You are on page 1of 56

Abstract of Pipe CULVERTS

Item Pipe
Item Description Unit
No. Culvert
Earthwork in excavation for foundation in structure including
5.01 all leads and lifts as per drawing and Technical specifications Cum 4043.47
clause no 304
Providing Back filling behind abutments, wing walls and return
walls, with selected imported granular material of approved
5.02 Cum 787.09
quality including all leads and lifts complete as per Technical
Specification Clause 305.
Filter media behind abutments,wing walls and return walls
5.03 complete with all leads and lifts as per drawing and Technical Cum
Specification Clause 2200

Providing and laying in position Plain Cement Concrete of


Grade M -15 in levelling course below open foundations,
5.04 abutment, pile caps, approach slabs, retaning wall , wing Cum 60.03
wall,box structure ,curtain wall, floor apron as per drawings
and Technical Specifications Sections 1700 and 2700

Providing and laying in position Plain/ Reinforced cement


concrete for foundations and substructure excluding cost of
steel complete as per drawing and Technical Specifications
5.05 Section 1500,1700, 2100 & 2200
a) M15 grade Cum
b) M 20 grade Cum 588
c) M25 grade
d) CRM
Providing and laying Reinforced cement concrete for box /
slab culverts in superstructure excluding cost of steel
Cum 47.0
5.06 complete as per drawing and Technical Specifications Sections
1500, 1700 and 2300
a) M 25 grade Cum
Providing and laying Head Wall of Pipe culvert/
Abutment/Pier/ Wing walls of culverts of Brick Masonary/
5.07 Cum
Stone masonary parapet etc.as per drawing and Technical
Specifications and as per direction of the Engineer
HYSD bar reinforcement complete for foundation,
5.08 substructure and superstructure as per drawing and Technical MT
Specification clause no 1600.
Providing and laying Stone pitching/Apron complete as per
5.09 Cum 482.27
drawings and Technical Specification 2504
Providing and laying filter media below stone pitching/ apron
5.10 Cum 241.14
complete as per, Technical Specification Clause 2504

Providing weep holes in abutments, wing walls and return


5.11 walls complete as per drawing and Technical Specification No.
2706.
Providing and fixing Asphaltic plug type expansion joints
5.12 complete as per drawing and Technical Specifications Section Lm
2600.
Painting culvert No. complete as per Technical specification
5.13 Nr. 68
section 800
Providing and laying selected granular material for pipe
5.14 bedding as per drawing and technical specification clause Cum 0.00
2904
Providing, laying and jointing NP-4 (as per IS: 458-1988)
Hume pipes for culverts complete as per drawing and Lm
technical specification section 2900 and IRC : SP : 13-1973.
5.15 a) 600 dia Lm
b) 750 dia Lm
c) 900 dia Lm
d) 1000 dia Lm 0.00
e) 1200 dia Lm 1366.80
Providing and fixing in position drainage spouts complete as
5.16 Nr.
per drawings and Technical Specifications Clause 2705 .
Providing and laying tar paper bearing complete as per IS-
5.17 Sqm
1398 & Technical Specification section 2000 .
M20 RCC Precast Guard Stone in M15 Foundation Block as per
5.18 Nr.
drawing and technical specification section 1700
Cement plaster 12mm thick in cement mortar 1:3 complete as
5.19 per drawing and Technical Specifications Section 1000 and Sqm
1300 and as directed by the Engineer
Dismantling structures (superstructure, substructure,
foundation and other miscellaneous structures), dismantling
of pavements as per Technical Specification Clause 202,
section 2800
5.20
a) Brick/ Stone masonary Cum 0.00
b) PCC Cum
c) RCC Cum
d) RCC Pipe Lm
1000 thick flexible stone apron as per Clause No. 2503.1 of
5.21 Cum
MOST specification and as per direction of the Engineer
150 mm thick Flat stone apron embedded in 300 thick M15
5.22 concrete as per Clause No. 2505.2 of MOST specification and Sqm
as per direction of the Engineer
Providing Reinforced Cement Concrete M 30 grade in
approach slabs including reinforcement complete as per
5.23 Cum
drawings and Technical Specifications 1500,1600 and 1700 &
2704
Providing and laying in position 65 mm thick wearing coat
consisting of 40 mm thick bituminous concrete over a 25 mm
5.24 thick layer of mastic asphalt over deck slab after applying Sqm
prime coat complete as per drawings and Technical
Specifications Sections 500
Construction of precast RCC railing of M30 Grade including
5.25 Lm
steel (Concrete 0.085 Cum/Rmt and steel 18 Kg/Rmt),

Length of
Pipes
pipe
1.2 m dia -
1.0 m dia -
0.9 m dia -
QUANTITY ESTIMATION FOR PIPE CULVERTS

Sl. No. Proposed Recommendation Dia of No of Proposed


Chainage Pipe (m) Rows total
(Km) width (m)
Proposed Proposed
(m)

1 10.060 Pipe Reconstruction 1X1.2 1.2 1 32.40


2 10.910 Pipe Reconstruction 1x1.2 1.2 1 32.40
3 13.196 Pipe Reconstruction 1x1.2 1.2 1 32.40
4 14.102 Pipe Reconstruction 1x1.2 1.2 1 32.40
5 20.712 Pipe Reconstruction 1x1.2 1.2 1 32.40
6 22.491 Pipe Reconstruction 1x1.2 1.2 1 32.40
7 12.225 Pipe New 1x1.2 1.2 1 32.40
8 9.258 Pipe New 2x1.2 1.2 2 32.40
9 9.400 Pipe New 1x1.2 1.2 1 32.40
10 9.700 Pipe New 1x1.2 1.2 1 32.40
11 10.600 Pipe New 2x1.2 1.2 2 32.40
12 13.500 Pipe New 2x1.2 1.2 2 32.40
13 14.685 Pipe New 2x1.2 1.2 2 32.40
14 16.500 Pipe New 1x1.2 1.2 1 32.40
15 17.500 Pipe New 2x1.2 1.2 2 32.40
16 17.930 Pipe New 2x1.2 1.2 2 32.40
17 22.250 Pipe New 1x1.2 1.2 1 32.40
18 23.255 Pipe New 1x1.2 1.2 1 32.40
19 24.200 Pipe New 2x1.2 1.2 2 32.40
20 24.701 Pipe New 1x1.2 1.2 1 32.40
21 25.400 Pipe New 1x1.2 1.2 1 32.40
22 25.934 Pipe New 1x1.2 1.2 1 32.40
23 33.050 Pipe New 1x1.2 1.2 1 32.40
24 33.375 Pipe New 1x1.2 1.2 1 32.40
25 34.000 Pipe New 1x1.2 1.2 1 32.40
26 34.500 Pipe New 1x1.2 1.2 1 32.40
27 34.853 Pipe New 1x1.2 1.2 1 32.40
28 36.200 Pipe New 1x1.2 1.2 1 32.40
29 37.950 Pipe New 1x1.2 1.2 1 32.40
30 38.600 Pipe New 1x1.2 1.2 1 32.40
31 39.705 Pipe New 2x1.2 1.2 2 32.40
32 40.200 Pipe New 1x1.2 1.2 1 32.40
33 41.000 Pipe New 1x1.2 1.2 1 32.40
34 41.388 Pipe New 1x1.2 1.2 1 32.40
New Head Excavation Backfill PCC M15 Head wall Granular Length of 300 thick 300 thick
wall Width (m3) (m3) (m3) M20 (m3) material Pipe apron stone
(m) (m3) pitching
(m3)

