Item Study Process Guideword Deviation Possible Causes Possible Consequences Action Required

Node parameters
1. 1. Temperature 1.1 High 1.1.1 High 1.1.1.1 The 1.1.1.1.1 Process fluid 1.1.1.1.1.1 Install flow
Reactor temperature flowrate of inlet temperature indicator
Cooler of gas from process fluid is not before E-202
E-201 stream 6 to 7 into E-202 is lowered together
low accordingly with High
Flow alarm.
1.1.1.2 Leakage 1.1.1.1.1.2 Use high
of pipeline grade
before process material to
fluid enter E- build the
202 pipeline.

1.2 Low 1.2.1 Low 1.2.1.1 The 1.2.1.1.1 Output of 1.2.1.1.1.1 Install flow
temperature Flowrate of process fluid indicator before E-202
of gas from inlet process temperature too High together with Low flow
stream 6 to 7 fluid into E-202 alarm
is high
1.3 1.3.1 Output 1.3.1.1 1.3.1.1.1 outlet 1.3.1.1.1 Proper
Contamination Process fluid Contamination temperature too low maintenance and
contamination in Inlet process operator alert
fluid
1.4 1.4.1 1.4.1. Presence 1.4.1.1. less cooling 1.4.1.1.1 Proper
Corrosion Corrosion of of contaminant crack of tube maintenance
tube in gas such as
02, H2S and CO2.
2. Pressure 2.1 High 2.1.1 High 2.1.1 Blockage 2.1.1.1 Will cause 2.1.1.1.1 Install
pressure build of the system rupture of heat pressure
up in system exchanger alarm.
Pressure
Alarm High
(PAH)
2.1.1.1.2 Install
pressure
relief
2.1.1.1.3 Effective
maintenance