Professional/Educational Background
BS Electrical Engineering-Yr 2004 Batangas State Univ.
Registered Electrical Engineer-Sept 2004-1st Place
Certified Instrument and Control Engineer-Sept 2013-3rd Place
IIEE Norther Batangas Chapter-Board of Director
Work Experience- 13 years
IE Manager-JG Summit Petrochemical Corp. (Present)
IE Superintendent-JG Summit Petrochemicals Corp. (YR 2014-17)
Sr. IE Project Engineer-JG Summit Petrochemical Corp. (YR 2011-14)
Sr. IE Engineer-JG Summit Petrochemical Corp. (YR 2009-11)
IE Engineer-JG Summit Petrochemical Corp. (YR 2006-09)
Branch Engineer-Manila Electric Company-(YR 2005-06)
College Instructor Engineering- De La Salle Lipa-(YR 2004-05)
POWER SYSTEM ANALYSIS OF
52MVA SUBSTATION OF PE 2 OF JG
SUMMIT PETROCHEMICAL
CORPORATION AT BATANGAS CITY
BY: RYAN ANTHONY K. UMALI, REE
AUGUST 15, 2017, PHILIPPINE INTERNATIONAL CONVENTION CENTER
PROFESSIONAL ELECTRICAL ENGINEERING BOARD INTERVIEW/EXAMINATION
POWER SYSTEM ANALYSIS
LOAD FLOW ANALYSIS
SHORT CIRCUIT ANALYSIS
PROTECTION COORDINATION AND EQUIPMENT EVALUATION
LARGE MOTOR STARTING IMPACT STUDY
ARC-FLASH ANALYSIS
FIRE PUMP EVALUATION
LOAD FLOW ANALYSIS-METHODOLOGY
BUS VOLTAGE
VOLTAGE DROP
NETWORK BUS VOLTAGE CALCULATION
ADMITANCE CALCULATION
CURRENT, POWER
(GAUSS-SEIDEL) TRANSFORMER
FLOW, PF
BUS LOADS USING Microsoft LOADING
CALCULATION
Excel
BUS BAR
LOADING
POWER FACTOR
CASE 1-Normal Loading without capacitor
MCC 9 bus Not Satisfactory Not Satisfactory Change tap settings of TRL3A to
tap 4
6.9kV Loads Satisfactory Satisfactory
MCC8 Loads Not Satisfactory Not Satisfactory Increase cable sizing of load
VOLTAGE DROP
branch circuit (Table 3.16 & 3.17)
MCC9 Loads Not Satisfactory Not Satisfactory
TRM1 Satisfactory Satisfactory
TRANSFORMER
TRL3A Satisfactory Satisfactory
LOADING
TRL3B Satisfactory Satisfactory
BUSBAR LOADING Satisfactory Satisfactory
POWER FACTOR Satisfactory Satisfactory Install capacitor at MCC8 & 9
SHORT CIRCUIT ANALYSIS-METHODOLOGY
MOMENTARY CALCULATION INTERRUPTING CALCULATION
MOMENTARY (1/2 CYCLE CALCULATION)
3Phase Fault
IMPEDANCES 3Phase Fault Single Line to Ground Fault
NETWORK Single Line to Ground Fault Line to Line Fault
Line to Line Fault Double Line to Ground Fault
Double Line to Ground Fault
CALCULATION INTERRUPTING
3PHASE IMPEDANCES
SLG NETWORK
LL
DLG
CALCULATION
MOMENTARY 3PHASE
ASYMMETRICAL INTERRUPTING
MOMENTARY SLG
RMS CURRENT SYMMETRICAL
ASYMMETRICAL LL
LV ACB INTR. RMS CURRENT
PEAK CURRENT DLG
MCCB INTR. MV INTR.
