PRESUPUESTO UNIDADES SANITARIAS EL CUMAJON. POZO l L R

PARTIDAS CANTIDAD UD. P.U. VALOR


SECTOR CUMAJON
ejecucion 8 " pozo I h=200' camisa 6" 65,000.00
analisis FQB fisico quimico y bacteriologico 6,500.00

1.00 DESCARGA A LINEA DE IMPULSION AL SALIR POZO CUMAJON (POZO I)

1.10 enrocamiento hormigon ciclopeo 3.00 m3 790.00 2,370.00


1.01 Losa 1.00 m x 1.00 x 0.20 0.32 m3 13,174.72 4,215.91
1.02 Platillo planchuela 1/4" metalica 1.00 P.A. 780.00 780.00
1.03 Sello sanitario hormigon 120 kg/cm2-10' 1.00 P.A. 973.00 973.00

DESCARGA Y TINACO DE 500 GALONES CERCANO A 1er BAO.


ACCESORIOS entrada a cada tinaco
1.04 Flota 3/4" 1.00 ud 2,750.00 2,750.00
1.05 Niple 2"X24" H.G. rosca 1.00 ud 645.43 645.43
1.06 Registro 0.60x0.60 m. 1.00 ud 3,000.00 3,000.00
1.07 Tapa de aluminio 2.00 ud 1,960.40 3,920.80
1.08 Valvula 3" 1.00 ud 4,100.00 4,100.00
1.09 Reduccion 2x3/4" HG 1.00 ud 275.00 275.00
1.10 Codo 3X90 HG 2.00 ud 115.90 231.80
1.11 Rebose 3/4" pvc 1.00 ud 1,500.00 1,500.00
1.12 Tuberia 3/4" pvc sch40 15.00 ud 210.00 3,150.00
1.13 Escalera 3/4" 9.00 ud 3,000.00 27,000.00

SUMINISTRO EQUIPO DE CLORO POR DILUSION

1.14 Dilusion 1.00 P.A. 84,500.00 84,500.00


1.15 Suministro Difusor 1.00 P.A. 3,500.00 3,500.00
1.16 Mano de Obra 1.00 P.A. 7,000.00 7,000.00

CASETA DE CLORACION
1.17 Caseta de Cloracion 1.00 P.A. 30,802.80 30,802.80

TOTAL SUB -TOTAL 252,214.74

LIMPIEZA Y REPLANTEO
No. PARTIDAS CANTIDAD UD. P.U. VALOR
DUD.
2.00 LINEA DE IMPULSION- Desde descarga bomba sumergible- hasta calle 0 3"
MOVIMIENTO DE TIERRA DE TUBERIAS
2.01 Excavacion 120.41 m3 1,200.00 144,495.75
2.02 Relleno compactado 72.25 m3 325.00 23,480.56
2.03 Bote de material sobrante 78.27 m3 289.66 22,671.26
2.04 Asiento de arena 14.45 m3 533.33 7,706.39
2.05 Relleno no clasificado 92.72 m3 210.00 19,470.80

3.00 RED DE DISTRIBUCION Y TUBERIAS

373701217.xls 1 de 20
373701217.xls

PRESUPUESTO UNIDADES SANITARIAS EL CUMAJON. POZO l L R

3.10 Limpieza y replanteo 1.00 P.A. 4,500.00 4,500.00

3.20 Movimiento de tierras:


3.21 Excavacin 573.60 m3
3.22 Excavacin en roca dura a mano 90% 516.24 m3 1,200.00 619,488.00
3.23 Excavacin en material tierra limosa 10% 57.36 m3 550.00 31,548.00
3.24 Asiento de arena 330.03 m3 533.33 176,016.50
3.25 relleno compactado 344.16 m3 325.00 111,852.00
3.26 Bote de material 300.00 m3 210.00 63,000.00

4.00 Tuberias:
De 3"pvc sdr-26 m.l
4.01 Suministro 956.00 m.l 157.90 150,952.40
4.02 Colocacin 956.00 m.l 80.00 76,480.00
4.03 Transporte interno 956.00 m.l 15.00 14,340.00
4.04 Pruebas Hidrosta. 956.00 m.l 10.00 9,560.00
4.05 Seales y Pasarelas 956.00 m.l 9.00 8,604.00
4.06 Valvula de 3" H.F. 1.00 ud 9,000.00 9,000.00
4.07 Caja de valvula telescopicas.HF coloc. 1.00 ud 2,100.00 2,100.00
4.08 Tee 3*3 PVC 7.00 ud 350.00 2,450.00
4.09 Tee 3*2 PVC 9.00 ud 150.00 1,350.00
4.10 Cruz 3*3 pvc 3.00 ud 235.00 705.00

Reducciones
4.11 De 3*2 pvc 1.00 ud 210.00 210.00
4.12 De 2* 1 1/ 2"pvc 3.00 ud 193.00 579.00

codos y mas
4.13 Codo 3*90 pvc 6.00 ud 116.00 696.00
4.14 Codo 3*22o 30' curva 5.00 ud 106.00 530.00
4.15 tapon 3" 1.00 ud 65.46 65.46
4.16 Anclaje de piezas especiales 38.00 ud 93.00 3,534.00
4.16 Cemento Tangit. 10.00 ud 93.00 930.00
4.17 Cemento solvente 1.00 gls. 1,034.65 1,034.65

PUNTO AGUA P. 1.00 ud 295,705.21 295,705.21


4.18 acometida 3/4" a tinaco L 13.00 m 9.00 ud 833.00 7,497.00
4.19 Acometida urb. 3/4" sch 40 a punto agua 1.00 ud 833.00 833.00
4.20 fuente punto de agua 1.00 ud 3,000.00 3,000.00

SUBTOTAL LINEA DE IMPULSION Y RED DE DISTRIBUCION Y TUBERIAS 1,814,384.99

5.00 EQUIPOS DE BOMBEO


Bomba sumergible de eje vertical RPM
5.01 3500 Monobloc hp motor electrico 1.00 ud 77,590.00 77,590.00
monofasico 230/460 v
5.02 manometro en glicerina 0-100 PSI
5.03 valor 3 tazones por h=200' cumplir TDH 1.00 ud 47,587.50 47,587.50

