You are on page 1of 13

CHILLED WATER PIPE SIZING (Black-Steel Schedule 40)

Pressure Drop: 400 Pa/m Unit of Flow: L/Sec


(Pipes up to 50 mm dia are sized at 1.2 m/sec velocity)

Pipe Sizing
Flow Rate
Pipe Branch Main
Section Flow Flow Vel
L/Sec Size Vel (m/s) Size
(l/s) (mm) (l/s) (mm) (m/s)
1 3.39 3.39 65 1.10 3.39 65 1.10
2 2.08 2.08 50 0.96 5.47 80 1.15
3 0.7 0.70 32 0.73 6.17 80 1.29
4 1.38 1.38 40 1.05 7.55 80 1.58
5 1.24 1.24 40 0.94 8.79 100 1.07
6 0.72 0.72 32 0.75 9.51 100 1.16
7 21 21.00 125 1.63 30.51 125 2.36
8 0.24 0.24 15 1.23 30.75 125 2.38
9 15.67 15.67 100 1.90 46.42 150 2.49
10 31.34 31.34 150 1.68 77.76 200 2.41
11 0 0.00 0 0.00
12 0 0.00 0 0.00
13 0 0.00 0 0.00
14 0 0.00 0 0.00
15 0 0.00 0 0.00
16 0 0.00 0 0.00
17 0 0.00 0 0.00
18 0 0.00 0 0.00
19 0 0.00 0 0.00
20 0 0.00 0 0.00
21 0 0.00 0 0.00
22 0 0.00 0 0.00
23 0 0.00 0 0.00
24 0 0.00 0 0.00
25 0 0.00 0 0.00
26 0 0.00 0 0.00
27 0 0.00 0 0.00
28 0 0.00 0 0.00
29 0 0.00 0 0.00
30 0 0.00 0 0.00
31 0 0.00 0 0.00
32 0 0.00 0 0.00
33 0 0.00 0 0.00
34 0 0.00 0 0.00
35 0 0.00 0 0.00
36 0 0.00 0 0.00
37 0 0.00 0 0.00
38 0 0.00 0 0.00
39 0 0.00 0 0.00
40 0 0.00 0 0.00
41 0 0.00 0 0.00
42 0 0.00 0 0.00
43 0 0.00 0 0.00
44 0 0.00 0 0.00
45 0 0.00 0 0.00
46 0 0.00 0 0.00
47 0 0.00 0 0.00
48 0 0.00 0 0.00
49 0 0.00 0 0.00
50 0 0.00 0 0.00

VELOCITY CALCULATOR
Flow L/Sec Pipe Dia (mm) ID (mm) Vel (m/s)
232 350 333.50 2.66
Duct Air Velocity Calculation
Width Height Flow Velocity
Section
(mm) (mm) (l/s) (m/s)
1 700 700 3600 7.35
2 650 400 2309 8.88
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
Chilled Water Pumps Schedule
PUMP RATINGS MOTOR DATA
PUMP SET CHARACTERISTICS PRESSURE MOTOR Heat
PUMP REFERENCE EMERGENCY ETS
#
NUMBER
SERVED ZONE LOCATION TYPE RATING RPM POWER ELECTRICAL QUANTITY POWER
REMARKS
ROOM
Exchanger
WATER FLOW HEAD (Schd.) HEAD (+10% SF) [Bar] (Qty.)
PER SET [V/PH/HZ]
[kW]
[L/S] [M] [M]

