OBRA MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL JIRN AGUSTN MEJA TRAMO ENTRE EL JR. AM
AGUSTN LOLI Y ULTIMA CUADRA DE LA AV. AGUSTN GAMARRA TRAMO ENTRE PUENTE GAMARRA E INIC
GAMARRA, DISTRITO DE HUARAZ, PROVINCIA DE HUARAZ-ANCASH
1 de 14
PRESUPUESTO DEDUCTIVO
OBRA MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL JIRN AGUSTN MEJA TRAMO ENTRE EL JR. AM
AGUSTN LOLI Y ULTIMA CUADRA DE LA AV. AGUSTN GAMARRA TRAMO ENTRE PUENTE GAMARRA E INIC
GAMARRA, DISTRITO DE HUARAZ, PROVINCIA DE HUARAZ-ANCASH
01.07 PAVIMENTOS
01.07.01 BASE GRANULAR
01.07.01.01 PREPARACIN DE MATERIAL EN OBRA (EXTRACCION Y APILAMIENTO).
01.07.01.02 CARGUIO DE MATERIAL EXTRAIDO
01.07.01.03 TRANSPORTE DE MATERIAL DE OBRA AL LUGAR DE ZARNADEO.
01.07.01.04 ZARANDEO.
01.07.01.05 CARGUIO DE MATERIAL SELECCIONADO
01.07.01.06 TRANSPORTE DE MATERIAL A OBRA .
01.07.01.07 ESPARCIDO, NIVELADO Y COMPACTADO...
01.07.02 PAVIMENTO RIGIDO
01.07.02.01 ENCOFRADO Y DESENCOFRADO DE PAVIMENTO RGIDO.
01.07.02.02 CONCRETO f'c=280 kg/cm2 PARA LOSA RGIDA
01.07.02.03 CURADO DE CONCRETO.
01.07.03 PAVIMENTO EMBOQUILLADO
01.07.03.01 ENCOFRADO Y DESENCOFRADO DE PAVIMENTO EMBOQUILLADO.
01.07.03.02 CONCRETO CICLOPEO f'c=175 kg/cm2 + 70 % PG.
01.07.03.03 CURADO DE CONCRETO.
01.08 JUNTAS
01.08.01 JUNTA DE AISLAMIENTO, TIPO A
01.08.02 JUNTA DE DILATACION (D=3/4"@ 0.30 m, L=0.40m) TIPO B
01.08.03 JUNTA LONGITUDINAL DE CONSTRUCCION (D=1/2''@0.8m, L=0.8m), TIPO C,
01.08.04 JUNTA TRANSVERSAL DE CONTRACCIN, TIPO D.
01.09 PINTURA EN PAVIMENTOS
01.09.01 PINTURA LINEAL CONTINUA.
01.09.02 PINTURA LINEAL DISCONTINUA
01.09.03 PINTURA PARA PASE PEATONAL
01.10 PRUEBAS DE CONTROL
01.10.01 PRUEBA COMPACTACIN SUELOS (PROCTOR MODIFICADO DENSIDAD DE CAMPO).
01.10.02 PRUEBA DE RESISTENCIA A LA COMPRESIN DEL CONCRETO
02 VEREDAS DE CONCRETO
02.01 OBRAS PRELIMINARES
02.01.01 TRAZO Y NIVELACIN DURANTE LA EJECUCIN DE LA OBRA..,
02.02 MOVIMIENTO DE TIERRAS
02.02.01 EXCAVACION MANUAL EN TERRENO CONGLOMERADO
02.02.02 PERFILADO Y COMPACION DE SUB-RASANTE,
2 de 14
PRESUPUESTO DEDUCTIVO
OBRA MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL JIRN AGUSTN MEJA TRAMO ENTRE EL JR. AM
AGUSTN LOLI Y ULTIMA CUADRA DE LA AV. AGUSTN GAMARRA TRAMO ENTRE PUENTE GAMARRA E INIC
GAMARRA, DISTRITO DE HUARAZ, PROVINCIA DE HUARAZ-ANCASH
3 de 14
PRESUPUESTO DEDUCTIVO
OBRA MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL JIRN AGUSTN MEJA TRAMO ENTRE EL JR. AM
AGUSTN LOLI Y ULTIMA CUADRA DE LA AV. AGUSTN GAMARRA TRAMO ENTRE PUENTE GAMARRA E INIC
GAMARRA, DISTRITO DE HUARAZ, PROVINCIA DE HUARAZ-ANCASH
COSTO DIRECTO
GASTOS GENERALES
UTILIDAD
SUB-TOTAL
4 de 14
PRESUPUESTO DEDUCTIVO
OBRA MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL JIRN AGUSTN MEJA TRAMO ENTRE EL JR. AM
AGUSTN LOLI Y ULTIMA CUADRA DE LA AV. AGUSTN GAMARRA TRAMO ENTRE PUENTE GAMARRA E INIC
GAMARRA, DISTRITO DE HUARAZ, PROVINCIA DE HUARAZ-ANCASH
IGV (18.00%)
VALORIZACIONES
5 de 14
DUCTIVO
TRAMO ENTRE EL JR. AMADEO FIGUEROA Y EL JR.