373701217.xls 2 de 20
373701217.xls

PRESUPUESTO UNIDADES SANITARIAS EL CUMAJON. POZO l L R

SUBTOTAL EQUIPOS DE BOMBEO SUMERGIBLE 125,177.50

6.00 ESTACION DE BOMBEO

6.01 TINACO 500 GLS 1.00 ud 12,000.00 12,000.00


6.02 M. de O. Instalacion electromecanica 1.00 ud 55,000.00 55,000.00
6.03 Verja malla ciclonica y 3 lineas block 1.00 ud 33,450.00 33,450.00
6.04 electrificacion y transformador 10 KVA 1.00 ud 75,000.00 75,000.00
6.05 plata forma y poste 1.00 ud 65,000.00 65,000.00

SUBTOTAL ESTACION DE BOMBEO 240,450.00

373701217.xls 3 de 20
373701217.xls

PRESUPUESTO UNIDADES SANITARIAS EL CUMAJON. POZO l L R

TOTAL GENERAL DE INGENIERIA 2,432,227.22

GASTOS INDIRECTOS

Seguros polizas y fianzas 0.03 % 60,805.68


Gastos Administrativos 0.04 % 85,127.95
Transporte 0.01 % 24,322.27
Direccion Tecnica y Responsabilidad 0.10 % 243,222.72
413,478.63

TOTAL GENERAL GASTOS DE INGENIERIA E INDIRECTOS 2,845,705.85

373701217.xls 4 de 20
373701217.xls

PRESUPUESTO SECTOR central BA0S. La Caoba POZO II L R

SISTEMA DE ABASTECIMIENTO DE AGUA POTABLE

PARTIDAS CANTIDAD UD. P.U. VALOR


1.00 POZO II

fuente : pozo profundo 0=10 encamisado


1.01 200.00 pies 400.00 80,000.00
en 8" pvc sdr 21
1.02 aforos 48 hrs 1.00 P.A. 53,300.00 53,300.00
1.03 analisis fisico quimico y bacteriologico (ta 1.00 P.A. 6,500.00 6,500.00
1.04 enrocamiento proteccion entrada pluvial 3.00 m3 790.00 2,370.00
1.05 losa 1.50*1.50*.20 0.72 m3 13,174.72 9,485.80

2.00 DESCARGA Y TINACO DE 500 GALONES CERCANO A 1er BAO.


ACCESORIOS descarga pozo control niveles piezometricos en tinaco
2.01 Niple 2"X24" 1.00 ud 645.43 645.43
2.02 Ventilacion 2" 1.00 ud 114.00 114.00
2.03 Registro 1.00 ud 3,000.00 3,000.00
2.04 Tapa de aluminio 2.00 ud 1,960.40 3,920.80
2.05 Valvula 3 " compuerta bronce coloc. 1.00 ud 4,100.00 4,100.00
2.06 Reduccion 4 x 3" HG 2.00 ud 325.00 650.00
2.07 Codo 3X90 HG 3.00 ud 115.90 347.70
2.08 Rebose 4" 1.00 ud 1,500.00 1,500.00
2.09 Valvula 4" junta dresser 3.00 ud 7,950.00 23,850.00
2.10 Tee 4X2"HG 1.00 ud 350.00 350.00
2.11 Reduccion 2" x 3/4"HG 1.00 ud 275.00 275.00
2.12 Tee 2x 3/4" HG 1.00 ud 325.00 325.00
2.13 llave de chorro globo 3/4 " 1.00 ud 285.00 285.00
2.14 Tee 4X3"HG 2.00 ud 350.00 700.00
2.15 Tee 4X4 HG 2.00 ud 673.00 1,346.00
2.16 Niple 4X8'' HG 4.00 ud 475.00 1,900.00
2.17 Escalera 3/4 1.00 ud 3,000.00 3,000.00
2.18 Valvula 2 a tinaco 500 gls 1.00 ud 275.00 275.00
2.19 Tuberia 3/4 HG 13.00 ud 210.00 2,730.00

SUMINISTRO EQUIPO DE CLORO POR DILUSION

2.20 Dilusion 1.00 P.A. 84,500.00 84,500.00


2.21 Suministro Difusor 1.00 P.A. 3,500.00 3,500.00
2.22 Mano de Obra 1.00 P.A. 7,000.00 7,000.00

CASETA DE CLORACION
2.23 Caseta de Cloracion 1.00 P.A. 30,802.80 30,802.80

TOTAL SUB -TOTAL 326,772.52

No. PARTIDAS CANTIDAD UD. P.U. VALOR


Llin LilIMPIEZA Y REPLANTEO DUD.
3.00 LINEA DE IMPULSION- Desde nudo 0 hasta nudo 2 0= 4" sdr 21
MOVIMIENTO DE TIERRA DE TUBERIAS
EXCAVACION 268.13 m3 1,200.00 321,750.00
3.01 RELLENO COMPACTADO 160.88 m3 325.00 52,284.38
3.02 BOTE DE MATERIAL SOBRANTE 174.28 m3 289.66 50,482.31
3.03 ASIENTO DE ARENA 32.18 m3 533.33 17,159.89
3.04 RELLENO NO CLASIFICADO 206.46 m3 210.00 43,355.81

4.00 RED DE DISTRIBUCION Y TUBERIAS

4.10 Limpieza y replanteo P.A. 3,130.00


4.20 Movimiento de tierras: 0=3" sdr26
4.21 Excavacin 1,056.24 m3
4.22 Excavacin en roca dura a mano 90% 950.62 m3 1,200.00 1,140,739.20
4.23 Excavacin en material tierra limosa 10% 105.62 m3 550.00 58,093.20
4.24 Asiento de arena 195.60 m3 533.33 104,319.35
4.25 relleno compactado 633.74 m3 325.00 205,966.80
4.26 Bote de material 127.14 m3 210.00 26,699.40

