You are on page 1of 2

Ref. Drawing NO.

= K2P1-01-M-28 / 29
Phase-2
1 2 3 4 5 6 7 8 9 104000
10 11 12 13 14 15 16 17
5000 5000 6500 6500 6500 6500 6500 6500 6500 6500 3000 6500 6500 6500 6500 6500 6500
To Halishahar Reservoir (Phase-2)
To Battali Hill Reservoir ( Phase-1 )
A Dia 1100 STP
Dia 1000 STP UP Dia.1000 STP
5500

8200 6500 6500 6500 6500 5900 5900 5900 5900 4200 5900 5900 5900 5900 4200

6400
B
15000

UP D1TP04 D1TP03 D1TP02 D3TP01 D2TP05 D2TP04 D2TP03 D2TP02 D2TP01 D1TP04 D1TP03 D1TP02 D1TP01
Civil Mechanical
9500

Rain Water Pit

3900
Dia.1400 STP

2600
B Dia.20
C Dia.20 Dia.20 Dia.20
D5HVO4 UP UP
Dia.1400 STP Dia.1400 STP Dia.1200 to 1400 4 - Nashirabad ET Hand Rail
5000

2 - Drain Pump Platform/Steps/Ladder Dia.50 GSP Dia.1200 STP Dia.1000 STP


Hand Rail (Phase-2) (PHASE-2) Phase-2 Utility Water 4200 6000 4200 Transmission Pump (Phase-2)
Halishahar (Phase-2) Hand Rail Platform/Steps/Ladder 5 - Battali Hill Platform/Steps/Ladder
Dia.1400 STP

Dia.1400 STP
Transmission Pump (Phase-2) (PHASE-2) Transmission Pump (PHASE-2)
55000
40000

MV Hand Rail (Phase-2)


CIVIL Mechanical
D5HV03 D1200 D1200
From Phase - 1 KARNAPHULI WTP

D1200
D5HV05 Mechanical
CIVIL FL+35.3
From Phase - 2 KARNAPHULI WTP
Bottom - FLOOR PLAN
SCALE 1:200
11 12 13 12 13 12 13 12 14 15
EL-1200
TEE-1100X600 TEE-1100X600 TEE-1100X600 TEE-1100X600
7 7
8 8
8 8
10 10
600X500

600X500

600X500

600X500

600X500
RE-

RE-

RE-

RE-

RE-
RE-700X600

RE- RE- RE- RE-


700X300 700X300 700X300 700X300
16 17
9 9
6 6
EL-600 EL-600 EL-600 EL-600 EL-600
RE-1400X1200
TEE-1400X600 TEE-1400X600 TEE-1400X600 TEE-1400X600
BOTTOM PLAN (PIPE DETAIL)
SCALE 1:100
EL-600 EL-600 EL-600 EL-600
TEE-1400X600 TEE-1400X600 TEE-1400X600 TEE-1400X600
P-1400-01 P-1400-02 P-1400-02 P-1400-02 P-1400-03 RE-1400X1200
1 4 2 4 2 4 2 4 3 5
SECTION B - B
SCALE 1:100
PROJECT: TITLE: SCALE
KARNAPHULI WATER SUPPLY PROJECT - PHASE 2 (KWSP2) NASIRABAD PUMPING STATION OVERVIEW PLAN & SECTION 1:200
CLIENT: CONSULTANTS: CONTRACTORS: REV. DESCRIPTION DATE SIGN. DESIGNED: DRAWN: CHECKED (CONSULTANT) Ref DWG No.: K2P1-01-M-28 / 29
CHITTAGONG WATER SUPPLY
NJS CONSULTANTS CO., LTD. DWG No.:
& SEWERAGE AUTHORITY In association with
(CWASA)
BETS, AQUA, ACE, SMEC KOLON - KUBOTA JV DATE:
SEE DETAIL

4000
+23.35 +23.90
DISTANCE
END OF PACKAGE 3500 0.00

9920
+23.30
W1(Kolon) & W2(Kobuta) Tie Point

45590

BOUNDARY
FLOW METER BOX
10400
+24.0 +24.0

COP+23.690
DIP 900,
DISTANCE

DIP900
29760 0.00

7000
5000
Boundary BOUNDARY
+28.24 +27.5

+30.0

+27.5
4000
5070

DIP1200, COP+28.300 DIP1200, COP+25.900


CIVIL WORK
1:2 MECHANICAL WORK
Pump Room ( Phase-1 )
CIVIL MECHANICAL
WORK WORK
Guard House
D5HVO3

103490
D5HVO4
1000
+30.0 Sub-Station
OUTLET PIPE DIP 1400
1:1.5 +30.0
2000
2000
Electrical

INLET PIPE ( EXISTING )


Room

Electrical House
Reservoir ( Phase-2 ) Reservoir (Phase-1)

DIP 1000
V = 24,800m V = 26,300m

Boundary
Generatar
Room
2000
Oil Tank Oil Tank

1200
DIP1200 ( EXISTING) 5720 +27.5

31
FL+35.3

10
DIP800 ( EXISTING) FLOW METER CHAMBER

3500

3500
6000
+30.0 +35.0
Existing Road
U-Drain +27.5
+35.0 RAMP 5743 COP +29.36m

3950
INLET PIPE DIP
31392 22164 5000 SEE DETAIL "K2

1:1.5
59520 85400

1:1.5
3130
22200

+40

+35.0
1:1.5

+40
1:1.5
1:1.5
1:1.5
+45
U-300x300
+27.5
2000

1:1.5

1:1.5
+30.0
GENEARAL LAYOUT
SCALE=1:600
PROJECT: TITLE: SCALE
KARNAPHULI WATER SUPPLY PROJECT - PHASE 2 (KWSP2) NASIRABAD RESERVOIR YARD PIPE : GENEARAL LAYOUT 1:600
CLIENT: CONSULTANTS: CONTRACTORS: REV. DESCRIPTION DATE SIGN. DESIGNED: DRAWN: CHECKED (CONSULTANT) Ref DWG No.: K2P1-24-YP-01
CHITTAGONG WATER SUPPLY JAHANGIR ALAM BYUNG SUN KIM TAKAO OCHIAI
NJS CONSULTANTS CO., LTD.
& SEWERAGE AUTHORITY In association with
DWG No.: K2P1-24-YP-00 Sht No.:
01 OF 01
(CWASA) CWASA APPROVAL
BETS, AQUA, ACE, SMEC KOLON - KUBOTA JV DATE: