You are on page 1of 15

ELECON ENGINEERING COMPANY LIMITED

VALLABH VIDYANAGAR

388 120

BIL DOCUMENT NO.- BIL T-01-01-D603-DC-R1

CO/1941

RAW MATERIAL HANDELING SYSTEM


Bramhani Industries LTD

CIVIL DESIGN CRITERIA

CLIENT: M/S. BRAMHANI INDUSTRIES LTD.


CONSULTANT: M/S MECON LTD

ELECON ENGINEERING COMPANY LIMITED ˘ V V NAGAR


Project RAW MATERIAL HANDLING SYSTEM, 2.5 MT INTERGRADED STEEL PLANT ( 1.25MTPY ) Date Oct-08
Subject Design Criterion for Civil works Rev 1

Contents of This report

I Introduction
II Analysis and Design considerations for various types of structures
III List of Documents and Drawings

I Introduction

This document contains analysis and design methodology of Civil works for the following structures

A Civil designs and Drawings for WT complexes (WT1&2 & WT3&4) & Associated Structures like
Side arm charger foundation(near W.T),Weigh bridge foundation ( Near W.T) and WT shed foundations

B Under ground Tunnels for conveyors

C Pent houses , PH-1& PH-2

D Over Ground Junction Houses ( foundations only) & Trestles for Conveyor Galleries.

E RCC ramp for unloading Hopper

F Main CHP MCC buildings along with cable trenches & Pump Houses.

G WT control room along with cable treches

H Stacker Reclaimer / Barrel Reclaimer.


Project RAW MATERIAL HANDLING SYSTEM, 2.5 MT INTERGRADED STEEL PLANT ( 1.25MTPY ) Date Oct-08
Subject Design Criterion for Civil works Rev 1

II Analysis and Design considerations

A)Wagon Tippler Complex I & II

S. No Structure Wagon Tippler Complex I & II ( For WT 1,2 & 3, 4) Reference

1 Configuration
** Wagon tippler pit is underground RCC box type structure with deep walls. The walls will be provided with Counterforts at
suitable intervals to reduce wall slenderness. Combined base raft supporting pit walls and hopper supporting and other
equipment supporting pedestals will be provided. The base raft is solid raft with uniform thickness or inverted beam-slab system

**Side arm charger foundation : RCC block foundation


** Load cell weigh bridge foundati: Open foundation system Founding levels to be based on approved soil
** Track stop foundations : Open foundation system report
** WT shed foundations : Open foundation system

2 Materials Concrete Gr M25


Reinf. Steel Fe 415/500 Rafts bottom 75mm
Cover to reinf top 50mm
Walls sides 50mm
in contact with
water/earth 50 mm
CF's/tiebeams
inside face 30 mm In contact with earth 50mm
floor slabs 30 mm not in contact with earth 40mm
beams 30 mm Columns 40mm
Foundations 50mm
RCC hopper 30mm

3 Loading Dead load D Unit wt. Of concrete at 2.5 t/cum


Unit wt. Of brick work at 2.0 t/cum

Live load L 500 Kg/sqm on floors Unless other wise specified


LR 300 kg/sqm on accessible roof (1 50+100 water proofing+50 dust load)
LR 225 kg/sqm on Non accessible roof (75+100 water proofing + 50 dust load)

Equipment EQ As applicable i.e as per system drawings supplied by ELECON For Monorails/Hoists etc - An
Load Impact factor of 1.25 will be considered in design

Coal Load CL Unit weight of coal at 1.05 t/cum, Angle of repose = 37 deg

Iron Ore Load IL

Earth pressure SP case 1 Dry case with unit weight of soil = 1.8 t/cum
case 2 Water table case above WT 1.8 t/m3 (Ka γ h)
below WT water pr (HP)+sub soil pr (SP)
Water table level shall be considered at graded ground level
Ka (earth pressure coefficient) Ka = Ko=0.5
It shall be considered as earth pressure at rest
Live load
surcharge
SCL 2 t/sqm (vertical surcharge) & Horizontal surcharge Pressure 2*0.5 = 1 t/sqm on pit walls
pressure

Seismic loads SL Zone - II as per IS:1893


WT pit being an underground structure seismic loads are not Considered in the Analysis and design

Wind loads WL As per IS:875


WT pit being an underground structure Wind loads are not Considered in the Analysis and design

Buoyancy foundations resting on soil/Soft Disintegrated Rock = 1.0


foundations embedded in to the Hard Rock = 0.5
Water table level shall be considered at graded ground level

All other loads/details not mentioned shall be as per Technical Specifications ( Chapter E3 of Technical Specifications)
Project RAW MATERIAL HANDLING SYSTEM, 2.5 MT INTERGRADED STEEL PLANT ( 1.25MTPY ) Date Oct-08
Subject Design Criterion for Civil works Rev 1

