You are on page 1of 8

Alignment Approval Note

Sub.: Consultancy Services for ‘Preparation of DPR for Selected Stretches/Corridors of Various
road Networks (Likely to be declared as NH) in State of Maharashtra, for Up-gradation to
2–lane with Paved Shoulders/4 Lane configuration.

Name of project section: Kolhapur–Gaganbawda–Talere

1. The project section starts from Talare Junction on NH 66 (Km 287.200 of NH-66) at Km
53.600 of SH-177 (Talere village) and ends at the start of Kolhapur Ring Road at Km
138.360 of SH-177 (Balinge) and passes from important towns of Vaibhavwadi,
Gaganbawda, Aslaj, Salwan, Kale & Balinge. The length of the project section as per DPR
contract was 99.0 Km but the actual length of the project section along existing road
alignment comes to 83.950 Km.
2. There is requirement of 2-lane with paved shoulder for the entire stretch as the traffic
(AADT) is 5883 PCU (year 2016).
3. The project section has been proposed to be divided into 3 numbers of sub sections for
improvement as per following details-
(i) from Ch. Km 53.600 (Design Ch. 0.000) to Ch. Km 85.450 (Design Ch. 30.670),
design length 30.670 Km;
(ii) from Ch. Km 85.450 (Design Ch. 30.670) to Ch. Km 138.360 (Design Ch. 82.440),
design length 51.770 Km;
(iii) construction of RUB on new alignment from Ch. Km 64.850 (Design Ch. 10.830)
to Ch. Km 67.000 (Design Ch. 12.900), design length 1.670 Km and construction
of major bridge over Bhogawati river near Balinge on new alignment from Ch. Km
135.200 (Design Ch. 79.300) to Ch. Km 135.700 (Design Ch. 79.800), design
length 0.530 Km, i.e. total design length 2.200 Km.
4. Following new bypasses/major realignments are proposed in the project section where land
acquisition is required –
(i) Realignment due to construction of RUB at Kokisare (LC-21, Rly Km 287/9) from Ch.
Km 64.850 (Design Ch. 10.830) to Ch. Km 67.000 (Design Ch. 12.900), design length
1.670 Km;
(ii) Realignment due to construction of major bridge Bhogawati river near Balinge on new
alignment from Ch. Km 135.200 (Design Ch. 79.300) to Ch. Km 135.700 (Design Ch.
79.800), design length 0.530 Km.
Page | 1
Alignment Approval Note
For the above bypasses, it is proposed that construction contract should be awarded
separately after the land acquisition is completed. Therefore, these bypasses have been
proposed to be taken up in Phase II. The detailed techno-economic study for 2-3 alternative
alignments shall be separately submitted for approval.
5. Considering the development of new bypasses/major realignments in phase II , the entire
project section has been improved as per IRC SP- 73 -2015 except at following locations due
to site constraints –
(i) Certain curves could not be improved as per IRC: SP-73-2015 standard as it involved
land acquisition/ demolition of structures/ cutting of hills/filling on valley side etc and
therefore it has been improved to the possible extent within available ROW.
Justification for each curves are as below-

