Professional Documents
Culture Documents
PETROFAC SAUDI AR
Contarct No. 6600036254 (IK) FADHILI GAS PLANT (PACK
DAILY INSPECTION
DATE : 04-
Scheduled
SL No RFI No. Description Location Inspection Time
Erection Inspection of pre-cast Design panel for SS-442 Grid line Substation 442
3 PSAL-QAN-SITEPC-0570 1/A-D & 18/A-D outside wall panel W37, W39, W41, W43, W45, 8:00 AM
Train 2
W85, W87, W89, W91, W93 & W95.
Erection Inspection of pre-cast Design panel for SS-444 Grid line Substation 444
4 PSAL-QAN-SITEPC-0571 1/A-D & 18/A-D outside wall panel W37, W39, W41, W43, W45, 8:20 AM
Train 4
W85, W87, W89, W91, W93 & W95.
Erection Inspection of pre-cast Design panel for SS-446 Grid line Substation 446
5 PSAL-QAN-SITEPC-0572 1/A-D & 18/A-D outside wall panel W37, W39, W41, W43, W45, 8:40 AM
Train 6
W85, W87, W89, W91, W93 & W95.
PAINT/CAOTING RFI's
D44-M-RB-
Q-012-01 Q-1064 H W W Ahmad. R D.Dano Arturo Cabile Alzharani 113224 Sht. 01
Rev. 0
D44-M-RB-
Q-012-01 Q-1064 H W W Ahmad. R D.Dano Isack Alzharani 113224 Sht. 01
Rev. 0
D44-M-RB-
F. Ali/ Ahmad.
Q-012-01 Q-1066 H W W D.Dano Arturo Cabile Alzharani 111682 Sht. 01,
R
02 Rev.01
D44-M-RB-
F. Ali/ Ahmad.
Q-012-01 Q-1066 H W W D.Dano Faisal H. Alzharani 111682 Sht. 01,
R 02 Rev.01
D44-M-RB-
F. Ali/ Ahmad.
Q-012-01 Q-1066 H W W D.Dano Irfan R. Alzharani 111682 Sht. 01,
R 02 Rev.01
D45-M-RB-
F. Ali/ Ahmad.
Q-010-01 Q-1049 H W W D.Dano Isack Alzharani 112580 Sht. 01
R Rev. 0
D44-M-RB-
F. Ali/ Ahmad.
Q-010-01 Q-1049 H W W D.Dano Isack Alzharani 111523 Sht. 01
R Rev. 01
D44-M-RB-
F. Ali/ Ahmad.
Q-010-01 Q-1049 H W W D.Dano Faisal H. Alzharani 111682 Sht. 01,
R 02 Rev.01
D44-M-RB-
H-100-03 H-2033 H W W F. Ali Nicolas Richard Mark Castillo 111523 Sht. 01
Rev. 01
Remarks
OK
OK & Excluded
W24, W25
OK
OK
OK
Reschedule
OK
OK
Pending
PETROFAC SAUDI AR
Contarct No. 6600036254 (IK) FADHILI GAS PLANT (PACK
DAILY INSPECTION
DATE : 05-
Scheduled
SL No RFI No. Description Location Inspection Time
D45-M-RB-
F. Ali/ Ahmad.
Q-010-01 Q-1048 H W H D.Dano Isack Alzharani 112580 Sht. 01
R Rev. 0
D45-M-RB-
F. Ali/ Ahmad.
Q-010-01 Q-1049 H W W D.Dano Isack Alzharani 112580 Sht. 01
R Rev. 0
D44-M-RB-
Q-012-01 Q-1064 H W W Ahmad. R D.Dano Isack Alzharani 113224 Sht. 01
Rev. 0
D45-M-RB-
Q-012-01 Q-1064 H W W Ahmad. R D.Dano Isack Alzharani 112580 Sht. 01
Rev. 0
D44-M-RB-
Ahmad. R/ F.
M-100-03 M-1072 I W W D.Dano Richard Alzharani 111523 Sht. 01
Ali Rev. 01
Remarks
OK
OK
OK & Excluded
W20, W21, W22
& W24
OK
Reschedule
PETROFAC SAUDI AR
Contarct No. 6600036254 (IK) FADHILI GAS PLANT (PACK
DAILY INSPECTION
DATE : 06-
Scheduled
SL No RFI No. Description Location Inspection Time
D44-M-RB-
Ahmad. R/ F.
M-100-03 M-1072 I W W D.Dano Richard Alzharani 111523 Sht. 01
Ali Rev. 01
D44-M-RB-
Ahmad. R/ F.
M-100-03 M-1072 I W W D.Dano Richard Alzharani 111523 Sht. 01
Ali Rev. 01
D44-M-RB-
Q-012-01 Q-1064 H W W Ahmad. R D.Dano Isack Alzharani 113224 Sht. 01
Rev. 0
D44-M-RB-
Q-012-01 Q-1064 H W W Ahmad. R D.Dano Isack Alzharani 113224 Sht. 01
Rev. 0
D44-M-RB-
Q-012-01 Q-1064 H W W Ahmad. R D.Dano Arturo Cabile Alzharani 113224 Sht. 01
Rev. 0
D45-M-RB-
F. Ali/ Ahmad.
Q-010-01 Q-1049 H W W D.Dano Isack Alzharani 112580 Sht. 01
R Rev. 0
D44-M-RB-
F. Ali/ Ahmad.
Q-010-01 Q-1049 H W W D.Dano Isack Alzharani 111523 Sht. 01
R
Rev. 01
Remarks
Reschedule
Reschedule
OK
OK
OK
OK
OK
PETROFAC SAUDI AR
Contarct No. 6600036254 (IK) FADHILI GAS PLANT (PACK
DAILY INSPECTION
DATE : 07-
Scheduled
SL No RFI No. Description Location Inspection Time
D44-M-RB-
Ahmad. R/ F.
