You are on page 1of 2

TRAINING PATHWAY H-024-1

START

Comply with shop & equipment safety rules . 01.01


1/3
Adhere to worksite safety requirement . 01.02
WORKSHOP SAFETY 2/3
RULES
( H-024-1 ) LP 1 Report unsafe acts and condition ,accident 01.06
and injuries 3/3

Extinguish fire during fire break out . 01.03


FIRE SAFETY 1/1
( H-024-1 ) LP 2
Perform emergency first aid treatment 01.04
1/2
PERSONAL SAFETY
( H-024-1 ) LP 3 Conduct artificial respiration 01.05
2/2

Identify type of materials 03.01


WELDING MATERIAL 1/2
( H-024-1 ) LP 4 Select parent metal for welding. 03.02
2/2

Interpret various types of joints in welding. 02.01


1/3

TECHNICAL DRAWING Interpret various symbols used in welding. 02.02


2/3
( H-024-1 ) LP 5
Interpret various processes in welding. 02.03
3/3

Identify SMAW equipment. 07.01


WELDING EQUIPMENT 1/2
( H-024-1 ) LP 6 Set up SMAW equipment and accessories 07.02
2/2

Carry out Padding/ buttering . 07.03


INTRUDUCTION SMAW
( H-024-1 ) LP 7 1/1
Select welding consumables . 03.03
WELDING COMSUMABLES 1/2
( H-024-1 ) LP 8
Handle welding consumables 03.04
(identify, segregate, store & bake). 2/2
Set up gas cutting equipment and accessories04.01
.
1/4
Lay out material for cutting processes 04.02
CUTTING PROCESS 2/4
( H-024-1 ) LP 9 04.03
Set up gas cutting flame
3/4
Cut material using gas cutting process 04.04
4/4

Cut material using dics cutter 04.05


04.05
MECHANICAL CUTTING 4/4
1/2
PROCESS Cut metal using power saw . 04.06
( H-024-1 ) LP 10 2/2

Fabricate joints for a given job 05.01


1/4
Grind work piece . 05.04
PREPARE MATERIAL FOR
2/4
WELDING
( H-024-1 ) LP 11 Perform fitting for joint 05.02
3/4
Tack weld work piece 05.03
4/4

Weld, carbon steel plate of thickness range 07.04


6-9mm in 2F position 1/5
Weld, carbon steel plate of thickness range 07.05
6-9mm in 1G position 2/5
SMAW PLATE/PIPE ( 2F,1G )
( H-024-1 ) LP 12 Weld ,sch 40 c/steel pipe of size range 07.06
6-8inches (NPS) 1G position 3/5

Check inter pass irregularities and clean . 08.03


4/5
Check
Checkwelding against
dimension, drawing,& welding
penetration 08.01
08.05
procedure
reinforcement ,height, surface 1/5
Irregularities and misalignment 5/5
Check dimension on prepared specimens 08.02
2/5
QUALITY CONTROL
( H-024-1 ) LP 13 Prepare welded joints for inspection 08.04
3/5

Check test jigs(bend test and nick break 08.06


tests) 4/5

Prepare specimen for mechanical test. 08.07


5/5
END

You might also like