7.60 84.50 14.58 1.71 17.00 34.44 34.80 10.26 3.70


7.60 84.50 14.58 1.71 17.00 34.44 34.80 10.26 3.70
7.60 84.50 14.58 1.71 17.00 34.44 34.80 10.26 3.70
7.60 84.50 14.58 1.71 17.00 34.44 34.80 10.26 3.70
7.60 84.50 14.58 1.71 17.00 34.44 34.80 10.26 3.70
7.60 84.50 14.58 1.71 17.00 34.44 34.80 10.26 3.70
7.60 84.50 14.58 1.71 17.00 34.44 34.80 10.26 3.70
9.60 250.23 55.26 2.16 20.38 136.62 67.20 12.96 3.70
7.60 84.50 14.58 1.71 17.00 34.44 34.80 10.26 3.70
7.60 84.50 14.58 1.71 17.00 34.44 34.80 10.26 3.70
9.60 250.23 55.26 2.16 20.38 136.62 67.20 12.96 3.70
9.60 250.23 55.26 2.16 20.38 136.62 67.20 12.96 3.70
9.60 250.23 55.26 2.16 20.38 136.62 67.20 12.96 3.70
7.60 84.50 14.58 1.71 17.00 34.44 34.80 10.26 3.70
9.60 250.23 55.26 2.16 20.38 136.62 67.20 12.96 3.70
9.60 250.23 55.26 2.16 20.38 136.62 67.20 12.96 3.70
7.60 80.79 13.55 1.71 17.00 32.07 32.40 10.26 3.70
7.60 80.79 13.55 1.71 17.00 32.07 32.40 10.26 3.70
9.60 242.61 53.26 2.16 20.38 131.74 64.80 12.96 3.70
7.60 80.79 13.55 1.71 17.00 32.07 32.40 10.26 3.70
7.60 80.79 13.55 1.71 17.00 32.07 32.40 10.26 3.70
7.60 80.79 13.55 1.71 17.00 32.07 32.40 10.26 3.70
7.60 80.79 13.55 1.71 17.00 32.07 32.40 10.26 3.70
7.60 80.79 13.55 1.71 17.00 32.07 32.40 10.26 3.70
7.60 80.79 13.55 1.71 17.00 32.07 32.40 10.26 3.70
7.60 80.79 13.55 1.71 17.00 32.07 32.40 10.26 3.70
7.60 80.79 13.55 1.71 17.00 32.07 32.40 10.26 3.70
7.60 80.79 13.55 1.71 17.00 32.07 32.40 10.26 3.70
7.60 80.79 13.55 1.71 17.00 32.07 32.40 10.26 3.70
7.60 80.79 13.55 1.71 17.00 32.07 32.40 10.26 3.70
9.60 242.61 53.26 2.16 20.38 131.74 64.80 12.96 3.70
7.60 80.79 13.55 1.71 17.00 32.07 32.40 10.26 3.70
7.60 80.79 13.55 1.71 17.00 32.07 32.40 10.26 3.70
7.60 80.79 13.55 1.71 17.00 32.07 32.40 10.26 3.70
266.80 4043.47 787.09 60.03 587.96 1908.63 1366.80 360.18 122.09
Filter No. of Pipes
Material of 2.5m
length (m)

6.98 14
6.98 14
6.98 14
6.98 14
6.98 14
6.98 14
6.98 14
8.33 54
6.98 14
6.98 14
8.33 54
8.33 54
8.33 54
6.98 14
8.33 54
8.33 54
6.98 13
6.98 13
8.33 52
6.98 13
6.98 13
6.98 13
6.98 13
6.98 13
6.98 13
6.98 13
6.98 13
6.98 13
6.98 13
6.98 13
8.33 52
6.98 13
6.98 13
6.98 13
241.14 763.00
QUANTITY ESTIMATION FOR Pipe CULVERTS

Sl. No. Design Type of Structure Recomm Widening Span Arrangement Dia of No of
Chainage endation Pipe (m) Rows
(Km)

Existing Proposed Existing Proposed


(m) (m)

1 32.447 Pipe Pipe New 1 1 x 1.0 1 x 1.0 1.0 3


Existing Proposed Length of Type of Existing Existing New Disman Excavation Backfill
total total widening widening Head Head Head tling of (m3) (m3)
width (m) width (m) (m) wall wall wall head
length width Length wall
(m) (m) (m) (m3)

19.6 29.2 9.6 New 11.70 0.45 11.70 0.00 0.00 0.00
PCC M15 Head wall Granular Length of 300 thick 300 thick Filter No. of
(m3) M15 (m3) material Pipe (m) apron stone Material Pipes of
(m3) pitching (m3) 2.5m
length