Minimum
Sr. Design Ch.
Radius (m) Design Speed Justification
No. (Km)
(Kmph)
Geometric improvement
1 10.841 180 65 within available land in
overlaying location
2 10.889 30 20 ,,
3 10.948 20 20 ,,
4 11.003 60 40 ,,
5 11.074 90 40 ,,
6 11.268 160 65 ,,
7 12.031 50 30 ,,
8 12.098 80 40 ,,
9 12.202 120 50 ,,
10 12.448 60 40 ,,
11 12.521 200 65 ,,
12 12.565 20 20 ,,
13 12.584 5 10 ,,
14 12.593 5 10 ,,
15 12.614 5 10 ,,
16 12.823 90 40 ,,
To avoid dismantling of
17 13.801 125 50
structures in built-up
18 14.050 200 65 ,,
19 14.296 150 60 ,,
20 14.432 150 60 ,,
21 14.581 150 60 ,,
22 19.227 170 65 ,,
23 19.405 150 60 ,,
24 20.168 150 60 Reverse curve at junction
25 20.282 150 60 ,,
To avoid dismantling of
26 21.038 200 65
structures in built-up
27 21.456 40 30 Ghat section
Page | 2
Alignment Approval Note
Minimum
Sr. Design Ch.
Radius (m) Design Speed Justification
No. (Km)
(Kmph)
28 21.600 80 40 Ghat section
29 21.986 50 30 Ghat section
30 22.073 200 65 Ghat section
31 22.146 50 30 Ghat section
32 22.295 40 30 Ghat section
33 22.356 70 40 Ghat section
34 22.467 10 10 Ghat section
35 22.553 50 30 Ghat section
36 22.758 20 20 Ghat section
37 22.704 50 30 Ghat section
38 22.799 100 50 Ghat section
39 22.926 65 40 Ghat section
40 23.033 60 40 Ghat section
41 23.120 50 30 Ghat section
42 23.202 30 20 Ghat section
43 23.276 30 20 Ghat section
44 23.324 30 20 Ghat section
45 23.438 30 20 Ghat section
46 23.526 20 20 Ghat section
47 23.604 100 50 Ghat section
48 23.662 15 20 Ghat section
49 23.758 50 30 Ghat section
50 23.783 20 20 Ghat section
51 23.804 20 20 Ghat section
52 23.863 30 20 Ghat section
53 23.924 50 30 Ghat section
54 24.058 55 20 Ghat section
55 24.140 50 30 Ghat section
56 24.209 10 10 Ghat section
57 24.260 20 20 Ghat section
58 24.316 20 20 Ghat section
59 24.393 30 20 Ghat section
60 24.449 30 20 Ghat section
61 24.520 50 30 Ghat section
62 24.641 35 30 Ghat section
63 24.716 30 20 Ghat section
64 24.759 15 20 Ghat section
65 24.818 50 30 Ghat section
66 24.844 50 30 Ghat section
67 24.886 30 20 Ghat section
68 24.921 50 30 Ghat section
69 24.977 30 20 Ghat section
70 25.025 50 30 Ghat section
71 25.058 20 20 Ghat section
72 25.084 50 30 Ghat section
73 25.110 10 10 Ghat section
74 25.174 50 30 Ghat section
75 25.218 20 20 Ghat section
76 25.298 50 30 Ghat section
Page | 3
Alignment Approval Note
Minimum
Sr. Design Ch.
Radius (m) Design Speed Justification
No. (Km)
(Kmph)
77 25.374 20 20 Ghat section
78 25.443 70 40 Ghat section
79 25.500 30 20 Ghat section
80 25.549 10 10 Ghat section
81 25.620 25 20 Ghat section
82 25.698 20 20 Ghat section
83 25.790 15 20 Ghat section
84 25.843 12 10 Ghat section
85 25.879 20 20 Ghat section
86 25.923 30 20 Ghat section
87 26.047 50 30 Ghat section
88 26.251 17 20 Ghat section
89 26.293 50 30 Ghat section
90 26.356 30 20 Ghat section
91 26.408 15 20 Ghat section
92 26.428 30 20 Ghat section
93 26.457 50 30 Ghat section
94 26.492 50 30 Ghat section
95 26.560 90 40 Ghat section
96 26.649 50 30 Ghat section
97 26.707 30 20 Ghat section
98 26.754 30 20 Ghat section
99 26.830 45 30 Ghat section
100 26.883 50 30 Ghat section
101 26.920 30 20 Ghat section
102 26.948 30 20 Ghat section
103 26.969 30 20 Ghat section
104 26.999 20 20 Ghat section
105 27.023 20 20 Ghat section
106 27.044 30 20 Ghat section
107 27.070 30 20 Ghat section
108 27.145 40 30 Ghat section
109 27.251 50 30 Ghat section
110 27.283 50 30 Ghat section
111 27.342 16 20 Ghat section
112 27.382 10 10 Ghat section
113 27.395 20 20 Ghat section