1 C HWP-B3-S3-01~03 Towers H12 & H13A Basement 3 Horizontal Split case pump set 161.30 68.00 74.80 PN20 160 380/3/60HZ 3 N 3 pumps in parallel ( 2duty / 1 standby) variable speed
2 C HWP-B3-S3-04~06 S3 PODIUM Basement 3 Horizontal Split case pump set 232.43 48.40 53.24 PN16 168 380/3/60HZ 3 N 3 pumps in parallel ( 2duty / 1 standby) variable speed 8 4
3 C HWP-B3-S3-07~08 S3 COLD STORES Basement 3 End suction pump set 6.77 47.00 51.70 PN16 7.5 380/3/60HZ 2 Y 2 pumps in parallel ( 1duty / 1 standby) constant speed
4 CHWP-C3-S4-01~03 Towers H 13B & H 13C Commercial 3 Horizontal Split case pump set 165.06 65.00 71.50 PN20 166 380/3/60HZ 3 N 3 pumps in parallel ( 2duty / 1 standby) variable speed
5 CHWP-C3-S4-04~06 S4 PODIUM Commercial 3 Horizontal Split case pump set 221.46 63.90 70.29 PN16 168 380/3/60HZ 3 N 3 pumps in parallel ( 2duty / 1 standby) variable speed 9 4
6 CHWP-C3-S4-07~08 S4 COLD STORES Commercial 3 End suction pump set 5.76 34.60 38.06 PN16 7.5 380/3/60HZ 2 Y 2 pumps in parallel ( 1duty / 1 standby) constant speed
7 CHWP-C3-S4-09~11 RESIDENTIAL AREAS Commercial 3 Horizontal Split case pump set 102.63 62.50 68.75 PN16 75 380/3/60HZ 3 N 3 pumps in parallel ( 2duty / 1 standby) variable speed
10 2
8 CHWP-C3-S4-12~14 COMMERCIAL AREAS Commercial 3 Horizontal Split case pump set 119.68 96.00 105.60 PN16 186 380/3/60HZ 3 N 3 pumps in parallel ( 2duty / 1 standby) variable speed

DIAPHRAGM EXPANSION TANKS & AIR SEPARATORS


SYSTEM EXPANSION TANK AIR SEPARATORS
MAX. PRESSURE
CAPACITY PRESSURE
# SYSTEM SERVED LOCATION REFERENCE QUANTITY REFERENCE FLOW (L/S) PRESSURE RATING
LITERS RATING
DROP (M) (BARS)
1 Towers H12 & H13A Basement 3 EXP-B3-S3-01 2500 1 PN20 AS-B3-S3-01 154.37 3 PN20
2 S3 PODIUM Basement 3 EXP-B3-S3-02 2500 1 PN20 AS-B3-S3-02 230.28 3 PN20
3 S3 COLD STORES Basement 3 EXP-B3-S3-03 200 1 PN20 AS-B3-S3-03 6.77 3 PN20
4 Towers H13B & H13C Commercial 3 EXP-C3-S4-01 2500 1 PN20 AS-C03-S4-01 161.24 3 PN20
5 S4 PODIUM Commercial 3 EXP-C3-S4-02 2500 1 PN16 AS-C3-S4-02 219.26 3 PN16
6 S4 COLD STORES Commercial 3 EXP-C3-S4-03 200 1 PN16 AS-C3-S3-01 5.76 3 PN16
7 RESIDENTIAL AREAS Commercial 3 EXP-C3-S4-04 750 1 PN16 AS-C03-S4-03 100.88 3 PN16
8 COMMERCIAL FLOORS Commercial 3 EXP-C3-S4-05 1000 1 PN16 AS-C3-S4-04 121 3 PN16

QUANTITY OF EQUIPMENTS
EQUIPMENT QUANTITY
Chilled Water Pumps 22
Make Up Water Pumps 4
Heat Exchangers 10
Expansion Tanks 8
Air Separators 8
JABAL OMAR DEVELOPMENT PROJECT
RECORD OF CONSTRUCTION SUBMITTALS LOG
Contract No:883 Work Package No: Phase II

DATE DATE DATE


SL Final
TRANSMITTAL No. Rev. TYPE DESCRIPTION RECEIVED By RETURNED RETURNED Submittal No Manufaturer Supplier Sub-no sample
No# Code
DAR TO SAB TO HILL