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0


Abstruct of BOX CULVERTS
Item
No.
5.01

5.02

5.03

5.04

5.05

5.06

5.07

5.08

5.09
5.10

5.11

5.12

5.13
5.14

5.15

5.16

5.17

5.18
5.19

5.20

5.21

5.22

5.23

5.24

5.25

5.26
Abstruct of BOX CULVERTS
Item Description
Earthwork in excavation for foundation in structure including all leads and lifts as per drawing and
Technical specifications clause no 304
Providing Back filling behind abutments, wing walls and return walls, with selected imported granular
material of approved quality including all leads and lifts complete as per Technical Specification Clause
305.
Filter media behind abutments,wing walls and return walls complete with all leads and lifts as per drawing
and Technical Specification Clause 2200
Providing and laying in position Plain Cement Concrete of Grade M -15 in levelling course below open
foundations, abutment, pile caps, approach slabs, retaning wall , wing wall,box structure ,curtain wall, floor
apron as per drawings and Technical Specifications Sections 1700 and 2700
Providing and laying in position Plain/ Reinforced cement concrete for foundations and substructure
excluding cost of steel complete as per drawing and Technical Specifications Section 1500,1700, 2100 &
2200
a) M15 grade
b) M 20 grade
c) M25 grade
d) CRM
Providing and laying Reinforced cement concrete for box / slab culverts in superstructure excluding cost of
steel complete as per drawing and Technical Specifications Sections 1500, 1700 and 2300
a) M 25 grade
Providing and laying Head Wall of Pipe culvert/ Abutment/Pier/ Wing walls of culverts of Brick Masonary/
Stone masonary parapet etc.as per drawing and Technical Specifications and as per direction of the
Engineer
HYSD bar reinforcement complete for foundation, substructure and superstructure as per drawing and
Technical Specification clause no 1600.
Providing and laying Stone pitching/Apron complete as per drawings and Technical Specification 2504
Providing and laying filter media below stone pitching/ apron complete as per, Technical Specification
Clause 2504
Providing weep holes in abutments, wing walls and return walls complete as per drawing and Technical
Specification 2706.
Providing and fixing Asphaltic plug type expansion joints complete as per drawing and Technical
Specifications Section 2600.
Painting culvert No. complete as per Technical specification section 800
Providing and laying selected granular material for pipe bedding as per drawing and technical specification
clause 2904
Providing, laying and jointing NP-4 (as per IS: 458-1988) Hume pipes for culverts complete as per drawing
and technical specification section 2900 and IRC : SP : 13-1973.
a) 600 dia
b) 750 dia
c) 900 dia
d) 1000 dia
e) 1200 dia
Providing and fixing in position drainage spouts complete as per drawings and Technical Specifications
Clause 2705 .
Providing and laying tar paper bearing complete as per IS-1398 & Technical Specification section 2000 .

M20 RCC Precast Guard Stone in M15 Foundation Block as per drawing and technical specification section
1700
Cement plaster 12mm thick in cement mortar 1:3 complete as per drawing and Technical Specifications
Section 1000 and 1300 and as directed by the Engineer
Dismantling structures (superstructure, substructure, foundation and other miscellaneous structures),
dismantling of pavements as per Technical Specification Clause 202, section 2800
a) Brick/ Stone masonary
b) PCC
c) RCC
d) RCC Pipe
1000 thick flexible stone apron as per Clause No. 2503.1 of MOST specification and as per direction of the
Engineer
150 mm thick Flat stone apron embedded in 300 thick M15 concrete as per Clause No. 2505.2 of MOST
specification and as per direction of the Engineer
Providing Reinforced Cement Concrete M 30 grade in approach slabs including reinforcement complete as
per drawings and Technical Specifications 1500,1600 and 1700 & 2704

Providing and laying 25 mm thick mastic asphalt wearing course on top of deck slab excluding
prime coat with paving grade bitumen meeting the requirements given in table 500-29, prepared
by using mastic cooker and laid to required level and slope after cleaning the surface, including
providing antiskid surface with bitumen precoated fine grained hard stone chipping of 9.5 mm
nominal size at the rate of 0.005cum per 10 sqm and at an approximate spacing of 10 cm center
to center in both directions, pressed into surface when the temperature of surfaces not less than
100 deg. C, protruding 1 mm to 4 mm over mastic surface, all complete as per clause 515 &
2702.

Construction of precast RCC railing of M30 Grade including steel (Concrete 0.085 Cum/Rmt and steel 18
Kg/Rmt),
Providing and fixing 80mm NB MS pipe rail on crash barrier complete including providing three or more
coats of epoxy paint of approved colour, make and quality over a coat of epoxy primer complete as per
drawings and Technical Specifications Sections 1900
Unit Box Culvert Total Qty

Cum 8156 8156

Cum 7434 7434

Cum 2876 2876

Cum 1364 1364

Cum 1583 1583


Cum
Cum 3495 3495
Cum
Cum
Cum 673 673

Cum

MT 307 307
Cum 926 926
Cum 463 463

No. 3563 3563

Lm 0 0
Nr. 82 82
Cum

Lm
Lm
Lm
Lm
Lm
Lm
Nr. 82 82

Sqm 0 0

Nr.
Sqm

Cum
Cum
Cum 0 0
Lm
Cum 2207 2207

Sqm 1435 1435

Cum 1449 1449

Sqm 7389 7389

Lm 361 361

Lm 0 0
QUANTITY ESTIMATION FOR BOX C

Box Dimensions
Required
No. of No. of
S.No Design span length
CA proposal Proposal structures cells L (Width)
Chainage (m)