M-100-03 M-1072 I W W D.Dano Richard Alzharani 111523 Sht. 01
Ali Rev. 01
D44-M-RB-
Ahmad. R/ F.
M-100-03 M-1072 I W W D.Dano Richard Alzharani 111523 Sht. 01
Ali Rev. 01
D45-M-RB-
Q-012-01 Q-1064 H W W Ahmad. R D.Dano Isack Alzharani 116355 Sht. 01
Rev. 02
D45-M-RB-
Q-012-01 Q-1064 H W W Ahmad. R D.Dano Isack Alzharani 116503 Sht. 01
Rev. 1
D44-M-RB-
Q-012-01 Q-1064 H W W Ahmad. R D.Dano Arturo Cabile Alzharani 113224 Sht. 01
Rev. 0
Remarks
OK
OK
OK
OK
OK
PETROFAC SAUDI AR
Contarct No. 6600036254 (IK) FADHILI GAS PLANT (PACK
DAILY INSPECTION
DATE : 08-
Scheduled
SL No RFI No. Description Location Inspection Time
D45-M-RB-
Q-012-01 Q-1064 H W W Ahmad. R D.Dano Isack Alzharani 116355 Sht. 01
Rev. 02
D45-M-RB-
Q-012-01 Q-1064 H W W Ahmad. R D.Dano Isack Alzharani 116503 Sht. 01
Rev. 1
D44-M-RB-
Q-012-01 Q-1065 H H H F. Ali D.Dano Irfan R. Alzharani 116341 Sht. 01
Rev. 02
D44-M-RB-
Q-010-01 Q-1048 H W H F. Ali D.Dano Richard Alzharani 111668 Sht. 01
Rev. 01
D44-M-RB-
N/A N/A W W W F. Ali D.Dano Richard Alzharani 111668 Sht. 01
Rev. 01
D45-M-RB-
F. Ali/ Ahmad.
Q-010-01 Q-1049 H W W D.Dano Isack Alzharani 112580 Sht. 01
R Rev. 0
D44-M-RB-
QDC-ITP-010 QDC-CL-C-012 H W W Ahmad. R D.Dano Arturo Cabile Alzharani 111682 Sht. 01,
02 Rev.01
D44-M-RB-
F. Ali/ Ahmad.
Q-010-01 Q-1049 H W W D.Dano Irfan R. Alzharani 112494 Sht. 01,
R 02 Rev.01
Remarks
OK
OK & Excluded
W04, W05 &
W07
Reschedule
OK
OK
OK
OK
OK
PETROFAC SAUDI AR
Contarct No. 6600036254 (IK) FADHILI GAS PLANT (PACK
DAILY INSPECTION
DATE : 09-
Scheduled
SL No RFI No. Description Location Inspection Time
Receiving and Storage Inspection for Structural Pre- Cast Double OME-250 Area-B
3 PSAL-QAN-SITEPC-0601 8:30 AM
T slab OME-250 R11, R17, R16, R25, R26 & R28 (06Nos.)
PAINT/CAOTING RFI's
surface preparation Inspection of Repair & Touch-up of 6
1 PSAL-QAN-SITEPC-0577 Corners & under the Roof Galvanized Plates (Embeded) In PIB- PIB 346 Train-6 8:00 AM
346 See highlights on the attached drawings)
D44-M-RB-
D.Dano / Vincent
Q-012-01 Q-1065 H H H F. Ali Irfan R. Alzharani 116341 Sht. 01
M Rev. 02
D45-M-RB-
Q-012-01 Q-1064 H W W Ahmad. R D.Dano Isack Alzharani 116355 Sht. 01
Rev. 02
D45-M-RB-
Q-012-01 Q-1064 H W W Ahmad. R D.Dano Isack Alzharani 116355 Sht. 01
Rev. 02
D44-M-RB-
Q-012-01 Q-1064 H W W Ahmad. R D.Dano Arturo Cabile Alzharani 113224 Sht.01
Rev.01
D45-M-RB-
Q-012-01 Q-1064 H W W Ahmad. R D.Dano Isack Alzharani 116503 Sht. 01
Rev. 1
D44-M-RB-
H-100-03 H-2033 H W W F. Ali Nicolas Richard Mark Castillo 111668 Sht. 01
Rev. 01
D44-M-RB-
H-100-03 H-2033 H W W F. Ali Nicolas Irfan R. Mark Castillo 112494 Sht. 01,
02 Rev.01
D45-M-RB-
H-100-04 H-2034 H W W F. Ali Anecito Isack Mark Castillo 112580 Sht.01
Rev.01
Remarks
OK
OK
OK
OK
OK & Ecluded
W05, W11 & W12
Ok
Pending
OK
PETROFAC SAUDI AR
Contarct No. 6600036254 (IK) FADHILI GAS PLANT (PACK
DAILY INSPECTION
DATE : 10-
Scheduled
SL No RFI No. Description Location Inspection Time
Crushing of Non-Shrink Grout testing & sample Area SS-446 Grid Substation 446
1 PSAL-QAN-SITE-PC-0607 line 7-18/D wall panels W13 to W35 for 28 days RFI ref. PSAL- 9:00 AM
Train 6
QAN-SITE-PC-0455 (Fugro Jubail)
D44-M-RB-
Q-010-01 Q-1049 H W W F. Ali D.Dano Isack Alzharani 112494 Sht. 01,
02 Rev.01
Remarks
PETROFAC SAUDI AR
Contarct No. 6600036254 (IK) FADHILI GAS PLANT (PACK
DAILY INSPECTION
DATE : 11-
Scheduled
SL No RFI No. Description Location Inspection Time
Receiving and Storage Inspection for Structural Pre- Cast Double OME-250 Area-B
1 PSAL-QAN-SITEPC-0608 8:50 AM
T slab OME-250 R07, R14, R20, R22, R23, R24 & R27 (07Nos.)
