Which statements about the reorganization of planned independent requirements
in SAP ECC are true?
There are 2 correct answers to this question.

Response:

The reorganization can be parameterized using a plant­specific reorganization interval.

The reorganization is a form of demand adjustment in which non­settled planned
independent requirements for the planning are set to inactive but are not deleted.

The reorganization only affects planned independent requirements that lie on a time
axis to the past from a specified key date.

The reorganization only deletes planned independent requirements that have no fixed
planned orders to them.

Question: Score 1 of 1 
http://www.erpprep.com/node/872/take 20/37
1/13/2017 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam ­ Full | ERPPrep

For a specific end product, you want to use a planning time fence and fixing type
1 to ensure that the planning situation in SAP ECC calms down in a short­term
time window. Two customer orders arrive at short notice and their receipts should
really be within the planning time fence, due to their date/time. Which statement
is true with this scenario?
Please choose the correct answer.

Response:

Requirements planning only examines changes that are relevant to scheduling within
the planning time fence; the customer orders are covered in time.

The MRP controller has no possibility of creating planned orders within the planning
time fence.

Newly created planned orders cannot be created by requirements planning before the
end of the planning time fence, at the earliest.

Within the planning time fence, the newly created planned orders are automatically
frozen by requirements planning (roll forward).

Question: Score 1 of 1 

Where are the standard operation times for an operation defined?
Please choose the correct answer.

Response:

Production Resource/Tool (PRT)

Material Master

Work Center

Routing

Question: Score 1 of 1 

In the course of a customer project, you are confronted with an SAP ECC system
that shows the error message displayed below when you test requirements
planning in plant 1000. Large numbers of materials are already available in plant
1000.
http://www.erpprep.com/node/872/take 21/37
1/13/2017 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam ­ Full | ERPPrep

As a first step in solving the problem, you activate requirements planning in the
Customizing for plant 1000. What further steps must you take before you can put
requirements planning in plant 1000 into operation in SAP ECC?

Please choose the correct answer.

Response:

Implement theplanning files in Customizing­ Specify the plant parameters for plant
1000 in the requirement planning views

Activate requirements planning in Customizing for MRP areas in plant 1000­ Specify
the plant parameters for plant 1000 in the requirement planning views

Implement the planning files in Customizing­ Specify the plant parameters for plant
1000 in Customizing

Createa planning file in Customizing­ Specify the plant parameters for plant 1000 in
Customizing

Question: Score 1 of 1 

You select the master data for production orders via production versions. Which
information is contained in a production version?
Please choose the correct answer.

Response:

The default order type to be used

The explosion dates for the routing and BOM

The control parameters for selecting routings and BOM

The routing and BOM alternatives to be used

Question: Score 1 of 1 

In modeling in­house production using SAP ECC, bills of material (BOM) are to be
recorded in the system. On which business levels can you create a BOM?
There are 2 correct answers to this question.

Response:
http://www.erpprep.com/node/872/take 22/37
1/13/2017 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam ­ Full | ERPPrep

At the plant level

At the client level

At the business area level

At the company code level

Question: Score 1 of 1 

The availability check during production order creation should use a different
scope of check than during order release.
How can you fulfill this requirement?
Please choose the correct answer.

Response:

Maintain appropriate checking rules in checking control for order creation and order
release.

Maintain an appropriate availability checking group in the material master.

Maintain appropriate availability checking rules in the order type­dependent
parameters.

Maintain appropriate availability checking rules in the production scheduling profile.

Question: Score 1 of 1 

You use a planning time fence and fixing type 1. You receive a customer order
with a material availability date within the planning time fence.
What do you have to consider in this scenario?
Please choose the correct answer.

Response:

The MRP controller cannot create planned orders within the planning time fence.

Planned orders that are created by requirements planning are shifted to the end of the
planning time fence.

http://www.erpprep.com/node/872/take 23/37
1/13/2017 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam ­ Full | ERPPrep

Planned orders are created within the planning time fence and automatically firmed by
requirements planning.

Requirements planning considers only changes that are relevant for scheduling within
the planning time fence.

Question: Score 1 of 1 

Which of the following items of master data are needed for repetitive
manufacturing?
There are 3 correct answers to this question.

