PORTICO PRINCIPAL 1

0.30 5.05 0.40 4.95 0.30

PCV= 8.904 t PCV= 16.776 t PCV= 11.184 t


0.25
PCM= 31.013525 t PCM= 46.0285 t PCM= 34.417125 t
4 5/8" MU= 2.114 t 4 3/4" MU= 0.876 t 4 5/8" MU= 1.676 t
1
0.15 5.40 5.30 0.15

s/c= 0.5 t-m3

PISO Y= 2.30 t-m3 0.2


SUELO 1 y= 1.65 t-m3 0.43
C B A
SUELO 2 Y= 1.80 t-m3 0.42
1.8

Ycz= 2.4 t-m3 0.65

0.1
SOLADO Y= 2.2 t-m3

fc= 210 kg/cm2


fy= 4200 kg/cm2
Gt= 18 t-m2

DIMENCIONAMIENTO

4 3/4" = db= 1.9 cm


As= 2.84 cm2

ld= 44.05379 cm =0.08/210


ld= 31.92 cm ld= 44.054 cm =0.004
ld= 20 cm 20

ld= 45 cm d= 55 cm h= 65 cm

CAPACIDAD PORTANTE DEL SUELO

=()()(11)(22)()/

qe= 13.7945 t/m2

SOLICITACIONES

CARGA DE SERVICIO PS1= 8.904 + 31 = 39.917525 ton


PS2= 16.78 + 46 = 62.8045 ton
PS3= 11.18 + 34 = 45.601125 ton

PS= 148.32315 ton

CARGA ULTIMA
PU1= 1.70+1.40 = 58.555735 ton
PU2= 1.70+1.40 = 92.9591 ton
1.70+1.40
PU3= 1.70+1.40 = 67.196775 ton

PU= 218.71161 ton

DIMENCIONAMIENTO PRLIMINAR

L= 11 m
=/
= 10.75 m2
=/ = 0.977 m B= 0.95 m

A= 10.45 m2

MAGNITUD DE LA RSULTANTE
R
- +
=0
39.918 tn 62.805 tn 45.601 tn

c b a R= -39.918 -62.805 -45.601

R= -148.323 tn
Xo

0.15 5.40 5.30 0.15

=0 - + Xo=

Xo= 5.576 m

e= 5.726 - 5.5 e= 0.226 m

Ms= Ms= 33.55 t-m

VERIFICACION DE PRESIONES <

PS= 148.32315 ton


=/+
()/
Ms= 33.547485 ton-m2
A= 10.45 m2
C= 5.5 m Gman= 15.945 t-m2 < Gt= 18 t-m2 CONFORME
I= 105.37083 m4

CARGA DE DISEO PU, MU

=0 R= -218.71161 ton
Xo= 5.583 m
e= 0.083 m
Mu= 18.071 ton-m

REACCION AMPLIFICADA DEL SUELO

1,2=/+ G1= 21.873 ton-m


()/
1,2=/+
()/
G2= 19.986 ton-m

58.555735 92.9591 67.196775

18.987 20.779

DIAGRAMA DE MOMENTOS Y FUERZA CORTANTE

0.15 5.40 5.30 0.15

18.987 20.779

76

55.6
2.25
2.9 3.30
V +
-
4.3

40.3

83.5 54.9
40.8

M+
-
0.2 0.3

85.2

R= 40.65 ton
CALCULO DE LA ECUACION DE LA CURVA H= 1.792 ton-m

0.081461 X2 h= 0.1629221 X
18.987 X F= 0.081 X2
h
X= 4.80

18.987 y= 43.2 -18.987 4.8 -0.08146106 23


X X2
L= 2.2534773
X= 3.30 y= -49.81351
43.2

VERIFICACION POR FLECCION (Vu < Vc)


0.40
76 ton

d
0.55 Vu= 49.81 ton-m
VU= 49.81351 ton = 0.53

Vc= 34.111 ton-m

Vu > Vc

2.55 m REDIMENCIONAR d
3.30 m
REDIMENCIONAMINETO

d= 81 cm Vc= 50.236 ton-m

Vu < Vc

d= 81 cm CONFORME

VERIFICACION POR PUNZONAMIENTO (Vu < Vc)

