ID: PP704-SEC-F07
Security Plan Procedure Issue Date:
Attachment No. 7 Rev. No. A Rev. Date: 2-Jan-14
2.5 Remarks:
3.3 Remarks:
4.1 What is the nature and probable value of the stock to be held on site?
a) The store
4.3 Is there a need for a fenced storage compound, and where should it be located?
4.4 Is it practicable or desirable to place the site accomodation within the site perimeter?
4.5 Are security tools set to be provided, if so how many and where?
5.0 Transporation:
5.2 Will transport require Radio Communication with departure and destination bases?
5.4 Remarks:
a) Perimeter lights
b) Storage compound
c) Vehicle Park
d) Boat wharf
6.2 Remarks:
7.2 Should a fenced off vehicle park be provided within the site:
7.3 Remarks:
8.1 is the project big enough, and does it justify, part or full time security surveillance by a security CCC?
Doc. ID: PP704-SEC-F07
Security Plan Procedure Issue Date:
Attachment No. 7 Rev. No. A Rev. Date: 2-Jan-14
8.3 Remarks:
9.2 Remarks
10.1 Have the cost of providing the security aspects been discussed with the relevant CCC representative?
10.2 What security costs have been allowed for in the tender?
10.3 Remarks
Name and title of CCC official/security officer carrying out the security audit:
Name:
Title:
Doc. ID: PP704-SEC-F07
Security Plan Procedure Issue Date:
Attachment No. 7 Rev. No. A Rev. Date: 2-Jan-14
Signature:
Date: