You are on page 1of 204

DAFTAR HARGA SATUAN BAHAN DAN UPAH

No. JENIS BAHAN SATUAN

I. HARGA DASAR BAHAN

1. SEMEN Semen PC Zak


Semen PC kg
Semen Warna kg
Floor hardener kg
Semen putih kg
Cornis Zak
Cornis kg

2. PASIR Pasir Beton m3


Pasir Beton kg
Pasir Urug m3
Pasir Urug kg

3. BATU KALI Batu kali m3


Batu koral m3
Batu koral kg
Batu split m3
Batu split kg

4. BATU BATA Batu bata bh

5. TANAH Tanah urug m3


Tanah Sirtu m3

II. BAHAN PENUTUP ATAP

1. SENG BJLS Seng gelombang uk. 5' kpg


Seng gelombang uk. 7' kpg
Seng gelombang uk. 10' kpg
Seng Plat Lbr

2. ASBES Asbes gelombang 5' kpg


Nok asbes bh

3. GENTENG KERAMIK Keramik warna natural bh


Keramik warna special bh
Nok keramik warna natural bh
Nok Keramik warna special bh

4. GENTENG METAL Genteng metal uk. 2x4 (0.25mm) lbr


Genteng metal berpasir 2x5 (0,4mm) lbr
Nok genteng metal bh

5. GENTENG TANAH LIAT Genteng tanah liat bh


Nok genteng tanah liat bh

1
6. POLYCARBONATE Polycarbonate m2

7. ATAP ZINCALUME Atap Zincalume 0,35 m'


Atap Alkan 0,35 m'
Nok Zickcalume 0,30 m'

8. ATAP BITUMEN Atap gelombang kpg


Atap motif genteng kpg
Nok bh

9. LAIN-LAIN Aluminium foil m2


Kalsiplank btg
Karpet talang m`

III BAHAN KAYU

1. MERAWAN, KULIM Papan m3


Balok kayu m3

2. MERANTI Papan m3
Balok kayu m3

4. RACUK Papan m3
Balok kayu m3

3. LAIN-LAIN Gelam 6-8 cm pj. 4m btg


Gelam 8-10 cm pj. 4m btg

IV BAHAN PENUTUP DINDING/LANTAI

1. KERAMIK PUTIH 20 x 25 kotak


20 x 25 buah
30 x 30 kotak
30 x 30 buah
40 x 40 kotak
40 x 40 buah

2. KERAMIK WARNA 20 x 25 kotak


20 x 25 bh
20 x 20 (KM/WC) kotak
20 x 20 (KM/WC) bh
30 x 30 (kasar) kotak
30 x 30 (kasar) bh
30 x 30 kotak
30 x 30 bh
40 x 40 kotak
40 x 40 bh
40 x 40 kotak
40 x 40 bh

3. GRANITE TILE 60 x 60 kotak


60 x 60 bh

2
60 x 60 kotak
60 x 60 bh
80 x 80 kotak
80 x 80 bh
80 x 80 kotak
80 x 80 bh
Granite Pola uk. 1,2 x 1,2 m ls

4. BATU ALAM Batu candi m2


Granit alam m2
Andesit m2
Lempeng (kecil) m2
Lempeng (besar) m2
Andesit + bevel m2

5. LAIN-LAIN Karpet biasa m2


Karpet t.6mm m2
Lantai vinyl kayu m2
Wallpaper m2
Nat keramik bks

V BAHAN CETAK

1. BUIS BETON Buis beton dia. 100cm bh


Buis beton dia. 80cm bh
Buis beton dia. 60cm bh
Buis beton dia.40cm bh
Buis beton dia. 30cm bh
Buis beton dia. 20cm bh

2. ROSTER Roster keramik bh


Roster keramik bh
Roster terawang bh
Roster beton bh

3. GLASS BLOK Glass block bh

4. PANEL BETON Panel beton bh


Panel beton bh
Kolom beton pracetak m

5. PAVING BLOK Segi enam t. 6 cm bh


Persegi panjang t. 6 cm bh
Segi enam t.8 cm bh
Persegi panjang t. 8 cm bh
Segi enam warna t. 6 cm bh
Persegi panjang warna t. 6 cm bh
Segi enam warna t.8 cm bh
Persegi panjang warna t. 8 cm bh

6. KANSTEIN Uk. 60x30x20/12 bh


Uk. 60x30x10/15 bh
Uk.40x20x10/13 bh

3
7. BATACO BETON Bataco uk. 20x40 bh

VI BAHAN BESI/BAJA/ALUMINIUM/BAJA RINGAN

1. BESI BETON Besi 6mm btg


Besi 8mm btg
Besi 10mm btg
Besi Beton kg
Kawat beton kg
Wiremesh dia.8 kg
Wiremesh dia,6 kg

2. BAJA Besi strip kg


Baja WF, IWF, H kg
Baja Siku, CNP kg
Kawat las kg

3. ALUMINIUM Profil aluminium m


Aluminium strip m

4. BAJA RINGAN Profil C channel 75.100 (6m) btg


Profil C channel 75.75 (6m) btg
Reng AZ 0,55mm x 6m btg
Baut chnael 12x 3/4 bh
Screw/dynabolt bh
Valery gutter talang jurai m

VII. BAHAN PIPA

1. PIPA PVC Pipa PVC AW 1/2" btg


Pipa PVC AW 3/4" btg
Pipa PVC AW 3" btg
Pipa PVC AW 4" btg
Pipa PVC DW 3" btg
Pipa PVC DW 4" btg

2. PIPA GALVANIS Pipa galvanis 1/2" btg


Pipa galvanis 3/4" btg

3. LAIN-LAIN Lem pipa btl


Penampung air fiber kap. 1,1 L unit
Penampung air stainless kap. 1,1 L unit

VIII. BAHAN LANGIT-LANGIT

1. PLYWOOD Plywood 3 mm lbr


Plywood 4 mm lbr
Plywood 6 mm lbr
Plywood 9 mm lbr
Plywood 12 mm lbr

4
2. SOFT BOARD Gypsum 9 mm kpg

3. HARD BOARD Calsiboard 3,5mm kpg


Eternit kpg

4. PLAFOND PVC Plafond PVC putih + pasang m2


Plafond PVC warna + pasang m2
Ornamaen PVC unit

5. LIST PLAFOND List plafond 1x4 btg


List plafond besar btg
List gypsum kecil btg
List gypsum besar btg
List PVC btg

6. LAIN-LAIN Skrup gypsum 1" dus


Lakban gypsum roll
Paku plywood kg
Hollow galvanis 20x40 m
Hollow galvanis 40x40 m

IX. BAHAN FINISHING

1. KAYU Menie kg
Plamir kayu kg
Cat dasar kg
Cat penutup kg
Thiner ltr
Teak Oil ltr
Politur ltr
Residu/Ter ltr
Dempul kayu kg
Vernis ltr

2. BESI Menie kg
Cat penutup blk

3. TEMBOK Cat tembok eksterior liter


Cat tembok interior kg
Cat Tembok interior kg
Dempul/Plamir kg
Cat dasar/Sealer kg

4. THINNER Thinner klg

5. KUAS Kuas 1" bh


Kuas 1 1/2" bh
Kuas 2" bh
Kuas 3" bh
Kuas 4" bh
Kual roll bh

5
X. BAHAN KACA

1. KACA POLOS Kaca polos 3mm m2


Kaca polos 5mm m2
Kaca polos 8mm m2
Kaca polos 10mm m2
Kaca polos 12mm m2

2. KACA RYBEN/HITAM Kaca polos 3mm


Kaca polos 5mm
Kaca polos 8mm
Kaca polos 10mm

3. LAIN-LAIN Sunblast polos m2


Kaca film m2
Kaca patri m2
Lem kaca btl

XI BAHAN INSTALASI LISTRIK

1. KABEL LISTRIK NYM 2 x 2,5 m


NYM 3 x 2,5 m

2. SAKELAR Sakelar tunggal bh


Saklar seri bh

3. STOP KONTAK Stop kontak bh


Stop kontak AC bh

4. LAMPU Downlight 4" bh


Lampu SL bh
Lampu T5
Lampu TL RAM bh

5. LAIN-LAIN Pipa listrik btg


T dus, L bh
Lakban listrik roll
Klem kabel bks
Mangkok inbow bh

XII. BAHAN PENGUNCI DAN PENGGANTUNG

1. KUNCI TANAM Kunci tanam lengkap bh


Kunci tanam lengkap bh
Kunci bulat (KM/WC) bh
Kunci tanam kecil (KM/WC) bh
Handle pintu stainless steel bh
Cylinder kunci bh

2. ENGSEL/GRENDEL Engsel 3" steanless steel ktk


Engsel 3" biasa ktk
Engsel 4" steanless steel ktk

6
Engsel 4" biasa ktk
Engsel tanam bh
Grendel tanam bh

3. LAIN-LAIN Gembok bh
Door closer kw 1 bh
Door closer kw.2 bh
Door stop bh
Door holder bh
Kait angin bh
Spring knip ktk
Handle pintu/pull handle bh
Kunci slot bh

XIII. BAHAN SANITAIR

1. CLOSED Closed jongkok bh


Closed jongkok bh
Closed duduk bh
Closed duduk bh

2. JET SHOWER/BIDET Jet shower bh


Jet shower bh

3. KRAN TEMBOK Kran air 1/2 - 3/4" bh


Kran air 1/2 - 3/4" bh

4. WASTAFEL Wastafel bh
Wastafel bh
Wastafel lengkap (kran, sifon, flexibel,
stopkran) bh

5. URINOIR Urinoir bh
Pembatas Urinoir bh

6. BATHUBE Bathube bh

7. LAIN-LAIN Bak fiberglass uk. 1 m3 bh


Bak cuci piring stainless steel bh
Waterdrain bh
Floor drain stainless steel bh
Sealtape bh

XIV. BAHAN PENGIKAT KAYU

1. PAKU Paku bermacam ukuran kg


Beton ktk
Paku seng kg

2. LEM Lem kayu kg


Lem aica aibon kg

7
XV. LAIN-LAIN

1 Jendela nako 5mm ryben unit


2 Diamond wheel bh
3 Bambu dia.6-8/ 600cm btg
4 Tali Ijuk kg
5 Kawat jaring galvanis lbr
6 Kawat duri roll
7 Air ltr
8 Minyak Bekesting ltr
9 Minyak Pelumas ltr
10 Sewa alat las jam
11 Sewa alat jam
12 Solar ltr
13 Rolling door m2
14 Folding gate m2
15 Folding gate PVC m
16 Skrup fixer bh
17 Sealant tube
18 Soda api kg
19 Amplas lbr
20 Pintu KM/WC PVC bh
21 Pintu KM/WC Aluminium lengkap bh
22 Sewa scafolding unit

HARGA DASAR UPAH

1 Pekerja OH
2 Tukang OH
3 Kepala Tukang OH
4 Mandor OH

8
HARGA DASAR (Rp) KETERANGAN

65,000.00 semen tipe I; semen baturaja; 1 zak @ 50 kg


1,300.00
12,000.00 setara SG
7,000.00
6,000.00 setara kingkong
75,000.00 setara A+; 1 zak @ 20 kg
3,750.00

85,000.00
60.71 BJ 1400 kg/m3
65,000.00
46.43 BJ 1400 kg/m3

465,000.00
435,000.00
322.22 BJ 1350 kg/m3
475,000.00
351.85 BJ 1350 kg/m3

550.00 uk. 8x8x16 cm; batu bata lubang press mesin

57,000.00
80,000.00

26,500.00 uk. 0,8 x 1,50 m


38,500.00 uk. 0,8 x 2,1 m
55,000.00 uk. 0,8 x 3,0 m
22,000.00 Lebar 90 cm

50,000.00 lebar 105 cm


40,000.00 panjang 105 cm

10,396.00 setara Kanmuri; 1m 2 @ 14 bh


16,336.00 setara Kanmuri; 1m 2 @ 14 bh
20,000.00 setara Kanmuri; 1m @ 3,9 bh
33,500.00 setara Kanmuri; 1m @ 3,9 bh

29,500.00 setara Sakura roof; 1 m2 @ 1,62 lbr


45,500.00 setara Sakura roof; 1m2 @ 1,62 lbr
23,000.00 panjang 90 cm

1,000.00 1 m2 @ 17,5 bh
1,500.00 1 m @ 3,5 bh

9
90,799.03 setara Twinlite; 1 roll x 5mmx2,1mx 11,8m

63,500.00 uk.lebar 105 cm


55,000.00 uk. Lebar 105 cm
25,666.67 uk. 300x60

127,500.00 setara onduline; uk. 200x95 cm


39,000.00 setara onduline; uk. 106x40 cm
105,000.00 setara onduline;; uk. Panjang 90 cm

10,710.42 tipe woven two side; 1 roll @ 30m x 1,2m


45,000.00 1 btg @ 3m
8,000.00 lebar 53 cm

5,500,000.00 Kayu Klas II


5,800,000.00 Kayu Klas II

3,500,000.00 Kayu klas III


3,800,000.00 Kayu klas III

1,200,000.00
1,600,000.00 Kayu klas

8,000.00
10,000.00

48,000.00 setara mulia, arwana


2,400.00 setara mulia, arwana
45,000.00 setara mulia, arwana
4,090.91 setara mulia, arwana
48,000.00 setara mulia, arwana
8,000.00 setara mulia, arwana

50,000.00 setara Pegasus, Impresso


2,500.00 setara Pegasus, Impresso
56,430.00 setara KIA
2,257.20 setara KIA
135,850.00 setara Roman
12,350.00 setara Roman
50,000.00 setara mulia, arwana
4,545.45 setara mulia, arwana
61,000.00 setara Platinum
10,166.67 setara Platinum
48,000.00 setara Asia Tile
8,000.00 setara Asia Tile

240,000.00 setara granito


80,000.00 setara granito

10
168,000.00 setara garuda
56,000.00 setara garuda
463,000.00 setara granito
231,500.00 setara granito
275,000.00 setara Decogress
137,500.00 setara Decogress
2,500,000.00

140,000.00 uk. 10x20


1,500,000.00
140,000.00
70,000.00
90,000.00
160,000.00

17,500.00 uk. 2m x 30 m
81,250.00 uk. 4m x 40 m
177,060.24 setara Gaimaru; 1ktk@ 3,3m2
40,333.00 1 roll x 1 m x 15 m
12,000.00 setara SG

800,000.00 d0=100 cm; d1=120cm


500,000.00 d0=80 cm; d1=100cm
350,000.00 d0=60 cm; d1=75cm
150,000.00 d0=40 cm; d1=48cm
90,000.00 d0=30 cm; d1=38cm
45,000.00 d0=20 cm; d1=25cm

47,000.00 uk. 30x30


35,000.00 uk. 20x20
8,000.00 uk. 10x20
5,000.00 uk. 25x25

19,500.00 uk. 20x20

157,500.00 uk. 50x240


137,500.00 uk. 40x240
90,000.00

2,027.03 1 m2 @ 37 bh; K 200


1,704.55 1 m2 @ 44 bh; K200
2,297.30 1 m2 @ 37 bh; K 200
1,931.82 1 m2 @ 44 bh; K200
2,351.35 1 m2 @ 37 bh; K 200
1,977.27 1 m2 @ 44 bh; K200
2,621.62 1 m2 @ 37 bh; K 200
2,204.55 1 m2 @ 44 bh; K200

