Project : SENORO GAS DEVELOPMENT PROJECT

Client : PT.TRIPATRA Eng&Const Volume Calculation


Sub Cont : PT.PELITA NUSA PERKASA

Work Package : Civil Work CPP AREA SEPTICKTANK


SNO-A-WB-05-096_REV 2

CALCULATION
No. Description
Tot.sum Sum/Unit dia Length (m)
1 2 3 4 5 6

EARTH WORK
1) Soil Excavation
- Septictank 21.00 1.00
- Basin 21.00 1.00
- Resapan 21.00 1.00

2) Soil Disposal
- Septictank 21.00 1.00
21.00 1.00
21.00 1.00
21.00 1.00
21.00 1.00
21.00 2.00
21.00 2.00
- Basin 21.00 1.00
21.00 2.00
21.00 2.00
- Resapan 21.00 1.00

3) Soil Backfill & Compaction


- Soil Excavation 21.00 1.00
- Soil Disposal 21.00 1.00

4) Compacted Subgrade
- Septictank 21.00 1.00
- Basin 21.00 1.00
- Resapan 21.00 1.00

5) Sand Bedding
- Resapan 21.00 1.00

6) Compacted Gravel 1/2 - 1 1/2


- Resapan 21.00 1.00

7) Geomembrane 0.5 mm
- Resapan 21.00 1.00

CONCRETE WORK
1) Concrete fc 28 Mpa
Septicktank
- Lantai 21.00 1.00
- Plat Atas-1 21.00 1.00
- Plat Atas-2 + Cover 21.00 1.00
- Dinding Axis Y-1 21.00 1.00
- Dinding Axis Y-2 21.00 1.00
- Dinding Axis X-1 21.00 2.00
- Dinding Axis X-2 21.00 2.00
- Partisi Dinding dalam 1 21.00 1.00
- Partisi Dinding dalam 2 21.00 1.00
- Dinding Axis Y-3 21.00 1.00
Basin
- Lantai 21.00 1.00
- Dinding 21.00 2.00
21.00 2.00
- Cover 21.00 1.00

2) Reinforcing Bar,
- D10 0.00 0.00
- D13 21.00 1.00
- D16 21.00 1.00
- D19 0.00 0.00
- D22 0.00 0.00

3) Formwork
Septicktank
- Lantai 21.00 1.00
- Plat Atas-1 21.00 1.00
- Plat Atas-2 + Cover 21.00 1.00
- Dinding Axis Y-1 21.00 1.00
- Dinding Axis Y-2 21.00 1.00
- Dinding Axis X-1 21.00 2.00
- Dinding Axis X-2 21.00 2.00
- Partisi Dinding dalam 1 21.00 1.00
- Partisi Dinding dalam 2 21.00 1.00
- Dinding Axis Y-3 21.00 1.00
Basin
- Lantai 21.00 1.00
- Dinding 21.00 2.00
21.00 2.00
- Cover 21.00 1.00

4) Lean Concrete
- Lantai Septicktank 21.00 1.00
- Lantai Basin 21.00 1.00

5) PVC
- Pipe 4" 21.00 5.00

6) Aksesoris
- Ventilasi Pipe 2" 21.00 1.00
- Socket Pipe PVC 4" 21.00 5.00
- L 45 4" 21.00 3.00
Date Print 01-December-2017
olume Calculation Revision
Calculate by SA
CPP AREA SEPTICKTANK Checked by
SNO-A-WB-05-096_REV 2
Approval by
CALCULATION
Remark
Width (m) High (m) Volume
7 8 10 11

m3
m3
m3
m3

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

m3
m3
m3

m2
m2
m2
m2

m3
m3

m3
m3

m2
m2

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

kg
kg
kg
kg
kg
kg

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

m3
m3
m3

m
m

ea
ea
ea
BILL OF QUANTITY

Project Name : Senoro Gas Development Project


Work Package : General Civil, Tank Foundation, and Building Works
Client : PT. Tripatra Engineers & Constructors
Subcontractor : PT. Pelita Nusa Perkasa
Work Tittle : SEPTICKTANK
WO No. : 9608-WO-PNP-172
Area : CPP All Area

NO DESIGNATION
UNIT
SEPTICKTANK
I EARTH WORK
1 Soil Excavation m3
2 Soil Disposal m3
3 Soil Backfill & Compaction m3
4 Compacted Soil m2

II CONCRETE WORK
1 Concrete fc 28 Mpa m3
2 Rebar Ton
3 Formwork m2
4 Lean Concrete m3

III PLUMBING
1 - Pipe 4" m
2 - Ventilasi Pipe 2" m
3 - Socket Pipe PVC 4" ea
4 - L 45 4" ea

Work commencements date : th, 2014 Work completion date :

Issued by Review by : Approved by : Accepted by

PT. PNP TSC


Name Name
Construction Lead Construction Engineer
Title Project Control Site Manager Title
Engineer Building
Date 11/7/2014 11/7/2014 11/7/2014 Date 11/7/2014

Note : Calculation untuk 1 unit Septictank


VOLUME

:
Lead Construction Engineer
Building
11/7/2014