1 883-2-S34-P34S-C-CN08-TRN-BE-0506 1 MAR TACCO HVAC Pumps 10/12/2012 B 16/12/2012 16/12/2012 MAR-MO-0029 Taco USA Al Saem -York 98
2 883-2-S34-P34S-C-CN08-TRN-BE-0621 1 MAR Pumps for HVAC System & Domestic Water Supply ( Rev-01) 10/01/2013 B 22/01/2013 22/01/2013 MAR-MO-0085 KSB (Europe) MEAC 204
Armstronge Arabian Air
3 883-2-S34-P34S-C-CN08-TRN-BE-0881 2 MAR Chilled water Pump ( Back of House) 20/05/2013 B 03/06/2013 04/06/2013 MAR-MO-0136 463
Canada Conditioning
Design Modification for Chilled Water Pumps Estimated Head
4 883-2-S34-P34S-C-CN08-TRN-BE-2868 1 OTH 25/12/2014 B 01/01/2015 04/01/2015
Calculations for Commercial Floors
5 883-2-S34-P34S-C-CN08-TRN-BE-3134 0 MAR Seletion of Commercial Areas Chilled Water Pumps 20/01/2015 B 26/01/2015 26/01/2015 MAR-MO-0213 Armstrong ( Canada ) Arabian Air Conditioning 1005
6 883-2-S34-P34S-C-CN08-SAB-DAR-TRN-EB-5007 1 OTH S4 Cold Stores Chilled Water Pumps Head Loss Calculations 29/10/2015 B 22/11/2015 23/11/2015 OTH-M0-0575
7 883-2-S34-P34S-C-CN08-SAB-DAR-TRN-EB-5008 1 OTH S4 Podium Chilled Water Pumps Head Loss Calculations 29/10/2015 B 22/11/2015 23/11/2015
8 883-2-S34-P34S-C-CN08-SAB-DAR-TRN-EB-5009 1 OTH S3 Cold Store Chilled Water Pumps Head Loss Calculations 29/10/2015 B 22/11/2015 23/11/2015
9 883-2-S34-P34S-C-CN08-SAB-DAR-TRN-EB-5010 1 OTH S3 Podium Chilled Water Pumps Head Loss Calculations 29/10/2015 B 22/11/2015 23/11/2015

10 883-2-S34-P34S-C-CN08-SAB-DAR-TRN-EB-5011 1 OTH S3S4 Apartments Chilled Water Pumps Head Loss Calculations 29/10/2015 B 22/11/2015 23/11/2015

11 883-2-S34-P34S-C-CN08-SAB-DAR-TRN-EB-5012 1 OTH S4 Tower Chilled Water Pumps Head Loss Calculations 29/10/2015 B 22/11/2015 23/11/2015
12 883-2-S34-P34S-C-CN08-SAB-DAR-TRN-EB-5013 1 OTH S3 Tower Chilled Water Pumps Head Loss Calculations 29/10/2015 B 22/11/2015 23/11/2015

13 883-2-S34-P34S-C-CN08-SAB-DAR-TRN-CA-5293 0 MAR Selection of Chilled Water Pumps (Excluding Commercial Floor's) 16/12/2015 B MAR-MO-0759 Armstrong (CANADA) Arabian Air Conditioning
NO