50,000.00
48,000.00
28,000.00

11
2,000.00

25,000.00 1 batang @ 12 m
46,000.00 1 batang @ 12 m
70,000.00 1 batang @ 12 m
9,704.64
18,000.00
9,712.90 uk. 8mm x 2,1 m x 5,4 m; 150x150
9,356.01 uk. 6mm x 2,1 m x 5,4 m; 150x150

11,000.00
12,000.00
11,000.00
33,500.00 setara Niko; 1 ktk @ 2 kg

46,666.67 setara Damai sejahtera


33,333.33 setara Damai sejahtera

82,000.00 setara Taso


72,000.00 setara Taso
34,500.00 setara Taso
165.00
1,000.00
37,500.00 panjang 6 m

17,000.00 setara Wavin; 1 batang @ 6 m


22,000.00 setara Wavin; 1 batang @ 6 m
136,000.00 setara Wavin; 1 batang @ 6 m
224,000.00 setara Wavin; 1 batang @ 6 m
109,000.00 setara Wavin; 1 batang @ 6 m
116,000.00 setara Wavin; 1 batang @ 6 m

65,000.00 1 btg @ 6m
85,000.00 1 btg @ 6m

8,000.00
1,150,000.00 setara tedmont
3,775,000.00 setara tedmont

45,000.00
60,000.00
75,000.00
115,000.00
150,000.00

12
60,000.00 setara Jayaboard

68,000.00
14,000.00 uk. 100 x 100 cm

175,000.00 setara Shunda plafond


250,000.00 setara Shunda plafond
3,500,000.00 setara Shunda plafond; uk. 1,2m x 1,6m

8,000.00 1 batang @ 3,8 m


17,000.00 1 batang @ 3,8 m
13,000.00 1 batang @ 1,7 m
16,000.00 1 batang @ 1,7 m
120,000.00 1 batang @ 4 m

40,000.00
15,000.00
25,000.00
4,000.00 1 btg @ 4 m
5,375.00 1 btg @ 4 m

34,000.00
12,000.00 setara Matex; 1 galon @ 4 kg
31,000.00 bodiluc
49,000.00 setara Platone
22,500.00 setara Cobra merah
57,500.00
76,500.00
4,500.00 setara Bintang bola
45,000.00 setara Rj; 1 klg@ 5 kg
46,500.00

34,000.00
49,000.00 setara Platone

96,120.00 setara Dulux; 1 galon @ 2,5 l


19,600.00 setara Vinilex; 1 galon @ 5 kg
11,600.00 setara Q Luc; 1 galon @ 5 kg
9,000.00 setara Rj; 1 galon @ 5 kg
25,000.00 setara Vinilex

25,000.00 setara Cobra merah

4,000.00 setara Eterna


5,000.00 setara Eterna
8,000.00 setara Eterna
12,000.00 setara Eterna
16,000.00 setara Eterna
25,000.00 setara ACE

13
65,000.00 setara Asahimas
95,000.00 setara Asahimas
200,000.00 setara Asahimas
350,000.00 setara Asahimas
450,000.00 setara Asahimas

75,000.00
110,000.00
200,000.00
400,000.00

65,000.00 lebar 120 cm


65,000.00 lebar 120 cm
2,000,000.00 list kuningan
20,000.00

9,000.00 setara Eterna; 1 roll @ 50 m


11,000.00 setara Eterna; 1 roll @ 50 m

15,000.00 setara Clipsal


17,000.00 setara Clipsal

14,000.00 setara Clipsal


46,000.00 setara Clipsal

55,000.00 setara Philips


35,000.00 setara Philips

295,000.00 setara Philips; 2 x 28 watt

6,000.00 1 btg @ 3 meter


2,500.00
8,000.00
5,000.00
3,000.00

250,000.00 setara Solid, Gradino, Dekkson


95,000.00 setara Kodai, Medio
125,000.00 setara Dekkson
35,000.00
150,000.00 setara Gradino, Solid
100,000.00 setara Gradino, Solid

30,000.00 setara Solid; 1 ktk @ 2 pcs


12,000.00 1 ktk @ 2 pcs (untuk jendela)
35,000.00 setara Solid; 1 ktk @ 2 pcs (untuk pintu)

14
15,000.00 1 ktk @ 2 pcs (untuk pintu)
650,000.00 setara Dekson
83,000.00

20,000.00
312,000.00 setara Solid
150,000.00 setara Alpa
57,000.00
56,000.00
45,000.00
32,000.00 1 ktk @ 2 pcs
120,000.00 setara Dolomite
35,000.00 setara stainless steel

225,000.00 setara Toto


95,000.00 setara Toho
1,900,000.00 setara Toto
1,250,000.00 setara Amstand

140,000.00 setara San-Ei


75,000.00 setara Onda

198,000.00 setara San-Ei


35,000.00 setara Onda

950,000.00 setara Toto


550,000.00 setara Amstand

950,000.00 setara Amstand

1,550,000.00 setara Amstand


552,000.00 setara Amstand

9,392,000.00 setara Exclusive

395,000.00
400,000.00
25,000.00
125,000.00 setara Onda
3,000.00

18,000.00
20,000.00 1 ktk @ 50 buah
25,000.00

13,000.00
45,000.00

15
150,000.00 uk. 60 x 120
125,000.00 setara Bosch
37,500.00
3,500.00
194,400.00 uk. 2,4 m x 3 m
115,000.00 1 rol @ 60m
40.00
11,125.00
23,500.00
6,666.67
6,666.67
11,125.00
350,000.00 bahan galvanum; uk. Minimal 7 m2
450,000.00 bahan galvanum; tebal 0,3-0,4 mm
1,250,000.00
165.00
25,000.00
40,000.00
5,000.00
200,000.00
1,800,000.00 setara Solidoor
45,000.00 1 bulan

75,000.00
90,000.00
110,000.00
110,000.00

16
DAFTAR HARGA SATUAN PEKERJAAN

DIV. NO. JENIS PEKERJAAN

2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN


1. Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter
2. Pengukuran dan Pemasangan 1 m' Bouwplank
3. Pembuatan 1 m2 kantor sementara lantai plesteran
4. Pembuatan 1 m2 gudang semen dan peralatan
5. Pembuatan 1 m2 bedeng pekerja
6. Pembersihan dan perataan lapangan 1 m2
7. Pembuatan 1 m2 Steger/perancah dari bambu
8. Pembuatan 1 buah kotak adukan ukuran 40cm x 50cm x 25cm
9. Pembongkaran 1m3 beton bertulang
10 . Pembongkaran 1m3 dinding tembok bata
11 . Pembuatan 1 m2 pagar kawat jaring galvanis panjang 240 cm
12 . Pemasangan 1 m2 panel beton pracetak 5x40x240 cm

2.3.1 HARGA SATUAN PEKERJAAN TANAH


1. Menggali 1 m3 tanah biasa sedalam 1 m
2. Menggali 1 m3 tanah biasa sedalam 2 m
3. Menggali 1 m3 tanah keras sedalam 1 m
4. Menggali 1 m3 tanah lumpur sedalam 1 m
5. Pengerjaan stripping 1 m2 tanah tebing setinggi 1 m
6. Pembuangan 1 m3 tanah sejauh 30 meter
7. Pengurugan kembali 1 m3 galian tanah
8. Pemadatan tanah 1 m3 tanah (per 20 cm)
9. Pengurugan 1 m3 dengan pasir urug
10 . Pengurugan 1 m3 sirtu padat

4.1.1 HARGA SATUAN PEKERJAAN BETON


1. Membuat 1 m3 beton mutu F'c=9,8 Mpa (K125), slump (122) cm, w/c=0,78
2. Membuat 1 m3 lantai kerja beton mutu F'c=7,4 Mpa (K100) slump (3-6)cm, w/c=0,87
3. Membuat 1 m3 beton mutu F'c=14,5 Mpa (K175), slump (122) cm, w/c=0,66
4. Membuat 1 m3 beton mutu F'c=19,3 Mpa (K225), slump (122) cm, w/c=0,58
5. Membuat 1 m3 beton mutu F'c=21,7 Mpa (K250), slump (122) cm, w/c=0,56
6. Membuat 1 m3 beton mutu F'c=26,4 Mpa (K300), slump (122) cm, w/c=0,52
7. Membuat 1 m3 beton mutu F'c=31,2 Mpa (K350), slump (122) cm, w/c=0,48
8. Pembesian 1 kg dengan besi polos atau besi ulir
9. Pemasangan 1 kg jaring kawat baja (wiremesh)
10 . Pemasangan 1 m2 bekesting untuk pondasi
11 . Pemasangan 1 m2 bekesting untuk sloof
12 . Pemasangan 1 m2 bekesting untuk kolom
13 . Pemasangan 1 m2 bekesting untuk balok
14 . Pemasangan 1 m2 bekesting untuk lantai
15 . Pemasangan 1 m2 bekesting untuk dinding
16 . Pemasangan 1 m2 bekesting untuk tangga
17 . Pemasangan 1 m2 jembatan untuk pengecoran beton
18 . Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekesting)
19 . Membuat 1 m3 sloof beton bertulang (200 kg besi + bekesting)
20 . Membuat 1 m3 kolom beton bertulang (300 kg besi + bekesting)
21 . Membuat 1 m3 balok beton bertulang (200 kg besi + bekesting)
22 . Membuat 1 m3 kolom beton bertulang (150 kg besi + bekesting)
23 . Membuat 1 m3 dinding beton bertulang (150 kg besi + bekesting)
24 . Membuat 1 m3 dinding beton bertulang (200 kg besi + bekesting)
25 . Membuat 1 m' kolom praktis beton bertulang (11x11) cm

17
26 . Membuat 1 m' ring balok beton bertulang (10x15) cm

4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMINIUM


1. Pemasangan 1 kg besi profil
2. Pemasangan 1 kg rangka kuda-kuda baja IWF
3. Pengerjaan 100 kg pekerjaan perakitan
4. Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
5. Pengerjaan 10 cm pengelasan dengan las listrik
6. Pemasangan 1 m2 pintu rolling door besi
7. Pemasangan 1 m2 pintu lipat (folding door) bahan plastik/PVC
8. Pemasangan 1 m kusen pintu alluminium
9. Pemasangan 1 m2 pintu aluminium strip lebar 8 cm
10 . Pemasangan 1 m2 pintu kaca rangka aluminium
11 . Pemasangan 1 m2 terali besi strip (2x3) mm
12 . Pemasangan 1 m' talang datar/jurai seng bjls 28 lebar 90 cm
13 . Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60x120cm, dinding partisi
14 . Pemasangan 1 m2 rangka besi hollow 1x40.20.2mm, modul 60x60cm, plafon

4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING


1. Pemasangan 1 m2 dinding bata lobang tebal 1 batu campuran 1 SP:3PP
2. Pemasangan 1 m2 dinding bata lobang tebal 1 batu campuran 1 SP:4PP
3. Pemasangan 1 m2 dinding bata lobang tebal 1/2 batu campuran 1 SP:3PP
4. Pemasangan 1 m2 dinding bata lubang tebal 1/2 batu campuran 1 SP:4PP
5. Pemasangan 1 m2 dinding terawang (rooster) 10x12x20 campuran 1SP : 4PP
6. Pemasangan 1 m2 dinding rooster keramik 30x30 campuran 1SP : 4PP
7. Pemasangan 1 m2 dinding glass block 20x20 campuran 1SP : 4PP

4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN


1. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15 mm
2. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm
3. Pemasangan 1 m2 Berapen 1SP : 5PP tebal 15 mm
4. Pemasangan 1 m' plesteran skonig 1 Sp : 3 PP lebar 10 cm
5. Pemasangan 1 m2 plesteran ciprat 1 Sp : 2 PP
6. Pemasangan 1 m2 finishing siar pasangan batu kali campuran 1 SP : 2 PP
7. Pemasangan 1 m2 acian

4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING


1. Pemasangan 1 m2 lantai granite tile ukuran 60cm x 60cm
2. Pemasangan 1 m2 lantai keramik ukuran 30cm x 30cm
3. Pemasangan 1 m2 lantai keramik ukuran 20cm x 20cm
4. Pemasangan 1 m' plint keramik ukuran 10 cm x 20 cm
5. Pemasangan 1 m' plint keramik ukuran 10 cm x 10 cm
6. Pemasangan 1 m' plint keramik ukuran 5 cm x 20 cm
7. Pemasangan 1 m2 lantai marmer ukuran 100cm x 100cm
8 Pemasangan 1 m2 lantai lantai karpet
9. Pemasangan 1 m2 lantai lantai parquet kayu
10 . Pemasangan 1 m2 dinding keramik 20cm x 20 cm
11 . Pemasangan 1 m2 dinding marmer 100cm x 100 cm
12 Pemasangan 1 m2 dinding batu candi hitam
13 . Pemasangan 1 m2 wallpaper lebar 50 cm
14 . Pemasangan 1 m2 floor harderner
15 . Pemasangan 1 m2 lantai keramik ukuran 40cm x 40cm
16 . Pemasangan 1 m2 dinding keramik 20cm x 25 cm

18
4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)
1. Pemasangan 1 m2 langit-langit asbes semen (tebal 4 mm, 5 mm, 6 mm)
2. Pemasangan 1 m2 langit-langit plywood ukuran (120 x 240) cm (tebal 3 mm, 4 mm, 6 mm)
3. Pemasangan 1 m2 langit-langit gypsum board ukuran (120 x 240 x 9) mm (tebal 9 mm)
4. Pemasangan 1 m' list langit-langit kayu profil
5. Pemasangan 1 m' list langit-langit gypsum profil
6. Pemasangan 1 m2 langit-langit kalsiboard ukuran (120 x 240 x 9) mm (tebal 3,5 mm)

4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP


1. Pemasangan 1 m2 roof polycarbonate
2. Pemasangan 1 m2 atap asbes gelombang 0,92mx1,8mx5mm
3. Pemasangan 1 m' nok asbes
4. Pemasangan 1 m2 genteng keramik warna natural
5. Pemasangan 1 m2 genteng metal
6. Pemasangan 1 m' nok genteng keramik
7. Pemasangan 1 m' nok genteng metal
8. Pemasangan 1 m2 atap seng gelombang
9. Pemasangan 1 m' nok atap seng
10 . Pemasangan 1 m2 atap aluminium/alkan
11 . Pemasangan 1 m' nok aluminium
12 . Pemasangan 1 m2 aluminium foil
13 . Pemasangan 1 m2 atap bitumen 95x200
14 . Pemasangan 1 m' nok bitumen 90cm
15 . Pemasangan 1 m2 atap zincalume
16 . Pemasangan 1 m' nok zincalume
17 . Pemasangan 1 m2 genteng tanah liat
18 . Pemasangan 1 m' nok genteng tanah liat

