International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056

Volume: 03 Issue: 06 | June-2016 www.irjet.net p-ISSN: 2395-0072

Design, Cost & Time analysis of Precast & RCC building


1Akash Lanke, 2Dr. D. Venkateswarlu
1
Student at Godavari Institute of Engineering & Technology rajahmundry, India, akash123lanke@gmail.com
2Prof. & HOD Civil Engineering Godavari Institute of Engineering & Technology rajahmundry, India.

---------------------------------------------------------------------***---------------------------------------------------------------------
Abstract - Precast concrete is well known technology in 2. METHODOLOGY
which some standardized units which are manufactured in
factories are used for fast construction. Though the Literature review:
technology is developed many years ago but the To study the construction techniques of precast and
implementation is not up the mark in our country. In this traditional method we have gone through various research
study we have carried out detailed study of various concepts papers, books,
of precast, go through number of literature & found the facts Case study & Visits
associated with it. We have taken one building as a case & In the reference of our work we have visited two
Design the same building as a precast building & Traditional constructions sites & Study the similar cases. One is of
Cast in-situ building. Here we have made cost analysis as well precast construction & Second was for RCC Structure the
as feasibility check on basis of costing & Duration. For more actual implementation of precast work is been observed &
practical study we have visited the two ongoing construction site difficulties were discussed with engineers & Project
sites of Precast & cast in-situ & gathered required manager.
information, From this analysis It is remarkably seen that the Analysis:
cost of precast building is significantly reduces & duration of In this work we have made cost comparison as well as
construction is also much lesser than traditional method. feasibility check for precast construction on large scale. Also
From all this study we can be conclude that the precast few advantages & Drawbacks are identified by us.
concrete system is economical than conventional cast in Design:
place method but still there are some conditions which we In this study we have made Precast Design of a 12 storied
have to take care of while using precast, those are quantity of building, sincere attempt is made here to follow the
construction, Distance of site from manufacturing unit, Type standards. Also for comparison we have made the typical
of building etc. RCC design of the same building & compare it with precast
Key Words: Precast concrete, Cost of Precast, Cost & Time one.
analysis etc. Cost comparison:
After design calculations we have find out the cost of both
1. INTRODUCTION: the structures (i.e RCC & Precast) & made comparison of
both. For calculation the market rates are considered.
Earlier Roman builders use concrete for construction of
culverts, tunnels etc. Now a days pre-cast technology From above Process we have come to the conclusion about
include a variety of architectural and structural the precast construction & related facts about execution &
applications which can be used in various element of economic aspects. & detail conclusions have been drawn in
building. The process was invented by city engineer John the report.
Alexander Brodie, Actually idea was not taken up broadly in
Britain Yet, it was adopted all over the world, The Precast 3. DESIGN CONCEPT FOR PRECAST SYSTEM
Concrete industry focuses on utility, underground, and Structural Concept:
other non-pre-stressed products, and is represented Taking consideration of cost economy, build ability and the
primarily by the National Precast Concrete Association. structural concept developed consists of
In this study we have gone through precast structural Conventional foundations comprising footings, raft slab or
concepts, structure suitability, feasibility, & cost & time piles and pile caps.
analysis of precast structure. We have also made Precast concrete non-load bearing walls.
comparison of both precast & Traditional cast in situ Precast concrete floor system, either:
construction method on the basis of selected case. The - Precast concrete beams and precast slabs with a composite
detailed design of precast & RCC building is prepared & in-situ topping or precast concrete walls with precast
costing of both is compared. concrete slab system

2016, IRJET | Impact Factor value: 4.45 | ISO 9001:2008 Certified Journal | Page 343
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 03 Issue: 06 | June-2016 www.irjet.net p-ISSN: 2395-0072