Box Culvert

1 1.036 Box Culvert New 1 x 2.0 x 3.0 1 1 26.00 2.00

2 1.925 Box Culvert New 1 x 2.0 x 3.0 1 1 26.00 2.00

3 3.975 Box Culvert New 1 x 2.0 x 3.0 1 1 26.00 2.00

4 4.708 Box Culvert New 1 x 2.0 x 3.0 1 1 26.00 2.00

5 5.525 Box Culvert New 1 x 2.0 x 2.0 1 1 26.00 2.00

6 6.875 Box Culvert New 1 x 3.0 x 3.0 1 1 26.00 3.00

7 9.406 Box Culvert Reconstruction 1 x 2.0 x 2.0 1 1 26.00 2.00

8 9.650 Box Culvert Reconstruction 2 x 2.0 x 2.0 1 2 26.00 2.00

9 15.525 Box Culvert New 2 x 2.0 x 2.0 1 2 35.50 2.00

10 16.839 Box Culvert Reconstruction 2 x 2.0 x 2.0 1 2 26.00 2.00

11 20.125 Box Culvert New 1 x 2.0 x 2.0 1 1 26.00 2.00

12 27.008 Box Culvert New 1 x 2.0 x 2.0 1 1 26.00 2.00

13 28.275 Box Culvert New 1 x 2.0 x 2.0 1 1 26.00 2.00

14 29.710 Box Culvert New 1 x 2.0 x 2.0 1 1 26.00 2.00

15 32.300 Box Culvert New 1 x 2.0 x 2.0 1 1 26.00 2.00

16 34.292 Box Culvert Reconstruction 1 x 3.0 x 3.0 1 1 26.00 3.00

17 37.725 Box Culvert New 1 x 2.0 x 2.0 1 1 26.00 2.00


18 39.850 Box Culvert New 1 x 2.0 x 2.0 1 1 26.00 2.00

19 40.875 Box Culvert New 1 x 2.0 x 2.0 1 1 26.00 2.00

20 41.784 Box Culvert New 1 x 2.0 x 2.0 1 1 26.00 2.00

21 13.457 Box Culvert Widening 1 x 3.0 x 3.0 1 1 16.00 3.00

22 14.658 Box Culvert Widening 1 x 1.0 x 1.0 1 1 15.00 1.00

23 14.830 Box Culvert Widening 1 x 3.0 x 3.0 1 1 15.00 3.00

24 17.112 Box Culvert Widening 1 x 3.5 x 3.5 1 1 15.00 3.50

25 17.631 Box Culvert Widening 1 x 1.5 x 1.5 1 1 15.50 1.50

26 21.024 Box Culvert Widening 1 x 1.2 x 1.2 1 1 16.00 1.20

27 21.457 Box Culvert Widening 1 x 1.5 x 1.5 1 1 15.00 1.50

28 21.852 Box Culvert Widening 1x 1.5 x 1.5 1 1 16.00 1.50

29 22.559 Box Culvert Widening 1 x 1.2 x 1.2 1 1 14.00 1.20

30 22.959 Box Culvert Widening 1 x 1.5 x 1.5 1 1 16.50 1.50

31 23.220 Box Culvert Widening 1 x 1.2 x 1.2 1 1 17.00 1.20

32 24.550 Box Culvert Widening 1 x 1.0 x 1.0 1 1 16.50 1.00

33 25.278 Box Culvert Widening 1 x 1.0 x 1.0 1 1 15.00 1.00

34 25.500 Box Culvert Widening 1 x 4.6 x 4.6 1 1 13.00 4.60

35 25.844 Box Culvert Widening 1 x 2.0 x 2.0 1 1 16.50 2.00

36 25.972 Box Culvert Widening 1 x 1.0 x 1.0 1 1 15.00 1.00

37 33.853 Box Culvert Widening 1 x 1.5 x 1.5 1 1 15.00 1.50

38 35.416 Box Culvert Widening 1 x 3.0 x 3.0 1 1 16.00 3.00


39 36.569 Box Culvert Widening 1 x 1.5 x 1.5 1 1 17.50 1.50

40 38.061 Box Culvert Widening 1 x 1.5 x 1.5 1 1 15.00 1.50

41 38.757 Box Culvert Widening 1 x 1.5 x 1.5 1 1 16.00 1.50


Y ESTIMATION FOR BOX CULVERTS

Box Dimensions
PCC M15
Earth RCC M25
t2 (Top Intermediat work exc. (levelling (for raft)
t3 (Base t1 (Wall course)
H (Ht) a (Offset) slab e wall (m3) (m3)
slab thick) thick) (m3)
thick) thickness

3.00 0.00 0.30 0.30 0.30 0.00 186.13 11.85 23.79

3.00 0.00 0.30 0.30 0.30 0.00 186.13 11.85 23.79

3.00 0.00 0.30 0.30 0.30 0.00 186.13 11.85 23.79

3.00 0.00 0.30 0.30 0.30 0.00 186.13 11.85 23.79

2.00 0.00 0.30 0.30 0.30 0.00 149.60 10.51 23.79

3.00 0.00 0.30 0.30 0.30 0.00 213.47 14.79 32.94

2.00 0.00 0.30 0.30 0.30 0.00 149.60 10.51 23.79

2.00 0.00 0.30 0.30 0.30 0.00 204.27 16.38 42.09

2.00 0.00 0.30 0.30 0.30 0.00 234.86 20.75 55.20

2.00 0.00 0.30 0.45 0.45 0.00 228.84 17.16 62.29

2.00 0.00 0.30 0.30 0.30 0.00 149.60 10.51 23.79

2.00 0.00 0.30 0.30 0.30 0.00 149.60 10.51 23.79

2.00 0.00 0.30 0.30 0.30 0.00 149.60 10.51 23.79

2.00 0.00 0.30 0.30 0.30 0.00 149.60 10.51 23.79

2.00 0.00 0.30 0.30 0.30 0.00 149.60 10.51 23.79

3.00 0.00 0.30 0.30 0.30 0.00 213.47 14.79 32.94

2.00 0.00 0.30 0.30 0.30 0.00 149.60 10.51 23.79


2.00 0.00 0.30 0.30 0.30 0.00 149.60 10.51 23.79

2.00 0.00 0.30 0.30 0.30 0.00 149.60 10.51 23.79

2.00 0.00 0.30 0.30 0.30 0.00 149.60 10.51 23.79

3.00 0.00 0.25 0.25 0.25 0.00 182.52 10.96 19.15

1.00 0.00 0.25 0.25 0.25 0.00 69.42 4.26 7.83

3.00 0.00 0.25 0.25 0.25 0.00 180.25 10.61 18.28

3.50 0.00 0.25 0.25 0.25 0.00 207.95 12.20 20.89

1.50 0.00 0.25 0.25 0.25 0.00 97.78 5.95 10.70

1.20 0.00 0.25 0.25 0.25 0.00 81.61 5.07 9.30

1.50 0.00 0.25 0.25 0.25 0.00 97.13 5.85 10.45

1.50 0.00 0.25 0.25 0.25 0.00 98.43 6.05 10.95

1.20 0.00 0.25 0.25 0.25 0.00 79.40 4.73 8.45

1.50 0.00 0.25 0.25 0.25 0.00 99.08 6.15 11.20

1.20 0.00 0.25 0.25 0.25 0.00 82.71 5.24 9.73

1.00 0.00 0.25 0.25 0.25 0.00 70.88 4.49 8.40

1.00 0.00 0.25 0.25 0.25 0.00 69.42 4.26 7.83

4.60 0.00 0.25 0.25 0.25 0.00 262.28 14.67 24.08

2.00 0.00 0.25 0.25 0.25 0.00 127.27 7.81 13.99

1.00 0.00 0.25 0.25 0.25 0.00 69.42 4.26 7.83

1.50 0.00 0.25 0.25 0.25 0.00 97.13 5.85 10.45

3.00 0.00 0.25 0.25 0.25 0.00 182.52 10.96 19.15


1.50 0.00 0.25 0.25 0.25 0.00 100.38 6.35 11.70

1.50 0.00 0.25 0.25 0.25 0.00 97.13 5.85 10.45

1.50 0.00 0.25 0.25 0.25 0.00 98.43 6.05 10.95

5936 394 844


RCC M25 Filter media Back fill
RCC M25 Reinforcing PCC M15
(for top behind behind
(side walls) steel Curtain wall Stone apron Floor apron
slab) 750 mm 450 thick abutment abutment
(m )
3
(tonns) (m )
3
(m3) thick (m3) (m2) (m3) (m3)