S. No Structure Wagon Tippler Complex I & II ( For WT 1,2 & 3, 4) Reference

4
LOAD
COBINATIONS Load combinations (for U.G structures)

1 D+ SP +Buoyancy
2 D+L+EL( DL of Equip. load )
3 D+L+EL+SP
4 D+L+EQ Load+ EL(Dl of EQ) + Coal load
5 D+L+EL+ SP + (Operational loads) + coal load/Iron Ore load
6 D+L+EL+ SP + EQ load (Operational loads) +Buoyancy+ coal load/Iron Ore load

Case-1 Hopper full with top horizontal at grating level

Case-II Hopper Paritially empty with highest level of coal / Ore at grating level and making an angle of 37deg with horizontal

5 ANALYSIS **3-D modelling using STAAD for Design of Raft,Beams,CF's etc


The entire pit including walls and base raft will be modelled in STAAD for structural analysis. The Counterfort’s,Tie beams and
base raft are idealized using beam elements and soil is represented with linear elastic springs with values of subgrade reactions
(ks) attached to bottom of raft as supporting system

Spring constants to be considered for wagon tippler area considered as per soil report

**Floor slabs using IS:456 coefficients for various support conditions

**Pit walls -BM's using Coefficients given in Engineering monograph no 27 Engg


monograph no
27 will be
**Hopper walls -Bm's using Coefficients given in Engineering monograph no 27
enclosed along
with the design
Note: For under ground pit walls abutting rock, the lateral earth pressure coefficients will be calculated appropriately giving due report
consideration to failure wedge formation. In such cases, generally there will not be any lateral pressures developed. if the back
fill behind the pit walls is done with PCC up to rock then no lateral earth pressures are considered in the design of walls etc

6 Design Pit walls & Rafts will be designed as cracked section with limiting crack width 0.1mm on earth/water face and 0.3mm
away from earth /water face in accordance with IS 456 by Limit State Method
slabs , floor beams, as per IS:456-2000 using Limit state method of design
walls, columns and
isolated footings,
counterforts, tiebeams
etc.,

Hopper walls The hopper walls are designed for lateral ( coal / Ore) pressure frictional forces during filling and
emptying and forces due to impact and filling of arches of coal / Iron Ore.

Stability against uplift Minimum factor of safety will be 1.2 considering only chartercristic Dead load at 0.9 times actual
value

Minimum factor of safety wrt sliding = 1.5

Check for Base pressure


under foundations Will be checked with the SBC given in confirmatory soil report

Note If the miscellaneous foundations are resting on filled up soil , the same has to be checked for
filled up bearing pressure

Water Proofing for Under ground structures:

The water proofing for Under ground structures is as per technical specifications of civil works
Project RAW MATERIAL HANDLING SYSTEM, 2.5 MT INTERGRADED STEEL PLANT ( 1.25MTPY ) Date Oct-08
Subject Design Criterion for Civil works Rev 1
B) Under Ground Tunnels

S. No Structure Under ground Tunnels for conveyors Reference

Configuration RC tunnels are box type with or with out Cf's and beams with base raft with uniform thicknes or invert beam slab system

2 Materials Concrete Gr M25 Rafts bottom 75mm


Reinf. Steel Fe 415/500 top 50mm
Cover to reinf sides 50mm
base raft/walls CF's/tiebeams
in contact with
water/earth 50 mm
In contact with earth 50mm
inside face 30 mm not in contact with earth 30mm
floor slabs 30 mm
beams 30 mm

3 Loading Dead load D Unit wt. Of concrete at 2.5 t/cum

Live load L 500 Kg/sqm on floors Unless other wise specified

Equipment EQ As applicable i.e as per system drawings supplied by ELECON


Load

Earth pressure SP It shall be considered as Earth pressure at rest (Ka = Ko=0.5) and it shall be considered as following cases
case 1 Dry case with unit weight of soil = 1.8 t/cum
case 2 Water table level shall be considered at graded ground level
The Horizontal pressure = water pr (HP)+submerged soil pr(SP)
* overburden pressure shall be considered on Top slab of tunnel

Live load
surcharge
pressure SCL 2 t/sqm (vertical surcharge) & Horizontal surcharge Pressure 2*0.5 = 1 t/sqm on pit walls

or Dispersion loads (arising out of railway load) through soil will be considered as 2 vert : 1 horz

Seismic loads SL Zone - II as per IS:1893

Being an underground structure, seismic loads are not Considered in the Analysis and design

Wind loads WL As per IS:875

Being an underground structure Wind loads are not Considered in the Analysis and design

Buoyancy foundations resting on soil/SDR = 1.0


foundations embedded in to the Hard Rock = 0.5
Water table level shall be considered at graded ground level

