You are on page 1of 1

ADB FUNDED REHABILITATION / IMPROVEMENTS OF 47 KM OF RURAL ROADS

IN THE POLONNARUWA DISTRICT - CONTRACT 3 (RDA/ADB/iROAD (NC)/NCB/CP-RR (PO3)

DAILY RECORD SHEET


Sheet No : Date:
Name of Road : Road No:
WHITE SUNNY
Weather Conditions:
BLACK CLOUDY

BLUE RAINY
Work Conducted:
Man App.
Location Equipment Staff
power Qty of
Description of Work
Sk U/ Work
From To Side Description Qty Description Qty
. k Done
PM
DPM
SM
SE
Surveyor
A.Surveyor
TO
Supervisor

Work Disturbed by Weather/ Operations / Environment / Social


Description of Location Equipment Man power Staff Time
Work Duration
From To Side Description Qty Description Qty Description Qty

Reason for work disturbance (Operations/Environment/Social)


……………………………………………………...........................................................................................
………………………………………………………………………………………………………………...
Detail of Other Plant & Equipment at Site
Description of P & E MG VR JCB EX WB BL
Working
Break Down
Idling

Status of Safety & Traffic Control …………………………………………………………………………..


………………………………………………………………………………………………………………...

Contractor (PM/DPM/SE) Consultant T/O Construction Engineer

You might also like