Limiting the cracking of the topping concrete at the


Design of Precast Building: supports, site placed reinforcement is provided.
Here we have considered a 12-storey office building for c. Precast columns:
design of precast building. The structural system of the Here for this structure, columns are of size 500 mm x
selected office block is based on skeletal frame consisting of
700 mm and with base plate connection at every
a framework of beams and slabs, columns. The structural
frames are the most common system due to the advantage alternate floor. That is designed as pin-ended at the
of greater flexibility in the building & functionality. These ultimate limit state. The base plate connections are
are also widely used as precast members because of their designed so that they are enabling to withstand
behaviors against forces & movements of structural moment capacity of column to behave as a two story
elements however it is important to understand the cantilever. The advantage of base plate connection is
physical effects of these forces and how they are to eliminate heavy column props and result in a safe &
transferred through the complete structure. Easy execution. A sufficient tolerance is necessary for
We have designed precast columns, beams, staircases, walls in-situ reinforcement at the time of execution so
and their connections have been selected to illustrate as 50mm gap is designed for column to column at the
many as possible of the types of design in a building project
beam support regions.
for which calculations may have to be prepared. The
drawings and calculations provided by us are preliminary Every column is to be casted in the direction of
one. They can be act as illustrative examples for others and precast beam with Reinforced concrete corbels with
more detail analysis is required, while implementation of T25 dowel bars which are prevents topping beams
project. when we laid the precast slabs while execution. All
columns are to be considered braced in both
Description of Building directions.
The building is a 12 stories commercial & office block d. Diaphragm action of Floor & structural
including car parks, shopping malls and service apartments. reliability
A typical floor of the building measures around 72 m x 24 m Here all precast elements are bound by a 65 mm thick
& having 8 m building grids in both directions is shown in concrete topping. These elements are reinforced with
Figure. The design floor-to-floor height is 3.6 m. Staircases, a layer of steel fabric mesh. Which can serves as
lift cores and other building services such as toilets etc. are structural ties in order to satisfy the reliability ties
included & the cast in-situ construction is provided requirement of strength the whole floor structure will
wherever necessary. perform as a stiff diaphragm which distributes
horizontal loads to the stabilizing cores at each end of
Structural System: the floor.
The building is consideed partialy as cast insitu Design information
cosstruction for tasking advantage of regularness in a. Codes of Practice
building grids. Beside acting as load bearing walls. BS 6399 :Design Loading for Building
staircase wells and lift cores also function as CP 65 : The Structural Use of Concrete
stabilising cores for the superstructure. The precast CP3, Chapter V :Wind Load
components consist of hollow core slabs, beams. b. Materials
columns and staircase flights. Concrete : M30 for topping, walls and all other
a. Hollow core slabs in-situ works
The design of hollow core slabs is based on class 2 : M40 for precast beam
prestressed concrete structures with least 2 hours fire : M40 for precast columns and hollow core slabs
retention. The hollow core slabs are 215mm thick & Steel : fy = 250 N/mm2 mild steel
cast with concrete. Each unit is designed as simply reinforcement
supported with minimal 100 mm seating at the : fy = 460 N/mm2 high yield steel reinforcement
support. : fy = 485 N/mm2 for steel fabric reinforcement
b. Precast beams: c. Dead loads
Precast beams are used in the office area are 540mm Concrete density = 24 kN/m3
deep. The beams, which are un-propped during Partitions, finishes and services = 1.75 kN/m2
construction, are seated directly on column corbels Brick walls = 3.0 k/Nm2 in
and they are designed as simply supported structures. elevation
For

2016, IRJET | Impact Factor value: 4.45 | ISO 9001:2008 Certified Journal | Page 344
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 03 Issue: 06 | June-2016 www.irjet.net p-ISSN: 2395-0072

RCC Design for same building: 4. COST COMPARISON & TIME EFFECTIVENESS
We Have Also made RCC Design for the same
structure. General comparison
The Details of RCC Design are as follows. Table 02: Comparison of precast & Cast in situ
The following image shows typical slab portion for the Particul Precast RCC
ar
selected case of building. Constru Very rapid Comparatively slow construction
ction speed of On site casting, so reinforcement
speed erection. laying & fixing, formwork, setting
Rapid of concrete required time.
construction on
site.
Quality Good quality Quality may affect due to site
control control. conditions, due to bad supervision,
unskilled labor.
Environ Weather is Environmental conditions like
mental eliminated as a temperature, humidity can affect on
conditio factor-you can performance of concrete.
ns cast in any
weather and get
the same
results, which
allows you to
perfect mixes
and methods
Labor Less labor is More Labors required on site in case of
Require required and RCC.
ment that labor can
be less skilled
Manufac High quality can RCC is to casted on site & the site
turing be achieved conditions are not regularized, so it may
Figure 01 Showing Slab units considered for Design conditio because of the affect on strength.
ns controlled
conditions in
the factory.
RCC Design Summary: Quantity Since a The owner can only buy small required
discount Precasters can quantity so quantity discount is not that
buy materials for much.
Table No 01: Showing RCC Design Summaries multiple
projects,
Name Nos Size Reinforcement Reinforcement Remark quantity
discounts can
IS1 20X12=240 d= 9" 12#@ 5.5"cc 12#@ 5.5"cc TWO lower costs
WAY Durabili With the ability RCC is sufficiently durable but it required
SLAB ty to so tightly proper quality control.
control the
IB1 26x12=312 20" X BOTTOM:- 2 # TOP:- 2 # 20 process, from
27" 32- FULL DE:- 1# 32 materials to
2 # 32- CE:- 3 # 32 consolidation to
curing, you can
CURTAIL
get extremely
IB2 26x12=312 20" X BOTTOM:- 3 # TOP:- 2 # 20 durable concrete
30" 32- FULL DE:- 1# 32 Size & Repeatability-it's In-situ concreting is suitable where the
Shape easy to make building is in uneven shape & there are
2 # 32- CE:- 4 # 32
many copies of no repetitive shapes,
CURTAIL the same precast Can be possible to modify shape on site
Colum 33 750 X 12 # 40 TIES:- 10 # @ product; by More flexibility in execution.
n 500 8"C/C maximizing
repetition, you
FOOTI 33 7550 X 32 # 100mm c/c 32 # 100mm c/c A + B= can get plenty of
NG 7550 X 1300 value from a
1300 A = mold and a set-
up
650,B=
650
This cannot be
modified on site