PAINT/CAOTING RFI's
Final Inspection of Repair & Touch-up of 6 Corners & under the
1 PSAL-QAN-SITEPC-0617 Roof Galvanized Plates (Embeded) In PIB-346 See highlights on PIB 346 Train-6 8:00 AM
the attached drawings)
D45-M-RB-
Q-012-01 Q-1064 H W W Ahmad. R D.Dano Isack Alzharani 116355 Sht. 01
Rev. 02
D45-M-RB-
Q-012-01 Q-1064 H W W Ahmad. R D.Dano Isack Alzharani 116355 Sht. 01
Rev. 02
D44-M-RB-
Q-012-01 Q-1064 H W W Ahmad. R D.Dano Arturo Cabile Alzharani 113224 Sht.01
Rev.01
D45-M-RB-
Q-012-01 Q-1064 H W W Ahmad. R D.Dano Isack Alzharani 116503 Sht. 01
Rev. 1
D44-M-RB-
F. Ali/ Ahmad.
Q-010-01 Q-1048 H W H D.Dano Richard Alzharani 111668 Sht. 01
R Rev. 01
D44-M-RB-
F. Ali/ Ahmad.
Q-010-01 Q-1049 H W W D.Dano Richard Alzharani 111668 Sht. 01
R Rev. 01
D44-M-RB-
F. Ali/ Ahmad.
N/A N/A W W W D.Dano Richard Alzharani 111537 Sht. 01
R Rev. 01
D44-M-RB-
F. Ali/ Ahmad.
Q-010-01 Q-1049 H W W D.Dano Isack Alzharani 112494 Sht. 01,
R 02 Rev.01
D44-M-RB-
H-100-03 H-2033 H W W F. Ali Nicolas Richard Mark Castillo 111668 Sht. 01
Rev. 01
D45-M-RB-
H-100-03 H-2033 H W W F. Ali Anecito Isack Mark Castillo 112580 Sht.01
Rev.01
Remarks
OK
OK
OK
OK & Excluded
W05, W11,
W12, W13 &
W14
OK
OK & Excluded
Grid line 3-5/D
OK
OK
OK
Pending
PETROFAC SAUDI AR
Contarct No. 6600036254 (IK) FADHILI GAS PLANT (PACK
DAILY INSPECTION
DATE : 12-
Scheduled
SL No RFI No. Description Location Inspection Time
PAINT/CAOTING RFI's
Final Inspection of Repair & Touch-up of Upside the Roof
1 PSAL-QAN-SITEPC-0618 Galvanized Plates (Embeded) In PIOB-350 See highlights on the PIOB 350 Area-B 8:00 AM
attached drawings)
D44-M-RB-
Q-012-01 Q-1064 H W W Ahmad. R D.Dano Arturo Cabile Alzharani 113224 Sht.01
Rev.01
D45-M-RB-
Q-012-01 Q-1064 H W W Ahmad. R D.Dano Isack Alzharani 116503 Sht. 01
Rev. 1
D44-M-RB-
F. Ali/ Ahmad.
Q-010-01 Q-1048 H W H D.Dano Richard Alzharani 111668 Sht. 01
R Rev. 01
D44-M-RB-
F. Ali/ Ahmad.
Q-010-01 Q-1049 H W W D.Dano Richard Alzharani 111668 Sht. 01
R Rev. 01
D45-M-RB-
F. Ali/ Ahmad.
M-100-03 M-1072 I W W D.Dano Isack Alzharani 112580 Sht. 01
R Rev. 01
D45-M-RB-
H-100-03 H-2033 H W W F. Ali Anecito Isack Mark Castillo 112580 Sht.01
Rev.01
D44-M-RB-
H-100-03 H-2033 H W W F. Ali Nicolas Richard Mark Castillo 111668 Sht. 01
Rev. 01
D45-M-RB-
H-100-03 H-2033 H W W F. Ali Anecito Isack Mark Castillo 112580 Sht.01
Rev.01
Remarks
OK
Reschedule
OK
OK
Delete
Open
OK
OK
PETROFAC SAUDI AR
Contarct No. 6600036254 (IK) FADHILI GAS PLANT (PACK
DAILY INSPECTION
DATE : 13-
Scheduled
SL No RFI No. Description Location Inspection Time
Plastering for verticle connections all corners & upside the Roof PIOB 350 Area-B
