You are on page 1of 2

OUM vs. AIM: Oracle Unified Methodology vs.

Application Implementation Methodology


This article maps the most commonly used documents in the AIM Methodology to those in the OUM or Oracle Unified Method method ology. In this
sense, this will be of some use to those who implement Oracle Applications using the age-old AIM, but have been asked by client to implement
using OUM.

This is by no means a comprehensive or even an authoritative list. For Partners who have access, the complete listing of such documents can be
found on Oracle Partner Website.

OUM Phase Used for


AIM Document Equivalent OUM Document Mandatory/Optiona
Introduced Customizations
BP.080 RD-011_FUTURE_PROCESS_MODEL.DOC Inception Optional
RD.010 RD-012_PRESENT_AND_FUTURE_ORG_STRUCT URES.DOC Inception Mandatory
BP.060 RD-020_HIGH_LEVEL_BUSINESS_DESCRIPT IONS.DOC Inception Mandatory
BP.040 RD-030_CURRENT_PROCESS_MODEL.DOC Inception Optional
RD.020 RD-034_CURRENT_BUSINESS_BASELINE_METRICS.DOC Inception Optional
RD-045_MOSCOW_LIST.XLS Inception Mandatory
RD-140_REQUIREMENTS_SPECIFICATION.DOC Inception Mandatory
RD.050 RA-023_USE_CASE_MODEL.DOC Inception Yes Mandatory
BR.100 RA-040_BUSINESS_DATA_STRUCT URES Inception Mandatory
RD.050 RA-024_USE_CASE_SPECIFICATION.DOC Elaboration Yes Mandatory
BR.070 RA-090_REPORTING_FIT_ANALYSIS.XLS Elaboration Yes Optional
BR.030 AN-010_BUSINESS_REQUIREMENTS_MAPPING_FORM.DOC Elaboration Mandatory
MD.050 AN-050_ANALYSIS_MODEL.DOC Elaboration Yes Mandatory
MD.050 AN-100_ANALYSIS_SPECIFICATION.DOC Elaboration Yes Mandatory
MD.070 DS-140_DESIGN_SPECIFICATION.DOC Elaboration Yes Mandatory
MD.060 DS-150_LOGICAL_DATABASE_DESIGN.DOC Elaboration Yes Optional
TA-
TA.030 Elaboration Optional
070_INITIAL_ARCHITECT URE_AND_APPLICAT ION_MAPPING.DOC
BR.100 DS-030_APPLICATION_SETUP_DOCUMENT.DOC Elaboration Mandatory
TE.020 TE-020_UNIT_TEST_SCENARIOS.DOC Elaboration Yes Mandatory
TE.030 TE-035_INTEGRATION_TEST_SCENARIOS.DOC Elaboration Yes Optional
TE.040 TE-025_SYSTEM_TEST_SCENARIOS.DOC Elaboration Mandatory
CV.040 CV-027_DATA_MAPPING.DOC Construction Mandatory
CV.060 CV-040_CONVERSION_COMPONENT_DESIGNS.DOC Construction Mandatory
DO.070 DO-070_USER_GUIDE V1.0.DOC Construction Mandatory
MD.100 IM-040_PHYSICAL_DATABASE_DESIGN.DOC Construction Yes Optional

You might also like