Professional Documents
Culture Documents
10.000
Prim ary beam s
10.000
30.000
Basic dimensions
Beam span; L = 30.000 ft
Beam spacing on one side; b1 = 10.000 ft
Beam spacing on other side; b2 = 10.000 ft
Deck orientation; Deck ribs perpendicular to beam
Profiles are assumed to meet all dimensional criteria in AISC 360-10
Overall depth of slab; t = 5.000 in
Height of ribs; hr = 1.500 in
Centers of ribs; ribccs = 6.000 in
Average width of rib; wr = 2.500 in
Material properties
Concrete
Specified compressive strength of concrete; fc = 3.00 ksi
Wet density of concrete; wcw = 150 lb/ft3
Dry density of concrete; wcd = 130 lb/ft3
Modulus of elasticity of concrete; Ec = wcd1.5 (fc 1 ksi) /(1 lb/ft3)1.5 = 2567 ksi
Steel
Specified minimum yield stress of steel; Fy = 50 ksi
Modulus of elasticity of steel; ES = 29000 ksi
Project Job Ref.
Combined deflections
Net total construction stage deflection; short = short_D + 2 - camber = 0.674 in
Net total long term deflection; long = short_D + L_s + L_l + 4 + 5 - camber = 1.204 in
Combined short and long term live load deflectn; live = L_s + L_l = 1.035 in
Net long term dead and super imposed dead defln; dead = short_D +4 + 5 - camber = 0.169 in
Post composite deflection; comp = L_s + L_l + 4 + 5 = 1.161 in
Allowable max deflection; Allow = 1.500 in
PASS - Deflection less than allowable
15.000 15.000
29 ribs with 1 stud per rib Studs as other half of beam