12 PSAL-QAN-SITEPC-0636 8:40 AM
at PIOB 350 Full building
PAINT/CAOTING RFI's
D45-M-RB-
Q-012-01 Q-1064 H W W Ahmad. R D.Dano Isack Alzharani 116503 Sht. 01
Rev. 1
D45-M-RB-
F. Ali/ Ahmad.
M-100-03 M-1072 I W W D.Dano Isack Alzharani 112580 Sht. 01
R Rev. 01
D44-M-RB-
Q-012-01 Q-1064 H W W Ahmad. R D.Dano Arturo Cabile Alzharani 113224 Sht.01
Rev.01
D45-M-RB-
Q-012-01 Q-1064 H W W F. Ali Carlus Isack Alzharani 116355 Sht. 01
Rev. 2
D45-M-RB-
Q-010-01 Q-1047 I I W F. Ali Carlus Isack Alzharani 116355 Sht. 01
Rev. 2
D44-M-RB-
Ahmad. R/ F.
M-100-03 M-1072 I W W D.Dano Richard Alzharani 111537 Sht. 01
Ali Rev. 01
D44-M-RB-
N/A N/A W W W F. Ali D.Dano Richard Alzharani 111537 Sht. 01
Rev. 01
D44-M-RB-
Q-010-01 Q-1048 H W H F. Ali D.Dano Richard Alzharani 111668 Sht. 01
Rev. 01
D44-M-RB-
N/A N/A W W W F. Ali D.Dano Richard Alzharani 111668 Sht. 01
Rev. 01
D45-M-RB-
Q-010-01 Q-1048 H W H F. Ali D.Dano Isack Alzharani 112580 Sht.01
Rev.01
D45-M-RB-
N/A N/A W W W F. Ali D.Dano Isack Alzharani 112580 Sht.01
Rev.01
D45-M-RB-
F. Ali/ Ahmad.
Q-010-01 Q-1049 H W W D.Dano Isack Alzharani 112580 Sht. 01
R Rev. 01
Remarks
OK & Excluded
W05, W11, W12
& W14
Pending
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
PETROFAC SAUDI AR
Contarct No. 6600036254 (IK) FADHILI GAS PLANT (PACK
DAILY INSPECTION
DATE : 14-
Scheduled
SL No RFI No. Description Location Inspection Time
PAINT/CAOTING RFI's
surface preparation Inspection of Repair & Touch-up of under Substation 446
1 PSAL-QAN-SITEPC-0605 the Roof Galvanized Plates (Embeded) In SS-446 See highlights 8:00 AM
Train 6
on the attached drawings)
D44-M-RB-
Q-012-01 Q-1064 H W W Ahmad. R D.Dano Arturo Cabile Alzharani 113224 Sht.01
Rev.01
D45-M-RB-
Q-012-01 Q-1064 H W W Ahmad. R D.Dano Isack Alzharani 116503 Sht. 01
Rev. 1
D45-M-RB-
Q-012-01 Q-1064 H W W Ahmad. R D.Dano Arturo Cabile Alzharani 116355 Sht. 01
Rev. 2
D45-M-RB-
Q-010-01 Q-1047 I I W Ahmad. R D.Dano Richard Alzharani 116355 Sht. 01
Rev. 2
D44-M-RB-
H-100-03 H-2033 H W W F. Ali Nicolas Irfan R. Mark Castillo 112494 Sht. 01,
02 Rev.01
Remarks
OK & Excluded
W29
Reschedule
OK
OK
Pending
PETROFAC SAUDI AR
Contarct No. 6600036254 (IK) FADHILI GAS PLANT (PACK
DAILY INSPECTION
DATE : 15-
Scheduled
SL No RFI No. Description Location Inspection Time
PAINT/CAOTING RFI's
surface preparation Inspection of Repair & Touch-up of under Substation 446
1 PSAL-QAN-SITEPC-0605 the Roof Galvanized Plates (Embeded) In SS-446 See highlights 8:00 AM
Train 6
on the attached drawings)
D45-M-RB-
F. Ali/ Ahmad.
M-100-03 M-1072 I W W D.Dano Isack Alzharani 112580 Sht. 01
R Rev. 01
D45-M-RB-
Q-012-01 Q-1064 H W W Ahmad. R D.Dano Isack Alzharani 116503 Sht. 01
Rev. 1
D44-M-RB-
Q-012-01 Q-1064 H W W Ahmad. R D.Dano Rasual Alzharani 116341 Sht.01
Rev.02
D44-M-RB-
Q-012-01 Q-1064 H W W Ahmad. R D.Dano Richard Alzharani 111537 Sht. 01
Rev. 1
D44-M-RB-
F. Ali/ Ahmad.
M-100-03 M-1072 I W W D.Dano Richard Alzharani 111537 Sht. 01
R Rev. 1
D44-M-RB-
H-100-03 H-2033 H W W F. Ali Nicolas Irfan R. Mark Castillo 112494 Sht. 01,
02 Rev.01
Remarks
OK
Pending
Reschedule
Reschedule
Reschedule
Ok
PETROFAC SAUDI AR
Contarct No. 6600036254 (IK) FADHILI GAS PLANT (PACK
DAILY INSPECTION
DATE : 16-
Scheduled
SL No RFI No. Description Location Inspection Time
PAINT/CAOTING RFI's
Saudi Aramco: Company General Use
Final Inspection of Repair & Touch-up of upside the Roof
1 PSAL-QAN-SITEPC-0649 Galvanized Plates (Embeded) In PIB-346 See highlights on the PIB 346 Train-6 9:00 AM
attached drawings)
