Professional Documents
Culture Documents
CLASE 05
Eliminar los pasos que no agregan valor
y sistemas pull
Agenda
Resumen
Gestionar los flujos asociados a la
cadena de valor.
Usar sistemas que halen (pull system) la
cadena de valor de acuerdo a las
necesidades del cliente.
Identificarlos
material
Mapearlos
Entender sus dinmicas
Proponer y medir mejoras
pull-systems
or
- --0- - 1 r- - - ~- ---...., 1
upplylng cuatorner
procesa procesa
A product
- ---- --
product
B
t
SUPERMARKET
(!) CUSTOMER PROCESS goes to supermarket and withdraws what it needs when it needs it.
@ SUPPLVINO PROCESS produces to replenish what was withdrawn
PURPOSE: Controts production ar supplying process without trying to schedule. Controls
productton between flows
G
Withdrawal
D
Production
CSSJ--
Kanban Arriving
~
Supermarket Withdrawal
~
Kanban
V
Signal
Kanban in Batches Kanban Post Kanban
Reflexiones
Biografa Steve Jobs.
Respecto a la segunda etapa de Jobs en Apple
He let go of his control-freak desire to manufacture products
in his own factories and instead outsourced the making of
everything from the circuit boards to the finished computers.
And he enforced on Apples suppliers a rigorous discipline.
When he took over, Apple had more than two months worth
of inventory sitting in warehouses, more than any other tech
company. Like eggs and milk, computers have a short shelf
life, so this amounted to at least a $500 million hit to profits. By
early 1998 he had halved that to a month.
Prefabricacin Just in Time (JIT)
Control de la cadena de abastecimiento, proveedores.
Reduccin de Inventarios
Tim Cook