49.84 20.28 11.17 51.15 76.49 62.21 129.24 421.20

49.84 20.28 11.17 51.15 76.49 62.21 129.24 421.20

49.84 20.28 11.17 51.15 76.49 62.21 129.24 421.20

49.84 20.28 11.17 51.15 76.49 62.21 129.24 421.20

34.24 20.28 8.68 37.69 57.40 34.16 78.96 176.80

49.84 28.08 12.35 54.51 83.24 71.54 129.24 421.20

34.24 20.28 8.68 37.69 57.40 34.16 78.96 176.80

35.41 35.88 11.14 44.42 70.90 47.17 78.96 176.80

48.35 48.99 13.88 44.42 70.90 47.17 101.76 241.40

51.01 38.22 13.81 44.42 70.90 47.17 78.96 176.80

34.24 20.28 8.68 37.69 57.40 34.16 78.96 176.80

34.24 20.28 8.68 37.69 57.40 34.16 78.96 176.80

34.24 20.28 8.68 37.69 57.40 34.16 78.96 176.80

34.24 20.28 8.68 37.69 57.40 34.16 78.96 176.80

34.24 20.28 8.68 37.69 57.40 34.16 78.96 176.80

49.84 28.08 12.35 54.51 83.24 71.54 129.24 421.20

34.24 20.28 8.68 37.69 57.40 34.16 78.96 176.80


34.24 20.28 8.68 37.69 57.40 34.16 78.96 176.80

34.24 20.28 8.68 37.69 57.40 34.16 78.96 176.80

34.24 20.28 8.68 37.69 57.40 34.16 78.96 176.80

25.87 14.00 8.66 53.84 54.86 34.91 75.15 259.20

9.26 5.63 2.46 20.19 30.61 4.89 20.25 21.00

24.26 13.13 6.16 53.84 82.29 34.91 71.55 243.00

28.01 15.00 9.69 62.25 63.47 93.35 110.25 336.00

13.44 7.75 4.67 28.60 29.02 19.67 37.35 55.80

11.47 6.80 3.95 23.56 23.85 13.33 29.30 34.56

13.01 7.50 4.60 28.60 29.02 19.67 36.45 54.00

13.87 8.00 4.73 28.60 29.02 19.67 38.25 57.60

10.04 5.95 3.73 23.56 23.85 13.33 26.42 30.24

14.31 8.25 4.80 28.60 29.02 19.67 39.15 59.40

12.19 7.23 4.06 23.56 23.85 13.33 30.74 36.72

10.18 6.19 2.60 20.19 30.61 4.89 22.05 23.10

9.26 5.63 2.46 20.19 30.61 4.89 20.25 21.00

31.42 16.58 8.42 80.76 123.63 78.58 111.92 514.28

18.43 10.31 4.56 37.02 56.45 16.48 47.70 112.20

9.26 5.63 2.46 20.19 30.61 4.89 20.25 21.00

13.01 7.50 4.60 28.60 29.02 19.67 36.45 54.00

25.87 14.00 8.66 53.84 54.86 69.81 92.70 259.20


15.17 8.75 4.93 28.60 29.02 19.67 40.95 63.00

13.01 7.50 3.38 28.60 43.53 9.83 31.73 54.00

13.87 8.00 3.52 28.60 43.53 9.83 33.53 57.60

1146 673 307 1583 2207 1435 2876 7434


PCC M15
RCC M30 Wearing Crash
Weep holes Guard for Exp. Joint Dismantling Stone
approach course Barrier
(Nos) Stone (Nr.) approach (m) (cum) Pitching
slab (cum) (sqm) (Rm)
slab (cum)

175.00 0.00 23.63 47.25 235.20 0.00 5.20 0.00 45.90

175.00 0.00 23.63 47.25 235.20 0.00 5.20 0.00 45.90

175.00 0.00 23.63 47.25 235.20 0.00 5.20 0.00 45.90

175.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 45.90

96.00 0.00 23.63 47.25 235.20 0.00 5.20 0.00 22.30

175.00 0.00 23.63 47.25 259.70 0.00 7.20 0.00 45.90

96.00 0.00 23.63 47.25 235.20 0.00 5.20 0.00 22.30

96.00 0.00 23.63 47.25 284.20 0.00 9.20 0.00 22.30

124.00 0.00 33.60 67.20 394.40 0.00 9.20 0.00 22.30

96.00 0.00 23.63 47.25 291.55 0.00 9.80 0.00 22.30

96.00 0.00 23.63 47.25 235.20 0.00 5.20 0.00 22.30

96.00 0.00 23.63 47.25 235.20 0.00 5.20 0.00 22.30

96.00 0.00 23.63 47.25 235.20 0.00 5.20 0.00 22.30

96.00 0.00 23.63 47.25 235.20 0.00 5.20 0.00 22.30

96.00 0.00 23.63 47.25 235.20 0.00 5.20 0.00 22.30

175.00 0.00 23.63 47.25 259.70 0.00 7.20 0.00 45.90

96.00 0.00 23.63 47.25 235.20 0.00 5.20 0.00 22.30


96.00 0.00 23.63 47.25 235.20 0.00 5.20 0.00 22.30

96.00 0.00 23.63 47.25 235.20 0.00 5.20 0.00 22.30

96.00 0.00 23.63 47.25 235.20 0.00 5.20 0.00 22.30

99.00 0.00 13.13 26.25 152.25 0.00 7.00 0.00 22.26

16.00 0.00 12.08 24.15 114.75 0.00 3.00 0.00 3.29

94.00 0.00 12.08 24.15 0.00 0.00 0.00 0.00 22.26

152.00 0.00 12.08 24.15 148.50 0.00 22.00 0.00 59.27

40.00 0.00 12.60 25.20 126.00 0.00 18.00 0.00 12.91

27.00 0.00 13.13 26.25 126.15 0.00 17.40 0.00 8.86

39.00 0.00 12.08 24.15 121.50 0.00 18.00 0.00 12.91

41.00 0.00 13.13 26.25 130.50 0.00 18.00 0.00 12.91

24.00 0.00 11.03 22.05 108.75 0.00 17.40 0.00 8.86

42.00 0.00 13.65 27.30 135.00 0.00 18.00 0.00 12.91

28.00 0.00 14.18 28.35 134.85 0.00 17.40 0.00 8.86

17.00 0.00 13.65 27.30 127.50 0.00 3.00 0.00 3.29

16.00 0.00 12.08 24.15 114.75 0.00 3.00 0.00 3.29

158.00 0.00 9.98 19.95 139.15 0.00 10.20 0.00 49.57

57.00 0.00 13.65 27.30 142.50 0.00 5.00 0.00 10.67

16.00 0.00 12.08 24.15 114.75 0.00 3.00 0.00 3.29

39.00 0.00 12.08 24.15 121.50 0.00 18.00 0.00 12.91

124.00 0.00 13.13 26.25 152.25 0.00 21.00 0.00 44.52


44.00 0.00 14.70 29.40 144.00 0.00 18.00 0.00 12.91

33.00 0.00 12.08 24.15 121.50 0.00 4.00 0.00 6.45

35.00 0.00 13.13 26.25 130.50 0.00 4.00 0.00 6.45

3563 0 725 1449 7389 0 361 0 926


Filter media
RCC for Toe
below Excavation PCC for Toe
wall
stone for Toe wall wall
M15
Pitching