D44-M-RB-
Q-012-01 Q-1064 H W W Ahmad. R D.Dano Rasual Alzharani 116341 Sht.01
Rev.02
D44-M-RB-
Q-012-01 Q-1064 H W W Ahmad. R D.Dano Richard Alzharani 111537 Sht. 01
Rev. 1
D44-M-RB-
F. Ali/ Ahmad.
M-100-03 M-1072 I W W D.Dano Richard Alzharani 111537 Sht. 01
R Rev. 1
D45-M-RB-
F. Ali/ Ahmad.
Q-010-01 Q-1049 H W W D.Dano Isack Alzharani 112580 Sht. 01
R Rev. 01
D45-M-RB-
M-100-03 M-1072 I W W F. Ali D.Dano Isack Alzharani 116355 Sht. 01
Rev. 2
D44-M-RB-
H-100-03 H-2033 H W W F. Ali Nicolas Richard Mark Castillo 111668 Sht. 01
Rev. 01
Remarks
OK
OK
OK
OK
OK
OK
PETROFAC SAUDI AR
Contarct No. 6600036254 (IK) FADHILI GAS PLANT (PACK
DAILY INSPECTION
DATE : 17-
Scheduled
SL No RFI No. Description Location Inspection Time
D45-M-RB-
Q-010-01 Q-1049 H W W F. Ali D.Dano Isack Alzharani 112580 Sht. 01
Rev. 01
Remarks
PETROFAC SAUDI AR
Contarct No. 6600036254 (IK) FADHILI GAS PLANT (PACK
DAILY INSPECTION
DATE : 18-
Scheduled
SL No RFI No. Description Location Inspection Time
Plastering for verticle connections 4 corners at SS-446 Big room Substation 446
8 PSAL-QAN-SITEPC-0659 7:30 AM
wall panels W13/W97, W35/W36, W48/W49 & W71/103 Train 6
PAINT/CAOTING RFI's
Final Inspection of Repair & Touch-up of under the Roof & 4 Substation 446
1 PSAL-QAN-SITEPC-0662 corners Galvanized Plates (Embeded) In SS-446 Big room See 8:00 AM
Train 6
highlights on the attached drawings)