Railway Surcharge Load from movement of Railway wagon shall be considered for the Design of Tunnel
Wagon Load & Wagon tippler walls.
Standard Axel Load of 21.5 MT/Axel shall be considered.
For Location of Track Refer Layout Drawings. (RTL - 227.64)
Project RAW MATERIAL HANDLING SYSTEM, 2.5 MT INTERGRADED STEEL PLANT ( 1.25MTPY ) Date Oct-08
Subject Design Criterion for Civil works Rev 1

S. No Structure Under ground Tunnels for conveyors Reference

4 Load combinations
LOAD
COBINATIONS 1 D+ SP +Buoyancy
2 D+L+EQ LOAD
3 D+L+EQ Load+SP
4 D+L+ SP + EQ load + Buoyancy
Water table level shall be considered at finished ground level

5 ANALYSIS **3-D modelling using STAAD for Design of Raft,Beams,CF's etc


The structure including walls and base raft will be modelled in STAAD for structural analysis. The Counterfort’s, top beams and
base raft are idealized using beam elements and soil is represented with linear elastic springs with values of subgrade reactions
(ks) attached to bottom of raft as supporting system

6 Design Pit walls & Raft, will be designed as cracked section with limiting crack width 0.2mm on earth/water face and 0.3mm
away from earth /water face in accordance with IS 456 by Limit State Method

Slabs , floor beams, as per IS:456-2000 using Limit state method of design
walls, columns and
Counter forts, Tie
Beams etc., minimum factor of safety will be 1.2 considering only chartercristic dead load at 0.9 times actual value

Check for Base pressure


under foundations Will be checked with the SBC given in confirmatory soil report
Project RAW MATERIAL HANDLING SYSTEM, 2.5 MT INTERGRADED STEEL PLANT ( 1.25MTPY ) Date Oct-08
Subject Design Criterion for Civil works Rev 1

C Pent Houses for conveyors

S. No Structure Pent houses , PH-1& PH-2 Reference


1 Configuration RCC FRAMED STRUCTURE

2 Materials Concrete Gr M25


Reinf. Steel Fe 415/500
Cover to reinf

Footings 50 mm
. Columns 40mm
floor slabs 30 mm
beams 30 mm

3 Loading Dead load D Unit wt. Of concrete at 2.5 t/cum


Unit wt. Of brick work at 1.9 t/cum

Live load L 500 Kg/sqm on floors Unless other wise specified


LR 300 kg/sqm on accessible roof (1 50+100 water proofing+50 dust load)

LR 225 kg/sqm on Non accessible roof (75+100 water proofing + 50 dust load)

Equipment EQ As applicable I.e as per system drawings supplied by ELECON For Monorails/Hoists etc - An
Load Impact factor of 1.25 will be considered in design

Wind loads WL As per IS:875

Seismic loads SL As IS 1893-2002/2005

4 LOAD
COBINATIONS 1 D+ L +EQ

2 D+L+EQ+SL/WL

3 D+SL/WL

5 ANALYSIS **3-D modeling using STAAD PRO/STRAP for Design of RC framed structure
**RC Roof slabs using IS:456 coefficients for various support conditions

6 Design RC floor/roof slabs , as per IS:456-2000 using Limit state method of design
pedestals and footings

Check for Base pressure


under foundations Will be checked with the SBC given in as per confirmatory soil report
Project RAW MATERIAL HANDLING SYSTEM, 2.5 MT INTERGRADED STEEL PLANT ( 1.25MTPY ) Date Oct-08
Subject Design Criterion for Civil works Rev 1
D Over Ground Junction Houses

S. No Structure Over Ground Junction Houses ( foundations only) & Foundations for Conveyor Galleries. Reference
1 Configuration The foundations for Junction towers will be open or pile foundation type

2 Materials Concrete Gr M25


Reinf. Steel Fe 415
Cover to reinf

Footings 50 mm
Columns/ pedestals 40mm
floor slabs 30 mm
tie beams 30 mm

3 Loading The following load cases will be considered at top of pedestal level (i.e at bottom of steel column)

D Dead load
L Live load
BL Belt loads
EQ Equipment loads
WL/SL Wind loads/seismic loads

4 LOAD
COBINATIONS 1 D+ L
2 D+L+Belt (BL)+EQ.load
3 D+L+Belt+EQ.+ WL/SL

5 Design Pedestals and footings The Pedestals Will be designed for axial load and bi-axial moments from the concepts given in
Indian/BS codes.
Footings are analysed using fundemental principles and designed using LSM of IS 456-2000
Marginal liftoff of the foundations may be allowed keeping the contact area of foundation
at 80% (min.) in wind/seismic case
Check for Base pressure
under foundations Will be checked with the SBC given in as per confirmatory soil report
Project RAW MATERIAL HANDLING SYSTEM, 2.5 MT INTERGRADED STEEL PLANT ( 1.25MTPY ) Date Oct-08
Subject Design Criterion for Civil works Rev 1
E Main CHP MCC buildings & W.T control buildings