5.00 Tuberias:

De 4"pvc sdr-26 desde solar alcaldesa a 375.00


5.01 Suministro De 4"pvc sdr-26 desde solar al 375.00 m.l 256.24 96,090.00
5.02 Colocacin 375.00 m.l 85.00 31,875.00
5.03 Transporte interno 375.00 m.l 25.00 9,375.00
5.04 pruebas hidrostaticas 375.00 m.l 20.00 7,500.00
5.05 Seales y Pasarelas 375.00 m.l 9.00 3,375.00

De 3"pvc sdr-26 1,956.00 m.l


5.06 Suministro 1,956.00 m.l 157.90 308,852.40
5.07 Colocacin 1,956.00 m.l 80.00 156,480.00
5.08 Transporte interno 1,956.00 m.l 25.00 48,900.00
5.09 Pruebas Hidrosta. 1,956.00 m.l 20.00 39,120.00
5.10 Seales y Pasarelas 1,956.00 m.l 9.00 17,604.00

piezas especiales
3.11 Valvula de 4" acero 1.00 ud 6,000.00 6,000.00
3.12 Junta dresser 4" 2.00 ud 4,500.00 9,000.00
3.13 Caja de valvula telescopicas.HF coloc. 1.00 ud 2,100.00 2,100.00
3.14 Tee 4*4" PVC 4.00 ud 271.79 1,087.16
3.15 Tee 3*3" PVC 16.00 ud 350.00 5,600.00
3.16 CRUZ 4*3" PVC 1.00 ud 575.00 575.00
3.17 Reduccion 4X3 PVC 1.00 ud 223.00 223.00

codos y mas
3.18 Codo 4*90 2.00 ud 187.48 374.96
3.19 Codo 3*90 33.00 ud 116.00 3,828.00
3.20 Codo 4*45 1.00 ud 177.48 177.48
3.21 Codo 3*45 2.00 ud 106.00 212.00
3.22 tapon 3" 15.00 ud 65.46 981.90
3.23 Cemento Tangit. 10.00 ud 93.00 930.00
3.24 Cemento solvente 3.00 gls. 1,034.65 3,103.95

PUNTO AGUA P. 1.00 ud 295,705.21 295,705.21


3.25 Acometida urbana 3/4" a cada tinaco incl. 26.00 ud 833.00 21,658.00
tee 3x 3/4 pvc en c/u

TOTAL SUB -TOTAL 3,094,708.40

4.00 EQUIPOS DE BOMBEO .

Bomba sumergible eje vertical (ver


4.01 cotizacion anexa), motor electrico 1.00 ud 158,625.00 158,625.00
monofasico 10 HP RPM eff.
83.3 %, manometro en glicerina 0-100 PSI

4.02 TINACO 500 GLS CONTROL NIVELES 1.00 ud 12,000.00 12,000.00


(automatico encendido y apagado bomba)
4.03 Tazones adic 3 uds aumento TDH 1.00 ud 47,587.50 47,587.50
verja de malla ciclonica 20.00 m.l. puerta,
1.00 ud 33,450.00 33,450.00
4.04 candado, 3 filas blocks, etc

TOTAL SUB -TOTAL 251,662.50


18% ITBIS 45,299.25

SUBTOTAL EQUIPO DE BOMBEO SUMERGIBLE 296,961.75

4.04 M. de O. Instalacion electromecanica 1.00 ud 55,000.00 55,000.00

4.05 electrificacion y transformador 10 kva 1.00 ud 75,000.00 75,000.00


4.06 plataforma y poste 1.00 ud 65,000.00 65,000.00
SUBTOTAL ESTACION DE BOMBEO 491,961.75

TOTAL GENERAL DE INGENIERIA 3,913,442.67

GASTOS INDIRECTOS

Seguros polizas y fianzas 0.03 % 97,836.07


Gastos Administrativos 0.04 % 136,970.49
Transporte 0.01 % 39,134.43
Direccion Tecnica y Responsabilidad 0.10 % 391,344.27
665,285.25

TOTAL GENERAL GASTOS DE INGENIERIA E INDIRECTOS 4,578,727.92

373701217.xls 5 de 20
373701217.xls

PRESUPUESTO UNIDADES SANITARIAS La Caoba y el Cumajon. Villa Hermosa La Romana R.D.

No. PARTIDAS CANTIDAD UD. P.U. VALOR

SECTOR ESTE
POZO III
ejecucion pozo III 8 camisa 6" 65,500.00

1.00 DESCARGA A LINEA DE IMPULSION AL SALIR POZO CUMAJON (POZO I)


Descarga E.B. linea de impulsion al salir pozo
proteccion pluvial al pozo
1.01 enrocamiento ciclopeo 1.50 m3 790.00 1,185.00
1.02 losa 1.00 m x 1.00 x 0.20 0.32 m3 13,174.72 4,215.91
1.03 platillo planchuela 1/4" metalica 1.00 p.a. 780.00 780.00
1.04 sello sanitario hormigon 120 kg/cm2-10' 1.00 p.a. 973.00 973.00

DESCARGA Y TINACO DE 500 GALONES


Accesorios entrada a cada tinaco
1.05 Flota de 3/4" 1.00 ud 2,750.00 2,750.00
1.06 Niple 2"X24" H.G. rosca 1.00 ud 645.43 645.43
1.07 Tinaco 500 GLS 1.00 ud 12,000.00 12,000.00
1.08 Registro 0.60x0.60 m. 1.00 ud 3,000.00 3,000.00
1.09 Tapa de aluminio, candado 2.00 ud 1,960.40 3,920.80
1.10 Valvula 3" 1.00 ud 4,100.00 4,100.00
1.11 Reduccion 2x3/4" HG 1.00 ud 275.00 275.00
1.12 Codo 3X90 HG 2.00 ud 115.90 231.80
1.13 Rebose 3/4" pvc 1.00 ud 1,500.00 1,500.00
1.14 Tuberia 3/4" pvc sch40 15.00 ud 210.00 3,150.00
1.15 Escalera 3/4" 1.00 ud 3,000.00 3,000.00