4.6.1 HARGA SATUAN PEKERJAAN KAYU


1. Pembuatan dan Pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II
2. Pembuatan dam pemasangan 1 m2 daun pintu panel
3. Pembuatan dam pemasangan 1 m2 pintu dan jendela kaca
4. Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas III tertutup (lebar sampai 90
cm)
5. Pemasangan 1 m2 jalusi kusen, kayu kelas II
6. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas II bentang 6 meter
7. Pemasangan 1 m3 konstruksi gordeng, kayu kelas II
8. Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas III
9. Pemasangan 1 m2 rangka langit-langit (50x100) cm, kayu kelas III
10 . Pemasangan 1 m2 rangka langit-langit (60x60) cm, III
11 . Pemasangan 1 m' lisplank ukuran (3x20) cm, kayu kelas II
12 . Pemasangan 1 m' lisplank ukuran (3x30) cm, kayu kelas II
13 . Pemasangan 1 m2 rangka dinding pemisah (60x120) cm kayu kelas III
14 . Pemasangan 1 m2 rangka dinding pemisah plywood rangkap, rangka kayu kelas III
15 . Pemasangan 1 m2 dinding lambrisering dari papan kayu kelas II
16 . Pemasangan 1 m2 dinding lambrisering dari plywood ukuran (120x240) cm
17 . Pemasangan 1 m' kalsiplank

4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA


1. Pemasangan 1 buah kunci tanam
2. Pemasangan 1 buah kunci tanam kamar mandi
3. Pemasangan 1 buah kunci silinder
4. Pemasangan 1 buah engsel pintu
5. Pemasangan 1 buah engsel jendela kupu-kupu
6. Pemasangan 1 buah spring knip

19
7. Pemasangan 1 buah kait angin
8. Pemasangan 1 buah door closer
9. Pemasangan 1 buah kunci slot
10 . Pemasangan 1 buah Door handle
11 . Pemasangan 1 buah door stop
12 . Pemasangan 1 m2 kaca tebal 5 mm
13 . Pemasangan 1 m2 kaca tebal 8 mm
14 . Pemasangan 1 m2 kaca tebal 12 mm
15 . Pemasangan 1 m2 kaca patri tebal 5 mm
16 . Pemasangan 1 buah kunci stainless steel

4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN


1. 1 m2 Pengikisan/pengerokan permukaan cat lama
2. 1 m2 Pengecatan bidang kayu baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup)
3. Pelaburan 1 m2 bidang kayu dengan teak oil
4. Pelaburan 1 m2 bidang kayu dengan politur
5. Pelaburan 1 m2 bidang kayu dengan cat residu dan ter
6. Pelaburan 1 m2 bidang kayu dengan vernis
7. Pengecatan 1 m2 tembok baru untuk interior ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat
penutup)
8. Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
9. Pemasangan 1 m2 wallpaper
10 . Pengecatan 1 m2 permukaan baja dengan menie besi
11 . Pengecatam 1 m2 permukaan baja galvanis secara manual sisitem 1 lapis cat
12 . Pengecatan 1 m2 tembok baru untuk exterior ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat
penutup)

5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


1. Pemasangan 1 buah closed duduk
2. Pemasangan 1 buah closed jongkok
3. Pemasangan 1 buah urinoir
4. Pemasangan 1 buah wastafel
5. Pemasangan 1 buah bathube
6. Pemasangan 1 buah bak fibreglass vol 1 m3
7. Pemasangan 1 buah bak cuci piring stainlessteel
8. Pemasangan 1 buah floor drain
9. Pemasangan 1 m' pipa galvanis diameter 1/2"
10 . Pemasangan 1 buah kran diameter 1/2" atau 3/4"
11 . Pemasangan 1 m' pipa galvanis diameter 3/4"
12 . Pemasangan 1 m' pipa PVC tipe AW diameter 1/2"
13 . Pemasangan 1 m' pipa PVC tipe AW diameter 3/4"
14 . Pemasangan 1 m' pipa PVC tipe DW diameter 3"
15 . Pemasangan 1 m' pipa PVC tipe DW diameter 4"
16 . Pemasangan 1 m' pipa beton diameter 30-100 cm

XXX HARGA SATUAN PEKERJAAN LAIN-LAIN


1. Pemasangan 1 m2 rangka atap baja ringan ex. TASO
2. Pemasangan 1 m2 paving blok 10x20 mutu K200
3. Pemasangan 1 titik nyala Lampu
4. Pemasangan 1 titik nyala stop kontak

20
SATUAN HARGA (Rp)

m2 288,385.50
m 53,026.50
m2 1,124,774.87
m2 828,805.00
m2 878,542.50
m2 14,300.00
m2 79,874.40
bh 111,941.00
m3 1,180,641.00
m3 617,153.25
m2 41,661.00
m2 406,996.50

m3 64,900.00
m3 79,695.00
m3 86,372.00
m3 104,445.00
m2 4,730.00
m2 28,435.00
m3 21,633.33
m3 47,300.00
m3 111,760.00
m3 129,250.00

m3 1,009,455.50
m3 965,275.17
m3 1,151,504.67
m3 1,221,734.08
m3 1,237,513.11
m3 1,272,816.74
m3 1,365,910.52
kg 13,496.25
kg 12,300.00
m2 159,427.38
m2 168,627.38
m2 276,155.25
m2 281,675.25
m2 312,955.25
m2 312,955.25
m2 257,115.56
m2 73,209.00
m3 4,001,541.16
m3 4,848,008.64
m3 7,493,770.33
m3 5,828,124.89
m3 5,158,763.16
m3 5,011,183.66
m3 5,492,209.89
m 82,891.34

21
m 101,641.84

kg 27,071.00
kg 28,393.50
kg 41,363.58
m2 791,412.75
cm 27,658.46
m2 -
m2 -
m 70,106.68
m2 813,535.30
m2 753,420.58
m2 512,780.52
m 102,442.00
m2 80,060.13
m2 96,117.00

m2 212,830.50
m2 216,108.00
m2 139,265.00
m2 98,733.25
m2 454,853.75
m2 502,003.75
m2 619,878.75

m2 59,068.37
m2 56,869.80
m2 33,015.58
m2 55,884.25
m2 46,432.40
m2 55,846.30
m2 34,988.75

m2 333,927.80
m2 201,346.70
m2 216,545.92
m 31,358.87
m 31,703.87
m 26,755.08
m2 1,959,567.80
m2 74,790.25
m2 350,305.24
m2 246,808.17
m2 2,117,077.55
m2 303,542.50
m2 114,662.25
m2 49,197.00
m2 203,463.75
m2 238,395.00

22
m2 51,670.23
m2 47,610.00
m2 46,966.00
m 16,108.47
m 22,755.46
m2 50,314.80

m2 131,857.83
m2 67,666.00
m 69,483.00
m2 198,126.60
m2 88,090.00
m 184,069.00
m 70,759.50
m2 49,484.50
m 30,245.00
m2 98,566.50
m 74,520.00
m2 32,689.83
m2 112,516.00
m 162,345.50
m2 108,830.25
m 74,520.00
m2 50,876.00
m 100,406.50

m3 10,690,975.00
m2 609,500.00
m2 563,155.00
m2 486,438.50

m2 715,070.00
m3 9,406,770.00
m3 5,867,357.50
m2 244,547.50
m2 128,708.00
m2 129,766.00
m' 102,867.50
m 103,097.50
191,682.00
m2 390,747.00
m2 314,065.00
m2 39,692.25
m 52,670.00

bh 168,820.00
bh 99,135.75
bh 202,635.75
bh 27,442.45
bh 19,440.75
bh 38,128.25

23
bh 45,603.25
bh 235,267.00
bh 45,206.50
bh 200,767.00
bh 78,660.00
m2 138,992.45
m2 274,325.60
m2 600,608.20
m2 2,554,397.25
bh 347,070.00

m2 15,617.00
m2 40,779.00
m2 42,124.50
m2 58,360.20
m2 11,195.25
m2 43,947.25
m2 19,192.35

m2 15,180.00
m2 91,280.79
m2 17,250.00
m2 30,532.50
m2 42,071.83

bh 1,943,730.00
bh 266,225.00
bh 2,535,922.50
bh 998,487.50
bh 13,054,920.75
bh 588,800.00
bh 528,080.00
bh 156,860.00
bh 33,476.50
m 57,241.25
m 38,076.50 listrik
m 14,237.00 rangka baja
m 15,387.00 paving blok
m 48,242.50
m 183,252.50
m 1,069,247.00

m2 175,708.50
m2 137,626.25
titik 225,900.25
titik 272,475.25

24
2.2.1. HARGA SATUAN PEKERJAAN PERSIAPAN

1. Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.200 75,000.00
Tukang Kayu L.02 OH 0.400 90,000.00
Kepala Tukang L.03 OH 0.020 110,000.00
Mandor L.04 OH 0.020 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Dolken Kayu 8-10/400
cm Batang 1.250 8,000.00
Semen Portland Kg 2.500 1,300.00
Seng gelombang 7' Lbr 1.200 38,500.00
Pasir beton m2 0.005 85,000.00
Koral Beton m3 0.009 435,000.00
Kayu 5/7 m3 0.072 1,600,000.00
Paku biasa 2"-5" Kg 0.060 18,000.00
Meni besi Liter 0.450 34,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

2. Pengukuran dan Pemasangan 1 m' Bouwplank


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 75,000.00
Tukang Kayu L.02 OH 0.100 90,000.00
Kepala Tukang L.03 OH 0.010 110,000.00
Mandor L.04 OH 0.005 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Balok 5/7 m3 0.012 1,600,000.00
Paku 2"-3" Kg 0.020 18,000.00
Kayu papan 3/20 m3 0.007 1,200,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

DIV. 2.2.1
3. Pembuatan 1 m2 kantor sementara lantai plesteran
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 2.000 75,000.00
Tukang Kayu L.02 OH 2.000 90,000.00
Tukang batu L.02 OH 1.000 90,000.00
Kepala Tukang L.03 OH 0.300 110,000.00
Mandor L.04 OH 0.050 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Dolken Kayu 8-10/400
cm Batang 1.250 8,000.00
Kayu m3 0.180 1,600,000.00
Paku biasa Kg 0.080 18,000.00
Besi strip Kg 1.100 9,704.64
Semen portland Kg 35.000 1,300.00
Pasir pasang m3 0.150 85,000.00
Pasir beton m3 0.100 85,000.00
Koral beton m3 0.150 435,000.00
Bata merah Bh 30.000 550.00
Seng plat Lbr 0.250 22,000.00
Jendela naco Bh 0.200 150,000.00
Kaca polos m2 0.080 95,000.00
Kunci tanam Bh 0.150 95,000.00
Plywood 4 mm Lbr 0.060 60,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

4. Pembuatan 1 m2 gudang semen dan peralatan


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)

DIV. 2.2.1
A. TENAGA
Pekerja L.01 OH 1.000 75,000.00
Tukang Kayu L.02 OH 2.000 90,000.00
Kepala Tukang L.03 OH 0.200 110,000.00
Mandor L.04 OH 0.050 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Dolken Kayu 8-10/400
cm Batang 1.700 8,000.00
Kayu m3 0.210 1,600,000.00
Paku biasa Kg 0.300 18,000.00
Semen portland Kg 10.500 1,300.00
Pasir beton m3 0.030 85,000.00
Koral beton m3 0.050 435,000.00
Seng gelombang Lbr 1.500 26,500.00
Seng plat Lbr 0.250 22,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

5. Pembuatan 1 m2 bedeng pekerja


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 75,000.00
Tukang Kayu L.02 OH 2.000 90,000.00
Kepala Tukang L.03 OH 0.200 110,000.00
Mandor L.04 OH 0.050 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Dolken Kayu 8-10/400
cm Batang 1.250 8,000.00
Kayu m3 0.186 1,600,000.00
Paku biasa Kg 0.300 18,000.00
Semen portland Kg 18.000 1,300.00
Pasir beton m3 0.030 85,000.00
Koral beton m3 0.050 435,000.00
Seng gelombang Lbr 1.500 26,500.00
Plywood 4mm Lbr 1.350 60,000.00

DIV. 2.2.1
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

6. Pembersihan dan perataan lapangan 1 m2


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 75,000.00
Mandor L.04 OH 0.050 110,000.00
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH TENAGA BAHAN


C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

7. Pembuatan 1 m2 Steger/perancah dari bambu


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.250 75,000.00
Tukang Kayu L.02 OH 0.017 90,000.00
Kepala Tukang L.03 OH 0.002 110,000.00
Mandor L.04 OH 0.013 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bambu dia.6-8 / 600 cm Batang 1.250 37,500.00
Tali Ijuk kg 0.186 3,500.00

JUMLAH TENAGA BAHAN


C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

DIV. 2.2.1
8. Pembuatan 1 buah kotak adukan ukuran 40cm x 50cm x 25cm
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Tukang Kayu L.02 OH 0.300 90,000.00
Kepala Tukang L.03 OH 0.030 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu papan kelas III m3 0.036 1,200,000.00
Kayu 5/7 klas III m3 0.014 1,600,000.00
Paku kg 0.080 18,000.00

JUMLAH TENAGA BAHAN


C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

9. Pembongkaran 1m3 beton bertulang


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 13.334 75,000.00
Mandor L.04 OH 0.666 110,000.00
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH TENAGA BAHAN


C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 10% X D
F. Harga Satuan Pekerjaan (D+E)

10. Pembongkaran 1m3 dinding tembok bata


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 6.667 75,000.00
Mandor L.04 OH 0.333 110,000.00
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH TENAGA BAHAN


C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 10% X D
F. Harga Satuan Pekerjaan (D+E)

DIV. 2.2.1
11. Pembuatan 1 m2 pagar kawat jaring galvanis panjang 240 cm
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.042 75,000.00
Tukang Kayu L.02 OH 0.004 90,000.00
Kepala Tukang L.03 OH 0.002 110,000.00
Mandor L.04 OH 0.042 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kawat jaring Lbr 0.1434 194,400.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

12. Pemasangan 1 m2 panel beton pracetak 5x40x240 cm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.375 75,000.00
Tukang L.02 OH 0.125 90,000.00
Kepala Tukang L.03 OH 0.012 110,000.00
Mandor L.04 OH 0.019 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Panel beton pracetak Lbr 0.986 137,500.00
Kolom beton pracetak Batang 0.525 90,000.00
Semen PC Kg 45.000 1,300.00
Pasir beton m3 0.074 85,000.00
Koral m3 0.146 435,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

DIV. 2.2.1
JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

DIV. 2.2.1
Jumlah Harga (Rp)

15,000.00
36,000.00
2,200.00
2,200.00
55,400.00

10,000.00
3,250.00
46,200.00
425.00
3,915.00
115,200.00
1,080.00
15,300.00
195,370.00

-
-

250,770.00
37,615.50
288,385.50

Jumlah Harga (Rp)

7,500.00
9,000.00
1,100.00
550.00
18,150.00

19,200.00
360.00
8,400.00
27,960.00

-
-

46,110.00
6,916.50
53,026.50

DIV. 2.2.1
Jumlah Harga (Rp)

150,000.00
180,000.00
90,000.00
33,000.00
5,500.00
458,500.00

10,000.00
288,000.00
1,440.00
10,675.11
45,500.00
12,750.00
8,500.00
65,250.00
16,500.00
5,500.00
30,000.00
7,600.00
14,250.00
3,600.00
519,565.11