UENTE GAMARRA E INICIO DE LA BERMA DE LA AV.
PRESUPUESTADO DEDUCTIVO
Und.
Precio Parcial Parcial
Metrado Metrado
S/. S/. S/.
0.00 0.00
0.00 0.00
m2 97.00 70.36 6,824.92 0.00
0.00 0.00
u 4.00 292.65 1,170.60 0.00
m2 1,260.32 1.43 1,802.26 0.00
m2 1,260.32 1.88 2,369.40 0.00
u 2.00 856.26 1,712.52 0.00
m3 1.06 166.25 176.23 0.00
m3 2.40 61.55 147.72 0.00
m3 169.88 61.55 10,456.11 0.00
glb 1.00 3,281.83 3,281.83 0.00
0.00 0.00
m3 256.38 40.35 10,344.93 0.00
m3 144.11 6.96 1,003.01 0.00
m2 1,372.01 2.77 3,800.47 0.00
m3 606.27 14.63 8,869.73 0.00
m3 606.27 4.35 2,637.27 0.00
0.00 0.00
m2 22.71 67.64 1,536.10 0.00
kg 153.99 4.72 726.83 0.00
m3 1.67 477.80 797.93 0.00
u 3.00 159.25 477.75 0.00
m2 1.67 2.84 4.74 0.00
0.00 0.00
m3 80.56 40.35 3,250.60 0.00
m2 67.13 6.17 414.19 0.00
m3 23.50 82.78 1,945.33 0.00
m3 33.57 58.82 1,974.59 0.00
m3 56.39 23.97 1,351.67 0.00
m 111.89 30.02 3,358.94 0.00
m 111.89 1.93 215.95 0.00
u 4.00 66.37 265.48 0.00
0.00 0.00
u 4.00 106.37 425.48 0.00
6 de 14
DUCTIVO
TRAMO ENTRE EL JR. AMADEO FIGUEROA Y EL JR.
UENTE GAMARRA E INICIO DE LA BERMA DE LA AV.
PRESUPUESTADO DEDUCTIVO
Und.
Precio Parcial Parcial
Metrado Metrado
S/. S/. S/.
0.00 0.00
0.00 0.00
m3 256.38 11.21 2,874.02 0.00
m3 294.84 2.38 701.72 0.00
m3 294.84 2.11 622.11 0.00
m3 294.84 6.84 2,016.71 0.00
m3 294.84 2.56 754.79 0.00
m3 294.84 2.11 622.11 0.00
m2 1,281.92 4.09 5,243.05 0.00
0.00 0.00
m2 153.60 36.54 5,612.54 0.00
m3 214.17 486.14 104,116.60 143.14 69,586.08
m2 1,027.60 2.84 2,918.38 0.00
0.00 0.00
m2 80.10 32.83 2,629.68 14.12 463.56
m3 54.06 178.72 9,661.60 52.04 9,300.59
m2 360.38 2.84 1,023.48 123.77 351.51
0.00 0.00
m 343.20 6.88 2,361.22 0.00
m 70.72 30.84 2,181.00 0.00
m 183.32 7.08 1,297.91 0.00
m 170.76 7.45 1,272.16 0.00
0.00 0.00
m 237.72 2.79 663.24 0.00
m 146.91 2.79 409.88 0.00
m2 113.76 6.62 753.09 0.00
0.00 0.00
u 9.00 195.60 1,760.40 0.00
u 33.00 35.63 1,175.79 0.00
0.00 0.00
0.00 0.00
m2 16.00 1.88 30.08 16.00 30.08
0.00 0.00
m3 2.04 40.35 82.31 2.04 82.31
m2 2.04 2.10 4.28 2.04 4.28
7 de 14
DUCTIVO
TRAMO ENTRE EL JR. AMADEO FIGUEROA Y EL JR.
