(EPCC) OF TELOK GONG LOOP PIPELINE PROJECT, MELAKA (TUAH)

Pre-Q Survey
Description Scope Unit Capable Experienced
Please Tick (scope interested) Please Tick Please Tick
4. PROCUREMENT Engineering (May include Supply + FAT + Install + SAT +
Process, Control & Spares required Commissioning
Instrumentation, Civil, Mech &
Piping, Electrical)
4.A SCRAPER LAUNCHER STATION
4.1 Mechanical & Piping System LS
4.1.1 Scraper Barrel & Quick Opening End LS
Closure (QOEC)
4.1.2 Valves & Actuator LS
4.1.3 Monolithic Isolation Joint (MIJ) & Spark LS
gap
4.1.4 Bulks Material (Pipes, Fittings, Flanges, LS
Gasket etc)
4.2 Instrument & Control System LS
4.3 Electrical System LS
4.B TAKE OFF VALVE STATION
4.4 Mechanical & Piping System LS
4.4.1 Monolithic Isolation Joint (MIJ) & Spark LS
gap
4.4.2 Bulks Material (Pipes, Fittings, Flanges, LS
Gasket etc)
4.5 Instrument & Control System LS
4.6 Electrical System LS
4.C BLOCK VALVE STATION
4.7 Mechanical & Piping System LS
4.7.1 Valves & Actuator LS
4.7.2 Monolithic Isolation Joint (MIJ) & Spark LS
gap
4.7.3 Bulks Material (Pipes, Fittings, Flanges, LS
Gasket etc)
4.8 Instrument & Control System LS
4.9 Electrical System LS
4.D SCRAPER RECEIVER STATION
4.10 Mechanical & Piping System LS
4.10.1 Scraper Barrel & Quick Opening End LS
Closure (QOEC)
4.10.2 Valves & Actuator LS
4.10.3 Monolithic Isolation Joint (MIJ) & Spark LS
gap
4.10.4 Bulks Material (Pipes, Fittings, Flanges, LS
Gasket etc)
4.11 Instrument & Control System LS
4.12 Electrical System LS
4.E METERING STATION
4.13 Mechanical & Piping System LS
4.13.1 Dry Gas Filter LS
4.13.2 Valves & Actuator LS
4.13.3 Manual Valves LS
4.13.4 Bulks Material (Pipes, Fittings, Flanges, LS
Gasket etc)
4.13.5 Monolithic Isolation Joint (MIJ) & Spark LS
gap
4.13.6 Others (BIDDER to specify) LS
4.14 Instrument & Control System LS
4.14.1 Pressure Safety Valve LS
4.14.2 Ultrasonic Flow Meter LS
4.14.3 Multi Stream Flow Computer LS
4.14.4 Transmitters LS
4.14.5 Gauges LS
4.14.6 Manual Valve Limit Switch LS
4.14.7 Junction Box LS
4.14.8 Ethernet Switches LS
4.14.9 Instrument Cables LS
4.14.10 Programmable Logic Control (PLC ) LS
4.14.11 Human Machine Interface (HMI) LS
4.14.12 VSAT LS
4.14.13 Others: Gas Chromatograph LS
(BIDDER to Specify, if any)
4.15 Electrical System LS
4.15.1 AC UPS and Batteries LS
4.15.2 24V DC UPS Charger and Batteries LS
System
4.15.3 Distribution Board LS
4.15.4 Fire Alarm & Fire Suppression System LS
4.15.5 Cables, Fittings and Accessories LS
4.15.6 Earthing & Lightning Protection LS
4.15.7 Socket Outlet, Lighting Fixtures, Poles LS
and Luminaires
4.15.8 Air Conditioning System LS
4.15.9 Others: _________ LS
(BIDDER to Specify, if any)
4.15.9a Oil Cooled Transformer Rectifier for LS
Cathodic Protection System
4.F PIPELINE
Engineering (May include Supply + FAT + Install + SAT +
Process, Civil, Pipeline, Spares required Commissioning
Coating, Hot Tap, CP)
4.16 Induction Bends LS
4.17 Monolithic Isolation Joint (MIJ) & Spark LS
gap
4.20 Others: _________ LS
(BIDDER to Specify, if any)
4.20 a Polarization Cell Replacement (PCR) LS
4.20 b Permanent Reference Cell LS
4.20 c Zinc Ribbon standard size LS
4.21 FACTORY ACCEPTANCE TEST (FAT) For supplied items LS
i.e. for Valve, MIJ, USM, Actuator and
etc
4.22 OPERATIONAL SPARES PART For supplied items LS
(EPCC) OF TELOK GONG LOOP PIPELINE PROJECT, MELAKA (TUAH)
Pre-Q Survey
Description Scope Unit Capable Experienced
Please Tick Please Tick
5. CONSTRUCTION Construct (Civil, Mechanical & Piping,