There is no

2016, IRJET | Impact Factor value: 4.45 | ISO 9001:2008 Certified Journal | Page 345
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 03 Issue: 06 | June-2016 www.irjet.net p-ISSN: 2395-0072

flexibility in Table 03 Shows Comparison of precast & Cast In-situ


changing size
shape on site. on basis of Duration.
Connecti Connections are Connections may be difficult
ons simpler
Operation Precast Cast-in-place
Design building design Somewhat limited building design
Flexibilit flexibility is flexibility Number of Day Number of Day
y more Excavation, Filling, etc. Same Same
Size No limitation for Because panel size is limited, Pouring & Curing
Limitati size. precast concrete cannot be used for concrete Strip Base 1 2
on two-way structural systems.
Pour. Cure. Strip
Cost It is Economics of scale demand regularly NA
Wall 2
comparatively shaped buildings.
economical Pour. Cure. Strip Top NA
when the 2
building having Damp proof course NA
no regular 1
shapes. Install on site 1 Included
Shape Here we Need It can be casted in any shape on site.
Regular shapes Total
in building to Duration in 2 7
achieve Days
economy, Need
for repetition of Recent works on the concept of precast construction
forms will affect
building design.. includes those buildings where the majority of
structural components are standardized i.e. having
Cost & Duration Comparison: same & repetitive size shape and produced in factory
As the population continuously growing rapidly, so in a location away from the construction site.
the need of rapid or fast construction is requirement Normally these members are manufactured on bulk
of future generation. Precast concrete construction production in industries to provide easy construction
methods are become feasible and alternatives method with less cost & time. When we wisely use precast
or solution in such applications Ides buildings and elements in building systems are seems to be
bridges. The primary benefit of precast construction is economical when it compared with Conventional type
reduction in time of construction. Waste management construction of buildings.
and cost efficient construction. 8.3 Cost Comparison of Selected Building:
Precast concrete is the ideal solution for residential After design & Analysis we have made cost analysis of
because the structure of residential buildings are same structure. And comapare cost of RCC structure
somewhat standard so the construction of same type with precast structure rates are adopted from DSR &
of elements are easy and result in to cost saving on if market inquiry.
its production is in bulk. Precast concrete provides This is overall estimating which attempts to find out
stability, Flexibility, sound durable and adaptability nearby cost of structure & accordingly we can
with cost efficiency. Precast concrete construction determine the economic aspects in this study. The
required less construction process which saws money comparison of both the structure is provided below.
on financing costs. Cost minimization on labor Table 04 Showing cost comparison of RCC & Precast
policies, skills, development of employ, providing building.
training to them is main factors. Repairs cost also
reduces in precast concrete construction. The
following table shows the comparison of precast &
cast in situ on basis of duration.

2016, IRJET | Impact Factor value: 4.45 | ISO 9001:2008 Certified Journal | Page 346
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 03 Issue: 06 | June-2016 www.irjet.net p-ISSN: 2395-0072

2016, IRJET | Impact Factor value: 4.45 | ISO 9001:2008 Certified Journal | Page 347
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 03 Issue: 06 | June-2016 www.irjet.net p-ISSN: 2395-0072

2016, IRJET | Impact Factor value: 4.45 | ISO 9001:2008 Certified Journal | Page 348
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 03 Issue: 06 | June-2016 www.irjet.net p-ISSN: 2395-0072