0.30 5.05 0.40 4.95 0.30

1.792
18.987 19.08 19.814 19.968 20.69 20.779

0.575 4.50 0.95 4.4 0.575

d/2 d/2 d/2 d/2


0.525 0.525

11.00 m
= 1.10

Vu= 52.80995 ton-m Vu= 83.038 ton Vu= 60.938 ton


Vc= 81.974 ton-m Vc= 149.044 ton-m Vc= 81.974 ton

Vu < Vc Vu < Vc Vu < Vc

CONFORME CONFORME CONFORME

TOMAMOS EL PERALTE MAS CRITICO d= 81 cm

Asmin

d= 81
h= 91

AsR Asmin

DISEO LONGITUDINAL
DATOS
fc= 210 kg/cm2 = 0.9
fy= 4200 kg/cm2
b= 95 cm
d= 81 cm

PARAMETROS MINIMOS
=0.70 /
=
Pmin= 0.00241523 Asmin= 18.585191 cm2

=( )/(0.85)
amin= 4.6031432 cm
= *Asmin*fy*(d-/2)
MURmin= 55.2872363 ton-m
PARAMETROS BALANCEADOS
=0.85/ (6000/
(6000+)) =
Pb= 0.02125 Asb= 163.51875 cm2

PARAMETROS MAXIMOS
= =
Pmax= 0.015938 Asmax= 122.63906 cm2
=( )/(0.85)
amax= 30.375 cm

= *Asmax*fy*(d -
/2) MURmax= 305.090729 ton-m

DIEO TRAMO C-B Mu= 40.8 ton-m


=0.59^2+/(^2)
0.03463416 w= 0.03537238

=/
=
Pd= 0.001768619 Asd= 13.609521 cm2

Mu= 40.8 ton-m < MURmin= 55.287236 ton-m

Asd= 18.585 cm2 Asd=Asmin

CANTIDAD DE ACERO MINIMO

Asmin 18.585191 cm2 n= 6.544081 = 7 unidades


As= 3/4"
As= 2.84 cm2 S= 0.113492 cm
db= 0.01905 m
2r= 0.15 m Asmin= 7 3/4" @ 0.1135

CANTIDAD DE ACERO DE REFUERSO

Asr 0.000 cm2


As= 3/4" n= 0 = 0 unidades
As= 2.84 cm2
db= 0.01905 m S= 0 cm
2r= 0.15 m
Asr= 0 3/4" @ 0

DIEO TRAMO B-A Mu= 54.94 ton-m

=0.59^2+/(^2)
=0.59^2+/(^2) 0.04663728 w= 0.04799644

=/
=
Pd= 0.002399822 Asd= 18.466629 cm2

Mu= 54.94 ton-m < MURmin= 55.287236 ton-m

Asd= 18.585 cm2 Asd=Asmin

CANTIDAD DE ACERO MINIMO

Asmin 18.585191 cm2 n= 6.544081 = 7 unidades


As= 3/4"
As= 2.84 cm2 S= 0.113492 cm
db= 0.01905 m
2r= 0.15 m Asmin= 7 3/4" @ 0.1135

CANTIDAD DE ACERO DE REFUERSO

Asr 0.000 cm2


As= 3/4" n= 0 = 0 unidades
As= 2.84 cm2
db= 0.01905 m S= 0 cm
2r= 0.15 m
Asr= 0 3/4" @ 0
DIEO APOYOS C Y A Mu= 0.3 ton-m

=0.59^2+/(^2) 0.00025466 w= 0.0002547

=/
Pd= 1.27351E-05 = Asd= 0.0979963 cm2

Mu= 0.3 ton-m < MURmin= 55.287236 ton-m

Asd= 18.585 cm2 Asd=Asmin

CANTIDAD DE ACERO MINIMO

Asmin 18.585191 cm2 n= 6.544081 = 7 unidades


As= 3/4"
As= 2.84 cm2 S= 0.113492 cm
db= 0.01905 m
2r= 0.15 m Asmin= 7 3/4" @ 0.1135

CANTIDAD DE ACERO DE REFUERSO

Asr 0.000 cm2


As= 3/4" n= 0 = 0 unidades
As= 2.84 cm2
db= 0.01905 m S= 0 cm
2r= 0.15 m
Asr= 0 3/4" @ 0