Response:

Master record for serial numbers

Production supply area

Production version

Repetitive manufacturing profile

Product cost collector

Question: Score 1 of 1 

When testing requirements planning in plant 1000, you receive the error message
displayed below. Large numbers of materials are already available in plant 1000.
As a first step in solving the problem, you activate requirements planning in the
Customizing for plant 1000.

Single Item Multi­Level

Requirement planning is not active in plant 1000 MD02 t37tdc00 INS

What further tasks do you perform before you can use requirements planning in
plant 1000 in SAP ECC?

Please choose the correct answer.

Response:

Set up the planning file in Customizing and specify the plant parameters for plant
1000 in the MRP views in material master.

http://www.erpprep.com/node/872/take 24/37
1/13/2017 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam ­ Full | ERPPrep

Set up the planning file in Customizing and specify the plant parameters for plant
1000 in Customizing.

Set up the planning files in Customizing and specify the plant parameters for plant
1000 in Customizing of the MRP group.

Activate requirements planning in Customizing for MRP areas in plant 1000 and
specify the plant parameters for plant 1000 in the MRP views in material master.

Question: Score 1 of 1 

You want to use production/resource tools in your manufacturing process. Which
production type do you use?
Please choose the correct answer.

Response:

KANBAN

Repetitive manufacturing

Process order

Production order

Question: Score 1 of 1 

Which of the following organizational efforts can be minimized using the KANBAN
procedure?
Please choose the correct answer.

Response:

Effort for Sales and Operations Planning (SOP)

Effort for capacity planning

Effort for master data maintenance

Effort for material staging

http://www.erpprep.com/node/872/take 25/37
1/13/2017 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam ­ Full | ERPPrep

Question: Score 1 of 1 

Which functions lead to a reduction in the capacity requirement for an individual
operation at a work center?
There are 3 correct answers to this question.

Response:

Rescheduling the operation

Setting the status technically complete (TECO)

Posting the goods receipt for the production order

Reducing the order quantity

Confirming the operation

Question: Score 1 of 1 

A customer has been using planning strategies 30 (production by lots) and 10
(anonymous make­to­stock production) in SAP ECC. The customer wishes to move
in part to planning strategy 40 (planning with final assembly). The issue of
consumption has an effect here for the first time.
Which properties apply for consumption with planning strategy 40?
There are 2 correct answers to this question.

Response:

Consumption creates a static and binding assignment, between the planned
independent requirements recorded in advance and the customer requirements that
arrive, for the entire procurement process.

Consumption can result in the subsequent specification and adjustment of planning
elements in terms of quantity and date, by means of customer orders that arrive.

Consumption can reduce the originally planned production quantity.

http://www.erpprep.com/node/872/take 26/37
1/13/2017 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam ­ Full | ERPPrep

Consumption can lead to an increase of the originally planned overall production
quantity.

Question: Score 1 of 1 

When maintaining a work center, formulas can be assigned in the scheduling
view. Formulas use formula parameters for calculation. What can be the origin of
the formula parameters used for scheduling?
There are 3 correct answers to this question.

Response:

General item values in bill of materials

User­defined field from operation in task list

Standard value from operation in task list

General values from work scheduling view in the material master

General operation values in task list

Question: Score 1 of 1 

Which data forms the basis for calculating the capacity requirement for an
operation?
There are 3 correct answers to this question.

Response:

Operation control key (routing)

Formulas (work center)

In­house production time (material master)

Standard values (routing)

Transport time (routing)

http://www.erpprep.com/node/872/take 27/37
1/13/2017 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam ­ Full | ERPPrep

Question: Score 1 of 1 

Where can you maintain available capacities in an SAP ECC system?
There are 2 correct answers to this question.

Response:

Work center

Routing

Pooled capacity

Production supply area

Question: Score 1 of 1 

Which types of objects can be changed with Engineering Change Management
(ECM)?
There are 3 correct answers to this question.

Response:

Material master

Bill of material

Task list

Work center

Production version

Question: Score 1 of 1 

Which objects can affect the calculation of capacity requirements for an operation?
There are 3 correct answers to this question.