MV CB C&L
Fault Point Fault Location Fault Type Networks/ Calculation
F1 13.8kV Power Plant Bus and downstream of Bolted-3ph,SLG, LL, DLG Momentary, Interrupting
BAC901
F2 Primary terminals of TRM1 Bolted-3ph,SLG, LL, DLG Momentary, Interrupting
F3 6.9kV switchgear (bus) Bolted-3ph,SLG, LL, DLG Momentary, Interrupting
F4 Primary terminals TRL3A Bolted-3ph,SLG, LL, DLG Momentary, Interrupting
F5 Primary terminals TRL3B Bolted-3ph,SLG, LL, DLG Momentary, Interrupting
F6 MCC8 Bus Bolted-3ph,SLG, LL, DLG Momentary
F7 MCC9 Bus Bolted-3ph,SLG, LL, DLG Momentary
F8 PE-KM5806 Terminals Bolted-3ph,SLG, LL, DLG Momentary
F9 PE-YM7601 Terminals Bolted-3ph,SLG, LL, DLG Momentary
F10 PE-KM8639 Terminals Bolted-3ph,SLG, LL, DLG Momentary
F11 PE-KM8601 Terminals Bolted-3ph,SLG, LL, DLG Momentary
F12 PC001 Terminals Bolted-3ph,SLG, LL, DLG Momentary
Interrupting
F13 GM1412 Terminals Bolted-3ph,SLG, LL, DLG Momentary
F14 GM1413 Terminals Bolted-3ph,SLG, LL, DLG Momentary
F15 VM5814 Terminals Bolted-3ph,SLG, LL, DLG Momentary
F16 GM8103A Terminals Bolted-3ph,SLG, LL, DLG Momentary
F17 GM8103S Terminals Bolted-3ph,SLG, LL, DLG Momentary
F18 MNDB Terminals Bolted-3ph,SLG, LL, DLG Momentary
F19 EMBD Terminals Bolted-3ph,SLG, LL, DLG Momentary
F20 YM7607 Terminals Bolted-3ph,SLG, LL, DLG Momentary
F21 SM8645 Terminals Bolted-3ph,SLG, LL, DLG Momentary
F22 GM7612 Terminals Bolted-3ph,SLG, LL, DLG Momentary
F23 7601M1 Terminals Bolted-3ph,SLG, LL, DLG Momentary
F24 KM8607 Terminals Bolted-3ph,SLG, LL, DLG Momentary
SHORT CIRCUIT ANALYSIS-RESULTS
Medium-Voltage Circuit Breakers
Interrupting Capacity
Making Capacity
Interrupting Capacity
Making Capacity
RECOMMENDATIONS
NEW TAPPING POINT AT 13.8kV POWER PLANT BUS WITH STEP DOWN
TRANSFORMER LOCATED NEAR THE FIRE PUMP
NEW FIRE PUMP CABLE WITH 2-HOUR FIRE RATING AND ROUTED OUTSIDE FIRE
HARZARD ZONE
BACKUP STANDBY GENERATOR WITH TRANSFER SWITCH
NEW UL LISTED FIRE CONTROLLER
FIRE PUMP EVALUATION
REUSE THE SPARE 630A BREAKER AT POWER PLANT
NEW 13.8kV FEEDER CABLE
NEW STEP-DOWN TRANSFORMER 2MVA 13.8/6.9kV
DELTA-WYE OIL IMMERSED TYPE
NEW TRANSFER SWITCH
NEW STANDBY GENERATOR AND SWITCHGEAR
NEW FIRE PUMP CONTROLLER
NEW CABLES
NEW FIRE PUMP SUPPLY STATION
FIRE PUMP EVALUATION
DESIGN EVALUATION
CIRCUIT BREAKER CAN HANDLE INDEFINITELY THE LOCKED ROTOR CONDITION OF THE PUMP
NO OVERLOAD PROTECTION PROVIDED
NORMAL MODE
RUNNING VOLTAGE DROP-SATISFACTORY
STARTING VOLTAGE DROP-SATISFACTORY
SHORT CIRCUIT RATINGS OF EQUIPMENT-SATISFACTORY
ARC-FLASH RATING-SATISFACTORY
BACKUP MODE
RUNNING VOLTAGE DROP-SATISFACTORY
STARTING VOLTAGE DROP-SATISFACTORY
SHORT CIRCUIT RATINGS OF EQUIPMENT-SATISFACTORY
ARC-FLASH RATING-SATISFACTORY
PE-Y5619 Low product purge bin filter 10 5.833 PE-Y5619 10 2 (1) 15.941 0.492 5.833 2.843
LOAD FLOW ANALYSIS-ANALYSIS RESULT