S. No Structure Main CHP MCC buildings , WT control buildings & Pump Houses. Reference

1 Configuration RCC FRAMED STRUCTURE

2 Materials Concrete Gr M25


Reinf. Steel Fe 415
Cover to reinf

Footings 50 mm
Columns 40mm
floor slabs 30 mm
beams 30 mm
Walls 50mm
3 Loading Dead load D Unit wt. Of concrete at 2.5 t/cum
Unit wt. Of brick work at 2.0 t/cum

Live load L
floors
RCC floor 500 Kg/sqm on floors Unless other wise specified
MCC/switch gear room 1500 Kg/sq.m
control room 1000 kg/sq.m
Toilet 200 kg/sq.m

Roofs
300 kg/sqm on accessible roof (1 50+100 water proofing+50 dust load)
225 kg/sqm on Non accessible roof (75+100 water proofing + 50 dust load)

Wind loads WL As per IS:875

Load combinations (for U.G structures)


4 LOAD
COBINATIONS 1 D+ L +EQ
2 D+L+EQ+SL/WL
3 D+SL/WL

5 ANALYSIS **3-D modeling using STAAD for Design of RC framed structure


**RC Floor/ Roof slabs using IS:456 coefficients for various support conditions
**All water retaining structures shall be designed as per IS 3370.

6 Design RC floor/roof slabs , as per IS:456-2000 using Limit state method of design
columns and footings

Check for Base pressure


under foundations Will be checked with the SBC given in soil report
Project RAW MATERIAL HANDLING SYSTEM, 2.5 MT INTERGRADED STEEL PLANT ( 1.25MTPY ) Date Oct-08
Subject Design Criterion for Civil works Rev 1
F RCC Ramp forTruck Unloading Hopper

S. No Structure RCC Ramp forTruck Unloading Hopper Reference


1 Configuration The RCC ramp for truck unloading hopper shall consists of RCC retaining walls on either sides of ramp and filled up with soil
soil upto required height

2 Materials Concrete Gr M25


Reinf. Steel Fe 415
Cover to reinf

Footings 75 mm
walls 30mm

3 Loading The following load cases will be considered

D Dead load
L Live load

Earth pressure SP case 1 Dry case with unit weight of soil = 1.8 t/cum
case 2 Water table case above WT 1.8 t/cum3 (Ka γ h)
below WT considered under saturated condition ( (γsat =2.1t/cum)

Ka (earth pressure coefficient) Ka = 0.279 ( as per coloumb's theory)


(active earth pressure as per IRC-6-2000)
Live load
surcharge SCL 2 t/sqm (vertical surcharge) & Horizontal surcharge Pressure 2*0.279 = 0.58 t/sqm on r. walls
pressure

4 LOAD
COBINATIONS 1 D+ L + SP
2 DL+L L+ SP+SCL

5 Design RCC slab and The RCC R walls will be analysed and designs as per fundamental principles
supporting system
designed using IS 456-2000/IRC specifications

Check for Base pressure


under foundations Will be checked with the SBC given in as per confirmatory soil report
Project RAW MATERIAL HANDLING SYSTEM, 2.5 MT INTERGRADED STEEL PLANT ( 1.25MTPY ) Date Oct-08
Subject Design Criterion for Civil works Rev 1

G Stacker Reclaimer & Barrel Reclaimer

S. No Structure Stacker Reclaimer & Barrel Reclaimer Reference


1 Configuration The foundation System shall consist of continuous wall carrying the rails which in turn is having raft foundation at 5.0m below
FGL with Nett bearing Capacity of 10t/m2 as per MOM held at Bangalore on 26-08-08. As per contour plan a filling of about 10-
12m is there under stacker reclaimer foundations. It shall be ensured that a min. of 10t/m 2 bearing pressure is achieved in this
filled up area.

2 Materials Concrete Gr M25


Reinf. Steel Fe 415
Cover to reinf

Footings 75 mm
walls 30mm

3 Loading The following load cases will be considered

D Dead load
L Live load
Equipment Loads as per Mechanical drgs.

4 LOAD
COBINATIONS 1 D+ L + EQPT Load.

5 Design RCC Wall & Raft. As per IS 456-2000.


Project RAW MATERIAL HANDLING SYSTEM, 2.5 MT INTERGRADED STEEL PLANT ( 1.25MTPY ) Date Oct-08
Subject Design Criterion for Civil works Rev 1