DIEO APOYO B Mu= 85.2 ton-m

=0.59^2+/(^2) 0.07232428 w= 0.07570579

=/
Pd= 0.00378529 = Asd= 29.127803 cm2

Mu= 85.2 ton-m > MURmin= 55.287236 ton-m

Asd= 29.128 cm2 Asd=Amin+AsR

CANTIDAD DE ACERO MINIMO

Asmin 18.585191 cm2 n= 6.544081 = 7 unidades


As= 3/4"
As= 2.84 cm2 S= 0.113492 cm
db= 0.01905 m
2r= 0.15 m Asmin= 7 3/4" @ 0.1135

CANTIDAD DE ACERO DE REFUERSO

Asr 10.543 cm2


As= 3/4" n= 3.712187 = 4 unidades
As= 2.84 cm2
db= 0.01905 m S= 0.226983 cm
2r= 0.15 m
Asr= 4 3/4" @ 0.227

d= 81
h= 91

Asmin= 73/4"@0.1135 Asr= 43/4"@0.227

0.95

0.705 m 1.21 m 0.705

DISEO REFUERZO TRANSVERSAL

58.555735 ton 92.9591 ton 67.19678 ton

0.30 0.65 0.40 0.55 0.30 0.65


61.638 ton-m 97.852 ton-m 70.733 ton-m

MU= 29.277868 t-m MU= 46.47955 t-m MU= 33.59839 t-m

fc= 210 kg/cm2 b= 100 cm


fy= 4200 kg/cm2 d= 81 cm

COLUMNA C
MU= 29.277868 ton-m CANTIDAD DE ACERO MINIMO

Pmin= 0.0024152 Asd 13.792168 cm2 n= 4.856397 = 5 unidades


Asmin= 19.563359 cm2 As= 3/4"
amin= 4.6031432 cm As= 2.84 cm2 S= 0.127738 cm
MURmin= 58.197 ton-m db= 0.01905 m
2r= 0.075 m Asd= 5 3/4" @ 0.1277
Pb= 0.02125
Asb= 172.125 cm2

Pmax= 0.0159375
Asmax= 129.09375 cm2
amin= 30.375 cm
MURmax= 321.148 ton-m

w= 0.021523 0.021249568
Pd= 0.00108 cm2
Asd= 8.7167649 cm2

Asd= 19.56336 ton-m Asd= Asmin

COLUMNA B
MU= 46.47955 ton-m CANTIDAD DE ACERO MINIMO

Pmin= 0.0024152 Asd 23.671664 cm2 n= 8.335093 = 8 unidades


Asmin= 19.563359 cm2 As= 3/4"
amin= 4.6031432 cm As= 2.84 cm2 S= 0.157007 cm
MURmin= 58.197 ton-m db= 0.01095 m
2r= 0 m Asd= 8 3/4" @ 0.157
Pb= 0.02125
Asb= 172.125 cm2

Pmax= 0.0159375
Asmax= 129.09375 cm2
amin= 30.375 cm
MURmax= 321.148 ton-m

w= 0.034434 0.033734368
Pd= 0.001722 cm2
Asd= 13.945741 cm2

Asd= 19.56336 ton-m Asd= Asmin

DISEO DE ACERO DE MONATAJE


b= 100 cm 2.84
h= 91
=0.0018

AsR= 16.38 tn-m


As= 3/4"
= As= 2.84 cm2 S= 17.338217 cm
()/ db= 0.01095 m
2r= 0 m AsR= 3/4" @ 0.1734
S= 17.33822

COLUMNA A
MU= 33.598388 ton-m CANTIDAD DE ACERO MINIMO

Pmin= 0.0024152 Asd 13.792168 cm2 n= 4.856397 = 5 unidades


Asmin= 19.563359 cm2 As= 3/4"
amin= 4.6031432 cm As= 2.84 cm2 S= 0.129763 cm
MURmin= 58.197 ton-m db= 0.01095 m
2r= 0.075 m Asd= 5 3/4" @ 0.1298
Pb= 0.02125
Asb= 172.125 cm2

Pmax= 0.0159375
Asmax= 129.09375 cm2
amin= 30.375 cm
MURmax= 321.148 ton-m

w= 0.024747 0.024385356
Pd= 0.001237 cm2
Asd= 10.022402 cm2

Asd= 19.56336 ton-m Asd= Asmin


m
cm
cm
0.1277

0.157
0.1298