-
-

978,065.11
146,709.77
1,124,774.87

Jumlah Harga (Rp)

DIV. 2.2.1
75,000.00
180,000.00
22,000.00
5,500.00
282,500.00

13,600.00
336,000.00
5,400.00
13,650.00
2,550.00
21,750.00
39,750.00
5,500.00
438,200.00

-
-

720,700.00
108,105.00
828,805.00

Jumlah Harga (Rp)

75,000.00
180,000.00
22,000.00
5,500.00
282,500.00

10,000.00
297,600.00
5,400.00
23,400.00
2,550.00
21,750.00
39,750.00
81,000.00

DIV. 2.2.1
481,450.00

-
-

763,950.00
114,592.50
878,542.50

Jumlah Harga (Rp)

7,500.00
5,500.00
13,000.00

-
-

-
-

13,000.00
1,300.00
14,300.00

Jumlah Harga (Rp)

18,750.00 1
1,530.00 2
220.00 0.2
1,430.00 0.05
21,930.00

46,875.00
651.00
-
47,526.00

-
-

69,456.00
10,418.40
79,874.40

DIV. 2.2.1
Jumlah Harga (Rp)

27,000.00
3,300.00
30,300.00

43,200.00
22,400.00
1,440.00
-
67,040.00

-
-

97,340.00
14,601.00
111,941.00

Jumlah Harga (Rp)

1,000,050.00
73,260.00
1,073,310.00

-
-

-
-

1,073,310.00
107,331.00
1,180,641.00

Jumlah Harga (Rp)

500,025.00
36,630.00
536,655.00

-
-

-
-

536,655.00
80,498.25
617,153.25

DIV. 2.2.1
Jumlah Harga (Rp)

3,150.00
360.00
220.00
4,620.00
8,350.00

27,876.96
27,876.96

-
-

36,226.96
5,434.04
41,661.00

Jumlah Harga (Rp)

28,125.00
11,250.00
1,320.00
2,090.00
42,785.00

135,575.00
47,250.00
58,500.00
6,290.00
63,510.00
311,125.00

DIV. 2.2.1
-
-

353,910.00
53,086.50
406,996.50

DIV. 2.2.1
2.3.1. HARGA SATUAN PEKERJAAN TANAH

1. Menggali 1 m3 tanah biasa sedalam 1 m


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.750 75,000.00
Mandor L.04 OH 0.025 110,000.00
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH TENAGA BAHAN


C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 10% X D
F. Harga Satuan Pekerjaan (D+E)

2. Menggali 1 m3 tanah biasa sedalam 2 m


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.900 75,000.00
Mandor L.04 OH 0.045 110,000.00
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH TENAGA BAHAN


C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 10% X D
F. Harga Satuan Pekerjaan (D+E)

3. Menggali 1 m3 tanah keras sedalam 1 m


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 75,000.00
Mandor L.04 OH 0.032 110,000.00
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH TENAGA BAHAN


C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 10% X D
F. Harga Satuan Pekerjaan (D+E)

4. Menggali 1 m3 tanah lumpur sedalam 1 m

DIV. 2.3.1
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 1.200 75,000.00
Mandor L.04 OH 0.045 110,000.00
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH TENAGA BAHAN


C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

5. Pengerjaan stripping 1 m2 tanah tebing setinggi 1 m


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.050 75,000.00
Mandor L.04 OH 0.005 110,000.00
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH TENAGA BAHAN


C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 10% X D
F. Harga Satuan Pekerjaan (D+E)

6. Pembuangan 1 m3 tanah sejauh 30 meter


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.330 75,000.00
Mandor L.04 OH 0.010 110,000.00
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH TENAGA BAHAN


C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 10% X D
F. Harga Satuan Pekerjaan (D+E)

7. Pengurugan kembali 1 m3 galian tanah

DIV. 2.3.1
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.250 75,000.00
Mandor L.04 OH 0.008 110,000.00
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH TENAGA BAHAN


C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 10% X D
F. Harga Satuan Pekerjaan (D+E)
* pengurugan kembali 1 m3 galian dihitung dari 1/3 kali dari koefisien pekerjaan galian

8. Pemadatan tanah 1 m3 tanah (per 20 cm)


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.500 75,000.00
Mandor L.04 OH 0.050 110,000.00
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH TENAGA BAHAN


C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 10% X D
F. Harga Satuan Pekerjaan (D+E)

9. Pengurugan 1 m3 dengan pasir urug


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 75,000.00
Mandor L.04 OH 0.010 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pasir urug m3 1.200 65,000.00

JUMLAH TENAGA BAHAN


C. PERALATAN

JUMLAH TENAGA ALAT

DIV. 2.3.1
D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

10. Pengurugan 1 m3 sirtu padat


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.250 75,000.00
Mandor L.04 OH 0.025 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Sirtu m3 1.200 80,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 10% X D
F. Harga Satuan Pekerjaan (D+E)

DIV. 2.3.1
Jumlah Harga (Rp)

56,250.00
2,750.00
59,000.00

-
-

-
-

59,000.00
5,900.00
64,900.00

Jumlah Harga (Rp)

67,500.00
4,950.00
72,450.00

-
-

-
-

72,450.00
7,245.00
79,695.00

Jumlah Harga (Rp)

75,000.00
3,520.00
78,520.00

-
-

-
-

78,520.00
7,852.00
86,372.00

DIV. 2.3.1
Jumlah Harga (Rp)

90,000.00
4,950.00
94,950.00

-
-

-
-

94,950.00
9,495.00
104,445.00

Jumlah Harga (Rp)

3,750.00
550.00
4,300.00

-
-

-
-

4,300.00
430.00
4,730.00

Jumlah Harga (Rp)

24,750.00
1,100.00
25,850.00

-
-

-
-

25,850.00
2,585.00
28,435.00

DIV. 2.3.1
Jumlah Harga (Rp)

18,750.00
916.67
19,666.67

-
-

-
-

19,666.67
1,966.67
21,633.33

Jumlah Harga (Rp)

37,500.00
5,500.00
43,000.00

-
-

-
-

43,000.00
4,300.00
47,300.00

Jumlah Harga (Rp)

22,500.00
1,100.00
23,600.00

78,000.00
-
78,000.00

-
-

DIV. 2.3.1
101,600.00
10,160.00
111,760.00

Jumlah Harga (Rp)

18,750.00
2,750.00
21,500.00

96,000.00
96,000.00

-
-

117,500.00
11,750.00
129,250.00

DIV. 2.3.1
4.1.1. HARGA SATUAN PEKERJAAN BETON

1. Membuat 1 m3 beton mutu F'c=9,8 Mpa (K125), slump (122) cm, w/c=0,78
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 1.650 75,000.00
Tukang Batu L.02 OH 0.275 90,000.00
Kepala Tukang L.03 OH 0.028 110,000.00
Mandor L.04 OH 0.083 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 276.000 1,300.00
Pasir Beton kg 828.000 60.71
Kerikil (Maks. 30mm) kg 1012.000 351.85
Air Liter 215.000 40.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

2. Membuat 1 m3 lantai kerja beton mutu F'c=7,4 Mpa (K100) slump (3-6)cm, w/c=0,87
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 1.200 75,000.00
Tukang Batu L.02 OH 0.200 90,000.00
Kepala Tukang L.03 OH 0.020 110,000.00
Mandor L.04 OH 0.060 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 230.000 1,300.00
Pasir Beton kg 893.000 60.71
Kerikil (Maks. 30mm) kg 1027.000 351.85
Air Liter 200.000 40.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

3. Membuat 1 m3 beton mutu F'c=14,5 Mpa (K175), slump (122) cm, w/c=0,66
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 1.650 75,000.00
Tukang Batu L.02 OH 0.275 90,000.00
Kepala Tukang L.03 OH 0.028 110,000.00
Mandor L.04 OH 0.083 110,000.00
JUMLAH TENAGA KERJA
B BAHAN

DIV. 4.1.1
Semen Portland kg 326.000 1,300.00
Pasir Beton kg 760.000 60.71
Kerikil (Maks. 30mm) kg 1029.000 351.85
Air Liter 215.000 40.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

4. Membuat 1 m3 beton mutu F'c=19,3 Mpa (K225), slump (122) cm, w/c=0,58
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 1.650 75,000.00
Tukang Batu L.02 OH 0.275 90,000.00
Kepala Tukang L.03 OH 0.028 110,000.00
Mandor L.04 OH 0.083 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 371.000 1,300.00
Pasir Beton kg 698.000 60.71
Kerikil (Maks. 30mm) kg 1047.000 351.85
Air Liter 215.000 40.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

5. Membuat 1 m3 beton mutu F'c=21,7 Mpa (K250), slump (122) cm, w/c=0,56
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 1.650 75,000.00
Tukang Batu L.02 OH 0.275 90,000.00
Kepala Tukang L.03 OH 0.028 110,000.00
Mandor L.04 OH 0.083 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 384.000 1,300.00
Pasir Beton kg 692.000 60.71
Kerikil (Maks. 30mm) kg 1039.000 351.85
Air Liter 215.000 40.00

DIV. 4.1.1
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

6. Membuat 1 m3 beton mutu F'c=26,4 Mpa (K300), slump (122) cm, w/c=0,52
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 1.650 75,000.00
Tukang Batu L.02 OH 0.275 90,000.00
Kepala Tukang L.03 OH 0.028 110,000.00
Mandor L.04 OH 0.083 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 413.000 1,300.00
Pasir Beton kg 681.000 60.71
Kerikil (Maks. 30mm) kg 1021.000 351.85
Air Liter 215.000 40.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

7. Membuat 1 m3 beton mutu F'c=31,2 Mpa (K350), slump (122) cm, w/c=0,48
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 2.100 75,000.00
Tukang Batu L.02 OH 0.350 90,000.00
Kepala Tukang L.03 OH 0.035 110,000.00
Mandor L.04 OH 0.105 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 448.000 1,300.00
Pasir Beton kg 667.000 60.71
Kerikil (Maks. 30mm) kg 1000.000 351.85

DIV. 4.1.1
Air Liter 215.000 40.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

8. Pembesian 10 kg dengan besi polos atau besi ulir


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.070 75,000.00
Tukang Batu L.02 OH 0.070 90,000.00
Kepala Tukang L.03 OH 0.007 110,000.00
Mandor L.04 OH 0.004 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Besi beton (polos/ulir) kg 10.500 9,704.64
Kawat beton kg 0.150 18,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)
1 kg

9. Pemasangan 10 kg jaring kawat baja (wiremesh)


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.025 75,000.00
Tukang Batu L.02 OH 0.025 90,000.00
Kepala Tukang L.03 OH 0.025 110,000.00
Mandor L.04 OH 0.001 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Jaring kawat baja dilas kg 10.200 9,712.90
Kawat beton kg 0.050 18,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)
1 kg

DIV. 4.1.1
10. Pemasangan 1 m2 bekesting untuk pondasi
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.520 75,000.00
Tukang Kayu L.02 OH 0.260 90,000.00
Kepala Tukang L.03 OH 0.026 110,000.00
Mandor L.04 OH 0.026 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu m3 0.040 1,600,000.00
Paku 5-10 cm kg 0.300 18,000.00
Minyak bekesting Liter 0.100 11,125.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

11. Pemasangan 1 m2 bekesting untuk sloof


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.520 75,000.00
Tukang Kayu L.02 OH 0.260 90,000.00
Kepala Tukang L.03 OH 0.026 110,000.00
Mandor L.04 OH 0.026 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu m3 0.045 1,600,000.00
Paku 5-10 cm kg 0.300 18,000.00
Minyak bekesting Liter 0.100 11,125.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

12. Pemasangan 1 m2 bekesting untuk kolom


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA

DIV. 4.1.1
Pekerja L.01 OH 0.660 75,000.00
Tukang Kayu L.02 OH 0.330 90,000.00
Kepala Tukang L.03 OH 0.033 110,000.00
Mandor L.04 OH 0.033 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu m3 0.040 1,600,000.00
Paku 5-12 cm kg 0.400 18,000.00
Minyak bekesting Liter 0.200 11,125.00
Balok kayu m3 0.015 1,600,000.00
Plywood tebal 9 mm Lbr 0.350 115,000.00
Dolken Kayu 8-10cm p.4m Batang 2.000 8,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

13. Pemasangan 1 m2 bekesting untuk balok


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.660 75,000.00
Tukang Kayu L.02 OH 0.330 90,000.00
Kepala Tukang L.03 OH 0.033 110,000.00
Mandor L.04 OH 0.033 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu m3 0.040 1,600,000.00
Paku 5-12 cm kg 0.400 18,000.00
Minyak bekesting Liter 0.200 11,125.00
Balok m3 0.018 1,600,000.00
Plywood tebal 9 mm Lbr 0.350 115,000.00
Dolken Kayu 8-10cm p.4m Batang 2.000 8,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

DIV. 4.1.1
14. Pemasangan 1 m2 bekesting untuk lantai
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.660 75,000.00
Tukang Kayu L.02 OH 0.330 90,000.00
Kepala Tukang L.03 OH 0.033 110,000.00
Mandor L.04 OH 0.033 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu m3 0.040 1,600,000.00
Paku 5-12 cm kg 0.400 18,000.00
Minyak bekesting Liter 0.200 11,125.00
Balok m3 0.015 1,600,000.00
Plywood tebal 9 mm Lbr 0.350 115,000.00
Dolken Kayu 8-10cm p.4m Batang 6.000 8,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

15. Pemasangan 1 m2 bekesting untuk dinding


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.660 75,000.00
Tukang Kayu L.02 OH 0.330 90,000.00
Kepala Tukang L.03 OH 0.033 110,000.00
Mandor L.04 OH 0.033 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu m3 0.030 1,600,000.00
Paku 5-12 cm kg 0.400 18,000.00
Minyak bekesting Liter 0.200 11,125.00
Balok m3 0.020 1,600,000.00
Plywood tebal 9 mm Lbr 0.350 115,000.00
Dolken Kayu 8-10cm p.4m Batang 3.000 8,000.00
Penjaga jarak bekesting/spacer Batang 4.000 8,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

DIV. 4.1.1
16. Pemasangan 1 m2 bekesting untuk tangga
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.660 75,000.00
Tukang Kayu L.02 OH 0.330 90,000.00
Kepala Tukang L.03 OH 0.033 110,000.00
Mandor L.04 OH 0.033 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu m3 0.030 1,600,000.00
Paku 5-12 cm kg 0.400 18,000.00
Minyak bekesting Liter 0.150 11,125.00
Balok m3 0.015 1,600,000.00
Plywood tebal 9 mm Lbr 0.350 115,000.00
Dolken Kayu 8-10cm p.4m Batang 2.000 8,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

17. Pemasangan 1 m2 jembatan untuk pengecoran beton


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.150 75,000.00
Tukang Kayu L.02 OH 0.050 90,000.00
Kepala Tukang L.03 OH 0.005 110,000.00
Mandor L.04 OH 0.008 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas (papan) m3 0.026 1,200,000.00
Paku 5-12 cm kg 0.600 18,000.00
Dolken Kayu 8-10cm p.4m Batang 0.500 8,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

18. Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekesting)