SUMINISTRO EQUIPO DE CLORO POR DILUSION

Dilusion 1.00 P.A. 84,500.00 84,500.00


Suministro Difusor 1.00 P.A. 3,500.00 3,500.00
Mano de Obra 1.00 P.A. 7,000.00 7,000.00

CASETA DE CLORACION
2.23 Caseta de Cloracion 1.00 P.A. 30,802.80 30,802.80

TOTAL SUB -TOTAL 233,029.74

LIMPIEZA Y REPLANTEO
No. PARTIDAS CANTIDAD UD. P.U. VALOR
DUD.
2.00 LINEA DE IMPULSION- Desde descarga bomba sumergible- hasta calle 0 3"
MOVIMIENTO DE TIERRA DE TUBERIAS
2.01 Excavacion 120.41 m3 1,200.00 144,495.75
2.02 Relleno compactado 72.25 m3 325.00 23,480.56

373701217.xls 6 de 20
373701217.xls

PRESUPUESTO UNIDADES SANITARIAS La Caoba y el Cumajon. Villa Hermosa La Romana R.D.

2.03 Bote de material sobrante 78.27 m3 289.66 22,671.26


2.04 Asiento de arena 14.45 m3 533.33 7,706.39
2.20 Relleno no clasificado 92.72 m3 210.00 19,470.80

3.00 RED DE DISTRIBUCION Y TUBERIAS

3.10 Limpieza y replanteo 1.00 p.a. 3,430.00 3,430.00

3.20 Movimiento de tierras:


3.21 Excavacin 1,173.60 m3 1,200.00
3.22 Excavacin en roca dura a mano 90% 1,056.24 m3 1,200.00 1,267,488.00
3.23 Excavacin en material tierra limosa 10% 117.36 m3 289.66 33,994.50
3.24 Asiento de arena 330.03 m3 533.33 176,016.50
3.25 relleno compactado 704.16 m3 325.00 228,852.00
3.26 Bote de material 300.00 m3 210.00 63,000.00

4.00 Tuberias:
De 3"pvc sdr-26 1,956.00 m.l
4.01 Suministro 1,956.00 m.l 157.90 308,852.40
4.02 Colocacin 1,956.00 m.l 80.00 156,480.00
4.03 Transporte interno 1,956.00 m.l 15.00 29,340.00
4.04 Pruebas Hidrosta. 1,956.00 m.l 10.00 19,560.00
4.05 Seales y Pasarelas 1,956.00 m.l 9.00 17,604.00

valvulas
4.06 Valvula de 3" H.F. 1.00 ud 9,000.00 9,000.00
4.07 Valvula de 2" H.F. 1.00 ud 5,000.00 5,000.00
4.08 Caja de valvula telescopicas.HF coloc. 2.00 ud 2,100.00 4,200.00
4.09 Tee 3*3 PVC 7.00 ud 350.00 2,450.00
4.10 Tee 3*2 PVC 9.00 ud 150.00 1,350.00
4.11 Cruz 3*3 pvc 3.00 ud 235.00 705.00
4.12 Cruz 3*2 pvc 1.00 ud 175.00 175.00

Reducciones
4.13 De 3*2 pvc 1.00 ud 210.00 210.00
4.14 De 2* 11/ 2"pvc 3.00 ud 193.00 579.00

codos y mas
4.15 Codo 3*90 6.00 ud 116.00 696.00
4.16 Codo 3*22o 30' curva 2.00 ud 106.00 212.00
4.17 tapon 3" 7.00 ud 65.46 458.22
4.18 tapon 2" 2.00 ud 43.00 7.00
4.19 Cemento Tangit. 10.00 ud 93.00 930.00
4.20 Cemento solvente 3.00 gls. 1,034.65 3,103.95
4.21 anclajes de piezas especiales 10.00 ud 93.00 930.00

PUNTO AGUA P. 1.00 ud 295,705.21 295,705.21


4.22 Acometida urb. 3/4" sch 40 a punto agua 1.00 ud 833.00 833.00

373701217.xls 7 de 20
373701217.xls

PRESUPUESTO UNIDADES SANITARIAS La Caoba y el Cumajon. Villa Hermosa La Romana R.D.

SUBTOTAL LINEA DE IMPULSION Y RED DE DISTRIBUCION Y TUBERIAS 2,848,986.54

5.00 EQUIPOS DE BOMBEO

5.01 Bomba sumergible de eje vertical RPM 1.00 ud 137,840.00 137,840.00


3500 Monobloc hp
motor electrico Monofasico 230/460v 7.5
5.02 HP 3500 RPM eff % manometro en 1.00 ud 23277.01 23,277.01
glicerina 0-100 PSI, adic. 3 tazones a
bomba sumergible para TDH

SUBTOTAL EQUIPOS DE BOMBEO SUMERGIBLE 161,117.01

6.00 ESTACION DE BOMBEO

6.01 M. de O. Instalacion electromecanica 1.00 ud 55,000.00 55,000.00

373701217.xls 8 de 20
373701217.xls

PRESUPUESTO UNIDADES SANITARIAS La Caoba y el Cumajon. Villa Hermosa La Romana R.D.

6.02 electrificacion y transformador 10 KVA 1.00 ud 75,000.00 75,000.00


6.03 plata forma y poste 1.00 ud 65,000.00 65,000.00
6.04 TINACO 500 GLS control niveles 1.00 ud 12,000.00 12,000.00

SUBTOTAL ESTACION DE BOMBEO 207,000.00

TOTAL GENERAL DE INGENIERIA 3,450,133.29

373701217.xls 9 de 20
373701217.xls

PRESUPUESTO UNIDADES SANITARIAS La Caoba y el Cumajon. Villa Hermosa La Romana R.D.