114 27.409 20 20 Ghat section
115 27.416 20 20 Ghat section
116 27.429 20 20 Ghat section
117 27.445 20 20 Ghat section
118 27.468 20 20 Ghat section
119 27.547 25 20 Ghat section
120 27.581 50 30 Ghat section
121 27.637 15 20 Ghat section
122 27.670 30 20 Ghat section
123 27.686 15 20 Ghat section
124 27.706 30 20 Ghat section
125 27.722 30 20 Ghat section
Page | 4
Alignment Approval Note
Minimum
Sr. Design Ch.
Radius (m) Design Speed Justification
No. (Km)
(Kmph)
126 27.735 10 10 Ghat section
127 27.764 50 30 Ghat section
128 27.808 30 20 Ghat section
129 27.853 20 20 Ghat section
130 27.893 30 20 Ghat section
131 27.991 30 20 Ghat section
132 28.039 50 30 Ghat section
133 28.136 30 20 Ghat section
134 28.184 15 20 Ghat section
135 28.209 50 30 Ghat section
136 28.230 30 20 Ghat section
137 28.273 20 20 Ghat section
138 28.382 45 30 Ghat section
139 28.425 50 30 Ghat section
140 28.449 50 30 Ghat section
141 28.475 50 30 Ghat section
142 28.496 30 20 Ghat section
143 28.516 30 20 Ghat section
144 28.542 50 30 Ghat section
145 28.580 30 20 Ghat section
146 28.618 30 20 Ghat section
147 28.675 50 30 Ghat section
148 28.733 50 30 Ghat section
149 28.791 50 30 Ghat section
150 28.830 100 50 Ghat section
151 28.917 21 20 Ghat section
152 29.007 20 20 Ghat section
153 29.034 30 20 Ghat section
154 29.079 30 20 Ghat section
155 29.098 30 20 Ghat section
156 29.127 30 20 Ghat section
157 29.172 30 20 Ghat section
158 29.247 15 20 Ghat section
159 29.283 50 30 Ghat section
160 29.333 50 30 Ghat section
161 29.376 20 20 Ghat section
162 29.397 20 20 Ghat section
163 29.428 20 20 Ghat section
164 29.460 50 30 Ghat section
165 29.494 15 20 Ghat section
166 29.579 25 20 Ghat section
167 29.623 20 20 Ghat section
168 29.670 20 20 Ghat section
169 29.711 20 20 Ghat section
170 29.747 30 20 Ghat section
171 29.829 40 30 Ghat section
172 29.873 20 20 Ghat section
173 29.923 40 30 Ghat section
174 29.957 20 20 Ghat section
Page | 5
Alignment Approval Note
Minimum
Sr. Design Ch.
Radius (m) Design Speed Justification
No. (Km)
(Kmph)
175 30.007 30 20 Ghat section
176 30.049 10 10 Ghat section
177 30.057 10 10 Ghat section
178 30.067 7 10 Ghat section
179 30.138 50 30 Ghat section
180 30.178 50 30 Ghat section
181 30.208 50 30 Ghat section
182 30.248 50 30 Ghat section
183 30.289 80 40 Ghat section
184 30.364 25 20 Ghat section
185 30.392 20 20 Ghat section
186 30.422 20 20 Ghat section
187 30.483 50 30 Ghat section
188 30.541 10 10 Ghat section
189 30.570 20 20 Ghat section
190 30.579 20 20 Ghat section
191 30.587 20 20 Ghat section
192 30.597 20 20 Ghat section
193 30.632 20 20 Ghat section
194 30.674 30 20 Ghat section
195 30.701 30 20 Ghat section
196 30.725 30 20 Ghat section
197 30.928 120 50 Ghat section
198 32.178 80 40 Built-up & junction
To avoid resettlement of
199 34.470 150 60
structures
To avoid resettlement of
200 37.005 150 60 structures on RHS (inner side
of curve)
Reverse curve, to avoid
201 37.198 170 60
resettlement of structures
202 37.562 200 60 ,,
To avoid resettlement of
203 38.970 150 60 structures on RHS (inner side
of curve)
Reverse curve, to avoid
204 39.174 200 60 resettlement of structures on
RHS
Reverse curve in built-up. To
205 41.762 120 50
avoid dismantling of structure
206 42.125 140 50 ,,
To avoid resettlement of
207 44.148 150 60 structures on RHS (inner side
of curve)
To keep the toe line away
from river towards inner side
208 46.906 150 60
of curve & to avoid shifting of
HT post
209 53.608 130 50 Built-up. To avoid dismantling

