Scheduling/Leveling Report - 2017-09-16 15:43:11 - PM.

exe
=========================================================

Default Project..................................................Ray 2017

Projects:
Ray 2017.........................................................Jabal
Al Akdhar

Scheduling/Leveling Settings:
-----------------------------
General
-------
Scheduling ......................................................Yes
Leveling ........................................................No
Ignore relationships to and from other projects .................No
Make open-ended activities critical .............................No
Use Expected Finish Dates .......................................Yes
Schedule automatically when a change affects dates ..............No
Level resources during scheduling ...............................No
Recalculate assignment costs after scheduling ...................No
When scheduling progressed activities use .......................Retained
Logic
Calculate start-to-start lag from ...............................Early Start
Define critical activities as ...................................Longest Path
Compute Total Float As ..........................................Finish Float
Calculate float based on finish date of .........................Each project
Calendar for scheduling Relationship Lag ........................Predecessor
Activity Calendar

Advanced
--------
Calculate multiple float paths...................................No

Statistics:
-----------
# Projects.......................................................1
# Activities.....................................................145
# Not Started....................................................145
# In Progress....................................................0
# Completed......................................................0
# Relationships..................................................166
# Activities with Constraint.....................................0

Errors:
-------
Warnings:
---------
Activities without predecessors..................................9
Project: Ray 2017 Activity: A1010 Contract Effective Date
Project: Ray 2017 Activity: A1030 Completion of Engineering
Project: Ray 2017 Activity: A1040 Complete Delivery of all
Materials at Site
Project: Ray 2017 Activity: A1050 Commencement of OHTL Civil
Construction Activities
Project: Ray 2017 Activity: A1060 Completion of OHTL
Installation Works
Project: Ray 2017 Activity: A1070 Completion of UG cable
Installation Works
Project: Ray 2017 Activity: A1080 Completion of testing and
commissiong
Project: Ray 2017 Activity: A1090 Completion of Project
Project: Ray 2017 Activity: A2390 Award of the Project

Activities without successors....................................33


Project: Ray 2017 Activity: A1010 Contract Effective Date
Project: Ray 2017 Activity: A1020 Completion of Site
Mobilization
Project: Ray 2017 Activity: A1030 Completion of Engineering
Project: Ray 2017 Activity: A1040 Complete Delivery of all
Materials at Site
Project: Ray 2017 Activity: A1060 Completion of OHTL
Installation Works
Project: Ray 2017 Activity: A1070 Completion of UG cable
Installation Works
Project: Ray 2017 Activity: A1080 Completion of testing and
commissiong
Project: Ray 2017 Activity: A1090 Completion of Project
Project: Ray 2017 Activity: A1120 Environment Impact Assessment
Study
Project: Ray 2017 Activity: A1420 Approved By IZKI Municipality
Project: Ray 2017 Activity: A1500 33KV Lightning Arrester
Project: Ray 2017 Activity: A1570 Aircraft warning spheres and
lights arrangement
Project: Ray 2017 Activity: A1580 Relay Setting Calculations
Project: Ray 2017 Activity: A1610 Complete Civil Material Mas
Submission
Project: Ray 2017 Activity: A1650 Access Raoad Layout and
details
Project: Ray 2017 Activity: A1660 Foundation General
Arrangement Drawing
Project: Ray 2017 Activity: A1670 Foundation Level Setting
Diagrams
Project: Ray 2017 Activity: A1680 Backfill Protection Diagram
(Including Stone Pitching)
Project: Ray 2017 Activity: A1730 Energization
Project: Ray 2017 Activity: A1880 33KV Cable (Free Issue)
Project: Ray 2017 Activity: A1910 33KV OHTL ACSR PANTHER
Conductor(Free Issue)
Project: Ray 2017 Activity: A1920 OPGW/Earth Shield Wire &
Accessories
Project: Ray 2017 Activity: A1930 Insulators
Project: Ray 2017 Activity: A1940 Hardware Fitting
Project: Ray 2017 Activity: A1950 Wooden Poles
Project: Ray 2017 Activity: A1960 On load Disconnector
Project: Ray 2017 Activity: A1970 Auto Reclosure (PMR)
Project: Ray 2017 Activity: A1980 Ligtning Arrestor
Project: Ray 2017 Activity: A1990 Construction of 5Meter Access
Road
Project: Ray 2017 Activity: A2000 Survey of Plan & Profile and
PEG Marking
Project: Ray 2017 Activity: A2080 Foundation Stabilization and
Protection Works
Project: Ray 2017 Activity: A2140 Tower Earthing Works
Project: Ray 2017 Activity: A2190 Conductor Light Installation

Out-of-sequence activities.......................................0
Activities with Actual Dates > Data Date.........................0

Milestone Activities with invalid relationships..................0

Finish milestone and predecessors have different calendars.......0

Scheduling/Leveling Results:
----------------------------
# Projects Scheduled/Leveled.....................................1
# Activities Scheduled/Leveled...................................145
# Relationships with other projects..............................0
Data Date........................................................22-Aug-17
Earliest Early Start Date........................................22-Aug-17
Latest Early Finish Date.........................................16-Aug-20
Exceptions:
-----------
Critical Activities..............................................15
Project: Ray 2017 Activity: A1130 Geo Technical Investigation
Project: Ray 2017 Activity: A1140 Geo Technical Investigation
Report Submission & Approval
Project: Ray 2017 Activity: A1160 Priliminary of NOC's Receipt
from Client
Project: Ray 2017 Activity: A1760 33KV Tower Material and other
Accessories
Project: Ray 2017 Activity: A1840 33KV OHL Tower Materials &
other Accessories
Project: Ray 2017 Activity: A1900 33KV Tower OHL material and
other Accessories
Project: Ray 2017 Activity: A2090 Towr Material Shifting and
Sorting out
Project: Ray 2017 Activity: A2100 Ground Assembly
Project: Ray 2017 Activity: A2110 Tower Erection
Project: Ray 2017 Activity: A2120 Tighting and Inspection
Project: Ray 2017 Activity: A2130 Tower painting
Project: Ray 2017 Activity: A2140 Tower Earthing Works
Project: Ray 2017 Activity: A2390 Award of the Project
Project: Ray 2017 Activity: A2410 Tower Design Calculations
Project: Ray 2017 Activity: A2420 Tower GA Drawings

Activities with unsatisfied constraints..........................0

Activities with unsatisfied relationships........................0

Activities with external dates...................................0