D44-M-RB-
Q-012-01 Q-1064 H W W Ahmad. R D.Dano Rasual Alzharani 116341 Sht.01
Rev.02
D44-M-RB-
Q-012-01 Q-1064 H W W Ahmad. R D.Dano Rasual Alzharani 116341 Sht.01
Rev.02
D44-M-RB-
F. Ali/ Ahmad.
Q-010-01 Q-1048 H W H D.Dano Richard Alzharani 111668 Sht. 01
R Rev. 01
D44-M-RB-
F. Ali/ Ahmad.
Q-010-01 Q-1049 H W W D.Dano Richard Alzharani 111668 Sht. 01
R Rev. 01
D44-M-RB-
F. Ali/ Ahmad.
Q-010-01 Q-1049 H W W D.Dano Richard Alzharani 111537 Sht. 01
R Rev. 01
D44-M-RB-
F. Ali/ Ahmad.
Q-010-01 Q-1048 H W H D.Dano Rasual Alzharani 112494 Sht. 01,
R 02 Rev.01
D44-M-RB-
F. Ali/ Ahmad.
N/A N/A W W W D.Dano Rasual Alzharani 112494 Sht. 01,
R 02 Rev.01
D44-M-RB-
F. Ali/ Ahmad.
Q-010-01 Q-1049 H W W Stalin Isack Alzharani 111668 Sht. 01
R Rev. 01
D45-M-RB-
F. Ali/ Ahmad.
Q-010-01 Q-1049 H W W Stalin Isack Alzharani 112580 Sht. 01
R Rev. 01
D44-M-RB-
H-100-03 H-2033 H W W F. Ali Nicolas Irfan R. Mark Castillo 112494 Sht. 01,
02 Rev.01
D45-M-RB-
H-100-03 H-2033 H W W F. Ali Anecito Isack Mark Castillo 112580 Sht.01
Rev.01
D45-M-RB-
H-100-03 H-2033 H W W F. Ali Anecito Isack Mark Castillo 112580 Sht.01
Rev.01
Remarks
OK
Reschedule
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
PETROFAC SAUDI AR
Contarct No. 6600036254 (IK) FADHILI GAS PLANT (PACK
DAILY INSPECTION
DATE : 19-
Scheduled
SL No RFI No. Description Location Inspection Time
4 PSAL-QAN-SITEPC-0668 Sampling & testing of Mixing water for Grout Monthly. PIOB-350 8:30 AM
PAINT/CAOTING RFI's
D44-M-RB-
Q-012-01 Q-1064 H W W Ahmad. R D.Dano Rasual Alzharani 116341 Sht.01
Rev.02
D44-M-RB-
F. Ali/ Ahmad.
Q-010-01 Q-1048 H W H D.Dano Richard Alzharani 111537 Sht. 01
R
Rev. 01
D44-M-RB-
F. Ali/ Ahmad.
Q-010-01 Q-1049 H W W D.Dano Richard Alzharani 111537 Sht. 01
R Rev. 01
D44-M-RB-
Q-010-01 Q-1045 H RH/H RH/H F. Ali D.Dano Richard Alzharani 111537 Sht. 01
Rev. 01
D44-M-RB-
F. Ali/ Ahmad.
Q-010-01 Q-1049 H W W Stalin Isack Alzharani 111668 Sht. 01
R Rev. 01
D44-M-RB-
H-100-03 H-2033 H W W F. Ali Nicolas Richard Mark Castillo 111668 Sht. 01
Rev. 01
D44-M-RB-
H-100-03 H-2033 H W W F. Ali Anecito Richard Mark Castillo 111537 Sht. 01
Rev. 01
Remarks
OK & Excluded
R27 & R28
OK
OK
Reschedule
OK
OK
OK
PETROFAC SAUDI AR
Contarct No. 6600036254 (IK) FADHILI GAS PLANT (PACK
DAILY INSPECTION
DATE : 20-
Scheduled
SL No RFI No. Description Location Inspection Time
4 PSAL-QAN-SITEPC-0668 Sampling & testing of Mixing water for Grout Monthly. PIOB-350 8:30 AM
D44-M-RB-
Q-012-01 Q-1064 H W W Ahmad. R D.Dano Rasual Alzharani 116341 Sht.01
Rev.02
D44-M-RB-
F. Ali/ Ahmad.
Q-010-01 Q-1048 H W H D.Dano Isack Alzharani 116355 Sht. 01
R Rev. 02
D44-M-RB-
F. Ali/ Ahmad.
Q-010-01 Q-1049 H W W D.Dano Isack Alzharani 116355 Sht. 01
R Rev. 02
D44-M-RB-
F. Ali/ Ahmad.
Q-012-01 Q-1064 H W W Carlos Arturo Cabile Alzharani 113224 Sht.01
R Rev.01
Remarks
OK
OK
OK
Actual Done
Grid line 1/A-C
& 1-5/C W17 to
W41
Actual Done
Grid line 1/A-C
& 1-5/C W17 to
W41
OK
PETROFAC SAUDI AR
Contarct No. 6600036254 (IK) FADHILI GAS PLANT (PACK
DAILY INSPECTION
DATE : 21-
Scheduled
SL No RFI No. Description Location Inspection Time
PAINT/CAOTING RFI's
D44-M-RB-
Q-012-01 Q-1064 H W W Ahmad. R D.Dano Rasual Alzharani 116341 Sht.01
Rev.02
D44-M-RB-
F. Ali/ Ahmad.
Q-010-01 Q-1048 H W H D.Dano Isack Alzharani 116355 Sht. 01
R Rev. 02
D44-M-RB-
F. Ali/ Ahmad.
Q-010-01 Q-1049 H W W D.Dano Isack Alzharani 116355 Sht. 01
R Rev. 02
D44-M-RB-
Ahmad. R/ F.
M-100-03 M-1072 I W W D.Dano Isack Alzharani 116355 Sht. 01
Ali Rev. 02
D44-M-RB-
H-100-03 H-2032 H W W F. Ali Nicolas Richard Mark Castillo 111537 Sht. 01
Rev. 01
D44-M-RB-
H-100-03 H-2032 H W W F. Ali Nicolas Faisal H. Mark Castillo 112480 Sht. 01,
02 Rev.01
Remarks
OK
OK
OK
Ok
OK
OK
PETROFAC SAUDI AR
Contarct No. 6600036254 (IK) FADHILI GAS PLANT (PACK
DAILY INSPECTION
DATE : 22-
Scheduled
SL No RFI No. Description Location Inspection Time
D44-M-RB-
Q-012-01 Q-1064 H W W Ahmad. R D.Dano Rasual Alzharani 116341 Sht.01
Rev.02
D44-M-RB-
F. Ali/ Ahmad.
Q-010-01 Q-1048 H W H D.Dano Richard Alzharani 111537 Sht. 01
R Rev. 01
D44-M-RB-
F. Ali/ Ahmad.
Q-010-01 Q-1049 H W W D.Dano Richard Alzharani 111537 Sht. 01
R Rev. 01
D44-M-RB-
Q-012-01 Q-1066 H W W F. Ali D.Dano Arturo Cabile Alzharani 111523 Sht. 01
Rev. 01
D44-M-RB-
Q-012-01 Q-1066 H W W F. Ali D.Dano Richard Alzharani 111537 Sht. 01
Rev. 01
D44-M-RB-
Q-012-01 Q-1066 H W W F. Ali D.Dano Richard Alzharani 111668 Sht. 01
Rev. 01
Remarks
OK
OK
OK
OK
OK
OK
PETROFAC SAUDI AR
Contarct No. 6600036254 (IK) FADHILI GAS PLANT (PACK
DAILY INSPECTION
DATE : 23-
Scheduled
SL No RFI No. Description Location Inspection Time
PAINT/CAOTING RFI's
Final Inspection of Repair & Touch-up of under the Roof Substation 444
1 PSAL-QAN-SITEPC-0699 Galvanized Plates (Embeded) In SS-444 Full Room See highlights 2:00 PM
Train 4
on the attached drawings)
Final Inspection of Repair & Touch-up of under the Roof & 4 Substation 446
2 PSAL-QAN-SITEPC-0700 corners Galvanized Plates (Embeded) In SS-446 Small Room See 8:00 AM
Train 6
highlights on the attached drawings)