GASTOS INDIRECTOS

Seguros polizas y fianzas 0.03 % 86,253.33


Gastos Administrativos 0.04 % 120,754.67
Transporte 0.01 % 34,501.33
Direccion Tecnica y Responsabilidad 0.10 % 345,013.33
586,522.66

TOTAL GENERAL GASTOS DE INGENIERIA E INDIRECTOS 4,036,655.95

373701217.xls 10 de 20
373701217.xls

1.00 Materiales
1.01 losa 1.00 m x 1.00 x 0.20 m3 13,200.00
1.02 platillo planchuela 1/4" metalica p.a. 780.00
1.03 sello sanitario hormigon 120 kg/cm2-10' p.a. 973.00
1.04 Registro 0.60x0.60 m. ud 3,000.00
1.05 Reduccion 4X3 PVC ud 223.00
1.06 Flota 3/4" ud 2,750.00
1.07 Niple 2"X24" H.G. rosca ud 645.43
1.08 Tinaco 500 GLS ud 12,000.00
1.09 Tapa de aluminio, candado ud 1,960.40
1.10 Valvula 3" ud 4,100.00
1.11 valvula 2 a tinaco 500 gls ud 275.00
1.12 Valvula 4" junta dresser ud 7,950.00
1.13 Valvula de 4" acero ud 6,000.00
1.14 Reduccion 2x3/4" HG ud 275.00
1.15 Reduccion 4x 3" HG ud 325.00
1.16 Codo 3X90 HG ud 115.90
1.17 Rebose 3/4" pvc ud 1,500.00
1.18 Junta dresser 4" ud 4,500.00
1.19 Tuberia 3/4" pvc sch40 ud 210.00
1.20 Tuberia 3/4" pvc sch40 ml 36.27
1.21 Tuberia 3/4" pvc sch40 ml 105.00
1.22 Tuberias 3"pvc sdr-26 m.l 157.90
1.23 Tuberias de 4"pvc sdr-26 desde solar alcaldesa a nudo 2 ml 256.24
1.24 Escalera 3/4" ud 3,000.00
1.25 Asiento de arena m3 533.33
1.26 Relleno no clasificado m3 210.00
1.27 Relleno compactado m3 325.00
1.28 Seales y Pasarelas de Tuberias 3" y 4" pvc sdr-26 m.l 9.00
1.29 Tee 4*4 PVC ud 271.79
1.30 Tee 3*3 PVC ud 350.00
1.31 Tee 3*2 PVC ud 150.00
1.32 Cruz 3*3 pvc ud 235.00
1.33 Cruz 3*2 pvc ud 175.00
1.34 CRUZ 4*3" PVC ud 575.00
1.35 Reduccion de 3*2 pvc ud 210.00
1.36 Reduccion de 2* 11/ 2"pvc ud 193.00
1.37 Codo 3*90 pvc ud 116.00
1.38 Codo 3*22o 30' curva ud 106.00
1.39 tapon 3" ud 65.46
1.40 tapon 2" ud 43.00
1.41 Cemento Tangit. ud 93.00
1.42 Cemento solvente gls. 1,034.65
1.43 anclajes de piezas especiales ud 93.00
1.44 tinacos 125 gls ud 4,975.00
1.45 Acometida urb. 3/4" sch 40 a punto agua ud 833.00
1.46 Acometida urb. 3/4" sch 40 a punto agua ud 833.00
1.47 pileta de hormigon armado ud 4,777.00
1.48 Codo 4*90 ud 187.48
1.49 Codo 3*90 ud 116.00
1.50 Codo 4*45 ud 177.48
1.51 Codo 3*45 ud 106.00
1.52 fuente punto de agua ud 3,000.00
1.53 VENTILACION 2" ud 114.00
1.54 fuente : pozo profundo 0=10 encamisado en 8" pvc sdr 21 Pie 400.00
1.55 Valvula de 3" H.F. ud 9,000.00

373701217.xls 11 de 20
373701217.xls

1.56 Valvula de 2" H.F. ud 5,000.00


1.57 Caja de valvula telescopicas.HF coloc. ud 2,100.00
1.58 Tee 4X2"HG ud 350.00
1.59 Reduccion 2" x 3/4"HG ud 275.00
1.60 Tee 2x 3/4" HG ud 325.00
1.61 llave de chorro globo 3/4 " ud 285.00
1.62 Tee 4X3"HG ud 350.00
1.63 Tee 4X4 HG ud 673.00
1.64 Niple 4X8'' HG ud 475.00
Bomba sumergible de eje vertical RPM 3500 Monobloc hp
ud 77,590.00
1.65 motor electrico monofasico 230/460 v
Bomba sumergible marca "APEC" DE 6 Etapas, Descarga 3" , con
ud 137,840.00
1.66 cheque integrado.
motor electrico Monofasico 230/460v 7.5 HP 3500 RPM eff %
ud 23,277.01
1.67 manometro en glicerina 0-100 PSI
(ver cotizacion anexa), motor electrico monofasico 10 HP
ud 158,625.00
1.68 RPM eff. 83.3 %, manometro en glicerina 0-100 PSI
1.69 electrificacion y transformador 10 KVA ud 75,000.00
1.70 plata forma y poste ud 65,000.00
1.71 Dilusion ud 84,500.00
1.72 Suministro Difusor ud 3,500.00
1.73 anclajes de piezas especiales

2.00 Mano de Obra


2.01 enrocamiento ciclopeo m3 790.00
2.02 Excavacion m3 1,200.00
2.03 Excavacin en roca dura a mano 90% m3 1,200.00
2.04 Excavacin en material tierra limosa 10% m3 550.00
2.05 Bote de material sobrante m3 289.66
2.06 Bote de material m3 210.00
2.07 Transporte interno de Tuberias 3"pvc sdr-26 m.l 15.00
2.08 Transporte interno de Tuberias 4"pvc sdr-26 m.l 25.00
2.09 Pruebas Hidrosta de Tuberias 3"pvc sdr-26 m.l 10.00
2.10 Pruebas Hidrosta de Tuberias 4"pvc sdr-26 m.l 20.00
2.11 Colocacin de Tuberias 3"pvc sdr-26 m.l 80.00
2.12 Colocacin de Tuberias 4"pvc sdr-26 m.l 85.00
2.13 Instalacion electromecanica ud 55,000.00
2.14 Mano de Obra suministro equipo de cloro por dilusion p.a. 7,000.00

3.00 Otros
3.01 Tazones adic 3 uds aumento TDH 47,587.50
3.02 verja de malla ciclonica 20.00 m.l. puerta, candado, 3 filas blocks, etc 33,450.00
Punto de agua 295705.21

373701217.xls 12 de 20
ESPECIFICACIONES TECNICAS Y RECOMENDACIONES. La Caoba y el Cumajon, Villa Hermosa La
Romana RED DE 57 BAOS.