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 5.300 75,000.00
Tukang Batu L.02 OH 0.275 90,000.00
Tukang Kayu L.02 OH 1.300 90,000.00
Tukang Besi L.02 OH 1.050 90,000.00
Kepala Tukang L.03 OH 0.262 110,000.00
Mandor L.04 OH 0.265 110,000.00
JUMLAH TENAGA KERJA
B BAHAN

DIV. 4.1.1
Kayu m3 0.200 1,600,000.00
Paku 5-12 cm kg 1.500 18,000.00
Minyak bekesting Liter 0.400 11,125.00
Besi beton polos kg 157.500 9,704.64
Kawat beton kg 2.250 18,000.00
Sement Portland kg 336.000 1,300.00
Pasir Beton m3 0.540 85,000.00
Kerikil m3 0.810 475,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

19. Membuat 1 m3 sloof beton bertulang (200 kg besi + bekesting)


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 5.650 75,000.00
Tukang Batu L.02 OH 0.275 90,000.00
Tukang Kayu L.02 OH 1.560 90,000.00
Tukang Besi L.02 OH 1.400 90,000.00
Kepala Tukang L.03 OH 0.323 110,000.00
Mandor L.04 OH 0.283 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas m3 0.270 1,600,000.00
Paku 5-12 cm kg 2.000 18,000.00
Minyak bekesting Liter 0.600 11,125.00
Besi beton polos kg 210.000 9,704.64
Kawat beton kg 3.000 18,000.00
Sement Portland kg 336.000 1,300.00
Pasir Beton m3 0.540 85,000.00
Kerikil m3 0.810 475,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

20. Membuat 1 m3 kolom beton bertulang (300 kg besi + bekesting)


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 7.050 75,000.00
Tukang Batu L.02 OH 0.275 90,000.00

DIV. 4.1.1
Tukang Kayu L.02 OH 1.650 90,000.00
Tukang Besi L.02 OH 2.100 90,000.00
Kepala Tukang L.03 OH 0.403 110,000.00
Mandor L.04 OH 0.353 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas m3 0.400 1,600,000.00
Paku 5-12 cm kg 4.000 18,000.00
Minyak bekesting Liter 2.000 11,125.00
Besi beton polos kg 315.000 9,704.64
Kawat beton kg 4.500 18,000.00
Sement Portland kg 336.000 1,300.00
Pasir Beton m3 0.540 85,000.00
Kerikil kg 0.810 475,000.00
Kayu kelas balok m3 0.150 1,600,000.00
Plywood 9 mm Lbr 3.500 115,000.00
Dolken Kayu 8-10cm p.4m Batang 20.000 8,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

21. Membuat 1 m3 balok beton bertulang (200 kg besi + bekesting)


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 6.350 75,000.00
Tukang Batu L.02 OH 0.275 90,000.00
Tukang Kayu L.02 OH 1.650 90,000.00
Tukang Besi L.02 OH 1.400 90,000.00
Kepala Tukang L.03 OH 0.333 110,000.00
Mandor L.04 OH 0.318 110,000.00
JUMLAH TENAGA KERJA

DIV. 4.1.1
B BAHAN
Kayu kelas m3 0.320 1,600,000.00
Paku 5-12 cm kg 3.200 18,000.00
Minyak bekesting Liter 1.600 11,125.00
Besi beton polos kg 210.000 9,704.64
Kawat beton kg 3.000 18,000.00
Sement Portland kg 336.000 1,300.00
Pasir Beton m3 0.540 85,000.00
Kerikil kg 0.810 475,000.00
Kayu kelas balok m3 0.140 1,600,000.00
Plywood 9 mm Lbr 2.800 115,000.00
Dolken Kayu 8-10cm p.4m Batang 16.000 8,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

22. Membuat 1 m3 kolom beton bertulang (150 kg besi + bekesting)


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 5.300 75,000.00
Tukang Batu L.02 OH 0.275 90,000.00
Tukang Kayu L.02 OH 1.300 90,000.00
Tukang Besi L.02 OH 1.050 90,000.00
Kepala Tukang L.03 OH 0.265 110,000.00
Mandor L.04 OH 0.265 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas m3 0.320 1,600,000.00
Paku 5-12 cm kg 3.200 18,000.00
Minyak bekesting Liter 1.600 11,125.00
Besi beton polos kg 157.500 9,704.64
Kawat beton kg 2.250 18,000.00
Sement Portland kg 336.000 1,300.00
Pasir Beton m3 0.540 85,000.00
Kerikil kg 0.810 475,000.00
Kayu kelas balok m3 0.120 1,600,000.00
Plywood 9 mm Lbr 2.800 115,000.00
Dolken Kayu 8-10cm p.4m Batang 32.000 8,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

DIV. 4.1.1
23. Membuat 1 m3 dinding beton bertulang (150 kg besi + bekesting)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 5.300 75,000.00
Tukang Batu L.02 OH 0.275 90,000.00
Tukang Kayu L.02 OH 1.300 90,000.00
Tukang Besi L.02 OH 1.050 90,000.00
Kepala Tukang L.03 OH 0.262 110,000.00
Mandor L.04 OH 0.265 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas m3 0.240 1,600,000.00
Paku 5-12 cm kg 3.200 18,000.00
Minyak bekesting Liter 1.600 11,125.00
Besi beton polos kg 157.500 9,704.64
Kawat beton kg 2.250 18,000.00
Sement Portland kg 336.000 1,300.00
Pasir Beton m3 0.540 85,000.00
Kerikil kg 0.810 475,000.00
Kayu kelas balok m3 0.160 1,600,000.00
Plywood 9 mm Lbr 2.800 115,000.00
Dolken Kayu 8-10cm p.4m Batang 24.000 8,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

24. Membuat 1 m3 dinding beton bertulang (200 kg besi + bekesting)


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 5.650 75,000.00
Tukang Batu L.02 OH 0.275 90,000.00
Tukang Kayu L.02 OH 1.560 90,000.00
Tukang Besi L.02 OH 1.400 90,000.00
Kepala Tukang L.03 OH 0.323 110,000.00
Mandor L.04 OH 0.283 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas m3 0.250 1,600,000.00
Paku 5-12 cm kg 3.000 18,000.00

DIV. 4.1.1
Minyak bekesting Liter 1.200 11,125.00
Besi beton polos kg 210.000 9,704.64
Kawat beton kg 3.000 18,000.00
Sement Portland kg 336.000 1,300.00
Pasir Beton m3 0.540 85,000.00
Kerikil kg 0.810 475,000.00
Kayu kelas balok m3 0.105 1,600,000.00
Plywood 9 mm Lbr 2.500 115,000.00
Dolken Kayu 8-10cm p.4m Batang 14.000 8,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

25. Membuat 1 m' kolom praktis beton bertulang (11x11) cm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.180 75,000.00
Tukang Batu L.02 OH 0.020 90,000.00
Tukang Kayu L.02 OH 0.020 90,000.00
Tukang Besi L.02 OH 0.020 90,000.00
Kepala Tukang L.03 OH 0.006 110,000.00
Mandor L.04 OH 0.009 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas m3 0.002 1,600,000.00
Paku 5-12 cm kg 0.001 18,000.00
Minyak bekesting Liter 0.100 11,125.00
Besi beton polos kg 3.000 9,704.64
Kawat beton kg 0.450 18,000.00
Sement Portland kg 4.000 1,300.00
Pasir Beton m3 0.006 85,000.00
Kerikil kg 0.009 475,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

DIV. 4.1.1
JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

26. Membuat 1 m' ring balok beton bertulang (10x15) cm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.297 75,000.00
Tukang Batu L.02 OH 0.033 90,000.00
Tukang Kayu L.02 OH 0.033 90,000.00
Tukang Besi L.02 OH 0.003 90,000.00
Kepala Tukang L.03 OH 0.010 110,000.00
Mandor L.04 OH 0.015 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas m3 0.003 1,600,000.00
Paku 5-12 cm kg 0.020 18,000.00
Minyak bekesting Liter 0.100 11,125.00
Besi beton polos kg 3.600 9,704.64
Kawat beton kg 0.050 18,000.00
Sement Portland kg 5.500 1,300.00
Pasir Beton m3 0.009 85,000.00
Kerikil kg 0.015 475,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

DIV. 4.1.1
Jumlah Harga (Rp)

123,750.00
24,750.00
3,080.00
9,130.00
160,710.00

358,800.00
50,271.43
356,074.07
8,600.00
773,745.50

-
-

934,455.50
75,000.00
1,009,455.50

cm, w/c=0,87
Jumlah Harga (Rp)

90,000.00
18,000.00
2,200.00
6,600.00
116,800.00

299,000.00
54,217.86
361,351.85
8,000.00
722,569.71

-
-

839,369.71
125,905.46
965,275.17

Jumlah Harga (Rp)

123,750.00
24,750.00
3,080.00
9,130.00
160,710.00

DIV. 4.1.1
423,800.00
46,142.86
362,055.56
8,600.00
840,598.41

-
-

1,001,308.41
150,196.26
1,151,504.67

Jumlah Harga (Rp)

123,750.00
24,750.00
3,080.00
9,130.00
160,710.00

482,300.00
42,378.57
368,388.89
8,600.00
901,667.46

-
-

1,062,377.46
159,356.62
1,221,734.08

Jumlah Harga (Rp)

123,750.00
24,750.00
3,080.00
9,130.00
160,710.00

499,200.00
42,014.29
365,574.07
8,600.00

DIV. 4.1.1
915,388.36

-
-

1,076,098.36
161,414.75
1,237,513.11

Jumlah Harga (Rp)

123,750.00
24,750.00
3,080.00
9,130.00
160,710.00

536,900.00
41,346.43
359,240.74
8,600.00
946,087.17

-
-

1,106,797.17
166,019.58
1,272,816.74

Jumlah Harga (Rp)

157,500.00
31,500.00
3,850.00
11,550.00
204,400.00

582,400.00
40,496.43
351,851.85

DIV. 4.1.1
8,600.00
983,348.28

-
-

1,187,748.28
178,162.24
1,365,910.52

Jumlah Harga (Rp)

5,250.00
6,300.00
770.00
440.00
12,760.00

101,898.73
2,700.00
104,598.73

-
-

117,358.73
17,603.81
134,962.54
13,496.25

Jumlah Harga (Rp)

1,875.00
2,250.00
2,750.00
110.00
6,985.00

99,071.56
900.00
99,971.56

-
-

106,956.56
16,043.48
123,000.05
12,300.00

DIV. 4.1.1
Jumlah Harga (Rp)

39,000.00
23,400.00
2,860.00
2,860.00
68,120.00

64,000.00
5,400.00
1,112.50
70,512.50

-
-

138,632.50
20,794.88
159,427.38

Jumlah Harga (Rp)

39,000.00
23,400.00
2,860.00
2,860.00
68,120.00

72,000.00
5,400.00
1,112.50
78,512.50

-
-

146,632.50
21,994.88
168,627.38

Jumlah Harga (Rp)

DIV. 4.1.1
49,500.00
29,700.00
3,630.00
3,630.00
86,460.00

64,000.00
7,200.00
2,225.00
24,000.00
40,250.00
16,000.00
153,675.00

-
-

240,135.00
36,020.25
276,155.25

Jumlah Harga (Rp)

49,500.00
29,700.00
3,630.00
3,630.00
86,460.00

64,000.00
7,200.00
2,225.00
28,800.00
40,250.00
16,000.00
158,475.00

-
-

244,935.00
36,740.25
281,675.25

DIV. 4.1.1
Jumlah Harga (Rp)

49,500.00
29,700.00
3,630.00
3,630.00
86,460.00

64,000.00
7,200.00
2,225.00
24,000.00
40,250.00
48,000.00
185,675.00

-
-

272,135.00
40,820.25
312,955.25

Jumlah Harga (Rp)

49,500.00
29,700.00
3,630.00
3,630.00
86,460.00

48,000.00
7,200.00
2,225.00
32,000.00
40,250.00
24,000.00
32,000.00
185,675.00

-
-

272,135.00
40,820.25
312,955.25

DIV. 4.1.1
Jumlah Harga (Rp)

49,500.00
29,700.00
3,630.00
3,630.00
86,460.00

48,000.00
7,200.00
1,668.75
24,000.00
40,250.00
16,000.00
137,118.75

-
-

223,578.75
33,536.81
257,115.56

Jumlah Harga (Rp)

11,250.00
4,500.00
550.00
880.00
17,180.00

31,680.00
10,800.00
4,000.00
46,480.00

-
-

63,660.00
9,549.00
73,209.00

Jumlah Harga (Rp)

397,500.00
24,750.00
117,000.00
94,500.00
28,820.00
29,150.00
691,720.00

DIV. 4.1.1
320,000.00
27,000.00
4,450.00
1,528,481.01
40,500.00
436,800.00
45,900.00
384,750.00
2,787,881.01

-
-

3,479,601.01
521,940.15
4,001,541.16

Jumlah Harga (Rp)

423,750.00
24,750.00
140,400.00
126,000.00
35,530.00
31,130.00
781,560.00

432,000.00
36,000.00
6,675.00
2,037,974.68
54,000.00
436,800.00
45,900.00
384,750.00
3,434,099.68

-
-

4,215,659.68
632,348.95
4,848,008.64

Jumlah Harga (Rp)

528,750.00
24,750.00

DIV. 4.1.1
148,500.00
189,000.00
44,330.00
38,830.00
974,160.00

640,000.00
72,000.00
22,250.00
3,056,962.03
81,000.00
436,800.00
45,900.00
384,750.00
240,000.00
402,500.00
160,000.00
5,542,162.03

-
-

6,516,322.03
977,448.30
7,493,770.33

Jumlah Harga (Rp)

476,250.00
24,750.00
148,500.00
126,000.00
36,630.00
34,980.00
847,110.00

DIV. 4.1.1
512,000.00
57,600.00
17,800.00
2,037,974.68
54,000.00
436,800.00
45,900.00
384,750.00
224,000.00
322,000.00
128,000.00
4,220,824.68

-
-

5,067,934.68
760,190.20
5,828,124.89

Jumlah Harga (Rp)

397,500.00
24,750.00
117,000.00
94,500.00
29,150.00
29,150.00
692,050.00

512,000.00
57,600.00
17,800.00
1,528,481.01
40,500.00
436,800.00
45,900.00
384,750.00
192,000.00
322,000.00
256,000.00
3,793,831.01

-
-

4,485,881.01
672,882.15
5,158,763.16

DIV. 4.1.1
Jumlah Harga (Rp)

397,500.00
24,750.00
117,000.00
94,500.00
28,820.00
29,150.00
691,720.00

384,000.00
57,600.00
17,800.00
1,528,481.01
40,500.00
436,800.00
45,900.00
384,750.00
256,000.00
322,000.00
192,000.00
3,665,831.01

-
-

4,357,551.01
653,632.65
5,011,183.66

Jumlah Harga (Rp)

423,750.00
24,750.00
140,400.00
126,000.00
35,530.00
31,130.00
781,560.00

400,000.00
54,000.00

DIV. 4.1.1
13,350.00
2,037,974.68
54,000.00
436,800.00
45,900.00
384,750.00
168,000.00
287,500.00
112,000.00
3,994,274.68