D44-M-RB-
Q-012-01 Q-1064 H W W Ahmad. R D.Dano Rasual Alzharani 116341 Sht.01
Rev.02
D44-M-RB-
Q-010-01 Q-1048 H W H F. Ali D.Dano Rasual Alzharani 112494 Sht. 01,
02 Rev.01
D44-M-RB-
N/A N/A W W W F. Ali D.Dano Rasual Alzharani 112494 Sht. 01,
02 Rev.01
D44-M-RB-
Q-010-01 Q-1048 H W H F. Ali D.Dano Isack Alzharani 116355 Sht. 01
Rev. 02
D44-M-RB-
N/A N/A W W W F. Ali D.Dano Isack Alzharani 116355 Sht. 01
Rev. 02
D44-M-RB-
F. Ali/ Ahmad.
Q-010-01 Q-1049 H W W Stalin Isack Alzharani 111523 Sht. 01
R Rev. 01
D44-M-RB-
H-100-03 H-2032 H W W F. Ali Nicolas Faisal H. Mark Castillo 112480 Sht. 01,
02 Rev.01
D44-M-RB-
H-100-03 H-2032 H W W F. Ali Nicolas Irfan R. Mark Castillo 112494 Sht. 01,
02 Rev.01
Remarks
OK & Excluded
W27 & W37
OK
OK
OK
OK
Advance
Inspection Done
OK
OK
PETROFAC SAUDI AR
Contarct No. 6600036254 (IK) FADHILI GAS PLANT (PACK
DAILY INSPECTION
DATE : 25-
Scheduled
SL No RFI No. Description Location Inspection Time
Receiving and Storage Inspection for Structural Pre- Cast Double OME 245 Train 5
2 PSAL-QAN-SITEPC-0702 8:30 AM
T slab OME-250 R27 & R28 (02 Nos.)
