You are on page 1of 65

June 29, 2015

)(Elite Fire

Copyright 2015 All Rights Reserved


.

..






.
" " /
.


.
.

1
.

:
3................................................................................................................................................. -1
3............................................................................................................................. -2
5........................................................................................ -3
8............................................................................................................................................ -4
10.............................................................................................................. -5
13................................................................................................................................ -6
19..................................................................................................................... -7
21...................................................................................................................... -8
24................................................................................................................................ -9

: ) (Elite Fire
-1 34................................................................................................................................................
-2 35.................................................................................................................................
-3 ( ) 37........................................................................
-4 44......................................................................................................................
-5 48........................................................................................................................................
-6 52.............................................................................................................................................

64..................................................................................................................................................

2
.


)(Automatic Sprinkler System






.

.

()Classification of Occupancies


:

(:)Light Hazard

.
(


).

(:)Ordinary Hazard

- ( :)Group 1

.

(
).

3
.

- ( :)Group 2

.

(




).

(:)Extra Hazard

- ( :)Group 1

.

(

37.8

).

- ( :)Group 2

.

(


).

(:)Special Occupancy Hazard

4
.

()Types of Systems

(:)Wet Pipe System


( 4C
)70C 12.1.

( :)1 ( )Wet System ()Dry System

(:)Dry Pipe System

5
.


(
4C )70C 12.1
.49C

(:)Preaction System



( )


.

( :)2 ()Preaction System

6
.

(:)Deluge System

( )


.

( :)3 ()Deluge System

: ( )25 mm

.

: ( )15 mm

.

7
.

()Sprinkler

:
( ) ( )

.


.

- (.)Frame
- (.)Orifice
- (.)Cap/Seal
- (.)Glass Bulb
- (.)Deflector

- ( :)Pendent
(.)SSP
- ( :)Upright
()
(.)SSU
- ( :)Side Wall

.

8
.

()Side Wall ()Upright ()Pendent

:
()Bulb
30C
:
- :
.
- :
.
- : (
)

.

( :)4
9
.

- ( :)Loop

.

- ( :)Tree
( )Branch 8.

- ( :)Grid .

( :)5
10
.

- (:)As

( :)6

=
:S .
:L .

(.)S

( :)7

11
.

- :


.)20.9 m2( 225 ft2

( :)1

( :)2

( :)3

.)1.8 m( 6 ft

12
.


(:)AD

( :)8



.NFPA

( :)9
13
.


( )Branch
( )Cross Main :

( :)10

14
.

= 1.2

: .


:

=

: .
: .

1.2
= .

: .
: .

( :)11
15
.

(:)Dd

(.)8





.
(:)Qst
:
= .
: .
: .

(:)Pst
:
. = .
: ( )K-Factor 5.6
.
:. .
: )0.5 bar( 7 psi
.

( :)4 ( )K-Factor

16
.

(:)Pipe Schedule
NFPA13


:

( :)5

( :)6

17
.

( :)7

(:)Piping and Fittings

( )Steel Pipes
( )Copper ( )UPVC

( )UPVC
.

( )2
.

( :)12
18
.

( )Plan
:

- .
-.
- .
- (.)Schematic Diagram
- ( )Partitions .
- .
- .
- ( )False Ceilings .
- .
- .
- .
- .
- .
-
.
- .
- (
).
- .
- (.)Fittings
- ( )Hangers .

19
.

- .
- ( ) .
- .
-
.
-
.
-
(.)Hydrants
-
.
- .
- (.)Pressure Reducing Valve
- (.)Detailed Legend
-
.

20
.

30 - .
60 - .
90 - .

10
10 .

- (:)Hydrants

( :)13 ()Hydrants

21
.

- (:)Pressure Tanks


()5.2 bar


()5.2 bar

.

( :)14

- (:)Gravity Tanks

( :)15
22
.

- (:)Pumps


( )Main Pump
( )Diesel Pump
( )Jockey Pump 10%
.

( :)16 ( )

) ( 3.78
=
1000
: (.)m3
: (.)gpm
: (.(min

23
.


( )23 - 17 .

- : .
- : ) (.
- )6.1 L/min.m2( : ( )0.15 gpm/ft2 (.)8
- )139 m2( : ( )1500 ft2 (.)8
- )12.1 m2( : ( )130 ft2 (.)2
: ( )12.1 m2 .
- :
139
= = = 11.49 = 12
12.1
12.
: .
- :

= 1.2 = 1.2 139 = 14.4

- :

1.2 1.2 139


= . = = 3.54 = 4
4
- : (.)Standard
- )5.6 k( : (.)4
- .)12.7 mm( :
- : (.)Wet Steel Schedule 40

24
.

( :)17
( )cm

25
.

:
(:)S
20
= . = = 4.35 = 5
4.6

20
= = =4
. 5
:WParking .

=2

(:)L
12.1
= = =3
4
:

= 1.5

()4.6 m

()12.1 m2
( )2


.

:
( )12.1 m2

.

26
.

( :)18
( )cm

27
.

( :)19
( )Tree

28
.

( :)20 ()6

29
.

( :)21

30
.

( :)22 ( )Node

31
.

( :)23
32
.

:
. = = 130 0.15 = 19.5

. = .

. 2 19.5 2
. (= (= ) ) = 12.13
5.6


(.)Riser

( )S
( )3 m
( )6 m
.

( )S
( )4 m
( )2 m .

( )Elite Fire

.

33
.