UENTE GAMARRA E INICIO DE LA BERMA DE LA AV.
PRESUPUESTADO DEDUCTIVO
Und.
Precio Parcial Parcial
Metrado Metrado
S/. S/. S/.
m3 2.34 23.97 56.09 2.34 56.09
m3 2.34 9.76 22.84 2.34 22.84
m3 2.34 4.35 10.18 2.34 10.18
0.00 0.00
m3 2.34 4.81 11.26 2.34 11.26
m3 2.34 2.38 5.57 2.34 5.57
m3 2.34 2.11 4.94 2.34 4.94
m3 2.34 6.84 16.01 2.34 16.01
m3 2.34 2.56 5.99 2.34 5.99
m3 2.34 2.11 4.94 2.34 4.94
m2 16.00 4.09 65.44 16.00 65.44
0.00 0.00
m2 7.42 61.48 456.18 7.42 456.18
m3 2.88 381.54 1,098.84 2.88 1,098.84
m2 16.00 2.84 45.44 16.00 45.44
0.00 0.00
m 7.15 7.45 53.27 7.15 53.27
m 20.95 7.45 156.08 20.95 156.08
0.00 0.00
u 3.00 35.63 106.89 3.00 106.89
u 3.00 195.60 586.80 3.00 586.80
0.00 0.00
0.00 0.00
m2 30.30 1.88 56.96 10.14 19.06
0.00 0.00
m3 25.45 40.35 1,026.91 10.63 428.92
m3 10.91 52.60 573.87 4.56 239.86
m2 30.30 6.97 211.19 10.14 70.68
m3 47.83 23.97 1,146.49 22.01 527.58
m3 47.83 9.76 466.82 22.01 214.82
m3 47.83 4.35 208.06 22.01 95.74
0.00 0.00
0.00 0.00
m2 40.61 50.48 2,049.99 20.10 1,014.65
kg 768.26 4.51 3,464.85 431.44 1,945.79
8 de 14
DUCTIVO
TRAMO ENTRE EL JR. AMADEO FIGUEROA Y EL JR.
UENTE GAMARRA E INICIO DE LA BERMA DE LA AV.
PRESUPUESTADO DEDUCTIVO
Und.
Precio Parcial Parcial
Metrado Metrado
S/. S/. S/.
m3 9.61 477.80 4,591.66 5.15 2,460.67
m2 40.61 2.84 115.33 32.64 92.70
0.00 0.00
m2 20.04 45.49 911.62 0.00 0.00
kg 290.81 4.51 1,311.55 63.51 286.43
m3 7.38 477.80 3,526.16 0.94 449.13
m2 10.02 2.84 28.46 4.60 13.06
0.00 0.00
m 17.65 869.88 15,353.38 10.95 9,525.19
0.00 0.00
u 1.00 159.25 159.25 1.00 159.25
0.00 0.00
m 20.40 6.88 140.35 0.65 4.47
m 9.20 7.45 68.54 2.90 21.61
0.00 0.00
u 3.00 35.63 106.89 1.00 35.63
0.00 0.00
0.00 0.00
glb 1.00 1,467.12 1,467.12 0.00
glb 1.00 750.00 750.00 0.00
glb 1.00 500.00 500.00 0.00
glb 1.00 450.00 450.00 0.00
0.00 0.00
glb 1.00 1,175.00 1,175.00 0.00
glb 1.00 3,424.59 3,424.59 0.00
glb 1.00 1,222.18 1,222.18 0.00
glb 1.00 595.65 595.65 0.00
glb 1.00 1,491.60 1,491.60 0.00
glb 1.00 999.33 999.33 0.00
272,431.29 100,130.41
11.58% 31,540.50 11.58% 11,592.51
10.00% 27,243.13 10.00% 10,013.04
331,214.92 121,735.96
9 de 14
DUCTIVO
TRAMO ENTRE EL JR. AMADEO FIGUEROA Y EL JR.
UENTE GAMARRA E INICIO DE LA BERMA DE LA AV.
PRESUPUESTADO DEDUCTIVO
Und.