H LIST OF DOCUMENTS AND DRAWINGS

List of Design Documents


sno code subject

1 BIL/CVL/DBR/001 Design criterion for civil works -Raw Material handling plant

2 BIL/CVL/RMHS/001 & 002 Design of Wagon Tippler pit and associated structures ( 2 nos of WT complexes)

3 BIL/CVL/RMHS/003 & 004 Design of Underground Tunnels for conveyors

4 BIL/CVL/RMHS/005 Design of Pent Houses for PH-1&2 ( 2 nos)

5 BIL/CVL/RMHS/006 to 019 Design of foundations of Transfer houses

6 BIL/CVL/RMHS/020 to 22 Design of Main CHP Buildings ( 3 nos)

6 BIL/CVL/RMHS/023 Design of WT control room (2 nos)

7 BIL/CVL/RMHS/024 Design of RCC ramp for truck unloading

List of Drawings

Sno Structure/ Title Drawing No

1 General Notes drawing BIL/CVL/Gen. Notes/001


I Wagon tippler ( for 2 and 4 only) ( Coal tippler)
2 General arrangement drawings BIL/CVL/WT-1-1/001 ( Total sheets - 9)
3 Reinforcement details of raft BIL/CVL/WT-1/002 ( Total sheets - 3)
4 Reinforcement details of walls BIL/CVL/WT-1/003 ( Total sheets - 1)
5 Reinforcement details of CF's BIL/CVL/WT-1/004 (Total sheets - 1)
columns, Tiebeams
6 Reinforcement details of beams BIL/CVL/WT-1/005 ( Total sheet - 5 )
and slabs
7 RC details of Hopper BIL/WT-1/006 ( Total sheet - 1 )
8 RC details of stair case BIL/CVL/WT-1/007 ( Total sheet - 1 )
9 Details of Side arm charger BIL/CVL/WT-1/008 ( Total sheet - 2 )
foundations
10 Details of WT shed foundations BIL/CVL/WT-1/009 ( Total sheet - 1 )

II Wagon tippler ( for 1 and 3 only) (Ore tippler)


11 General arrangement drawings BIL/CVL/WT-2/001 ( Total sheets - 9)
12 Reinforcement details of raft BIL/CVL/WT-2/002 ( Total sheets - 3)
13 Reinforcement details of walls BIL/CVL/WT-2/003 ( Total sheets - 1)
14 Reinforcement details of CF's BIL/CVL/WT-2/004 (Total sheets - 1)
columns, Tiebeams
15 Reinforcement details of beams BIL/CVL/WT-2/005 ( Total sheet - 5 )
and slabs
16 RC details of Hopper BIL/WT-2/006 ( Total sheet - 1 )
17 RC details of stair case BIL/CVL/WT-2/007 ( Total sheet - 1 )
18 Details of Side arm charger BIL/CVL/WT-2/008 ( Total sheet - 2 )
foundations
19 Details of WT shed foundations BIL/CVL/WT-2/009 ( Total sheet - 1 )

III. Tunnels for conv -1


20 General arrangement drawings BIL/CVL/COV-1/001 ( Total sheet - 2 )
21 Reinforcement details BIL/CVL/COV-1/002 ( Total sheet - 5 )
IV Tunnels for conv -2
22 General arrangement drawings BIL/CVL/COV-2/001 ( Total sheet - 2 )
23 Reinforcement details BIL/CVL/COV-2/002 ( Total sheet - 5 )
V Pent House PH-1&2
24 Details of pent House for conv 1&2 BIL/CVL/PH1&2/001 ( Total sheet - 4 )

VI Juction Houses
Foundation for Jounction Houses JT12
25 Details of foundations & pedestals BIL/CVL/JT12/001 ( Total sheet - 2 )
26 Details of Floor/roof slabs BIL/CVL/JT12/002 ( Total sheet - 3 )

Foundation for Jounction Houses JT23


27 Details of foundations & pedestals BIL/CVL/JT23/001 ( Total sheet - 2 )
III 28 Details of Floor/roof slabs BIL/CVL/JT23/002 ( Total sheet - 3 )

Foundation for Jounction Houses JT24


29 Details of foundations & pedestals BIL/CVL/JT24/001 ( Total sheet - 2 )
30 Details of Floor/roof slabs BIL/CVL/JT24/002 ( Total sheet - 3 )

Foundation for Jounction Houses JT25


31 Details of foundations & pedestals BIL/CVL/JT25/001 ( Total sheet - 2 )
32 Details of Floor/roof slabs BIL/CVL/JT25/002 ( Total sheet - 3 )

Foundation for Jounction Houses JT26


33 Details of foundations & pedestals BIL/CVL/JT26/001 ( Total sheet - 2 )
34 Details of Floor/roof slabs BIL/CVL/JT26/002 ( Total sheet - 3 )
Project RAW MATERIAL HANDLING SYSTEM, 2.5 MT INTERGRADED STEEL PLANT ( 1.25MTPY ) Date Oct-08
Subject Design Criterion for Civil works Rev 1
Foundation for Jounction Houses JT27
35 Details of foundations & pedestals BIL/CVL/JT27/001 ( Total sheet - 2 )
36 Details of Floor/roof slabs BIL/CVL/JT27/002 ( Total sheet - 3 )