We have work out the cost of both the buildings (RCC loading, Asian Journal Of Civil Engineering (Building
&Precast), From this analysis & calculations it can be And Housing) Vol. 13, No. 2 (2012), 2011
said that the precast concrete system is economical [4] P. K. Aninthaneni and R. P. Dhakal, Conceptual
than conventional cast in place method, the cost development: low Loss Precast Concrete Frame
difference is found to be around 1.83 cr. but still there Building System with Steel Connections, 2014 NZSEE
are some conditions which we have to take care of Conference, New Zealand, 2014.
while using precast, those are quantity of [5] Sarakot Asaad Hasan, Behaviour Of Discontinuous
construction, Distance of site from manufacturing Precast Concretebeam-Column Connections,
unit. Type of building etc. we have identified that for University of Nottingham, 2011
standard & Repetitive work precast is the best option [6] M. N. Kataoka, M. A. Ferreira, A. L. H. C. El Debs, A
to choose. The main limitation of precast is study on the behavior of Beam column connections in
transportation from place of manufacturing to place of precast concrete structures: Experimental analysis,
site where it is to be fixed. Ibracon Structures and Materials Journal, Volume 5,
Number 5, 2012.
[7] Can Akogul and Oguz C. Celik, Effect of Elastomeric
5. CONCLUSION Bearing Modeling Parameters on the Seismic Design
of Highway Bridges with Precast Concrete Girders,
As we have seen various methods of precast, Design, The 14th World Conference on Earthquake
case studies of precast & it is found that, the design Engineering, October 12-17, 2008, Beijing, China,
comes out as economical if proper care while 2008.
designing is taken. We have design the same building [8]Radhika J. Popat and Rajul K. Gajjar, Seismic
by traditional & precast method & Notice the Cost & Evaluation of Beam-Column joints using GFRP Bars in
completion duration It is remarkably seen that the Multi-Storey building using ETABS, Radhika et al,
cost of precast building is significantly reduces & International Journal of Advanced Engineering
duration of construction is also much lesser than Research and Studies, E-ISSN22498974, 2011:
traditional method. From all this study we can be [9] Patrick Tiong Liq Yee, Azlan Bin Adnan, Abdul
conclude that the precast concrete system is Karim Mirasa and Ahmad Baharuddin Abdul Rahman ,
economical than conventional cast in place method Performance of IBS Precast Concrete Beam-Column
but still there are some conditions which we have to Connections Under Earthquake Effects:A Literature
take care of while using precast, those are quantity of Review, American J. of Engineering and Applied
construction, Distance of site from manufacturing Sciences 4 (1): 93-101, 2011, ISSN 1941-7020, 2010
unit. Type of building etc. we have identified that for Science Publications, 2011.
standard & Repetitive work precast is the best option [10]G. Metelli and P. Riva, Behavior of a Beam to
to choose. In observation the most important thing is Column DRY Joint for Precast Concrete Elements,
to be observed project is in precast construction The 14th World Conference on Earthquake
technique is the time effective it require less time to Engineering October 12-17, 2008, Beijing, China, 2008
construct. It requires skilled worker and qualified [11]www.bca.gov.sg/publications/BuildabilitySeries/
contractor, Lower initial cost especially for large others/bsl cp3.pdf www.cpci.ca
project. We can achieve better concrete quality [12]Precast industrial buildings detailing manual by
control and lighter concrete unite. The main limitation National Precast Concrete Association Australia
of precast is transportation from place of [13]www.worldhousing.net/uploads/precast__concre
manufacturing to place of site where it is to be fixed. te.pdf Precast construction by Svetlana Brzev, British
Columbia Institute of Technology, Canada ,Teresa
REFERENCES Guevara-Perez, Architect, Venezuela ACI 550R-96,
[1] Elias Issa Saqan, Evaluation of ductile beam- Design recommendations of precast Concrete
column connections for use in seismic-resistant Structures. Precast.ppt by Fundamental of Building
precast frames, Faculty of the Graduate School of the construction, Materials & Methods, 5th Edition
University of Texas at Austin, 1995 [14]D.S.R Pune Region 2014-15
[2] Bindurani, P, A. Meher Prasad, Amlan K. Sengupta,
Analysis of Precast Multi storeyed Building
[3] R. Vidjeapriya and K.P. Jaya, Behavior of Precast
Beam-Column Mechanical Connections under cyclic

2016, IRJET | Impact Factor value: 4.45 | ISO 9001:2008 Certified Journal | Page 349
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 03 Issue: 06 | June-2016 www.irjet.net p-ISSN: 2395-0072

Anexure-I

2016, IRJET | Impact Factor value: 4.45 | ISO 9001:2008 Certified Journal | Page 350