-
-

4,775,834.68
716,375.20
5,492,209.89

Jumlah Harga (Rp)

13,500.00
1,800.00
1,800.00
1,800.00
660.00
990.00
20,550.00

3,200.00
18.00
1,112.50
29,113.92
8,100.00
5,200.00
510.00
4,275.00
51,529.42

DIV. 4.1.1
-
-

72,079.42
10,811.91
82,891.34

Jumlah Harga (Rp)

22,275.00
2,970.00
2,970.00
270.00
1,100.00
1,650.00
31,235.00

4,800.00
360.00
1,112.50
34,936.71
900.00
7,150.00
765.00
7,125.00
57,149.21

-
-

88,384.21
13,257.63
101,641.84

DIV. 4.1.1
4.2.1. HARGA SATUAN PEKERJAAN BESI & ALUMINIUM

1. Pemasangan 1 kg besi profil


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.060 75,000.00
Tukang Las Konstruksi L.03 OH 0.060 90,000.00
Kepala Tukang L.03 OH 0.006 110,000.00
Mandor L.04 OH 0.003 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Besi Profil kg 1.150 11,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

2. Pemasangan 1 kg rangka kuda-kuda baja IWF


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.060 75,000.00
Tukang Las Konstruksi L.03 OH 0.060 90,000.00
Kepala Tukang L.03 OH 0.006 110,000.00
Mandor L.04 OH 0.003 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Besi Baja IWF kg 1.150 12,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

3. Pengerjaan 100 kg pekerjaan perakitan


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 75,000.00
Tukang Besi Konstruksi L.03 OH 0.100 90,000.00
Kepala Tukang L.03 OH 0.001 110,000.00
Mandor L.04 OH 0.005 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Solar Liter 1.000 11,125.00
Minyak Pelumas Liter 0.100 23,500.00
JUMLAH TENAGA BAHAN
C. PERALATAN
Sewa alat Jam 0.8 6,666.67
JUMLAH TENAGA ALAT

DIV. 4.2.1
D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

4. Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 1.650 75,000.00
Tukang Las Biasa L.02 OH 0.275 90,000.00
Kepala Tukang L.03 OH 0.028 110,000.00
Mandor L.04 OH 0.083 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Besi siku L 30.30.3 kg 15.000 11,000.00
Besi plat baja kg 32.800 11,000.00
Kawat las kg 0.050 33,500.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

5. Pengerjaan 10 cm pengelasan dengan las listrik


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.040 75,000.00
Tukang Besi Konstruksi L.03 OH 0.020 90,000.00
Kepala Tukang L.03 OH 0.002 110,000.00
Mandor L.04 OH 0.002 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kawat las listrik kg 0.400 33,500.00
Solar Liter 0.300 11,125.00
Minyak pelumas Liter 0.040 23,500.00
JUMLAH TENAGA BAHAN
C. PERALATAN

DIV. 4.2.1
Sewa alat Jam 0.17 6,666.67
JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

6. Pemasangan 1 m2 pintu rolling door besi


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 1.200 75,000.00
Tukang Las biasa L.03 OH 1.200 90,000.00
Kepala Tukang L.03 OH 0.120 110,000.00
Mandor L.04 OH 0.006 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pintu gulung besi m2 1.000
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

7. Pemasangan 1 m2 pintu lipat (folding door) bahan plastik/PVC


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.440 75,000.00
Tukang L.03 OH 0.440 90,000.00
Kepala Tukang L.03 OH 0.044 110,000.00
Mandor L.04 OH 0.022 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pintu lipat m2 1.000 -
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

8. Pemasangan 1 m kusen pintu alluminium


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.0430 75,000.00
Tukang khusus aluminium L.02 OH 0.0430 90,000.00
Kepala Tukang L.03 OH 0.0043 110,000.00
Mandor L.04 OH 0.0021 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Profil alluminium m 1.100 46,666.67
Skrup fixer buah 2.000 165.00
Sealeant Tube 0.060 25,000.00

DIV. 4.2.1
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

9. Pemasangan 1 m2 pintu aluminium strip lebar 8 cm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.0850 75,000.00
Tukang khusus aluminium L.03 OH 0.0850 90,000.00
Kepala Tukang L.03 OH 0.0085 110,000.00
Mandor L.04 OH 0.0042 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Profil aluminium m 4.400 46,666.67
Aluminium strip m 14.600 33,333.33
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

10. Pemasangan 1 m2 pintu kaca rangka aluminium


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.085 75,000.00
Tukang aluminium/kaca L.03 OH 0.085 90,000.00
Kepala Tukang L.03 OH 0.009 110,000.00
Mandor L.04 OH 0.005 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Profil aluminium m 4.400 46,666.67
Kaca m2 4.500 95,000.00
Sealant Tube 0.270 25,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

11. Pemasangan 1 m2 terali besi strip (2x3) mm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 1.670 75,000.00
Tukang las L.03 OH 1.670 90,000.00
Kepala Tukang L.03 OH 0.167 110,000.00
Mandor L.04 OH 0.083 110,000.00

DIV. 4.2.1
JUMLAH TENAGA KERJA
B BAHAN
Besi strip kg 6.177 11,000.00
Pengelasan cm 27.080 2,765.85
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

12. Pemasangan 1 m' talang datar/jurai seng bjls 28 lebar 90 cm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.200 75,000.00
Tukang L.03 OH 0.200 90,000.00
Kepala Tukang L.03 OH 0.020 110,000.00
Mandor L.04 OH 0.001 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Seng plat m 1.050 22,000.00
Paku 1 cm - 2,5 cm kg 0.015 18,000.00
Papan kayu kelas m3 0.019 1,600,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

13. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60x120cm, dinding partisi
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.250 75,000.00
Tukang Besi L.02 OH 0.250 90,000.00
Kepala Tukang L.03 OH 0.025 110,000.00
Mandor L.04 OH 0.013 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Rangka metal hollow 40.40.2 mm m' 3.500 5,375.00
Assesoris (perkuatan, las dll) Ls 100%xrangka
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

14. Pemasangan 1 m2 rangka besi hollow 1x40.20.2mm, modul 60x60cm, plafon


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)

DIV. 4.2.1
A. TENAGA
Pekerja L.01 OH 0.350 75,000.00
Tukang Besi L.02 OH 0.350 90,000.00
Kepala Tukang L.03 OH 0.035 110,000.00
Mandor L.04 OH 0.018 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Rangka metal hollow 40.20.2 mm m' 4.000 4,000.00
Assesoris (perkuatan, las dll) Ls 100%xrangka
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

DIV. 4.2.1
Jumlah Harga (Rp)

4,500.00
5,400.00
660.00
330.00
10,890.00

12,650.00
12,650.00

-
-

23,540.00
3,531.00
27,071.00

Jumlah Harga (Rp)

4,500.00
5,400.00
660.00
330.00
10,890.00

13,800.00
13,800.00

-
-

24,690.00
3,703.50
28,393.50

Jumlah Harga (Rp)

7,500.00
9,000.00
110.00
550.00
17,160.00

11,125.00
2,350.00
13,475.00

5,333.33
5,333.33

DIV. 4.2.1
35,968.33
5,395.25
41,363.58

Jumlah Harga (Rp)

123,750.00
24,750.00
3,080.00
9,130.00
160,710.00

165,000.00
360,800.00
1,675.00
527,475.00

-
-

688,185.00
103,227.75
791,412.75

Jumlah Harga (Rp)

3,000.00
1,800.00
220.00
220.00
5,240.00

13,400.00
3,337.50
940.00
17,677.50

DIV. 4.2.1
1,133.33
1,133.33

24,050.83
3,607.63
27,658.46

Jumlah Harga (Rp)

90,000.00
108,000.00
13,200.00
660.00
211,860.00

-
-

-
-

211,860.00
31,779.00

Jumlah Harga (Rp)

33,000.00
39,600.00
4,840.00
2,420.00
79,860.00

-
-

-
-

79,860.00
11,979.00

Jumlah Harga (Rp)

3,225.00
3,870.00
473.00
231.00
7,799.00

51,333.33
330.00
1,500.00

DIV. 4.2.1
53,163.33

-
-

60,962.33
9,144.35
70,106.68

Jumlah Harga (Rp)

6,375.00
7,650.00
935.00
462.00
15,422.00

205,333.33
486,666.67
692,000.00

-
-

707,422.00
106,113.30
813,535.30

Jumlah Harga (Rp)

6,375.00
7,650.00
990.00
550.00
15,565.00

205,333.33
427,500.00
6,750.00
639,583.33

-
-

655,148.33
98,272.25
753,420.58

Jumlah Harga (Rp)

125,250.00
150,300.00
18,370.00
9,130.00

DIV. 4.2.1
303,050.00

67,947.00
74,899.11
142,846.11

-
-

445,896.11
66,884.42
512,780.52

Jumlah Harga (Rp)

15,000.00
18,000.00
2,200.00
110.00
35,310.00

23,100.00
270.00
30,400.00
53,770.00

-
-

89,080.00
13,362.00
102,442.00

dinding partisi
Jumlah Harga (Rp)

18,750.00
22,500.00
2,750.00
1,430.00
45,430.00

18,812.50
5,375.00
24,187.50

-
-

69,617.50
10,442.63
80,060.13

Jumlah Harga (Rp)

DIV. 4.2.1
26,250.00
31,500.00
3,850.00
1,980.00
63,580.00

16,000.00
4,000.00
20,000.00

-
-

83,580.00
12,537.00
96,117.00

DIV. 4.2.1
4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING

1. Pemasangan 1 m2 dinding bata lobang tebal 1 batu campuran 1 SP:3PP


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.600 75,000.00
Tukang Batu L.02 OH 0.200 90,000.00
Kepala Tukang L.03 OH 0.020 110,000.00
Mandor L.04 OH 0.030 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata merah bh 120.000 550.00
Semen Portland kg 32.950 1,300.00
Pasir pasang m3 0.091 85,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

2. Pemasangan 1 m2 dinding bata lobang tebal 1 batu campuran 1 SP:4PP


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.600 75,000.00
Tukang Batu L.02 OH 0.200 90,000.00
Kepala Tukang L.03 OH 0.020 110,000.00
Mandor L.04 OH 0.030 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata merah bh 140.000 550.00
Semen Portland kg 26.550 1,300.00
Pasir pasang m3 0.093 85,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

3. Pemasangan 1 m2 dinding bata lobang tebal 1/2 batu campuran 1 SP:3PP


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 75,000.00
Tukang Batu L.02 OH 0.100 90,000.00
Kepala Tukang L.03 OH 0.010 110,000.00
Mandor L.04 OH 0.015 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata merah bh 60.000 550.00

DIV. 4.4.1
Semen Portland kg 14.370 1,300.00
Pasir pasang m3 0.040 85,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

4. Pemasangan 1 m2 dinding bata lubang tebal 1/2 batu campuran 1 SP:4PP


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 75,000.00
Tukang Batu L.02 OH 0.100 90,000.00
Kepala Tukang L.03 OH 0.010 110,000.00
Mandor L.04 OH 0.015 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata merah bh 60.000 550.00
Semen Portland kg 11.500 1,300.00
Pasir pasang m3 0.043 85,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

5. Pemasangan 1 m2 dinding terawang (rooster) 10x12x20 campuran 1SP : 4PP


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 75,000.00
Tukang Batu L.02 OH 0.100 90,000.00
Kepala Tukang L.03 OH 0.010 110,000.00
Mandor L.04 OH 0.015 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata rooster bh 43.000 8,000.00
Semen Portland kg 11.000 1,300.00
Pasir pasang m3 0.035 85,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

DIV. 4.4.1
JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

6. Pemasangan 1 m2 dinding rooster keramik 30x30 campuran 1SP : 4PP


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 75,000.00
Tukang Batu L.02 OH 0.100 90,000.00
Kepala Tukang L.03 OH 0.010 110,000.00
Mandor L.04 OH 0.015 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Rooster keramik bh 11.000 35,000.00
Semen Portland kg 11.000 1,300.00
Pasir pasang m3 0.035 85,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

7. Pemasangan 1 m2 dinding glass block 20x20 campuran 1SP : 4PP


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 75,000.00
Tukang Batu L.02 OH 0.100 90,000.00
Kepala Tukang L.03 OH 0.010 110,000.00
Mandor L.04 OH 0.015 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Rooster keramik bh 25.000 19,500.00
Semen Portland kg 11.000 1,300.00
Pasir pasang m3 0.035 85,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN
JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

DIV. 4.4.1
50.00 m2 pasangan dinding batu bata
Jumlah Harga (Rp)
waktu (hari)
5
45,000.00 0.60 oh x 50.00 = 30 oh 6
18,000.00 0.20 oh x 50.00 = 10 oh 2
2,200.00 0.02 oh x 50.00 = 1 oh 0.2
3,300.00 0.03 oh x 50.00 = 1.5 oh 0.3
68,500.00

66,000.00 120.00 bh x 50.00 = 6000 bh


42,835.00 32.95 kg x 50.00 = 1647.5 kg (1 zak @ 50 kg)
7,735.00 0.09 m3 x 50.00 = 4.55 m3
116,570.00

- 32.95 zak
-

185,070.00
27,760.50
212,830.50

Jumlah Harga (Rp)

45,000.00
18,000.00
2,200.00
3,300.00
68,500.00

77,000.00
34,515.00
7,905.00
119,420.00

-
-

187,920.00
28,188.00
216,108.00

Jumlah Harga (Rp)

22,500.00
9,000.00
1,100.00
1,650.00
34,250.00

550.00

DIV. 4.4.1
1,300.00
85,000.00
86,850.00

-
-

121,100.00
18,165.00
139,265.00

Jumlah Harga (Rp)

22,500.00
9,000.00
1,100.00
1,650.00
34,250.00

33,000.00
14,950.00
3,655.00
51,605.00

-
-

85,855.00
12,878.25
98,733.25

Jumlah Harga (Rp)

22,500.00
9,000.00
1,100.00
1,650.00
34,250.00

344,000.00
14,300.00
2,975.00
361,275.00

DIV. 4.4.1
-
-

395,525.00
59,328.75
454,853.75

Jumlah Harga (Rp)

22,500.00
9,000.00
1,100.00
1,650.00
34,250.00

385,000.00
14,300.00
2,975.00
402,275.00

-
-

436,525.00
65,478.75
502,003.75

Jumlah Harga (Rp)

22,500.00
9,000.00
1,100.00
1,650.00
34,250.00

487,500.00
14,300.00
2,975.00
504,775.00

539,025.00
80,853.75
619,878.75

DIV. 4.4.1
ak @ 50 kg) 32.95

DIV. 4.4.1
4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN

1. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15 mm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 75,000.00
Tukang Batu L.02 OH 0.150 90,000.00
Kepala Tukang L.03 OH 0.015 110,000.00
Mandor L.04 OH 0.015 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 7.776 1,300.00
Pasir pasang m3 0.023 85,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

2. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 75,000.00
Tukang Batu L.02 OH 0.150 90,000.00
Kepala Tukang L.03 OH 0.015 110,000.00
Mandor L.04 OH 0.015 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 6.240 1,300.00
Pasir pasang m3 0.024 85,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