Foundation for Jounction Houses JT28


37 Details of foundations & pedestals BIL/CVL/JT28/001 ( Total sheet - 2 )
38 Details of Floor/roof slabs BIL/CVL/JT28/002 ( Total sheet - 3 )

Foundation for Jounction Houses JT35


39 Details of foundations & pedestals BIL/CVL/JT35/001 ( Total sheet - 2 )
40 Details of Floor/roof slabs BIL/CVL/JT35/002 ( Total sheet - 3 )

Foundation for Jounction Houses JT36


41 Details of foundations & pedestals BIL/CVL/JT36/001 ( Total sheet - 2 )
42 Details of Floor/roof slabs BIL/CVL/JT36/002 ( Total sheet - 3 )

Foundation for Jounction Houses JT37


43 Details of foundations & pedestals BIL/CVL/JT37/001 ( Total sheet - 2 )
44 Details of Floor/roof slabs BIL/CVL/JT37/002 ( Total sheet - 3 )

Foundation for Jounction Houses JT38


45 Details of foundations & pedestals BIL/CVL/JT38/001 ( Total sheet - 2 )
46 Details of Floor/roof slabs BIL/CVL/JT38/002 ( Total sheet - 3 )

Foundation for Jounction Houses JT39


47 Details of foundations & pedestals BIL/CVL/JT39/001 ( Total sheet - 2 )
48 Details of Floor/roof slabs BIL/CVL/JT39/002 ( Total sheet - 3 )

Foundation for Jounction Houses JT40


49 Details of foundations & pedestals BIL/CVL/JT40/001 ( Total sheet - 2 )
51 Details of Floor/roof slabs BIL/CVL/JT40/002 ( Total sheet - 3 )

Foundations for Conveyor J1-C1A/B


52 G.A. & RCC detial of Foundations BIL/CVL/J1-C1A/B/001
Foundations for Conveyor J2-C1A/B
53 G.A. & RCC detial of Foundations BIL/CVL/J2-C1A/B/001
Foundations for Conveyor J3-C1A/B
54 G.A. & RCC detial of Foundations BIL/CVL/J3-C1A/B/001
Foundations for Conveyor J4-C1
55 G.A. & RCC detial of Foundations BIL/CVL/J4-C1/001
Foundations for Conveyor J5-C1
56 G.A. & RCC detial of Foundations BIL/CVL/J5-C1/001
Foundations for Conveyor J6-C1A/B
57 G.A. & RCC detial of Foundations BIL/CVL/J6-C1A/B/001
Foundations for Conveyor J7-C1
58 G.A. & RCC detial of Foundations BIL/CVL/J7-C1/001
Foundations for Conveyor J8-C1
59 G.A. & RCC detial of Foundations BIL/CVL/J8-C1/001
Foundations for Conveyor J9-C1
60 G.A. & RCC detial of Foundations BIL/CVL/J9-C1/001
Foundations for Conveyor J10-C1
61 G.A. & RCC detial of Foundations BIL/CVL/J10-C1/001
Foundations for Conveyor J11-C1
62 G.A. & RCC detial of Foundations BIL/CVL/J11-C1/001
Foundations for Conveyor J20-C1A/B
63 G.A. & RCC detial of Foundations BIL/CVL/J20-C1A/B/001
Foundations for Conveyor J21-C1A/B
64 G.A. & RCC detial of Foundations BIL/CVL/J21-C1A/B/001
Foundations for Conveyor J22-C1A/B/C
65 G.A. & RCC detial of Foundations BIL/CVL/J22-C1A/B/C/001
Foundations for Conveyor STC1/STC2
66 G.A. & RCC detial of Foundations BIL/CVL/STC1/STC2/001
Foundations for Conveyor J29-C1
