You are on page 1of 4

SLNO STEPS METHODDECSRIPTION SITEPHOTOS

1 STEP1 Existingconcretesurface

1.Chiptheconcretesurfacetomaintainthebondingofoldandnewconcrete.
2 STEP2

1.Installtheadditionalreinforcement3nosof10mmdiarebarateverybracketlocation.Andonerebar
10mmdiatobeprovidedinbetweenthebaseplates.(RefDrawingattached)

2.RebarshallbeinstalledbychemicalanchoringwithapprovedanchoringchemicalbyFisher/Hiltiandthe
depthofanchoringshallbe100mmasspecified.(RefAnnex1)

3.Ensurepropercleaningofdrilledholebyapplyingairblowerandremoveanylooseconcrete.

3 STEP3 4.Applytheanchoringchemicalbyinjectingaccordingthemanufacturer'srecommendation

5.Inserttherebartoreachuntilthedepthofthedrilledholeandleaveitforcuring.

6.Aftercuringtiethetopandbottomrebarwithbindingwirebymaintainingtheconcretecoverof30mmall
aroundthesurface.

1.Completeformworkbymaintainnecessarysupports.

2.FilltheconcreteC40/C50continuouslybycompactingwithnecessaryhandtoolstoensuretheconcrete
fillingintheentirelocationrequirementof50mmandabove.

4 STEP4 3.VetogroutCG518shallbeusedforlessthan50mmvoid.

4.Removetheshuttersafter24hrs,applythecuringcompoundandwetcuringminimumfor7days.
4

5
1.Chiptheconcretesurfacetomaintainthebondingagent.
2.Installtheadditionalreinforcement3nosof10mmdiarebarateverybracketlocation.Andonerebar10mmdiatobeprovidedinbetweenthebaseplates.(RefDrawingattached)
3.RebarshallbeinstalledbychemicalanchoringwithapprovedanchoringchemicalbyFisher/Hiltiandthedepthofanchoringshallbe100mmasspecified.(RefAnnex1)
4.Ensurepropercleaningofdrilledholebyapplyingairblowerandremoveanylooseconcrete.
5.Applytheanchoringchemicalbyinjectingaccordingthemanufacturer'srecommendation.
6.Inserttherebartoreachuntilthedepthofthedrilledholeandleaveitforcuring.
7.Aftercuringtiethetopandbottomrebarwithbindingwirebymaintainingtheconcretecoverof30mmallaroundthesurface.
8.`
9.Completeformworkbymaintainnecessarysupports.
10.Inserttheanchorboltwiththebaseplateandensurethealignments.
10.FilltheconcreteC40/C50continuouslybycompactingwithnecessaryhandtoolstoensuretheconcretefillingintheentirelocationrequirementof50mmandabove.
11.VetogroutCG518shallbeusedforlessthan50mmvoid.
12.Removetheshuttersafter24hrs,applythecuringcompoundandwetcuringfor7days.

You might also like