22.95 11.61 1.66 5.60

22.95 11.61 1.66 5.60

22.95 11.61 1.66 5.60

22.95 11.61 1.66 5.60

11.15 8.09 1.16 3.90

22.95 11.61 1.66 5.60

11.15 8.09 1.16 3.90

11.15 8.09 1.16 3.90

11.15 8.09 1.16 3.90

11.15 8.09 1.16 3.90

11.15 8.09 1.16 3.90

11.15 8.09 1.16 3.90

11.15 8.09 1.16 3.90

11.15 8.09 1.16 3.90

11.15 8.09 1.16 3.90

22.95 11.61 1.66 5.60

11.15 8.09 1.16 3.90


11.15 8.09 1.16 3.90

11.15 8.09 1.16 3.90

11.15 8.09 1.16 3.90

11.13 5.72 0.82 2.76

1.65 2.20 0.31 1.06

11.13 5.72 0.82 2.76

29.64 13.19 1.88 6.36

6.45 6.16 0.88 2.97

4.43 5.10 0.73 2.46

6.45 6.16 0.88 2.97

6.45 6.16 0.88 2.97

4.43 5.10 0.73 2.46

6.45 6.16 0.88 2.97

4.43 5.10 0.73 2.46

1.65 2.20 0.31 1.06

1.65 2.20 0.31 1.06

24.79 8.53 1.22 4.11

5.33 3.96 0.57 1.91

1.65 2.20 0.31 1.06

6.45 6.16 0.88 2.97

22.26 11.44 1.63 5.51


6.45 6.16 0.88 2.97

3.23 3.08 0.44 1.48

3.23 3.08 0.44 1.48

463 299 43 144


Project Name: Four Laning with Paved Shoulders of NH-6 from Chichra to Kharagpur (Km 185.150 to Km 134.400) in
55.52Kms) o
INVENTORY AND CONDITIO
Span arrangement Details of Protection works
Type of
Sl. structure Thicness of Carriageway Width of Parapet to parapet
Location (km)
No. (pipe,slab,box, Slab(m) Span/dia width (m) culvert (m) Height(m) /width(m)
Arch) No. Type Condition
(m)

1 2 3 4 5 6 7 8 9 10 11 12

1 183+646 SLC 0.30 1 2.5 10.0 13.8 0-4 0-4

2 181+629 HPC 1 1.2 10.0 15.0

3 180+983 SLC 0.40 1 3.0 6.8 10.2 0.5 0.4

4 180+343 SLC 0.40 1 2.0 6.8 10.8 0.4

5 179+186 SLC 0.40 1 5.0 6.8 11.6 0.5 0.4

6 178+244 HPC 1 1.2 6.8 12.8

7 177+700 HPC 2 1.0 6.8 13.8

8 176+362 SLC 0.30 1 3.0 6.8 11.3 0.5 0.4

9 175+371 SLC 0.40 1 3.0 6.8 11.2 0.4 0.4

10 174+450 SLC 0.80 1 1.5 6.8 11.6 0.5 0.4


11 174+186 HPC 2 1.2 6.8 15.0

12 172+282 HPC 1 1.2 6.8 15.0

13 170+196 HPC 2 1.0 6.8 15.0

14 169+726 HPC 2 1.0 6.8 15.0

15 168+825 HPC 3 1.0 6.8 19.6 1.2 0.5

16 163+755 HPC 1 1.0 6.6 18.0 0.5 0.4

17 163+443 SLC 0.30 1 3.0 6.6 11.4 0.5 0.4

18 159+643 SLC 0.40 1 3.0 6.6 11.3 0.5 0.4

19 158+433 SLC 0.40 1 6.0 6.6 10.8 0.5 0.4

20 157+865 SLC 0.40 1 3.0 6.8 11.6 0.4 0.4

21 156+209 SLC 0.40 1 6.0 6.8 11.6 0.5 0.4

22 156+013 HPC 6.8

23 153+942 SLC 6.8 10.6 0.5 0.4

24 153+675 HPC

25 152+684 SLC 0.40 1 3.0 6.8 11.6 0.6 0.5


26 152+541 HPC

27 151+584 HPC 2 1.0 6.8 11.1 0.5 0.4

28 150+890 HPC

29 149+869 SLC 0.30 1 3.0 7.6 12.2 0.8 0.4

30 148+010 HPC 1 1.0 6.8 14.8

31 146+271 SLC 0.50 1 6.5 6.8 11.6 0.5 0.4

32 144+890 SLC 0..4 1 3.0 6.8 11.6 0.5 0.4

33 140+592 SLC 0.50 1 6.0 9.3 14.1 0.6 0.4

34 139+938 HPC 1 1.0 9.3 12.8

35 139+810 HPC 1 1.0 9.3 13.1

36 139+296 HPC 1 1.0 9.3 13.3

37 138+622 SLC 0.40 1 3.0 9.3 13.1 0.4 0.4

38 138+165 SLC 0.40 1 2.0 9.3 13.1 0.6 0.4

39 137+762 SLC 0.30 1 3.0 7.0 10.8 0.5 0.4

40 137+162 SLC 0.50 2 2.0 7.0 15.0 0.5 0.4

41 137+117 SLC 0.30 1 2.0 6.8 15.0 0.6 0.4

42 136+373 HPC 6.8 10.0 0.4


43 135+200 SLC 0.40 1 2.0 6.8 11.2 0.5 0.3

Four lan

44 133+910 BOX CULVERT 0.30 1 3.0 8.7+4.2+8.7 25.6 1.5 0.2

45 133+890 BOX CULVERT 0.30 1 3.0 8.7+4.2+8.7 25.6 1.5 0.2

46 133+505 HPC 1 1.0 8.7+4.2+8.7 27.4

47 133+343 HPC 1 1.0 8.7+4.2+8.7 27.4

48 132+394 HPC
(Km 185.150 to Km 134.400) including Rehabilitation of existing Four Lane from Km 134.400 to Km 129.600 in the State of West Ben
55.52Kms) on EPC mode
INVENTORY AND CONDITION SURVERY FOR CULVERTS
Condition of various features of culvert Height above Bed Level Material
Overall
Parapet Condition
Slab/Pipe/Box/Ar Wing Return
Head wall Head U/S side (m) D/S side (m) Super Structure
ch wall wall
railling
13 14 15 16 17 18 19 20 21