67 G.A. & RCC detial of Foundations BIL/CVL/J29-C1/001
Foundations for Conveyor J29-C2
68 G.A. & RCC detial of Foundations BIL/CVL/J29-C2/001
Foundations for Conveyor J30-C1
69 G.A. & RCC detial of Foundations BIL/CVL/J30-C1/001
Foundations for Conveyor J31-C1
70 G.A. & RCC detial of Foundations BIL/CVL/J31-C1/001
Foundations for Conveyor J23-C1A/B
71 G.A. & RCC detial of Foundations BIL/CVL/J23-C1A/B/001
Foundations for Conveyor J25-C1
72 G.A. & RCC detial of Foundations BIL/CVL/J25-C1/001
Foundations for Conveyor J26-C1
73 G.A. & RCC detial of Foundations BIL/CVL/J26-C1/001
Foundations for Conveyor J27-C1A
74 G.A. & RCC detial of Foundations BIL/CVL/J27-C1A/001
Foundations for Conveyor J28-C1
75 G.A. & RCC detial of Foundations BIL/CVL/J28-C1/001
Foundations for Conveyor J28-C2
76 G.A. & RCC detial of Foundations BIL/CVL/J28-C2/001
Foundations for Conveyor J38-C1
77 G.A. & RCC detial of Foundations BIL/CVL/J38-C1/001
Foundations for Conveyor J35-C1A
Project RAW MATERIAL HANDLING SYSTEM, 2.5 MT INTERGRADED STEEL PLANT ( 1.25MTPY ) Date Oct-08
Subject Design Criterion for Civil works Rev 1
78 G.A. & RCC detial of Foundations BIL/CVL/J35-C1A/001
Foundations for Conveyor J36-C1
79 G.A. & RCC detial of Foundations BIL/CVL/J36-C1/001
Foundations for Conveyor J37-C1
80 G.A. & RCC detial of Foundations BIL/CVL/J37-C1/001
Foundations for Conveyor J30-C2
81 G.A. & RCC detial of Foundations BIL/CVL/J30-C2/001
Foundations for Conveyor J32-C1
82 G.A. & RCC detial of Foundations BIL/CVL/J32-C1/001
Foundations for Conveyor J12-C1
83 G.A. & RCC detial of Foundations BIL/CVL/J12-C1/001
Foundations for Conveyor J33-C1
84 G.A. & RCC detial of Foundations BIL/CVL/J33-C1/001
Foundations for Conveyor J34-C1
85 G.A. & RCC detial of Foundations BIL/CVL/J34-C1/001
Foundations for Conveyor J34-C2
86 G.A. & RCC detial of Foundations BIL/CVL/J34-C2/001
Foundations for Conveyor J31-C2
87 G.A. & RCC detial of Foundations BIL/CVL/J31-C2/001
Foundations for Conveyor J32-C2
88 G.A. & RCC detial of Foundations BIL/CVL/J32-C2/001
Foundations for Conveyor J40-C2
89 G.A. & RCC detial of Foundations BIL/CVL/J40-C2/001
Foundations for Conveyor J40-C1
90 G.A. & RCC detial of Foundations BIL/CVL/J40-C1/001
Foundations for Conveyor J39-C1
91 G.A. & RCC detial of Foundations BIL/CVL/J39-C1/001
Foundations for Conveyor J35-C1B
92 G.A. & RCC detial of Foundations BIL/CVL/J35-C1B/001
Foundations for Conveyor J12-C2
93 G.A. & RCC detial of Foundations BIL/CVL/J12-C2/001
Foundations for Conveyor J39-C1
94 G.A. & RCC detial of Foundations BIL/CVL/J39-C1/001
Foundations for Conveyor J1AC1
95 G.A. & RCC detial of Foundations BIL/CVL/J1AC1/001