Response:

In­house production time (material master)

http://www.erpprep.com/node/872/take 28/37
1/13/2017 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam ­ Full | ERPPrep

Transport time (routing)

Standard values (routing)

Formulas (work center)

Operation control key (routing)

Question: Score 1 of 1 

Which of the following master data is necessary for the creation of material
reservations for production orders?
Please choose the correct answer.

Response:

Routings

Production/resource tools

Production versions

Material master records

Question: Score 1 of 1 

In the SAP ECC system, a material is produced with the help of production orders.
Though originally used for rate­based planning only, the planning table is to be
used to plan this material. On the initial screen of the planning table, you select
this material and then receive a message informing you that you cannot use the
planning table for this material.
Which one of the following reasons for this message applies?
Please choose the correct answer.

Response:

There are no planned orders or production orders present.

There is no valid production version for this material.

There are no requirements present.

http://www.erpprep.com/node/872/take 29/37
1/13/2017 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam ­ Full | ERPPrep

The series production indicator has not been set.

Question: Score 1 of 1 

The company that you advise does not want to manage certain value­intensive
materials in the warehouse stock. Instead, the user wishes to control material
provision in such a way that these materials are procured directly for the
production and/or process order. How can you fulfill this request?
There are 2 correct answers to this question.

Response:

Controlling the material in question as a co­product

Using the special procurement key direct procurement/external procurement in the
material master for the component

Using the procurement type external procurement in the material master for the
component

Using the item type non­stock item in the bill of material for the material in question

Using the special procurement key subcontracting in the material master for the
component

Question: Score 1 of 1 

Which of the following statements about the planning functions available in SAP
ECC are true?
There are 2 correct answers to this question.

Response:

Long­term planning (LTP) is a long­term form of forecast planning.

Master production scheduling (MPS) refers to preferred planning of important
materials.

Material requirements planning (MRP) does not include automatic capacity leveling.

http://www.erpprep.com/node/872/take 30/37
1/13/2017 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam ­ Full | ERPPrep

In demand management (DM) material shortage situations are identified and given
requirement coverage elements.

Question: Score 1 of 1 

During the processing of production orders planned and actual costs are
determined. On which of the following objects can you collect these costs?
There are 2 correct answers to this question.

Response:

Product cost collector

Production order

Work center

Planned order

Question: Score 1 of 1 

Which of the following organizational units can be used for planning and
manufacturing in an SAP ECC system?
There are 3 correct answers to this question.

Response:

Sales area

Distribution channel

MRP area

Storage location

Question: Score 1 of 1 

What sequence do you follow in master data maintenance to define the production
of a material?

http://www.erpprep.com/node/872/take 31/37
1/13/2017 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam ­ Full | ERPPrep

Please choose the correct answer.

Response:

Create routing ­> Create work centers ­> Create BOM ­> Carry out component
assignment in BOM or routing

Create BOM ­> Create work centers ­> Create routing ­> Carry out component
assignment in BOM or routing

Create BOM ­> Create work centers ­> Create routing ­> Carry out component
assignment in work center

Create work centers ­> Create routing ­> Create BOM ­> Carry out component
assignment in work center

Question: Score 1 of 1 

What does SAP ERP mean?
Please choose the correct answer.

Response:

SAP ERP is a system hardware that includes modules for purchasing, sales and
distribution, materials management, production and so on.

SAP ERP is a technological platform, on the basis of which customer­specific
extensions can be imported.

SAP ERP is a planning system in which extended planning processes can be mapped.

SAP ERP is an application that an enterprise can use to manage its business processes
efficiently.

Question: Score 1 of 1 

Which of the following master data do you need to provide for process
manufacturing?
There are 3 correct answers to this question.

Response:

http://www.erpprep.com/node/872/take 32/37
1/13/2017 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam ­ Full | ERPPrep

Master recipe

Production versions

Serial numbers

Product cost collector

Resources

Question: Score 0 of 1 

Where can you define the default storage location for the material component of a
production order?
There are 3 correct answers to this question.

Response:

Routing

Production supply area of a work center

Production version (product)

BOM header (product)

Material master (component)

Question: Score 1 of 1 

What do you have to consider, when you use the ATP (Available To Promise)
checks for material?
There are 2 correct answers to this question.