Page | 6
Alignment Approval Note
Minimum
Sr. Design Ch.
Radius (m) Design Speed Justification
No. (Km)
(Kmph)
of structure
210 53.738 200 60 Built-up & junction
211 56.202 180 60 Built-up & bridge approach.
212 56.621 150 60 Built-up & junction
Built-up. To avoid dismantling
213 57.393 150 60
of structure
Reverse curve in built-up. To
214 57.602 150 60
avoid dismantling of structure
Built-up. To avoid dismantling
215 57.750 170 60
of structure
216 57.943 150 60 ,,
217 58.340 200 60 ,,
218 58.574 150 60 ,,
Reverse curve in built-up.
219 58.801 150 60
Bridge approach
Reverse curve in built-up. To
220 70.560 90 50
avoid dismantling of structure
Reverse curve in built-up and
221 70.876 150 60
junction
Reverse curve near built-up.
222 71.001 150 60 To avoid dismantling of
structure
Reverse curve in built-up.
223 79.994 120 50
Bridge approach & Junction
224 80.187 170 60 ,,

(ii) In the existing alignment portion, where new major realignment/new bypass are
proposed, only strengthening through BT pavement with geometric improvements
possible within ROW has been proposed (with 1 year defect liability period as NH
traffic will not use this section after construction of new bypass/realignment).
6. Accordingly , the construction work in the project section is proposed in following manner –
(a) Phase I ( ready for Immediate bidding with more than 90 % encumbrance free land
availability)
(i) from Ch. Km 53.600 (Design Ch. 0.000) to Ch. Km 85.450 (Design Ch. 30.670),
design length 30.670 Km (availability of land 90.40% even after LA required due to
proposed curve/junction/alignment improvements);
(ii) from Ch. Km 85.450 (Design Ch. 30.670) to Ch. Km 138.360 (Design Ch. 82.440),
design length 51.770 Km (availability of land 90.17% even after LA required due to
proposed curve/junction/alignment improvements);

Page | 7
Alignment Approval Note
(b) Phase II (bidding can be done after acquisition of land or clearance from
Forest/wildlife/sanctuary )
(i) RUB Realignment: from Ch. Km 64.850 (Design Ch. 10.830) to Ch. Km 67.000
(Design Ch. 12.900), design length 1.670 Km {included in sub section-III}.
(ii) Stretch passes through forest land from Ch. Km 85.450 (design Ch. 30.670) to Ch.
Km 85.780 (design Ch. 31.000), length 0.30 Km {included in sub section-II}.
(iii) Stretch passes through forest land at bridge realignment near Salwan from design
Ch. 56.000 to Design Ch. 56.150, length 0.15 Km {included in sub section-II}.
(iv) Realignment due to construction of major bridge over Bhogawati river near
Balinge on new alignment from Ch. Km 135.200 (Design Ch. 79.300) to Ch. Km
135.700 (Design Ch. 79.800), design length 0.530 Km {included in sub section-
III}.

7. Detailed feasibility study, cost estimate, EFC/SFC proposals are accordingly being prepared.
***
Executive Engineer – Mr. R. K. Bamane Consultant: AICONS ENGINEERING PVT.
Mobile No. - 7264046266 Name of Team leader: Dr. Mihir Lal Roy Chowdhury
Email id - nhkolhapur.ee@mahapwd.com Mobile No.- 9831016522/9009200033
E-mail id - aiconsgroup@gmail.com/
drmihirlal02@gmail.com