Foundation for Jounction Houses JT1A


96 Details of foundations & pedestals BIL/CVL/JT1A/001
97 Details of Floor/roof slabs BIL/CVL/JT1A/002
Foundation for Jounction Houses JT1
98 Details of foundations & pedestals BIL/CVL/JT1/001
99 Details of Floor/roof slabs BIL/CVL/JT1/002
Foundation for Jounction Houses JT6
100 Details of foundations & pedestals BIL/CVL/JT6/001
101 Details of Floor/roof slabs BIL/CVL/JT6/002
Foundation for Jounction Houses JT5
102 Details of foundations & pedestals BIL/CVL/JT5/001
103 Details of Floor/roof slabs BIL/CVL/JT5/002
Foundation for Jounction Houses JT-2A
104 Details of foundations & pedestals BIL/CVL/JT-2A/001
105 Details of Floor/roof slabs BIL/CVL/JT-2A/002
Foundation for Jounction Houses JT-2
106 Details of foundations & pedestals BIL/CVL/JT-2/001
107 Details of Floor/roof slabs BIL/CVL/JT-2/002
Foundation for Jounction Houses JT-7
108 Details of foundations & pedestals BIL/CVL/JT-7/001
109 Details of Floor/roof slabs BIL/CVL/JT-7/002
Foundation for Jounction Houses JT-8
110 Details of foundations & pedestals BIL/CVL/JT-8/001
111 Details of Floor/roof slabs BIL/CVL/JT-8/002
Foundation for Jounction Houses JT-3
112 Details of foundations & pedestals BIL/CVL/JT-3/001
113 Details of Floor/roof slabs BIL/CVL/JT-3/002
Foundation for Jounction Houses JT-4
114 Details of foundations & pedestals BIL/CVL/JT-4/001
115 Details of Floor/roof slabs BIL/CVL/JT-4/002
Foundation for Jounction Houses JT-9
116 Details of foundations & pedestals BIL/CVL/JT-9/001
117 Details of Floor/roof slabs BIL/CVL/JT-9/002
Foundation for Jounction Houses JT-10
118 Details of foundations & pedestals BIL/CVL/JT-10/001
119 Details of Floor/roof slabs BIL/CVL/JT-10/002
Foundation for Jounction Houses JT-11
120 Details of foundations & pedestals BIL/CVL/JT-11/001
121 Details of Floor/roof slabs BIL/CVL/JT-11/002
Foundation for Jounction Houses JT-20
122 Details of foundations & pedestals BIL/CVL/JT-20/001
123 Details of Floor/roof slabs BIL/CVL/JT-20/002
Foundation for Jounction Houses JT-34
124 Details of foundations & pedestals BIL/CVL/JT-34/001
125 Details of Floor/roof slabs BIL/CVL/JT-34/002
Foundation for Jounction Houses JT-33
126 Details of foundations & pedestals BIL/CVL/JT-33/001
127 Details of Floor/roof slabs BIL/CVL/JT-33/002
Foundation for Jounction Houses JT-12
Project RAW MATERIAL HANDLING SYSTEM, 2.5 MT INTERGRADED STEEL PLANT ( 1.25MTPY ) Date Oct-08
Subject Design Criterion for Civil works Rev 1
128 Details of foundations & pedestals BIL/CVL/JT-12/001
129 Details of Floor/roof slabs BIL/CVL/JT-12/002
Foundation for Jounction Houses JT-21
130 Details of foundations & pedestals BIL/CVL/JT-21/001
131 Details of Floor/roof slabs BIL/CVL/JT-21/002
Foundation for Jounction Houses JT-29
132 Details of foundations & pedestals BIL/CVL/JT-29/001
133 Details of Floor/roof slabs BIL/CVL/JT-29/002
Foundation for Jounction Houses JT-30
134 Details of foundations & pedestals BIL/CVL/JT-30/001
135 Details of Floor/roof slabs BIL/CVL/JT-30/002
Foundation for Jounction Houses JT-32
136 Details of foundations & pedestals BIL/CVL/JT-32/001
137 Details of Floor/roof slabs BIL/CVL/JT-32/002
Foundation for Jounction Houses JT-31
138 Details of foundations & pedestals BIL/CVL/JT-31/001
139 Details of Floor/roof slabs BIL/CVL/JT-31/002
Foundation for Jounction Houses JT-22
140 Details of foundations & pedestals BIL/CVL/JT-22/001
141 Details of Floor/roof slabs BIL/CVL/JT-22/002

VIII CHP MCC control room buildings

CHP MCC -1
52 General Arrangement BIL/CVL/MCC1/001( Total sheet - 1 )
53 Details foundations and plinth beams BIL/CVL/MCC1/002( Total sheet - 1 )
54 Reinf details of slabs and beams BIL/CVL/MCC1/003( Total sheet - 3 )
CHP MCC -2
55 General Arrangement BIL/CVL/MCC2/001( Total sheet - 1 )
56 Details foundations and plinth beams BIL/CVL/MCC2/002( Total sheet - 1 )
57 Reinf details of slabs and beams BIL/CVL/MCC2/003( Total sheet - 3 )
CHP MCC -3
58 General Arrangement BIL/CVL/MCC3/001( Total sheet - 1 )
59 Details foundations and plinth beams BIL/CVL/MCC3/002( Total sheet - 1 )
60 Reinf details of slabs and beams BIL/CVL/MCC3/003( Total sheet - 3 )

IX WT control room building

WT control room-1
61 General Arrangement BIL/CVL/MCC1/001( Total sheet - 1 )
62 Details foundations and plinth beams BIL/CVL/MCC1/002( Total sheet - 1 )
63 Reinf details of slabs and beams BIL/CVL/MCC1/003( Total sheet - 3 )
WT control room-2
64 General Arrangement BIL/CVL/MCC2/001( Total sheet - 1 )
65 Details foundations and plinth beams BIL/CVL/MCC2/002( Total sheet - 1 )
66 Reinf details of slabs and beams BIL/CVL/MCC2/003( Total sheet - 3 )

X RCC Ramp for Truck Unloading

67 General arrangement drawings BIL/CVL/001 ( Total sheet - 3 )


68 Details of substructures and foundations BIL/CVL/002 ( Total sheet - 3 )
69 Details of super structures BIL/CVL/003 ( Total sheet - 2 )
70 Misc. details BIL/CVL/004 ( Total sheet - 2

XI Stacker Reclaimer
General arrangement drawings BIL/CVL/SR/001
Details of foundations BIL/CVL/SR/002
Misc. details BIL/CVL/SR/003
XII Twin boom Stacker Reclaimer
General arrangement drawings BIL/CVL/TBSR/001
Details of foundations BIL/CVL/TBSR/002
Misc. details BIL/CVL/TBSR/003
XIII Barell Reclaimer
General arrangement drawings BIL/CVL/BR/001
Details of foundations BIL/CVL/BR/002
Misc. details BIL/CVL/BR/003