D44-M-RB-
Q-012-01 Q-1064 H W W Ahmad. R D.Dano Rasual Alzharani 116341 Sht.01
Rev.02
D44-M-RB-
Q-012-01 Q-1064 H W W Ahmad. R D.Dano Rasual Alzharani 116341 Sht.01
Rev.02
D44-M-RB-
F. Ali/ Ahmad.
Q-010-01 Q-1048 H W H D.Dano Faisal H. Alzharani 112480 Sht. 01,
R 02 Rev.01
D44-M-RB-
F. Ali/ Ahmad.
Q-010-01 Q-1049 H W W D.Dano Faisal H. Alzharani 112480 Sht. 01,
R
02 Rev.01
D45-M-RB-
F. Ali/ Ahmad.
Q-010-01 Q-1049 H W W Stalin Isack Alzharani 112580 Sht. 01
R Rev. 01
Remarks
OK
OK
OK
OK
OK
PETROFAC SAUDI AR
Contarct No. 6600036254 (IK) FADHILI GAS PLANT (PACK
DAILY INSPECTION
DATE : 26-
Scheduled
SL No RFI No. Description Location Inspection Time
Erection Inspection of pre-cast Double T slab for PIB-344 Double PIB 344 Train-4
5 PSAL-QAN-SITEPC-0710 8:00 AM
T slab No. R01 to R30
PAINT/CAOTING RFI's
D45-M-RB-
Q-012-01 Q-1064 H W W Ahmad. R D.Dano Isack Alzharani 116503 Sht. 01
Rev. 1
D44-M-RB-
Q-012-01 Q-1064 H W W Ahmad. R D.Dano Rasual Alzharani 116341 Sht.01
Rev.02
D44-M-RB-
Q-010-01 Q-1047 I I W F. Ali Carlus Arturo Cabile Alzharani 116341 Sht.01
Rev.02
D44-M-RB-
Q-012-01 Q-1064 H W W F. Ali Carlus Rasual Alzharani 116341 Sht.01
Rev.02
D44-M-RB-
Q-012-01 Q-1066 H W W F. Ali D.Dano Richard Alzharani 111537 Sht. 01,
Rev.01
D44-M-RB-
H-100-01 H-2024 H W W F. Ali Nicolas Richard Mark Castillo 111537 Sht. 01,
Rev.01
D44-M-RB-
H-100-01 H-2025 H W W F. Ali Nicolas Richard Mark Castillo 111537 Sht. 01,
Rev.01
Remarks
Re-Issue Reply
OK
OK
OK
Reply Hold
Reschedule
OK
OK
PETROFAC SAUDI AR
Contarct No. 6600036254 (IK) FADHILI GAS PLANT (PACK
DAILY INSPECTION
DATE : 27-
Scheduled
SL No RFI No. Description Location Inspection Time
Erection Inspection of pre-cast Double T slab for PIB-344 Double PIB 344 Train-4
2 PSAL-QAN-SITEPC-0710 8:00 AM
T slab No. R01 to R30
D44-M-RB-
Q-012-01 Q-1064 H W W F. Ali Carlus Rasual Alzharani 116341 Sht.01
Rev.02
D44-M-RB-
Q-012-01 Q-1066 H W W F. Ali D.Dano Richard Alzharani 111537 Sht. 01,
Rev.01
D44-M-RB-
Q-012-01 Q-1064 H W W Ahmad. R D.Dano Rasual Alzharani 116341 Sht.01
Rev.02
D44-M-RB-
Q-012-01 Q-1064 H W W Ahmad. R D.Dano Arturo Cabile Alzharani 113224 Sht.01
Rev.01
D44-M-RB-
Q-012-01 Q-1064 H W W F. Ali Carlus Rasual Alzharani 116341 Sht.01
Rev.02
D44-M-RB-
F. Ali/ Ahmad.
Q-010-01 Q-1049 H W W Stalin Isack Alzharani 116355 Sht. 01
R Rev. 02
Remarks
OK
OK
Tomorrow
OK
Tomorrow
OK
PETROFAC SAUDI AR
Contarct No. 6600036254 (IK) FADHILI GAS PLANT (PACK
DAILY INSPECTION
DATE : 28-
Scheduled
SL No RFI No. Description Location Inspection Time
D44-M-RB-
Q-012-01 Q-1064 H W W Ahmad. R D.Dano Rasual Alzharani 116341 Sht.01
Rev.02
D44-M-RB-
Q-012-01 Q-1064 H W W F. Ali Carlus Rasual Alzharani 116341 Sht.01
Rev.02
D44-M-RB-
F. Ali/ Ahmad.
Q-010-01 Q-1049 H W W Stalin Isack Alzharani 111537 Sht. 01
R Rev. 01
Remarks
OK
OK
Reschedule
PETROFAC SAUDI AR
Contarct No. 6600036254 (IK) FADHILI GAS PLANT (PACK
DAILY INSPECTION
DATE : 29-
Scheduled
SL No RFI No. Description Location Inspection Time
PAINT/CAOTING RFI's
surface preparation Inspection of Repair & Touch-up of under
1 PSAL-QAN-SITEPC-0724 the Roof Galvanized Plates (Embeded) In PIB-344 Full building PIB 344 Train-4 8:30 AM
See highlights on the attached drawings)
D44-M-RB-
Q-012-01 Q-1064 H W W Ahmad. R D.Dano Arturo Cabile Alzharani 113224 Sht.01
Rev.01
D44-M-RB-
Q-012-01 Q-1064 H W W Ahmad. R D.Dano Rasual Alzharani 116341 Sht.01
Rev.02
D45-M-RB-
Q-012-01 Q-1064 H W W F. Ali Carlus Rasual Alzharani 116503 Sht. 01
Rev. 1
D44-M-RB-
F. Ali/ Ahmad.
Q-010-01 Q-1049 H W W Stalin Isack Alzharani 116355 Sht. 01
R Rev. 02
D44-M-RB-
H-100-03 H-2032 H W W F. Ali Nicolas Faisal H. Mark Castillo 111537 Sht. 01
Rev. 01
Remarks
OK
OK
OK
OK
Hold
PETROFAC SAUDI AR
Contarct No. 6600036254 (IK) FADHILI GAS PLANT (PACK
DAILY INSPECTION
DATE : 30-
Scheduled
SL No RFI No. Description Location Inspection Time
Pre-Installation Inspection for Structural and Architectural Pre- EDGB 550 Area A
3 PSAL-QAN-SITEPC-0727 8:00 AM
cast Wall panel prior to Erection at EDGB 550 Full Building.
D44-M-RB-
Q-010-01 Q-1047 I I W F. Ali Carlus Isack Alzharani 116355 Sht. 01
Rev. 02
D45-M-RB-
Q-012-01 Q-1064 H W W Ahmad. R D.Dano Isack Alzharani 113208 Sht. 01
Rev. 02
D45-M-RB-
Q-012-01 Q-1065 H H H F. Ali D.Dano Isack Alzharani 113208 Sht. 01
Rev. 02
D44-M-RB-
Q-012-01 Q-1064 H W W Ahmad. R D.Dano Arturo Cabile Alzharani 113224 Sht.01
Rev.01
Remarks
OK
OK & Excluded
wall panel W01,
W02, W05, W06
OK
OK
PETROFAC SAUDI AR
Contarct No. 6600036254 (IK) FADHILI GAS PLANT (PACK
DAILY INSPECTION
DATE : 02-
Scheduled
SL No RFI No. Description Location Inspection Time
D45-M-RB-
Q-012-01 Q-1064 H W W Ahmad. R D.Dano Isack Alzharani 113208 Sht. 01
Rev. 02
D44-M-RB-
Q-012-01 Q-1066 H W W F. Ali D.Dano Arturo Cabile Alzharani 113224 Sht.01
Rev.01
D44-M-RB-
M-100-03 M-1072 I W W F. Ali D.Dano Arturo Cabile Alzharani 113224 Sht.01
Rev.01
D44-M-RB-
F. Ali/ Ahmad.
Q-010-01 Q-1049 H W W Stalin Isack Alzharani 112480 Sht. 01,
R 02 Rev.01
Remarks
OK & Excluded
W05, W06 &
W07
OK
Reschedule
OK
Scheduled
SL No RFI No. Description Location Inspection Time
D44-M-RB-
M-100-03 M-1072 I W W F. Ali D.Dano Arturo Cabile Alzharani 113224 Sht.01
Rev.01
D45-M-RB-
Q-012-01 Q-1064 H W W Ahmad. R D.Dano Isack Alzharani 113208 Sht. 01
Rev. 02
D44-M-RB-
F. Ali/ Ahmad.
Q-010-01 Q-1048 H W H D.Dano Rasual Alzharani 112494 Sht. 01,
R 02 Rev.01
D44-M-RB-
F. Ali/ Ahmad.
Q-010-01 Q-1049 H W W D.Dano Rasual Alzharani 112494 Sht. 01,
R 02 Rev.01
D45-M-RB-
F. Ali/ Ahmad.
Q-010-01 Q-1049 H W W Stalin Isack Alzharani 112580 Sht. 01
R Rev. 0
Remarks
Reschedule