Electrical, Instrumentation and Control)
+ SAT + Commissioning
5.A SCRAPER LAUNCHER STATION
5.1 Mechanical & Piping System LS
5.2 Instrument & Control System LS
5.3 5.3 Electrical System LS
5.4 5.4 SCADA & Telecommunication LS
5.5 Civil & Structure Works including SCADA LS
Building
5.6 Site Clearing, Grading & Site LS
Preparation of the Encroached Land
5.B TAKE OFF VALVE STATION
5.7 Mechanical & Piping System LS
5.8 Instrument & Control System LS
5.9 Electrical System LS
5.10 Civil & Structure Works LS
5.C BLOCK VALVE STATION
5.11 Mechanical & Piping System LS
5.12 Instrument & Control System LS
5.13 Electrical System LS
5.14 Hot Tap Works - 18" x 18" x 16" (1no) LS
5.15 Civil & Structure Works LS
5.D SCRAPER RECEIVER STATION
5.16 Mechanical & Piping System LS
5.17 Instrument & Control System LS
5.18 Electrical System LS
5.19 Civil & Structure Works LS
5.E HOT TAP STATION
5.20 Hot Tap Works including piping and valves - 36" LS
x 36" x 24" (2nos)
5.21 Civil & Structural Works (i.e. fencing, pipe LS
supports etc.)
5.F METERING STATION
5.22 Mechanical & Piping System LS
5.23 Instrument & Control System LS
5.24 Electrical System LS
5.25 Civil & Structure Works LS
5.25.1 Earthworks LS
5.25.2 Pipe Supports LS
5.25.3 Control Building including plumbing services & LS
sanitary services
5.25.4 Shelter including lifting equipment for metering LS
and regulating
5.25.5 Infraworks (i.e. fencing, access roads, lighting LS
poles, drainage system etc)
5.25.6 Others: _________ LS
(BIDDER to Specify, if any)
5.G PIPELINE
5.26 Transportation of coated pipe from Coating Yard LS
and mobilise to SITE
5.27 Clearing and Grading LS
5.28 Stringing LS
5.29 Trenching LS
5.30 Field Bending LS
5.31 Induction Bend LS
5.32 Welding LS
5.33 Non-Destructive Testing LS
5.34 Field Joint Coating LS
5.35 Holiday Test LS
5.36 Lowering In and Backfilling LS
5.37 Direct Current Voltage Gradient (DCVG) LS
5.38 Reinstatement and Revegetation LS
5.39 Markers LS
5.40 Buoyancy Control LS
5.41 Anchor Block LS
5.42 Pipeline Crossing LS
5.42.1 Major road crossings : LS
i) Jalan Simpang Ampat-Tampin (KP 0.470) LS
ii) Jalan Simpang Ampat- Brisu (KP 3.950) LS
iii) PLUS Highway (KM218.5) (KP 1.700) LS
iv) Jalan Padang Kambing (KP 6.500) LS
v) Jalan Padang Kambing (KP 6.555) LS
vi) Jalan Brisu Masjid Tanah (KP 8.780) LS
vii) Jalan Masjid Tanah Lubuk Cina (KP LS
16.070)
viii) Jalan Kampung Pulau (KP 17.442) LS
ix) Jalan Kuala Sungai Baru - Masjid LS
Tanah (KP 19.118)
5.42.2 Railway crossing (KP 0) LS
5.42.3 Waterways LS
5.42.4 TNB Overhead Transmission Line LS
5.43 Cathodic Protection System : LS
1. At Telok Gong MS LS
2. At Sungai Buloh LS
5.44 Others: _________ LS
(BIDDER to Specify, if any)
5.44a Close Interval Potential Survey (CIPS) LS
5.44b AC Mitigation Study, analysis and mitigation LS
5.44c Interference study, analysis and mitigation LS
5.H METERING AND CONTROL SYSTEM
5.45 Interface, integrate, configure, upgrade or LS
replace hardware (if necessary) for data transfer
from SCADA buildings to existing SCADA at
Petronas Gas Control Centre (PGCC) Segamat
and back-up system in Seremban Regional
Office (SRO) for the following systems :
Gas Management System (GMS) SCADA
Host System
Alarm Information Management System
(AIMS)
Plant Data Historian (PI)
Petronas Ga Berhad GTR Gas-i-Net
Auto Billing Correction (ABC), Auto Data
Backfilling and Gas Chromatograph Zoning
Server
Data Mart
Pipeline Leak Detection Server (PLDS)

You might also like