3. Pemasangan 1 m2 Berapen 1SP : 5PP tebal 15 mm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.150 75,000.00
Tukang Batu L.02 OH 0.075 90,000.00
Kepala Tukang L.03 OH 0.008 110,000.00
Mandor L.04 OH 0.008 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 5.184 1,300.00
Pasir pasang m3 0.026 85,000.00
JUMLAH TENAGA BAHAN

DIV. 4.4.2
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

4. Pemasangan 1 m' plesteran skonig 1 Sp : 3 PP lebar 10 cm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.080 75,000.00
Tukang Batu L.02 OH 0.400 90,000.00
Kepala Tukang L.03 OH 0.040 110,000.00
Mandor L.04 OH 0.004 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 0.500 1,300.00
Pasir pasang m3 0.013 85,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

5. Pemasangan 1 m2 plesteran ciprat 1 Sp : 2 PP


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 75,000.00
Tukang Batu L.02 OH 0.100 90,000.00
Kepala Tukang L.03 OH 0.010 110,000.00
Mandor L.04 OH 0.015 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 4.320 1,300.00
Pasir pasang m3 0.006 85,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

DIV. 4.4.2
JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

6. Pemasangan 1 m2 finishing siar pasangan batu kali campuran 1 SP : 2 PP


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 75,000.00
Tukang Batu L.02 OH 0.150 90,000.00
Kepala Tukang L.03 OH 0.015 110,000.00
Mandor L.04 OH 0.015 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 6.340 1,300.00
Pasir pasang m3 0.012 85,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

7. Pemasangan 1 m2 acian
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.200 75,000.00
Tukang Batu L.02 OH 0.100 90,000.00
Kepala Tukang L.03 OH 0.010 110,000.00
Mandor L.04 OH 0.010 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 3.250 1,300.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

DIV. 4.4.2
Jumlah Harga (Rp)

22,500.00
13,500.00
1,650.00
1,650.00
39,300.00

10,108.80
1,955.00
12,063.80

-
-

51,363.80
7,704.57
59,068.37

Jumlah Harga (Rp)

22,500.00
13,500.00
1,650.00
1,650.00
39,300.00

8,112.00
2,040.00
10,152.00

-
-

49,452.00
7,417.80
56,869.80

Jumlah Harga (Rp)

11,250.00
6,750.00
880.00
880.00
19,760.00

6,739.20
2,210.00
8,949.20

DIV. 4.4.2
-
-

28,709.20
4,306.38
33,015.58

Jumlah Harga (Rp)

6,000.00
36,000.00
4,400.00
440.00
46,840.00

650.00
1,105.00
1,755.00

-
-

48,595.00
7,289.25
55,884.25

Jumlah Harga (Rp)

22,500.00
9,000.00
1,100.00
1,650.00
34,250.00

5,616.00
510.00
6,126.00

DIV. 4.4.2
-

40,376.00
6,056.40
46,432.40

Jumlah Harga (Rp)

22,500.00
13,500.00
1,650.00
1,650.00
39,300.00

8,242.00
1,020.00
9,262.00

-
-

48,562.00
7,284.30
55,846.30

Jumlah Harga (Rp)

15,000.00
9,000.00
1,100.00
1,100.00
26,200.00

4,225.00
4,225.00

-
-

30,425.00
4,563.75
34,988.75

DIV. 4.4.2
4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING

1. Pemasangan 1 m2 lantai granite tile ukuran 60cm x 60cm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.700 75,000.00
Tukang Batu L.02 OH 0.350 90,000.00
Kepala Tukang L.03 OH 0.035 110,000.00
Mandor L.04 OH 0.035 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Granite tile ex. Garuda bh 3.150 56,000.00
Semen Portland kg 8.190 1,300.00
Pasir pasang kg 0.045 85,000.00
Semen warna kg 0.650 12,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

2. Pemasangan 1 m2 lantai keramik ukuran 30cm x 30cm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.700 75,000.00
Tukang Batu L.02 OH 0.350 90,000.00
Kepala Tukang L.03 OH 0.035 110,000.00
Mandor L.04 OH 0.035 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Keramik 30x30 (putih) bh 11.870 4,090.91
Semen Portland kg 10.000 1,300.00
Pasir pasang kg 0.045 85,000.00
Semen warna kg 1.500 12,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

3. Pemasangan 1 m2 lantai keramik ukuran 20cm x 20cm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.700 75,000.00
Tukang Batu L.02 OH 0.350 90,000.00
Kepala Tukang L.03 OH 0.035 110,000.00
Mandor L.04 OH 0.035 110,000.00
JUMLAH TENAGA KERJA

DIV. 4.4.3
B BAHAN
Keramik 20x20 (KM/WC) bh 26.500 2,257.20
Semen Portland kg 10.400 1,300.00
Pasir pasang kg 0.045 85,000.00
Semen warna kg 1.620 12,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

4. Pemasangan 1 m' plint keramik ukuran 10 cm x 20 cm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.090 75,000.00
Tukang Batu L.02 OH 0.090 90,000.00
Kepala Tukang L.03 OH 0.035 110,000.00
Mandor L.04 OH 0.005 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Plint keramik bh 5.300 1,128.60
Semen Portland kg 1.140 1,300.00
Pasir pasang kg 0.003 85,000.00
Semen warna kg 0.025 12,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

5. Pemasangan 1 m' plint keramik ukuran 10 cm x 10 cm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.090 75,000.00
Tukang Batu L.02 OH 0.090 90,000.00
Kepala Tukang L.03 OH 0.035 110,000.00
Mandor L.04 OH 0.005 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Plint keramik bh 10.600 564.30
Semen Portland kg 1.140 1,300.00

DIV. 4.4.3
Pasir pasang kg 0.003 85,000.00
Semen warna kg 0.050 12,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

6. Pemasangan 1 m' plint keramik ukuran 5 cm x 20 cm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.090 75,000.00
Tukang Batu L.02 OH 0.090 90,000.00
Kepala Tukang L.03 OH 0.035 110,000.00
Mandor L.04 OH 0.005 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Plint keramik bh 5.300 564.30
Semen Portland kg 0.570 1,300.00
Pasir pasang kg 0.002 85,000.00
Semen warna kg 0.013 12,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

7. Pemasangan 1 m2 lantai marmer ukuran 100cm x 100cm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.700 75,000.00
Tukang Batu L.02 OH 0.350 90,000.00
Kepala Tukang L.03 OH 0.035 110,000.00
Mandor L.04 OH 0.035 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Marmer bh 1.060 1,500,000.00
Semen Portland kg 8.190 1,300.00

DIV. 4.4.3
Pasir pasang kg 0.045 85,000.00
Semen warna kg 0.650 12,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

8. Pemasangan 1 m2 lantai lantai karpet


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.170 75,000.00
Tukang Batu L.02 OH 0.170 90,000.00
Kepala Tukang L.03 OH 0.017 110,000.00
Mandor L.04 OH 0.009 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Karpet biasa m2 1.050 17,500.00
Lem kg 0.350 45,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

9. Pemasangan 1 m2 lantai lantai parquet kayu


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.700 75,000.00
Tukang Batu L.02 OH 0.350 90,000.00
Kepala Tukang L.03 OH 0.035 110,000.00
Mandor L.04 OH 0.035 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Parquet vinyl kayu m2 1.050 177,060.24
Lem kg 0.600 45,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

DIV. 4.4.3
10. Pemasangan 1 m2 dinding keramik 20cm x 20 cm
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.900 75,000.00
Tukang Batu L.02 OH 0.450 90,000.00
Kepala Tukang L.03 OH 0.045 110,000.00
Mandor L.04 OH 0.045 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Keramik bh 26.500 2,257.20
Semen Portland kg 9.300 1,300.00
Pasir pasang kg 0.018 85,000.00
Semen warna kg 1.940 12,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

11. Pemasangan 1 m2 dinding marmer 100cm x 100 cm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 1.300 75,000.00
Tukang Batu L.02 OH 0.650 90,000.00
Kepala Tukang L.03 OH 0.065 110,000.00
Mandor L.04 OH 0.065 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Marmer bh 1.060 1,500,000.00
Semen Portland kg 12.440 1,300.00
Pasir pasang kg 0.025 85,000.00
Semen warna kg 0.650 12,000.00
Paku 12 cm kg 3.030 18,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

DIV. 4.4.3
12. Pemasangan 1 m2 dinding batu candi hitam
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.700 75,000.00
Tukang Batu L.02 OH 0.350 90,000.00
Kepala Tukang L.03 OH 0.035 110,000.00
Mandor L.04 OH 0.035 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu tempel hitam candi m2 1.100 140,000.00
Semen Portland kg 11.750 1,300.00
Pasir pasang kg 0.035 85,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

13. Pemasangan 1 m2 wallpaper lebar 50 cm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.350 75,000.00
Tukang Batu L.02 OH 0.175 90,000.00
Kepala Tukang L.03 OH 0.017 110,000.00
Mandor L.04 OH 0.002 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Wallpaper m 2.200 20,166.50
Lem kg 0.250 45,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

14. Pemasangan 1 m2 floor harderner


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)

DIV. 4.4.3
A. TENAGA
Pekerja L.01 OH 0.120 75,000.00
Tukang Batu L.02 OH 0.120 90,000.00
Kepala Tukang L.03 OH 0.012 110,000.00
Mandor L.04 OH 0.006 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Floor harderner kg 3.000 7,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

15. Pemasangan 1 m2 lantai keramik ukuran 40cm x 40cm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.700 75,000.00
Tukang Batu L.02 OH 0.350 90,000.00
Kepala Tukang L.03 OH 0.035 110,000.00
Mandor L.04 OH 0.035 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Keramik warna ex. Asia Tile bh 6.300 8,000.00
Semen Portland kg 10.000 1,300.00
Pasir pasang kg 0.045 85,000.00
Semen warna kg 1.500 12,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

16. Pemasangan 1 m2 dinding keramik 20cm x 25 cm

DIV. 4.4.3
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.900 75,000.00
Tukang Batu L.02 OH 0.450 90,000.00
Kepala Tukang L.03 OH 0.045 110,000.00
Mandor L.04 OH 0.045 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Keramik ex. Impresso bh 21.000 2,500.00
Semen Portland kg 9.300 1,300.00
Pasir pasang kg 0.018 85,000.00
Semen warna kg 1.940 12,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

DIV. 4.4.3
NUTUP DINDING

Jumlah Harga (Rp)

52,500.00
31,500.00
3,850.00
3,850.00
91,700.00

176,400.00
10,647.00
3,825.00
7,800.00
198,672.00

-
-

290,372.00
43,555.80
333,927.80

Jumlah Harga (Rp)

52,500.00
31,500.00
3,850.00
3,850.00
91,700.00

48,559.09
13,000.00
3,825.00
18,000.00
83,384.09

-
-

175,084.09
26,262.61
201,346.70

Jumlah Harga (Rp)

52,500.00
31,500.00
3,850.00
3,850.00
91,700.00

DIV. 4.4.3
59,815.80
13,520.00
3,825.00
19,440.00
96,600.80

-
-

188,300.80
28,245.12
216,545.92

Jumlah Harga (Rp)

6,750.00
8,100.00
3,850.00
550.00
19,250.00

5,981.58
1,482.00
255.00
300.00
8,018.58

-
-

27,268.58
4,090.29
31,358.87

Jumlah Harga (Rp)

6,750.00
8,100.00
3,850.00
550.00
19,250.00

5,981.58
1,482.00

DIV. 4.4.3
255.00
600.00
8,318.58

-
-

27,568.58
4,135.29
31,703.87

Jumlah Harga (Rp)

6,750.00
8,100.00
3,850.00
550.00
19,250.00

2,990.79
741.00
127.50
156.00
4,015.29

-
-

23,265.29
3,489.79
26,755.08

Jumlah Harga (Rp)

52,500.00
31,500.00
3,850.00
3,850.00
91,700.00

1,590,000.00
10,647.00

DIV. 4.4.3
3,825.00
7,800.00
1,612,272.00

-
-

1,703,972.00
255,595.80
1,959,567.80

Jumlah Harga (Rp)

12,750.00
15,300.00
1,870.00
990.00
30,910.00

18,375.00
15,750.00
34,125.00

-
-

65,035.00
9,755.25
74,790.25

Jumlah Harga (Rp)

52,500.00
31,500.00
3,850.00
3,850.00
91,700.00

185,913.25
27,000.00
212,913.25

-
-

304,613.25
45,691.99
350,305.24

DIV. 4.4.3
Jumlah Harga (Rp)

67,500.00
40,500.00
4,950.00
4,950.00
117,900.00

59,815.80
12,090.00
1,530.00
23,280.00
96,715.80

-
-

214,615.80
32,192.37
246,808.17

Jumlah Harga (Rp)

97,500.00
58,500.00
7,150.00
7,150.00
170,300.00

1,590,000.00
16,172.00
2,125.00
7,800.00
54,540.00
1,670,637.00

-
-

1,840,937.00
276,140.55
2,117,077.55

DIV. 4.4.3
Jumlah Harga (Rp)

52,500.00
31,500.00
3,850.00
3,850.00
91,700.00

154,000.00
15,275.00
2,975.00
172,250.00

-
-

263,950.00
39,592.50
303,542.50

Jumlah Harga (Rp)

26,250.00
15,750.00
1,870.00
220.00
44,090.00

44,366.30
11,250.00
55,616.30

-
-

99,706.30
14,955.95
114,662.25

Jumlah Harga (Rp)

DIV. 4.4.3
9,000.00
10,800.00
1,320.00
660.00
21,780.00

21,000.00
21,000.00

-
-

42,780.00
6,417.00
49,197.00

Jumlah Harga (Rp)

52,500.00
31,500.00
3,850.00
3,850.00
91,700.00

50,400.00
13,000.00
3,825.00
18,000.00
85,225.00

-
-

176,925.00
26,538.75
203,463.75

DIV. 4.4.3
Jumlah Harga (Rp)

67,500.00
40,500.00
4,950.00
4,950.00
117,900.00

52,500.00
12,090.00
1,530.00
23,280.00
89,400.00

-
-

207,300.00
31,095.00
238,395.00

DIV. 4.4.3
4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)

1. Pemasangan 1 m2 langit-langit asbes semen (tebal 4 mm, 5 mm, 6 mm)


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.030 75,000.00
Tukang Batu L.02 OH 0.070 90,000.00
Kepala Tukang L.03 OH 0.007 110,000.00
Mandor L.04 OH 0.004 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes semen m2 1.100 31,746.03
Paku tripleks kg 0.010 25,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

2. Pemasangan 1 m2 langit-langit plywood ukuran (120 x 240) cm (tebal 3 mm, 4 mm, 6 mm)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 75,000.00
Tukang Batu L.02 OH 0.100 90,000.00
Kepala Tukang L.03 OH 0.010 110,000.00
Mandor L.04 OH 0.005 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Plywood 4mm Lembar 0.375 60,000.00
Paku tripleks kg 0.030 25,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

3. Pemasangan 1 m2 langit-langit gypsum board ukuran (120 x 240 x 9) mm (tebal 9 mm)


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 75,000.00
Tukang Batu L.02 OH 0.050 90,000.00
Kepala Tukang L.03 OH 0.005 110,000.00
Mandor L.04 OH 0.005 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Gypsum board Lembar 0.364 60,000.00
Paku skrup kg 0.110 40,000.00
Cornis kg 0.300 3,750.00