)(Elite Fire


Fire
( )NFPA
( )Trees, Grids, and Hybrids 1000
( )
( .)FHC
Fire
(.)NFPA 13
11 10

.

1000 ( )1000 Pipes
:

34
.

:

.



.
- ( )US
( )SI Units
Tools Select Data Units
.OK

-
( )US
.

35
.

-
5


Units


.

- Options Tools Options


General Options Auto Save

.OK

. .

36
.

:
File
New
General Project Data
.

File Save As
.

)(Project Data
)(Project Title
)(Designed By
)(Date
)(Code Reference
)(Approving Agency
)(Comment

37
.

)(Client Data

)(Client Name
)(Address
)(City, State ZIP Code
)(Phone
)(Fax
)(Comment

38
.

)(Company Data

)(Company Name
)(Representative
)(Address
)(City, State ZIP Code
)(Phone
)(Fax
)(Comment

39
.

)(Building Data

)(Building Name
)(Building Owner
)(Contact at Building
)(Address of Building
)(City, State ZIP Code
)(Phone at Building
)(Fax at Building
)(Comment

40
.

)(System Data

:(In Rack Sprinkler Allow)



.)Table 17.3.3.1( NFPA13

:(Inside Hose Stream Allow) ( )FHC


50 gpm 100 gpm 1 NFPA14
(.)Table 11.2.3.1.2

:(Outside Hose Stream Allow) ( )FHC


100 gpm 250 gpm 500 gpm
1 2 .)Table 11.2.3.1.2( NFPA14

:(Default Pipe Material)


)] (Schet 40 Wet Steel [4
)] (PVC [7 )] (Copper [2
.

41
.

:(Default K-Factor)
( )5.6 k .

:(Sprinkler Model) .

:(Sprinkler Make) .Viking

:(Temperature Rating)
.

:(Sprinkler Size)
( )5.6 1.4 1/3 ()16.8 8.0
1 (.)20.8 19.6

:(Labor Rate)

.

:(Other Labor Hours) .

:(Other Material Costs) .

: (Primary Type of Discharge)


( )FHC Hose
Sprinkler .Sprinkler

:)Comment( .

:(Hazard Discription)

.

:(Min Desired Density)


.

:(Sprinkler System Type) Wet


Dry
()
( ).

42
.

:(Area of Sprinkler Operation)


.

:(Max Area Per Sprinkler)


.

:(Hydrant Test Data)


.

:(Source of Info)
.

:(Hydrant ID) .

:(Hydrant Elevation) .

:(Exterior Hose Flow) .

:(Test Static Pressure)


.

:(Test Residual Pressure)


.

:(Test Flow Rate)


.

:(Calculated Demand Pressure)


.

) :(Calculated Demand Flow Rate



.

-
Project
Enter/Edit Pipe Data
Pipe Data
.

43
.

)(Enter/Edit Pipe Data


:
()Pipe Data


:

:Node
.
:Add Pipe .
:Delete Pipe .
:Sort Pipe .
:Clear Pipe .
:Mark Inflow Node .
:Unmark Inflow Node .
:CPLD
.

44
.

:Beg .

:End .

:Mat

(.)System Data

:Loss
.

:Diameter
NFPA13

.

:Length .

:K-Factor
K-Factor ( )System Data
Default
(.)5.6 k

:Sprk Elev .

:Press Est
.

:Sprk Area
( )System Data Default
.

45
.

:Area Grp
( A B )
(
)
.

:N Sprk Flow ()FHC


( )FHC 18
50 gpm 100 gpm 250 gpm
.

:Std Fit ( )Fittings ( )Valves



] [ELT
].[2F3E

:N Std
.

:Eq Len
.

:P Type

.

:Status
] [Inactive
] [Active
.

:
] [Mark Inflow Node ][
).(21

46
.

47
.

-
Project
Calculation
Calculation
.

)(Calculation

:

(:)Calculation

48
.

:Demand Mode .

:(Minimum Residual Pressure At HMD Sprinkler Node) -


( .)12.13

: )0.5 bar( 7 psi


.

:(Minimum Desired Density) -


(.)0.15 gpm/ft2

:Supply Mode
.

:(Residual Pressure At Inflow Node Number) -


.

(:)Pipe Sizing

49
.

:(Maximum Allowed water velocity) -


.

:)Maximum Allowable Friction Loss Per 100 of Pipe) -


100
.

(:)Solution


( )Calculate

( )Calculate .

50
.

:(Number Of Unique Pipe Section) -


.

:(Number Of Flowing Sprinkler) -


.

:(Maximum Flow Velocity) -



( )
.

:(Sprinkler Flow) -
.

:(Non - Sprinkler Flow) - ( )FHC


.

:(HMD Sprinkler Node Number) -


.

:(HMD Actual Residual Pressure) -


.

:(HMD Actual Flow Rate) - .

: (Demand Resid Press At Sys Inflow Node) -


( ).

:(Demand Flow At System Inflow Node) -


( ).

-

Reports
Quick Preview Reports
.

( )Hydraulic Supply/Demand Graph


.

51
.

52
.

53
.

54
.

55
.

56
.

57
.

58
.

59
.

60
.

61
.

62
.

60
:

) ( 3.78 )(416.34 3.78 60


= = = 94.5 3
1000 1000

63
.

. -1

1- NFPA 13 Standard for the Installation of Sprinkler Systems, 2013 Edition.


2- NFPA 14 Standard for the Installation of Standpipe and Hose Systems,
2013 Edition.
3- BS 5306-Part 2 Code of Practice for Sprinkler System.
4- http://www.elitesoft.com

64