DESIGN LOADING
NOTE: Please verify existing antennas on tower. Safety shall be notified immediately if the existing antennas differ from the above listed information. Overturning Moment 7,033.06
NOTE: Please notify Safety upon installation and/or deinstallation of any antennas included in this tower assessment. Overturning Moment 4,314.40
SUMMARY:
Total Design Loads: 11,089.25 kN-m RECOMMENDATION:
Total Actual Loads: 11,347.45 kN-m
Existing tower still can accommodate the proposed
GT Tower Utilization: Tower load utilization accepted by GT is up to 105.0%. additional antenna.
HT Tower PTA Utilization: Summation of existing and proposed load %age utilization are 103.0%.
Therefore: Ok, since existing and additional antenna load is within original design load.