Option -2 Flexiable with Cemented Base and Cemented Sub-base width (3+11.25+.75)*2 m
Total Construction Cost 621.21 Lacs
Routine Maintenance (lakhs per yr) 3.50 Lacs
Overlay After 5 years 40 mm BC 98.88 Lacs
After 10 years 40mmBC 98.88 Lacs
After 15 years 40 mm BC 98.88 Lacs
After 20 years 40mmBC 98.88 Lacs
After 25 years 40 mm BC 98.88 Lacs
Option -3 Flexiable with Cemented Base and Granular Sub-base Both side (3+11.25+.75)*2 m
Total Construction Cost 616.49 Lacs
Routine Maintenance (lakhs per yr) 3.50 Lacs
Overlay After 5 years 40 mm BC 98.88 Lacs
After 10 years 40mmBC 98.88 Lacs
After 15 years 40 mm BC 98.88 Lacs
After 20 years 40mmBC 98.88 Lacs
After 25 years 40 mm BC 98.88 Lacs
Six Laning of New Udaipur Bypass in the State of Rajasthan (Length 23.883 Km) on EPC Mode.