Especificaciones:

La partida inicial de movimiento de tierras fue calculada de acuerdo con los diametros
calculados, y ubicados en este mismo libro.

Los precios de tuberia son precios actuales, al igual que los hormigones y la mano
de obra siguiendo los lineamientos de la Secretaria de Estado de Trabajo.
y los ultimos acuerdos del comite de salarios.

Las especificaciones del equipo de bombeo fueron logradas en la reunion con el presiente de Importadora.
tropical segun formulario de nuestra memoria tecnica de calculo y reuniones muy prudentes
por el tipo de equipo sumergible de los 3 pozos I, II,III sectores El Cumajon, Central y Este.
Adyacente al pozo de cada sector sera colocado un tinaco de 500 gls para la operacion automatica
y controles de niveles en cada pozo. ( encendido y apagado)

Estacion de bombeo .Se confirmaron las siguientes condiciones en este lugar :


Los equipos de bombeo operan hasta 1.50 m. sobre la rejilla con el nivel dinamico y descenso maximo.

El area del pozo sera protegida con verja de malla ciclinica, bisagra vertical y candado.

La linea de impulsion desde nudo O se considera a conectar con la red de tinacos al nudo mas cerca.
Las redes de distribucion seran PVC SDR 26 ( ASTM.= Normativa para tubos de cloruro de polivinilo

Todas las valvulas 3" y 2" seran de bronce rosca.por el costo de suministro.de globo o compuerta.

Las juntas dresser solamente a la salida del equipo de bombeo en diametro correspondiente.
La tuberia de 16" existente en calle La Ruta de la Caoba.( c/ 26 de enero) se cruza en solo un punto
En las intersecciones del D Exist.16 con la red de baos se han colocado tapones 3" H.G.

Los solares al llegar a la calle marginal sur de la Autovia Del Este se regiran por el Ayuntanuento
y por la ley 64-00 del MARN. Existe en el reglamento distancia con respecto a esta Via terrestre.

El presupuesto esta preparado para "trial and error" puede realizarse para cualquier escenario.
por ej. Si la comunidad aporta la excavacion, distancia al nudo de incorporacion al bao
A partir de cada descarga de equipo sumergible puede modificarse caudal, diametro, tipo 0, rugosidad
longitud y se obienen las presiones de cada acometida de bao.
En la red de distribucion las tuberias todas son sdr 26 o Sch 40.
La linea de impulsion desde descarga de pozo sera en HG. En el presupuesto. No uso sdr 21 pvc 1120
CALCULOS DE LONGITUDES DE TUBERIAS

RED DE BAOS SECTORES CUMAJON, CENTRAL Y ESTE

E-0 N-S

1000 380
de 3" 910 370 DE 2" Son existentes y Diam.1 1-2
750 370
* La tuberia de 3" posee una
200 380 donacion para la red
110 380 de 3000.00 ml pvc sdr 26
110 380
220 390
280 310
220 390
150 270
450 270
270
120 150 270
120 70 270
40 70 400
40 470 270
40 370 270
40 200 400
40 270

280
300 270.00
200 280.00
200 680.00
150 470.00
150 5730 470
1440 670
* 400
220
210
270
270
200
200
200
200
160
140
140
12,040

sub total 3" 19,210

suma Ln
EXC TOTALprom.
ANALISIS UNITARIOS

REGISTRO TUBO 24
De 0.00 @ 3.00 m.
1.- Excavacion Arcilla Limotosca 8.00 m3 200.00 1,600.00
2.- Relleno compactado 5.20 m3 250.00 1,300.00
3.- Bote material sobrante 2.80 m3 200.00 560.00
4.- Ladrillos 1,242.00 uds 11.00 13,662.00
5.- Cemento 15.00 fda 290.00 4,350.00
6.- Arena 1.80 m3 500.00 900.00
7.- Gravilla 1.00 m3 475.00 475.00
8.- Media Caa y fino pulido P.A. 350.00
9.- Tapa H.F.Pesada P.A. 4,060.00
10.- Escalera P.A. 2,500.00
11.- Mano de obra P.A. 2,000.00
12.- Limpieza final P.A. 250.00
CAJON HA
13- Replanteo PA 500.00
14- Hormigon armado Hormigonera As 3/8
15- Techo 0.65 m3 5,781.00 3,746.09
16- Losa de fondo 0.65 m3 5,781.00 3,746.09
17.- Muros 2.16 m3 5,781.00 12,486.96
52,486.14
TOTAL
HORMIGONES
12408 HORMIGON (1:3:5) A MANO:
1 Arena gruesa lavada. 0.5229 m3 900.00 424.86
2 Grava combinada. 0.8544 m3 1,000.00 480.60
3 Agua. 60.00 gl 0.50 19.20
4 Cemento gris. 6.40 fda 290.00 1,856.00
5 Vaciado a mano. 1.38 m3 550.00 559.80
M3 3,340.46

12409 HORMIGON (1:3:5), LIG.:


1 Arena gruesa lavada. 0.5229 m3 900.00 424.86
2 Grava combinada. 0.8544 m3 1,000.00 480.60
3 Agua. 60.00 gl 0.50 19.20
4 Cemento gris. 6.40 fda 290.00 1,856.00
5 Vaciado con, LIG.. 1.38 m3 400.00 357.32
M3 3,137.98