Precio Parcial Parcial
Metrado Metrado
S/. S/. S/.
18.00% 59,618.68 18.00% 21,912.46
390,833.60 143,648.42
10 de 14
PRESUPUESTO ADICIONAL
OBRA MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL JIRN AGUSTN MEJA TRAMO ENTRE EL JR. AMADEO FIGUEROA Y EL JR.
AGUSTN LOLI Y ULTIMA CUADRA DE LA AV. AGUSTN GAMARRA TRAMO ENTRE PUENTE GAMARRA E INICIO DE LA BERMA DE LA AV.
GAMARRA, DISTRITO DE HUARAZ, PROVINCIA DE HUARAZ-ANCASH
Precio Parcial
Item Descripcin Partida Und. Metrado
S/. S/.
SUB-TOTAL 170,097.65
IGV (18.00%) 18.00% 30,617.57
VALORIZACIONES 200,715.22
11 de 14
DESAGREGADO DE PARTIDAS
OBRA MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL JIRN AGUSTN MEJA TRAMO ENTRE EL JR. AMADEO FIGUEROA Y EL JR.
AGUSTN LOLI Y ULTIMA CUADRA DE LA AV. AGUSTN GAMARRA TRAMO ENTRE PUENTE GAMARRA E INICIO DE LA BERMA DE LA AV.
GAMARRA, DISTRITO DE HUARAZ, PROVINCIA DE HUARAZ-ANCASH
Precio Parcial
Item Descripcin Partida Und. Metrado
S/. S/.
12 de 14
DESAGREGADO DE PARTIDAS
OBRA MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL JIRN AGUSTN MEJA TRAMO ENTRE EL JR. AMADEO FIGUEROA Y EL JR.
AGUSTN LOLI Y ULTIMA CUADRA DE LA AV. AGUSTN GAMARRA TRAMO ENTRE PUENTE GAMARRA E INICIO DE LA BERMA DE LA AV.
GAMARRA, DISTRITO DE HUARAZ, PROVINCIA DE HUARAZ-ANCASH
Precio Parcial
Item Descripcin Partida Und. Metrado
S/. S/.
01.08.02 JUNTA DE DILATACION (D=3/4"@ 0.30 m, L=0.40m) TIPO B m 70.72 30.84 2,181.00
01.08.03 JUNTA LONGITUDINAL DE CONSTRUCCION (D=1/2''@0.8m, L=0.8m), TIPO C, m 183.32 7.08 1,297.91
01.08.04 JUNTA TRANSVERSAL DE CONTRACCIN, TIPO D. m 170.76 7.45 1,272.16
01.09 PINTURA EN PAVIMENTOS 0.00
01.09.01 PINTURA LINEAL CONTINUA. m 237.72 2.79 663.24
01.09.02 PINTURA LINEAL DISCONTINUA m 146.91 2.79 409.88
01.09.03 PINTURA PARA PASE PEATONAL m2 113.76 6.62 753.09
01.10 PRUEBAS DE CONTROL 0.00
01.10.01 PRUEBA COMPACTACIN SUELOS (PROCTOR MODIFICADO DENSIDAD DE CAMPO). u 9.00 195.60 1,760.40
01.10.02 PRUEBA DE RESISTENCIA A LA COMPRESIN DEL CONCRETO u 33.00 35.63 1,175.79
02 VEREDAS DE CONCRETO 0.00
02.01 OBRAS PRELIMINARES 0.00
02.01.01 TRAZO Y NIVELACIN DURANTE LA EJECUCIN DE LA OBRA.., m2 16.00 1.88 30.08
02.02 MOVIMIENTO DE TIERRAS 0.00
02.02.01 EXCAVACION MANUAL EN TERRENO CONGLOMERADO m3 2.04 40.35 82.31
02.02.02 PERFILADO Y COMPACION DE SUB-RASANTE, m2 2.04 2.10 4.28
02.02.03 ELIMINACIN DE MATERIAL EXCEDENTE DENTRO DE OBRA m3 2.34 23.97 56.09
02.02.04 ELIMINACIN DE MATERIAL EXCEDENTE FUERA DE OBRA A BOTADERO.. m3 2.34 9.76 22.84
02.02.05 CONFORMACION DE DEPOSITO DE MATERIAL EXCEDENTE, m3 2.34 4.35 10.18
02.03 BASE GRANULAR 0.00