Page 4 of 13 Document No: PLY-745-PP-02-09-LG Rev 0


JABAL OMER DEVELOPMENT PROJECT-PHASE II (MAKKAH AL MUKARRAMAH, KINGDOM OF SAUDI ARABIA)
HOTEL OPERATOR: STARWOOD
SHERATON WESTIN
Floor No. Floor Name FFL H13C H13B H13A H12Z
24 UR 427.75
23 RF-2 424.35
22 RF-1 420.75
21 UT-2 416.55 UPPER TECHNICAL -2 UPPER TECHNICAL -2 UPPER TECHNICAL -2 UPPER TECHNICAL -2
20 UT-1 412.15 UPPER TECHNICAL -1 UPPER TECHNICAL -1 UPPER TECHNICAL -1 UPPER TECHNICAL -1
19 Fl-19 407.15
18 Fl-18 403.65
17 Fl-17 400.15
16 Fl-16 395.75
15 Fl-15 392.25
14 Fl-14 388.75
G G G G
13 Fl-13 385.25 U U U U
12 Fl-12 381.75 E E E E
S S S S
11 Fl-11 378.25 T T T T
10 Fl-10 374.75
R R R R
9 Fl-9 371.25 O O O O
8 Fl-8 367.75 O O O O
7 Fl-7 364.25 M M M M
S S S S
6 Fl-6 360.75
5 Fl-5 357.25
4 Fl-4 353.75
3 Fl-3 350.25
2 Fl-2 346.75
1 Fl-1 342.35
LT LT 335.95 LOWER TECHNICAL LOWER TECHNICAL LOWER TECHNICAL LOWER TECHNICAL
UA UA 330.95 APARTMENTS, TECHNICAL ROOMS & HOTEL OPERATOR SERVICE AREAS
LA LA 326.95 APARTMENTS, TECHNICAL ROOMS & HOTEL OPERATOR SERVICE AREAS
MZ MZ 319.95 HOTEL RECEPTIONS, RESTAURANTS, TECHNICAL ROOM & RETAIL AREAS
P
GF GF 314.75 HOTEL RECEPTIONS, RESTAURANTS, TECHNICAL ROOM & RETAIL AREAS O
B1 B1 309.75 APARTMENTS, PARKING AREAS, TECHNICAL ROOMS & HOTEL OPERATOR SERVICE AREAS D
B2 B2 306.55 APARTMENTS, PARKING AREAS, TECHNICAL ROOMS & HOTEL OPERATOR SERVICE AREAS I
U
B3 B3 303.35 APARTMENTS, PARKING AREAS, TECHNICAL ROOMS & HOTEL OPERATOR SERVICE AREAS M
C3 C3 297.75 RETAIL AREAS, TECHNICAL ROOS & APARTMENTS
C2 C2 292.15 RETAIL AREAS, TECHNICAL ROOS & APARTMENTS
C1 C1 286.15 RETAIL AREAS AND TECHNICAL ROOMS
VAC SUMMARY Rev-01 CHW Pumps Schedule A4
Floor/Tower Sens. Load Total Load 11022C-FT-AC-PODIUM-2011
(kW) (kW) S. No. Serving Flow
Commercial-1 317.475 357.137 1 H12 110
Commercial-2 275.821 336.316 2 PODIUM-LS 85
Commercial-3 389.415 538.294 3 APPARTMENTS 95
Basement-3 345.085 434.445 4 H13A 110
Basement-2 429.420 500.613 5 H13B 65
Basement-1 598.703 647.499 6 PODIUM-RS 85
Ground Floor 314.976 463.493 7 H13C 95
Mezzanine 189.050 300.702 TOTAL 645
Lower Apartments 421.777 488.508
Upper Apartments 535.480 577.700 S. No. Serving Flow
Total Podium 3,817.202 4,644.707 1 Towers H12 & H13A 161.30
Tower H12 1,198.163 1,370.190 2 S3 PODIUM 232.43
Tower H13A 966.391 1,126.210 3 S3 COLD STORES 6.77
Tower H13B 1,326.892 1,506.076 4 Towers H 13B & H 13C 165.06
Tower H13C 1,148.283 1,294.325 5 S4 PODIUM 221.46
Total Towers 4,639.729 5,296.801 6 S4 COLD STORES 5.76
Total Phase-II 8,456.931 9,941.508 7 RESIDENTIAL AREAS 102.63
8 COMMERCIAL AREAS 119.68
TOTAL 1015.09
edule A4 FCU SCHEDULES A
DIUM-2011 SERIAL No. FCU-1A FCU-1B FCU-2 FCU-3 FCU-4 FCU-5
Qty. Cooling Load (kW) 1.76 2.64 3.51 4.38 5.26 7.02
2 Air Flow (lps) 85 140 190 235 280 380
3 Quantity
2 Commercial-1 6 6 12 1 8
2 Commercial-2 6 7 9 4 6
3 Commercial-3 8 1 9 5 18
3 Basement-3 11 6 15 20 2
3 Basement-2 5 6 25 10 24
18 Basement-1 5 2 16 7 15
Ground Floor 17 11 4 13 18
Qty. Mezzanine 7 3 16 3 10
3 Lower Apartments 11 13 8 9 10
3 Upper Apartments 9 8 9 8 20
2 Total Podium 85 63 123 80 131
3 Tower H12 26 44 19 124 172
3 Tower H13A 26 4 81 172
2 Tower H13B 26 8 38 122 156
3 Tower H13C 26 6 19 46 134
3 Total Towers 104 62 76 373 634
22.00 Total Phase-II 189 125 199 453 765

Floor/Tower Quantity Cooling Load (kW) Air Flow (mᶟ/hr)