Fair Fair Fair 1.5

Poor Poor

Fair Poor Poor 2

Poor Fair Poor 2

Fair Fair Fair 3.5

Poor Poor

Poor Poor

Fair Fair Poor 3

Fair Fair Poor 2.5

Fair Poor Poor 0.5


Poor Poor

Poor Poor

Poor Poor

Poor Poor

Fair Fair Fair

Fair Poor

Fair Fair Fair 1.5

Fair Fair Poor 2

Fair Fair 1

Fair Fair Poor 1

Fair Poor Fair 1

Poor Poor

Fair

Fair Fair Fair 1


Poor Poor

Fair Fair Fair 2

Poor Poor

Fair Fair Fair 5

Fair Fair 2.5

Fair Fair Fair 2

Poor Poor

Poor Poor

Poor Poor

Fair Poor 1

Poor Fair Fair 1.5

Poor Poor Poor 2

Fair Fair Fair 1.5

Fair Fair Fair 1.5

Choked
Poor Poor Poor 2

Four lane section

Fair Fair Fair 3

Fair Fair Fair

Fair Poor

Fair Poor
our Lane from Km 134.400 to Km 129.600 in the State of West Bengal (design length

Widening/ Reconstruction Remarks

22 23

Minor Repairs and Widening Good condition

No headwall and no
Reconstruction-Pipe
parapet on both side

Minor Repairs and Widening Choked

Minor Repairs and Widening No parapet

Minor Repairs and Widening

No headwall on both side


Reconstruction-Pipe
and 2m below bed level

Extra Culvert No visibility on L..H.S

Minor Repairs and Widening

Minor Repairs and Widening

Minor Repairs and Widening Choked


Head wall broken on
Reconstruction-Pipe R.H.S and no parapet on
both side

Pipe in good condition


but broken headwall on
Reconstruction-Pipe
both sides and no parapet
on both side

Head wall broken on


Reconstruction-Pipe both side and no parapet
on both side

Head wall broken on


Reconstruction-Pipe both sides and no parapet
on both side

Minor Repairs and Widening For canal crossing

Reconstruction-Pipe No parapet on R.H.S

Opening 0.5m visible


Minor Repairs and Widening
and filled with mud

Minor Repairs and Widening

Minor Repairs and Widening Wing wall not visible

Minor Repairs and Widening

Minor Repairs and Widening

Fully covered and head


Reconstruction-Pipe
wall and parapet broken

Openings are not


Minor Repairs and Widening
properly visible

Reconstruction-Pipe Not found

Minor Repairs and Widening Good condition


Reconstruction-Pipe Not found

Reconstruction-Box No proper visibility

Reconstruction-Pipe Not found

Minor Repairs and Widening

Headwall broken on
Reconstruction-Pipe R.H.S and no visibility
on L.H.S

Minor Repairs and Widening Good condition

Minor Repairs and Widening

Minor Repairs and Widening Good condition

No proper visibility on
Reconstruction-Pipe both side and poor
condition

Reconstruction-Pipe Poor condition

Headwall broken on both


Reconstruction-Pipe side and no parapet on
both side

Parapet are broken on


Minor Repairs and Widening L.H.S and wing wall are
not properly visible

Minor Repairs and Widening Good condition

Minor Repairs and Widening Bed level are broken

Minor Repairs and Widening Brick structure

Minor Repairs and Widening Brick structure

Reconstruction-Pipe Choked
Reconstruction-Box Poor condition

Crash barrier type

Openings are not


properly visible
Outlet for main
carriageway drain

Outlet for main


carriageway drain

Not found
Bill of Quantities

Project :

42
Bill of Quantities

BILL No 5

5.01 304

5.02 304

1500, 1700 &


5.03
2100

5.04 1400

2900 &
5.05
IRC SP-13

5.06 2904

5.07 1400

5.08 305 & 2900

1500, 1700,
5.09
2100, 2200

1500, 1700,
5.10 2100, 2200 &
2300

43
Bill of Quantities

1500, 1700,
5.11
2100, 2200

1500, 1700,
5.12
2100

1500, 1700 &


5.13
2200

1500, 1700,
5.14
2300 & 2700

44
Bill of Quantities

5.15 1600

5.16 1500 & 2200

1500, 1700,
5.17
2300 & 2704

5.18 2600

5.19 2700

5.20 2500

5.21 2504

5.22 2504

5.23 2503

5.24 2505

5.25 1300

2011
5.26
IS 1398

1500, 1600,
5.27
1700 & 2703

809, 1500,
5.28 1600 & 1700
IRC-6

45
Bill of Quantities

5.29 2705

5.30 IRC:7-1971

5.31

46
Bill of Quantities

47
Bill of Quantities

CROSS DRAINAGE WORKS

Earthwork in excavation for foundation of structures including setting out, removal of


stumps and other deleterious matter dressing of sides and bottom and including all lifts
and leads complete as per drawing and Technical Specification Clause 304

i) All types of soil, including backfilling up to ground level with approved material as
Cum
directed by Engineer-in-Charge
ii) Ordinary Rock (not requiring blasting) Cum 12,199.5
iii) Hard Rock required Control blasting Cum
iv) Hard Rock blasting prohibited Cum

Sand Filling in Foundation Trenches or below raft foundation of RCC box as per Drawing
Cum -
& Technical Specification clause 304 or as directed by Engineer-in-Charge

Plain Cement Concrete (Grade M 15) using 40 mm graded metal for levelling course, for
bedding of culverts, head wall etc. and annular space filling arround footing in rock, Cum 1,424.0
complete as per drawings and Technical Specification Section 1500,1700 and 2100.