Response:

ATP checks are automatically performed during Material Requirements Planning (MRP)
runs.

ATP checks are used to evaluate the free capacity on a certain work center.

http://www.erpprep.com/node/872/take 33/37
1/13/2017 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam ­ Full | ERPPrep

ATP checks can be carried out automatically when releasing a production order.

ATP checks can be adjusted to also consider future requirements and receipts.

ATP checks are mandatory for lead­time scheduling.

Question: Score 1 of 1 

You want to plan a finished material using material requirements planning in an
SAP ECC system. The resulting planned orders should be scheduled using basic
date scheduling (not lead­time scheduling).
Which of the following properties for the resulting dependent requirements
applies?
Please choose the correct answer.

Response:

If the individual material components are explicitly assigned to the operations of a
routing, the requirement dates of the dependent requirements are scheduled at each
start date of the operations.

In multi­level backward scheduling, dependent requirements are calculated to the
exact second.

When a customer order is created for the finished material, the dependent
requirements are automatically triggered for the components in the bill of material
without a planning run.

In multi­level backward scheduling, dependent requirements are triggered at the start
date for the planned order of the finished material.

Question: Score 1 of 1 

In which of the following objects can you activate back flushing for production
orders?
There are 3 correct answers to this question.

Response:

Work center

http://www.erpprep.com/node/872/take 34/37
1/13/2017 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam ­ Full | ERPPrep

Routing

Material master (finished product)

Production scheduling profile

Material master (component)

Question: Score 1 of 1 

Which activities lead to a reduction of the capacity requirements for an operation?
There are 3 correct answers to this question.

Response:

Posting the goods receipt for the production order

Setting the status technically complete (TECO)

Reducing the order quantity

Confirming the operation

Rescheduling the operation

Question: Score 1 of 1 

In SAP ECC, you want to map an in­house production process for general
warehouse production.

The fields in the area of the lot size­dependent in­house production time are to be
populated when the material master for the final product is created.

These fields can be maintained by updating from the scheduling result for the
associated routing. You now think that there could be significant changes to the
production times in the routing and decide against updating the material master.

What problem could this lead to?

Please choose the correct answer.

Response:

http://www.erpprep.com/node/872/take 35/37
1/13/2017 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam ­ Full | ERPPrep

In the course of basic dates scheduling with requirements planning, dependent
requirements request the components from the bill of materials at the wrong times.

Requirements planning runs up against an exception message in basic dates
scheduling because the material master parameters do not match the scheduling
result from the routing.

Lead time scheduling, which occurs by the time that a planned order is converted into
a production order (at the latest), cannot take place on the basis of incorrect basic
dates.

Subsequent capacity planning is no longer possible due to the obsolete scheduling
parameters.

Question: Score 1 of 1 

Which options can you offer someone who uses the SAP ECC system for production
orders and requires support for material supply in production?
There are 3 correct answers to this question.

Response:

Pull list

Logistics Information System (LIS)

Material directory

Automatic generation of a transport order

Pick list

Question: Score 1 of 1 

Your customer tests the firming options for planned orders in SAP ECC using a test
material. Therefore, the customer sets a firming date in the stock/requirements
list manually.

Additionally, the customer sets a planning time fence with firming type 1 in the
material master.

How is the resulting firming interval specified in this scenario?

http://www.erpprep.com/node/872/take 36/37
1/13/2017 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam ­ Full | ERPPrep

Please choose the correct answer.

Response:

By the firming mechanism with the longer firming interval

It is predefined in Customizing.

By the manual firming date

By the planning time fence from the material master

Question: Score 1 of 1 

The user you advise requests that you make it possible for the user to produce
materials for stock, for customer orders, projects, orders and cost centers with
production orders. 
Where can you make settings to ensure these options?
Please choose the correct answer.

Response:

Settlement profile.

Production scheduling profile.

Valuation variant.

Serial number profile.

Money Back Guarantee  Testimonial  FAQs  Privacy Policy  Terms and Conditions  About Us  Join Us  


Contact Us

http://www.erpprep.com/node/872/take 37/37

You might also like