Commercial-1 54 185.29 43,241
Commercial-2 50 218.95 50,345
Commercial-3 57 237.62 55,461
Basement-3 140 501.28 110,218
Basement-2 151 586.65 123,887
Basement-1 161 788.14 171,223
Ground Floor 83 439.02 100,342
Mezzanine 67 337.36 77,750
Lower Apartments 168 612.91 128,771
Upper Apartments 169 794.60 171,967
Kitchens 30 125.86 23,220
Total Podium 1,130 4,827.68 1,056,425
Tower H12 648 1,694.63 365,526
Tower H13A 460 1,501.39 328,822
Tower H13B 613 1,813.84 395,098
Tower H13C 458 1,500.51 329,624
Total Towers 2,179 6,510.37 1,419,070
Total Phase-II 3,309 11,338.05 2,475,495
Garbage Rooms 34 114.03 58403
FCU SCHEDULES A4
FCU-6 FCU-7 FCU-8 FCU-9 FCU-10 HW-FCU-4 TOTAL
8.78 10.53 14.04 17.55 21.06 5.26 Qty kW lps
470 570 760 940 1040 280

3 3 5 44 279.01 15,040
1 5 4 42 260.58 14,045
4 6 51 315.01 16,965
9 6 69 377.24 20,215
2 19 14 2 107 814.13 43,925
2 10 2 7 5 71 611.51 32,440
12 7 11 2 95 664.36 35,760
10 5 9 2 6 71 613.34 32,460
3 6 6 2 68 436.11 23,480
1 1 3 59 335.17 18,055
47 68 54 15 11 0 677 4,706.46 252,385
119 95 14 613 4284.79 230,545
22 58 14 377 2593.72 139,760
79 116 14 559 3988.74 214,700
61 76 14 382 2765.06 148,955
281 345 0 0 0 56 1,931 13,632.31 733,960
328 413 54 15 11 56 2608 18,338.77 986,345

Air Flow (lps) Reference Reference


155,668
181,242 883-2-S34-P34S-C-CN08-TRN-BE-1885-R1
199,660
396,785
445,993 883-2-S34-P34S-C-CN08-TRN-BE-1952-R2
616,403
361,231 883-2-S34-P34S-C-CN08-SAB-DAR-TRN-EB-
279,900 4129-R0
463,576
883-2-S34-P34S-C-CN08-SAB-DAR-TRN-CA-
619,081 5385-R0
83,592
3,803,130
1,315,894
1,183,759
883-2-S34-P34S-C-CN08-TRN-BE-1943-R2
1,422,353
1,186,646
5,108,652
8,911,782
210,251 883-2-S34-P34S-C-CN08-TRN-BE-2435-R3 To replace DX Units
Reference

11022C-FT-AC-Podium-03,04-2014

11022C-FT-AC-TH12-8001
11022C-FT-AC-TH13A-8001
11022C-FT-AC-TH13B-8001
11022C-FT-AC-TH13C-8001
CHILLED WATER PIPING

HORIZONTAL PIPE WORK

FCU INSTALLATION
VALVE PACKAGE
SERRVICE BREAK
DOWN (%)

BALANCING
SUPPORTS

% TOTAL
RISERS
5 40 10 15 20 10 100
1 COMMERCIAL-1 100 100 50 80 66
2 COMMERCIAL-2 0
3 COMMERCIAL-3 0
4 BASEMENT-3 0
5 BASEMENT-2 0
6 BASEMENT-1 0
7 FROUND FLOOR 0
8 MEZZANINE 0
9 LOWER APARTMENT 0
10 UPPER APARTMENT 0
PODIUM TOTAL 10 10 5 0 8 0 6.6
11 LOWER TECHNICAL 0
12 LEVEL-1 0
13 LEVEL-2 0
14 LEVEL-3 0
15 LEVEL-4 0
16 LEVEL-5 0
17 LEVEL-6 0
18 LEVEL-7 0
19 LEVEL-8 0
20 LEVEL-9 0
21 LEVEL-10 0
22 LEVEL-11 0
23 LEVEL-12 0
24 LEVEL-13 0
25 LEVEL-14 0
26 LEVEL-15 0
27 LEVEL-16 0
28 LEVEL-17 0
29 LEVEL-18 0
30 LEVEL-19 0
31 UPPER TECHNICAL-1 0
32 UPPER TECHNICAL-2 0
33 ROOF FLOOR-1 0
34 ROOF FLOOR-2 0
35 UPPER ROOF 0
TOWER TOTAL 0 0 0 0 0 0 0
PODIUM FLOORS 40
FLOORS BREAK DOWN
TOWER FLOORS 60
GRAND TOTAL 4 4 0 0 3.2 0 2.44