12410 HORMIGON (1:3:5) LIG. Y WINCHE:


1 Arena gruesa lavada. 0.5229 m3 900.00 424.86
2 Grava combinada. 0.8544 m3 1,000.00 480.60
3 Agua. 60.00 gl 0.50 19.20
4 Cemento gris. 6.40 fda 290.00 1,856.00
5 Vaciado con lig. y winche. 1.38 m3 450.00 617.56
M3 3,398.22
12411 HORMIGON (1:2:4) A MANO:
1 Arena gruesa lavada. 0.4483 m3 900.00 364.24
2 Grava combinada. 0.8976 m3 1,000.00 504.90
3 Agua. 60.00 gl 0.50 19.20
4 Cemento gris. 8.23 fda 290.00 2,386.70
5 Vaciado a mano. 1.35 m3 550.00 547.63
M3 3,822.67
4,204.94
12412 HORMIGON (1:2:4), LIG.:
1 Arena gruesa lavada. 0.4483 m3 900.00 364.24
2 Grava combinada. 0.8976 m3 1,000.00 504.90
3 Agua. 60.00 gl 0.50 19.20
4 Cemento gris. 8.23 fda 290.00 2,386.70
5 Vaciado con, LIG.. 1.35 m3 400.00 349.56
M3 3,624.60
12413 HORMIGON (1:2:4) LIG. Y WINCHE:
1 Arena gruesa lavada. 0.4483 m3 900.00 364.24
2 Grava combinada. 0.8976 m3 1,000.00 504.90
3 Agua. 60.00 gl 0.50 19.20
4 Cemento gris. 8.23 fda 290.00 2,386.70
5 Vaciado con lig. y winche. 1.35 m3 450.00 604.14
M3 3,879.18
HORMIGON ARMADO LOSAS:
LOSA H=15, 1:2:4, 3/8 @ 0.25 AD.:
ACERO DE 3/8" + 10% 1.50 qq 2,200.00 3,300.00
MANO DE OBRA ACERO 1.50 qq 333.60 500.40
SUBIDA DEL ACERO 1.50 qq 33.43 50.15
MADERA BRUTA AMERICANA(4 56.95 pc 49.19 2,801.26
alAMBRE CAL. #14 (0.15LB/M) 11.39 lb 40.00 455.60
CLAVOS DE ACERO (0.08LB/M) 0.67 lb 50.00 33.50
ALAMBRE CAL. #14 (0.15LB/M) 1.25 lb 4.00 5.00
ENCOFRADO Y DESENCOFRA 16.70 m2 84.36 1,408.81
HORM. EN LIGADORA 1:2:4 + 1.10 m3 4,200.00 4,620.00
COSTO METRO CUB 13,174.72

CASETA DE CLORACION
Limpieza y replanteo 1.0000 700.00 700.00
Block de 6" 8.0000 mt2 890.00 7,120.00
Paete pulido 16.0000 mt2 317.22 5,075.52
H.A. Losa techo 0.8000 mt2 13,174.72 10,539.78
Pintura 16.0000 mt2 150.00 2,400.00
Puerta de pino apanelada 1.8500 mt2 670.00 1,239.50
Dintel 1,30m 0.0400 mt3 19,900.00 796.00
Block calados 1.0000 p.a. 360.00 360.00
Ventilacion inferior 1.0000 p.a. 610.00 610.00
cantos 18.0000 ml 109.00 1,962.00
30,802.80
RESUMEN PRESUPUESTOS SECTORES CUMAJON CENTRAL ESTE VILLA HERMOSA. LA
ROMANA, REPUBLICA DOMINICANA
CONSULTORIA II RED DE BANOS, SANTO DOMINGO, 3 DE AGOSTO DEL 2015
Sector I
EL CUMAJON. 2,845,705.85

