Professional Documents
Culture Documents
Client:
Submitted by:
Introduction
Treatment methodology
Scope of supply
Battery limits
Exclusions
Scope of work
Commercial offer
Peacock Aqua Engineers
Plot no 33, Radh e nagar colony
H S.DargaHyderabad,500062
Tel: 040-65142770
Email: p eacock.eng@gmail.com
To
The Director
GVR food products
Khammam
Sir,
With reference to the enquiry regarding effluent treatment plant for your requirement We are
pleased to offer our lowest price bid with technical specifications.
Director
ETP DESIGN BASIS AND PERFORMANCE PROJECTION
The below data has been considered for design of the plant
Flow 50 m3 /Day
BOD 850 mg/L
COD 1200mg/L
pH 6.0 8.5
TSS 700 mg/L
O&G 40mg/l
The Effluent Treatment system upon reaching steady state, would produce the following results
when operated under optimum design conditions and subjected to regular testing programmes
and monitoring
After Treatment
Flow 50 m3 /Day
BOD < 10 0 mg/L
pH 6.5 8.5
TSS < 100 mg/L
O&G < 10 mg/L
COD < 250 mg/L
ETP PROCESS DESCRIPTIO N
The Effluent from the diary is passed through a grit chamber where all the sand is sedimented, it
is removed from time to time manually. The degritted effluent is then passed through a bar
screen to remove coarse solids and big particles to see that the mechanical equipment doesnt get
clogged. The Bar screen is cleaned from time to time manually. The effluent is then passed
through a grease trap where oil and grease are separated .The grease tr is cleaned from time to
time manually.
The effluent after grease trap is taken into a equaliz tank .The function of the equalization
tank is to equalize the effluent and pump uniform quantity of effluent into the treatment plant.
The equalization tank is provided with two pumps (one working +one standby) working on
level controller. The contents of the equalization tank are well mixed by air supplied through
coarse bubble diffusers. The equalized effluent is then passed primary clarifier in which solids
will be settled and the clarified effluent will be sent to Fluidized media reactor. In this process
bacterial growth medium is used to maintain the MLSS in the reactor and oxygen is supplied by
diffusers, the overflow from the FMR reactor is taken Activated sludge process tank. In this
process sufficient microorganisms are maintained in the reactor by the way of MLSS and oxygen
is supplied through fine bubble diffusers with the help of air blowers. The effluent from aeration
tank enters into a secondary clarifier in which solids will be settled. The settled sludge is
pumped into aeration tank to maintain the MLSS in the and part is wasted and taken into
the sludge drying beds. The clarified effluent is then taken into treated effluent storage tank and
EQUALISATION TANK
This is a RCC tank function of the tank is to homogenize the quality of effluent water, as well as
to feed effluent at a uniform rate to the rest of the treatment plant, an equalization tank is
proposed. In order to mix the contents.
This is a RCC tank with sloping bottom. The function of the primary clarifier is to settle the
suspended solids present in the Raw effluent to minimize the TSS level in the effluent. The
clarifier is provided with tube pac media to separate & settle sludge.
These are RCC tanks. The function of the tank is biological stabilisation of the wastewater is
accomplished in the aeration tank in the presence of microorganisms, for the respiration of
which, Oxygen is supplied by means of diffused aeration prising membrane diffusers and air
blowers.
These are mechanical equipment. The function of the blowers is to supply oxygen to the
diffusers. These diffusers are of fine pore type. The function of the diffusers is to convert the air
into small bubbles to increase the air transfer efficiency.
SECONDARY CLARIFIER
This is a RCC tank with sloping bottom. The mixed liquor (waste water with micro organism)
existing in the aeration tank has to be clarified in this clarifier, as well as to thicken the biomass
MLSS (Mixed Liquor Suspended Solids). The clarifier is provided with tube pac media to
separate & settle sludge.
SLUDGE PUMPS
These are mechanical equipments. The function of the pump is to lift the settled sludge in both
primary and secondary clarifiers and the same will be mped into aeration tanks and sledge
drying beds
This is a civil unit. The function of the drying beds to solidify the clarified sludge which will
be in slurry form. These beds should be cleaned manually time to time.
CHLORINATION SYSTEM
The function of the system is to disinfect the treated effluent by dosing suitable quantity of
Sodium hypo solution by a dosing pump.
SCOPE OF SUPPLY (ETP)
MOC : MS
Protection : Epoxy coated
Size : As per invert levels
Make : Fabricated as per IS standard
Specifications:
Specifications: 2 Sets
(1W + 1 S)
MOC : CI
Discharge : 3 klph
Head : 10 meters
Make : Kirloskar/eq
04 Air b lowers
Specifications:
2 sets
MOC : CI (1W + 1 S)
Discharge : 100 cum/hr
Head : 4 meters
Make of Blower : Everest/eq
Make of Motor: Kirloskar/eq
05 Diffusers
MOC : EPDM
Size : 63 X 600 long
Make of Blower : SSI/eq
06 M BBR M edia One lot
Specifications:
MOC:PP
Surface Area:400sqm/cum
Shape: Cylindrical
Capacity : 3 KLPH
Media type :tubular channels
MOC of media: PVC
Make: COOLDECK or Equivalent
Capacity : 3 KLPH
Media type :tubular channels
MOC of media: PVC
Make: COOLDECK or Equivalent
Specifications: 2 sets
1W + 1 S
MOC : MS
Discharge : 1.5 klph
Head : 5 meters
Type : Air lift
ELECTRICAL WORKS
01 Control panels
Wall mounting Sheet metal fabricated control panel with epoxy based powder coating
with neoprene gaskets and individual closing doors
Switch gear includes
Switch fuse units
Contactors
Overload relays
On Off push buttons
Digital type volt meters with selectors
Digital type ammeters
Digital type Energy meters
MCCB
RYB indicators
Water level controllers
Make of Switch gear : L&T/ ABB or eq
02 Cabling
03 Earthing
Supply and laying of suitable earthing from control panel, motors and pumps to earth
pit.
Type : G. I conductors
Pit rods : G. I pipes
Qty : 01 Lot
04 Cable trays
Type : GI perforated
Size : Suitable
Qty : 01 Lot
INSRUMENTATION
01 Pressure gauges
01 Piping
02 Valves
MOC : C.I
Type : Ball/ butter fly
Qty : 01 lot
EXCLUSIONS
Plant lighting
Operation of plant
All utilities
Plant commissioning X
Earthing pits X
Plant lighting X
Total 9,25,000
(In words: Nine lac twenty five thousand rupees only.)
P&F Nil
Duration: 12 weeks
Director