SOLENOID VALVE FOR CONSTRUCTION 2016.04.02
LIQUID LINE
01 2017.10.19
LAYOUT'S REQUIREMENT
refrigerant pipe
ANCHOR BOLT
CONDENSER
EVAPORATOR
Key Plan :
ceiling gi PIPE
SUPPORT
WATER DRAIN PIPE
front view side view WALK IN COLDROOM +4C & WALK IN FREEZER -18C ROAD
5.5M
OUTDOOR UNIT - SPLIT SYSTEM INDOOR UNIT - SPLIT SYSTEM TYPICAL EVAPORATOR & CONDENSER INSTALLATION
Check all measurements on site. Do not scale
off drawing This drawing is to be read in
conjunction with the Specification and any
discrepancies are to be immediately reported
to the Designer. This drawing remains the
copyright property of the Designer and is not
to be reproduced in whole or in part without
permission of the Designer.
roof
MOTOR
HANGER ROD
D
Location: No. 27-3, Fengsheng Road,
Jiulongpo District, Chongqing, PR China
beam g.i SHEET
CONTROL WIRING
Project Title:
2nd GENERATION FIBER OPTICAL
& CABLING PRODUCTION AND
SPECIAL FIBER R&D BASE PROJECT
Location:
roof roof
Building Number : 99-02
insulation
Project M.E.P: VU MAI THANH
u.PVC DRAIN PIPE VINYL TAPE Checked by: BAO NGUYEN NHU
APPROVAL TO PROCEED:
TYPICAL DETAILS MEP PRINCIPAL