02.03.01 PREPARACIN DE MATERIAL EN OBRA (EXTRACCION Y APILAMIENTO). m3 2.34 4.81 11.26
02.03.02 CARGUIO DE MATERIAL EXTRAIDO m3 2.34 2.38 5.57
02.03.03 TRANSPORTE DE MATERIAL DE OBRA AL LUGAR DE ZARNADEO. m3 2.34 2.11 4.94
02.03.04 ZARANDEO. m3 2.34 6.84 16.01
02.03.05 CARGUIO DE MATERIAL SELECCIONADO m3 2.34 2.56 5.99
02.03.06 TRANSPORTE DE MATERIAL A OBRA . m3 2.34 2.11 4.94
02.03.07 ESPARCIDO, NIVELADO Y COMPACTADO... m2 16.00 4.09 65.44
02.04 VEREDAS DE CONCRETO 0.00
02.04.01 ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 7.42 61.48 456.18
02.04.02 CONCRETO f'c=175 kg/cm2, BRUNADO CADA 10cm, ACABADO DE 1.5cm MEZCLA.. m3 2.88 381.54 1,098.84
02.04.03 CURADO DE CONCRETO. m2 16.00 2.84 45.44
02.05 JUNTAS 0.00
02.05.01 JUNTA DE CONTRACCIN DE 1" x 2" @ 3.5 m... m 7.15 7.45 53.27
02.05.02 JUNTA DE CONTRACCIN DE 1" x 6" @ 14.00 m... m 20.95 7.45 156.08
02.06 PRUEBAS DE CONTROL 0.00
02.06.01 PRUEBA DE RESISTENCIA A LA COMPRESION DEL CONCRETO u 3.00 35.63 106.89
02.06.02 PRUEBA COMPACTACION SUELOS (PROCTOR MODIFICADO DENSIDAD DE CAMPO) u 3.00 195.60 586.80
03 DESAGUE PLUVIAL 0.00
03.01 OBRAS PRELIMINARES 0.00
03.01.01 TRAZO Y NIVELACIN DURANTE LA EJECUCIN DE LA OBRA.., m2 30.30 1.88 56.96
03.02 MOVIMIENTO DE TIERRAS 0.00
03.02.01 EXCAVACION MANUAL EN TERRENO CONGLOMERADO m3 25.45 40.35 1,026.91
03.02.02 EXCAVACION MANUAL EN TERRENO ROCOSO.. m3 10.91 52.60 573.87
03.02.03 REFINE Y NIVELACIN DE FONDOS EN TERRENO NORMAL m2 30.30 6.97 211.19
03.02.04 ELIMINACIN DE MATERIAL EXCEDENTE DENTRO DE OBRA m3 47.83 23.97 1,146.49
03.02.05 ELIMINACIN DE MATERIAL EXCEDENTE FUERA DE OBRA A BOTADERO.. m3 47.83 9.76 466.82
03.02.06 CONFORMACION DE DEPOSITO DE MATERIAL EXCEDENTE, m3 47.83 4.35 208.06
03.03 CONCRETO ARMADO 0.00
03.03.01 CANAL TAPADO DRENAJE PLUVIAL 0.00
03.03.01.01 ENCOFRADO Y DESENCOFRADO m2 40.61 50.48 2,049.99
03.03.01.02 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 768.26 4.51 3,464.85
03.03.01.03 CONCRETO f'c=210 kg/cm2 m3 9.61 477.80 4,591.66
03.03.01.04 CURADO DE CONCRETO. m2 40.61 2.84 115.33
03.03.02 CANAL ABIERTO SUMIDERO 0.00
13 de 14
DESAGREGADO DE PARTIDAS
OBRA MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL JIRN AGUSTN MEJA TRAMO ENTRE EL JR. AMADEO FIGUEROA Y EL JR.
AGUSTN LOLI Y ULTIMA CUADRA DE LA AV. AGUSTN GAMARRA TRAMO ENTRE PUENTE GAMARRA E INICIO DE LA BERMA DE LA AV.
GAMARRA, DISTRITO DE HUARAZ, PROVINCIA DE HUARAZ-ANCASH
Precio Parcial
Item Descripcin Partida Und. Metrado
S/. S/.
SUB-TOTAL 331,214.92
IGV (18.00%) 18.00% 59,618.68
VALORIZACIONES 390,833.60
14 de 14