Coursed Rubble Stone masonry work in cement mortar 1:3 for foundation/substructure
including staging and treatment of joints complete as per drawing, Technical Cum -
Specification Section 1400 and as directed by the Engineer

Providing and laying and jointing NP4 (as per IS:458) Hume pipes for culverts, complete
as per Technical Specification Section 2900 and IRC Special Publication No.13 - 1998

i) Dia 600 mm (Internal) Rmt -


ii) Dia 750 mm (Internal) Rmt -
iii) Dia 900 mm (Internal) Rmt -
iv) Dia 1000 mm (Internal) Rmt -
v) Dia 1200 mm (Internal) Rmt 1,366.8
vi) Dia 1500 mm (Internal) Rmt -

Providing & Laying 1st Class bedding below hume pipes with graded sand or other
Cum -
granular material passing throuh 5.6mm sieve as per clause 2904 and design Drawing

Providing pointing with Cement mortar (1:3), complete as per Technical Specification
Sqm -
Section 1300 & 2200 and as directed by the Engineer.
Back filling behind head walls, wing walls/retaining and return walls and earth cushion
around pipes or at any other location complete as per drawing and Technical
Specification Clause 305 and Section 2900.

i) With selected granular materials Cum 8,221.1


ii) With Selected material Cum
Structural Plain Cement Concrete M 15 for Encasing and Curtain wall etc. including
formwork, excluding reinforcement complete as per drawing, Technical Specification Cum 1,625.7
Sections 1500, 1700, 2100 & 2200

Plain Cement Concrete Grade M 20 for Toe Wall complete as per drawings and
Technical Specifications Section 1500,1700 and 2100.

i) Foundation Cum -
ii) Substructure Cum -

48
Bill of Quantities

Structural Plain Cement Concrete M 20 for Head Walls , including formwork, excluding
reinforcement complete as per drawing, Technical Specification Sections 1500, 1700, Cum
2100 & 2200
Structural Plain/Reinforced Cement Concrete in foundation, including formwork,
excluding reinforcement complete as per drawing, Technical Specification Sections
1500, 1700 & 2100
i) M20 Grade Cum -
ii) M25 Grade Cum -
iii) M30 Grade Cum -
iv) M35 Grade Cum -
Structural Plain/Reinforced Cement Concrete in substructure, parapet wall including
formwork, excluding reinforcement complete as per drawing, Technical Specification
Sections 1500, 1700 & 2200
i) M20 Grade Cum -
ii) M25 Grade Cum 3,495.0
iii) M30 Grade Cum -
iv) M35 Grade Cum -
Reinforced cement concrete in superstructure including shuttering and excluding
reinforcement complete as per drawing and Technical Specification Sections 1500,
1700, 2300 and 2700
i) M25 Grade Cum 673.0
ii) M30 Grade Cum -
iii) M35 Grade Cum -

49
Bill of Quantities

Providing and fixing in position HYSD/TMT - Fe 500 reinforcement including cutting ,


bending, binding etc complete as per drawing and Specifications. Laps, chairs and MT 307.0
wastage shall be included in the rate and shall not be considered in the measurement.

Providing 50 mm thick PCC M-20 grade coping above parapets, return walls and wing
walls as per Technical Specification Section 1500 and 2200 and as directed by the Cum -
Engineer.
Reinforced cement concrete M-30 in approach slab including shuttering and
reinforcement complete as per drawing and Technical Specification Sections 1500, Cum 1,449.0
1700, 2300 and 2704
Filler Joint : Providing & fixing 20 mm thick compressible fibre board in expansion joint
Rmt -
complete as per drawing & Technical Specification.
Providing weep holes in Plain/Reinforced concrete abutment, wing wall, return wall with
100 mm dia PVC pipe, extending through the full width of the structure with slope of 1V :
No. 3,563.0
20H towards drawing foce. Complete as per drawing and Technical specifications
Section 2700

Providing and laying of Filter media as per clause 2504.2.2. of MoRTH specifications to
a thickness of not less than 600 mm with smaller size towards the soil and bigger size
towards the wall and provided over the entire surface behind abutment, wing wall and
return wall to the full height compacted to a firm condition complete as per drawing and
Technical Specification 2500
i) With Crushed Material Cum 2,876.0
ii) With Natural Material Cum -
Providing and laying Filter material underneath pitching in slopes complete as per
drawing and Technical specification clause 2504.
i) With Crushed Material Cum 704.1
ii) With Natural Material Cum
Providing and laying pitching on slopes laid over prepared filter material complete as
Cum 1,408.3
per drawing and Technical specification clause 2504.
Providing and laying of boulder apron on river bed for protection against scour with
stone boulders weighing not less than 40 kg each as per Technical Specification clause Cum 2,207.0
2503 and as directed by the Engineer.
Providing 150mm thick Flat Stone Apron embedded in 300mm thick concrete (M15)
Cum 1,435.0
complete as per technical specifications
Provide 12mm thick plaster with Cement mortar (1 : 3), complete as per Technical
Sqm -
Specification Sections 1300 and as directed by the Engineer.
Providing and fixing Tar paper bearing complete as per drawing and Technical
Sqm -
Specifications Clause 2011

Construction of precast RCC railing of M30 Grade including steel, aggregate size not
exceeding 12 mm, true to line and grade, tolerance of vertical RCC post not to exceed 1
in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving Rmt -
adequate space between vertical post for expansion, complete as per approved
drawings and technical specifications.

Providing and constructing RCC crash barrier M-40 grade including centering, shuttering
and reinforcement (Concrete 0.3 Cum/Rmt and steel 28 Kg/Rmt), including Heavy
Class Pipe on top of Crash Barrier fixed with Mild Steel Plate @ 1000 mm c/c including
Rmt 361.0
Base Plate fixed with U Bolts, Nuts and Washers, including painting etc. all complete as
per approved Drawings and Technical Specifications 1500, 1600, 1700 and as per IRC-
6.

50
Bill of Quantities

Providing and fixing of drainage spouts along with drain pipes as complete as per
No. 82.0
drawing and Technical Specifications Section 2705 and as directed by the Engineer.

Providing and painting with Synthetic enamel paint of approved quality for Culvert
numbering, Type of Culvert and Details of Span Arrangement as per IRC:7-1971 and as No. 150.0
directed by Engineer
Providing and laying in position 65 mm thick wearing coat consisting of 40 mm thick
bituminous concrete over a 25 mm thick layer of mastic asphalt over deck slab after
sqm 7,389.0
applying prime coat complete as per drawings and Technical Specifications Sections
500

Total Carried to Summary

51
Bill of Quantities

52
Bill of Quantities

-
-
-
-

-
-
-

-
-

-
-

53
Bill of Quantities

-
-
-
-

-
-
-
-

-
-
-

54
Bill of Quantities

-
-
-
-
-

55
Bill of Quantities

56

You might also like