sector II
CENTRAL . 4,578,727.92

sector III
ESTE 4,036,655.95

TOTAL DEL PROYETO LAS CAOBAS 11,461,089.72


373701217.xls

1.00 Materiales
1.01 losa 1.00 m x 1.00 x 0.20 m3 4.76 13,200.00 62,832.00
1.02 platillo planchuela 1/4" metalica p.a. 2.00 780.00 1,560.00
1.03 sello sanitario hormigon 120 kg/cm2-10' p.a. 2.00 973.00 1,946.00
1.04 Registro 0.60x0.60 m. ud 3.00 3,000.00 9,000.00
1.05 Reduccion 4X3 PVC ud 223.00 0.00
1.06 Flota 3/4" ud 2.00 2,750.00 5,500.00
1.07 Niple 2"X24" H.G. rosca ud 3.00 645.43 1,936.29
1.08 Tinaco 500 GLS ud 4.00 12,000.00 48,000.00
1.09 Tapa de aluminio, candado ud 4.00 1,960.40 7,841.60
1.10 Valvula 3" ud 2.00 4,100.00 8,200.00
1.11 valvula 2 a tinaco 500 gls ud 3.00 275.00 825.00
1.12 Valvula 4" junta dresser ud 1.00 7,950.00 7,950.00
1.13 Valvula de 4" acero ud 2.00 6,000.00 12,000.00
1.14 Reduccion 2x3/4" HG ud 2.00 275.00 550.00
1.15 Reduccion 4x 3" HG ud 7.00 325.00 2,275.00
1.16 Codo 3X90 HG ud 2.00 115.90 231.80
1.17 Rebose 3/4" pvc ud 2.00 1,500.00 3,000.00
1.18 Junta dresser 4" ud 30.00 4,500.00 135,000.00
1.19 Tuberia 3/4" pvc sch40 ud 210.00 0.00
1.20 Tuberia 3/4" pvc sch40 ml 36.27 0.00
1.21 Tuberia 3/4" pvc sch40 ml 105.00 0.00
1.22 Tuberias 3"pvc sdr-26 m.l 4,868.00 157.90 768,657.20
1.23 Tuberias de 4"pvc sdr-26 desde solar alcaldesa a nudo 2 ml 375.00 256.24 96,090.00
1.24 Escalera 3/4" ud 3.00 3,000.00 9,000.00
1.25 Asiento de arena m3 916.74 533.33 488,924.94
1.26 Relleno no clasificado m3 783.80 210.00 164,598.00
1.27 Relleno compactado m3 4,189.38 325.00 1,361,548.50
1.28 Seales y Pasarelas de Tuberias 3" y 4" pvc sdr-26 m.l 5,243.00 9.00 47,187.00
1.29 Tee 4*4 PVC ud 1.00 271.79 271.79
1.30 Tee 3*3 PVC ud 15.00 350.00 5,250.00
1.31 Tee 3*2 PVC ud 18.00 150.00 2,700.00
1.32 Cruz 3*3 pvc ud 6.00 235.00 1,410.00
1.33 Cruz 3*2 pvc ud 1.00 175.00 175.00
1.34 CRUZ 4*3" PVC ud 1.00 575.00 575.00
1.35 Reduccion de 3*2 pvc ud 3.00 210.00 630.00
1.36 Reduccion de 2* 11/ 2"pvc ud 6.00 193.00 1,158.00
1.37 Codo 3*90 pvc ud 6.00 116.00 696.00
1.38 Codo 3*22o 30' curva ud 7.00 106.00 742.00
1.39 tapon 3" ud 23.00 65.46 1,505.58
1.40 tapon 2" ud 2.00 43.00 86.00
1.41 Cemento Tangit. ud 30.00 93.00 2,790.00
1.42 Cemento solvente gls. 7.00 1,034.65 7,242.55
1.43 anclajes de piezas especiales ud 10.00 93.00 930.00
1.44 tinacos 500 gls ud 4.00 4,975.00 19,900.00
1.45 Acometida urb. 3/4" sch 40 a punto agua ud 37.00 833.00 30,821.00
1.46 Acometida urb. 3/4" sch 40 a punto agua ud 833.00 0.00
1.47 pileta de hormigon armado ud 4,777.00 0.00
1.48 Codo 4*90 ud 2.00 187.48 374.96
1.49 Codo 3*90 ud 39.00 116.00 4,524.00
1.50 Codo 4*45 ud 1.00 177.48 177.48
1.51 Codo 3*45 ud 2.00 106.00 212.00
1.52 fuente punto de agua ud 1.00 3,000.00 3,000.00
1.53 VENTILACION 2" ud 1.00 114.00 114.00
1.54 fuente : pozo profundo 0=10 encamisado en 8" pvc sdr 21 Pie 200 400.00 80,000.00
1.55 Valvula de 3" H.F. ud 1.00 9,000.00 9,000.00
1.56 Valvula de 2" H.F. ud 5,000.00 0.00
1.57 Caja de valvula telescopicas.HF coloc. ud 4.00 2,100.00 8,400.00
1.58 Tee 4X2"HG ud 1.00 350.00 350.00
1.59 Reduccion 2" x 3/4"HG ud 1.00 275.00 275.00
1.60 Tee 2x 3/4" HG ud 1.00 325.00 325.00
1.61 llave de chorro globo 3/4 " ud 1.00 285.00 285.00
1.62 Tee 4X3"HG ud 2.00 350.00 700.00
1.63 Tee 4X4 HG ud 2.00 673.00 1,346.00
1.64 Niple 4X8'' HG ud 4.00 475.00 1,900.00
Bomba sumergible de eje vertical RPM 3500 Monobloc
ud 2.00 77,590.00 155,180.00
1.65 hp motor electrico monofasico 230/460 v
Bomba sumergible marca "APEC" DE 6 Etapas, Descarga 3" ,
ud 137,840.00 0.00
1.66 con cheque integrado.

373701217.xls 19 de 20
373701217.xls

motor electrico Monofasico 230/460v 7.5 HP 3500 RPM eff


ud 2.00 23,277.01 46,554.02
1.67 % manometro en glicerina 0-100 PSI
(ver cotizacion anexa), motor electrico monofasico 10 HP
ud 1.00 158,625.00 158,625.00
1.68 RPM eff. 83.3 %, manometro en glicerina 0-100 PSI
1.69 electrificacion y transformador 10 KVA ud 3.00 75,000.00 225,000.00
1.70 plata forma y poste ud 3.00 65,000.00 195,000.00
1.71 Dilusion ud 3.00 84,500.00 253,500.00
1.72 Suministro Difusor ud 3.00 3,500.00 10,500.00
1.73 anclajes de piezas especiales 48.00 93.00 4,464.00
Caseta de cloracion ud 3 30,802.34 92407.02
Tuberia de 3-4 HG ud 13 210.00 2730
RD$4,576,479.73
2.00 Mano de Obra
2.01 enrocamiento ciclopeo m3 4.50 790.00 3,555.00
2.02 Excavacion m3 962.14 1,200.00 1,154,568.00
2.03 Excavacin en roca dura a mano 90% m3 1,466.86 1,200.00 1,760,232.00
2.04 Excavacin en material tierra limosa 10% m3 162.98 550.00 89,639.00
2.05 Bote de material sobrante m3 330.82 289.66 95,825.32
2.06 Bote de material m3 727.14 210.00 152,699.40
2.07 Transporte interno de Tuberias 3"pvc sdr-26 m.l 4,868.00 15.00 73,020.00
2.08 Transporte interno de Tuberias 4"pvc sdr-26 m.l 375.00 25.00 9,375.00
2.09 Pruebas Hidrosta de Tuberias 3"pvc sdr-26 m.l 4,868.00 10.00 48,680.00
2.10 Pruebas Hidrosta de Tuberias 4"pvc sdr-26 m.l 375.00 20.00 7,500.00
2.11 Colocacin de Tuberias 3"pvc sdr-26 m.l 4,868.00 80.00 389,440.00
2.12 Colocacin de Tuberias 4"pvc sdr-26 m.l 375.00 85.00 31,875.00
2.13 Instalacion electromecanica ud 3.00 55,000.00 165,000.00
2.14 Mano de Obra suministro equipo de cloro por dilusion p.a. 2.00 7,000.00 14,000.00
2.15 Aforo 48 horas p.a. 1.00 53,300.00 53,300.00
2.16 Analisis fisico-quimico p.a. 2.00 6,500.00 13,000.00

RD$4,061,708.72
3.00 Otros
3.01 Tazones adic 3 uds aumento TDH 1.00 47,587.50 47,587.50
3.02 verja de malla ciclonica 20.00 m.l. puerta, candado, 3 filas blocks, etc 2.00 33,450.00 66,900.00
3.03 Punto de agua 3.00 295,705.21 887,115.63

RD$1,001,603.13

TOTAL GENERAL RD$9,639,791.59