DIV. 4.5.1
Lakban gypsum roll 0.025 15,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

4. Pemasangan 1 m' list langit-langit kayu profil


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.050 75,000.00
Tukang Batu L.02 OH 0.050 90,000.00
Kepala Tukang L.03 OH 0.005 110,000.00
Mandor L.04 OH 0.003 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
List kayu profil m 1.050 4,473.68
Paku kg 0.010 18,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

5. Pemasangan 1 m' list langit-langit gypsum profil


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.050 75,000.00
Tukang Batu L.02 OH 0.050 90,000.00
Kepala Tukang L.03 OH 0.005 110,000.00
Mandor L.04 OH 0.003 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
List gypsum sedang m 1.050 9,411.76
Paku skrup kg 0.010 40,000.00
Cornis kg 0.100 3,750.00
JUMLAH TENAGA BAHAN

DIV. 4.5.1
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

6. Pemasangan 1 m2 langit-langit kalsiboard ukuran (120 x 240 x 9) mm (tebal 3,5 mm)


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 75,000.00
Tukang Batu L.02 OH 0.050 90,000.00
Kepala Tukang L.03 OH 0.005 110,000.00
Mandor L.04 OH 0.005 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Gypsum board Lembar 0.364 68,000.00
Paku skrup kg 0.110 40,000.00
Cornis kg 0.300 3,750.00
Lakban gypsum roll 0.025 15,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

DIV. 4.5.1
Jumlah Harga (Rp)

2,250.00
6,300.00
770.00
440.00
9,760.00

34,920.63
250.00
35,170.63

-
-

44,930.63
6,739.60
51,670.23

mm, 4 mm, 6 mm)


Jumlah Harga (Rp)

7,500.00
9,000.00
1,100.00
550.00
18,150.00

22,500.00
750.00
23,250.00

-
-

41,400.00
6,210.00
47,610.00

m (tebal 9 mm)
Jumlah Harga (Rp)

7,500.00
4,500.00
550.00
550.00
13,100.00

21,840.00
4,400.00
1,125.00

DIV. 4.5.1
375.00
27,740.00

-
-

40,840.00
6,126.00
46,966.00

Jumlah Harga (Rp)

3,750.00
4,500.00
550.00
330.00
9,130.00

4,697.37
180.00
4,877.37

-
-

14,007.37
2,101.11
16,108.47

Jumlah Harga (Rp)

3,750.00
4,500.00
550.00
330.00
9,130.00

9,882.35
400.00
375.00
10,657.35

DIV. 4.5.1
-
-

19,787.35
2,968.10
22,755.46

ebal 3,5 mm)


Jumlah Harga (Rp)

7,500.00
4,500.00
550.00
550.00
13,100.00

24,752.00
4,400.00
1,125.00
375.00
30,652.00

-
-

43,752.00
6,562.80
50,314.80

DIV. 4.5.1
4.5.1 HARGA SATUAN PEKERJAAN PENUTUP ATAP

1. Pemasangan 1 m2 roof polycarbonate


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.140 75,000.00
Tukang Kayu L.02 OH 0.067 90,000.00
Kepala Tukang L.03 OH 0.007 110,000.00
Mandor L.04 OH 0.007 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Rooflight 2,1m x 11,8m m2 1.050 90,799.03
Paku kg 0.050 25,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

2. Pemasangan 1 m2 atap asbes gelombang 0,92mx1,8mx5mm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.140 75,000.00
Tukang Kayu L.02 OH 0.070 90,000.00
Kepala Tukang L.03 OH 0.007 110,000.00
Mandor L.04 OH 0.007 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel. 92x180 Lbr 0.750 50,000.00
Paku pancing 6x23 kg 0.120 25,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

3. Pemasangan 1 m' nok asbes


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.084 75,000.00
Tukang Kayu L.02 OH 0.125 90,000.00
Kepala Tukang L.03 OH 0.013 110,000.00
Mandor L.04 OH 0.004 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Nok asbes Lbr 1.000 40,000.00
Paku seng kg 0.040 25,000.00
JUMLAH TENAGA BAHAN

DIV. 4.5.2
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

4. Pemasangan 1 m2 genteng keramik warna natural


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.200 75,000.00
Tukang Kayu L.02 OH 0.100 90,000.00
Kepala Tukang L.03 OH 0.010 110,000.00
Mandor L.04 OH 0.010 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Genteng keramik ex. Kanmuri Bh 14.000 10,396.00
Paku biasa 2"-5" kg 0.030 18,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

5. Pemasangan 1 m2 genteng metal


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.200 75,000.00
Tukang Kayu L.02 OH 0.100 90,000.00
Kepala Tukang L.03 OH 0.010 110,000.00
Mandor L.04 OH 0.001 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Genteng metal ex. Sakura Bh 1.620 29,500.00
Paku biasa 1/2"-1" kg 0.200 18,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

DIV. 4.5.2
JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

6. Pemasangan 1 m' nok genteng keramik


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.400 75,000.00
Tukang Kayu L.02 OH 0.200 90,000.00
Kepala Tukang L.03 OH 0.020 110,000.00
Mandor L.04 OH 0.020 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Nok genteng beton Bh 3.900 20,000.00
Paku biasa 1/2"-1" kg 0.050 18,000.00
Semen PC kg 10.800 1,300.00
Pasir pasang m3 0.032 85,000.00
Semen warna kg 1.000 12,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

7. Pemasangan 1 m' nok genteng metal


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.250 75,000.00
Tukang Kayu L.02 OH 0.150 90,000.00
Kepala Tukang L.03 OH 0.015 110,000.00
Mandor L.04 OH 0.013 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Nok genteng metal Bh 1.100 23,000.00
Paku biasa 1/2"-1" kg 0.050 18,000.00
JUMLAH TENAGA BAHAN

DIV. 4.5.2
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

8. Pemasangan 1 m2 atap seng gelombang


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.120 75,000.00
Tukang Kayu L.02 OH 0.060 90,000.00
Kepala Tukang L.03 OH 0.006 110,000.00
Mandor L.04 OH 0.006 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Seng gel. 7' Bh 0.700 38,500.00
Paku biasa 1/2"-1" kg 0.020 18,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

9. Pemasangan 1 m' nok atap seng


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.150 75,000.00
Tukang Kayu L.02 OH 0.070 90,000.00
Kepala Tukang L.03 OH 0.007 110,000.00
Mandor L.04 OH 0.006 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Seng plat 3"x6" Bh 0.300 22,000.00
Paku biasa 1/2"-1" kg 0.040 18,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

DIV. 4.5.2
10. Pemasangan 1 m2 atap aluminium/alkan
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.150 75,000.00
Tukang Kayu L.02 OH 0.075 90,000.00
Kepala Tukang L.03 OH 0.080 110,000.00
Mandor L.04 OH 0.006 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
alkan t. 0,35 Lbr 1.050 55,000.00
Paku hak panj.15 cm kg 0.020 25,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

11. Pemasangan 1 m' nok aluminium


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 75,000.00
Tukang Kayu L.02 OH 0.100 90,000.00
Kepala Tukang L.03 OH 0.100 110,000.00
Mandor L.04 OH 0.050 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Nok standar 40x18 Bh 1.200 25,666.67
Paku hak panj.15 cm kg 0.040 25,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

12. Pemasangan 1 m2 aluminium foil


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.150 75,000.00

DIV. 4.5.2
Tukang Kayu L.02 OH 0.050 90,000.00
Kepala Tukang L.03 OH 0.005 110,000.00
Mandor L.04 OH 0.008 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Aluminium foil woven m2 1.050 10,710.42
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

13. Pemasangan 1 m2 atap bitumen 95x200


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.140 75,000.00
Tukang Kayu L.02 OH 0.070 90,000.00
Kepala Tukang L.03 OH 0.007 110,000.00
Mandor L.04 OH 0.007 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Atam bitumen ex. Onduline Bh 0.600 127,500.00
Paku kg 0.120 25,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

14. Pemasangan 1 m' nok bitumen 90cm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA

DIV. 4.5.2
Pekerja L.01 OH 0.084 75,000.00
Tukang Kayu L.02 OH 0.125 90,000.00
Kepala Tukang L.03 OH 0.013 110,000.00
Mandor L.04 OH 0.004 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Nok bitumen ex. Onduline Lbr 1.150 105,000.00
Paku kg 0.040 25,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

15. Pemasangan 1 m2 atap zincalume


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.150 75,000.00
Tukang Kayu L.02 OH 0.075 90,000.00
Kepala Tukang L.03 OH 0.080 110,000.00
Mandor L.04 OH 0.006 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Zincalujme t.0,35 Lbr 1.050 63,500.00
Paku hak panj.15 cm kg 0.020 25,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

16. Pemasangan 1 m' nok zincalume


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)

DIV. 4.5.2
A. TENAGA
Pekerja L.01 OH 0.100 75,000.00
Tukang Kayu L.02 OH 0.100 90,000.00
Kepala Tukang L.03 OH 0.100 110,000.00
Mandor L.04 OH 0.050 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Nok zincalume m 1.200 25,666.67
Paku kg 0.040 25,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

17. Pemasangan 1 m2 genteng tanah liat


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.200 75,000.00
Tukang Kayu L.02 OH 0.100 90,000.00
Kepala Tukang L.03 OH 0.010 110,000.00
Mandor L.04 OH 0.010 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Genteng ex. Lokal Bh 17.500 1,000.00
Paku biasa 2"-5" kg 0.030 18,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

18. Pemasangan 1 m' nok genteng tanah liat


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.400 75,000.00
Tukang Kayu L.02 OH 0.200 90,000.00
Kepala Tukang L.03 OH 0.020 110,000.00
Mandor L.04 OH 0.020 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Nok genteng Bh 3.500 1,500.00
Paku biasa 1/2"-1" kg 0.050 18,000.00
Semen PC kg 10.800 1,300.00
Pasir pasang m3 0.032 85,000.00
Semen warna kg 1.000 12,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

DIV. 4.5.2
JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

DIV. 4.5.2
Jumlah Harga (Rp)

10,500.00
6,030.00
770.00
770.00
18,070.00

95,338.98
1,250.00
96,588.98

-
-

114,658.98
17,198.85
131,857.83

Jumlah Harga (Rp)

10,500.00
6,300.00
770.00
770.00
18,340.00

37,500.00
3,000.00
40,500.00

-
-

58,840.00
8,826.00
67,666.00

Jumlah Harga (Rp)

6,300.00
11,250.00
1,430.00
440.00
19,420.00

40,000.00
1,000.00
41,000.00

DIV. 4.5.2
-
-

60,420.00
9,063.00
69,483.00

Jumlah Harga (Rp)

15,000.00
9,000.00
1,100.00
1,100.00
26,200.00

145,544.00
540.00
146,084.00

-
-

172,284.00
25,842.60
198,126.60

Jumlah Harga (Rp)

15,000.00
9,000.00
1,100.00
110.00
25,210.00

47,790.00
3,600.00
51,390.00

DIV. 4.5.2
-
-

76,600.00
11,490.00
88,090.00

Jumlah Harga (Rp)

30,000.00
18,000.00
2,200.00
2,200.00
52,400.00

78,000.00
900.00
14,040.00
2,720.00
12,000.00
107,660.00

-
-

160,060.00
24,009.00
184,069.00

Jumlah Harga (Rp)

18,750.00
13,500.00
1,650.00
1,430.00
35,330.00

25,300.00
900.00
26,200.00

DIV. 4.5.2
-
-

61,530.00
9,229.50
70,759.50

Jumlah Harga (Rp)

9,000.00
5,400.00
660.00
660.00
15,720.00

26,950.00
360.00
27,310.00

-
-

43,030.00
6,454.50
49,484.50

Jumlah Harga (Rp)

11,250.00
6,300.00
770.00
660.00
18,980.00

6,600.00
720.00
7,320.00

-
-

26,300.00
3,945.00
30,245.00

DIV. 4.5.2
Jumlah Harga (Rp)

11,250.00
6,750.00
8,800.00
660.00
27,460.00

57,750.00
500.00
58,250.00

-
-

85,710.00
12,856.50
98,566.50

Jumlah Harga (Rp)

7,500.00
9,000.00
11,000.00
5,500.00
33,000.00

30,800.00
1,000.00
31,800.00

-
-

64,800.00
9,720.00
74,520.00

Jumlah Harga (Rp)

11,250.00

DIV. 4.5.2
4,500.00
550.00
880.00
17,180.00

11,245.94
11,245.94

-
-

28,425.94
4,263.89
32,689.83

Jumlah Harga (Rp)

10,500.00
6,300.00
770.00
770.00
18,340.00

76,500.00
3,000.00
79,500.00

-
-

97,840.00
14,676.00
112,516.00

Jumlah Harga (Rp)

DIV. 4.5.2
6,300.00
11,250.00
1,430.00
440.00
19,420.00

120,750.00
1,000.00
121,750.00

-
-

141,170.00
21,175.50
162,345.50

Jumlah Harga (Rp)

11,250.00
6,750.00
8,800.00
660.00
27,460.00

66,675.00
500.00
67,175.00

-
-

94,635.00
14,195.25
108,830.25

Jumlah Harga (Rp)

DIV. 4.5.2
7,500.00
9,000.00
11,000.00
5,500.00
33,000.00

30,800.00
1,000.00
31,800.00

-
-

64,800.00
9,720.00
74,520.00

Jumlah Harga (Rp)

15,000.00
9,000.00
1,100.00
1,100.00
26,200.00

17,500.00
540.00
18,040.00

-
-

44,240.00
6,636.00
50,876.00

Jumlah Harga (Rp)

30,000.00
18,000.00
2,200.00
2,200.00
52,400.00

5,250.00
900.00
14,040.00
2,720.00
12,000.00
34,910.00

DIV. 4.5.2
-

87,310.00
13,096.50
100,406.50

DIV. 4.5.2
4.6.1 HARGA SATUAN PEKERJAAN KAYU

1. Pembuatan dan Pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 6.000 75,000.00
Tukang Kayu L.02 OH 18.000 90,000.00
Kepala Tukang L.03 OH 1.800 110,000.00
Mandor L.04 OH 0.300 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu klas II m3 1.200 5,800,000.00
Paku 10 cm kg 1.250 18,000.00
Lem kayu kg 1.000 13,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

2. Pembuatan dam pemasangan 1 m2 daun pintu panel


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 75,000.00
Tukang Kayu L.02 OH 3.000 90,000.00
Kepala Tukang L.03 OH 0.300 110,000.00
Mandor L.04 OH 0.050 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu klas III m3 0.040 3,500,000.00
Lem kayu kg 0.500 13,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

3. Pembuatan dam pemasangan 1 m2 pintu dan jendela kaca


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.800 75,000.00
Tukang Kayu L.02 OH 2.400 90,000.00
Kepala Tukang L.03 OH 0.240 110,000.00
Mandor L.04 OH 0.040 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu klas III m3 0.024 3,500,000.00
Lem kayu kg 0.300 13,000.00

DIV. 4.6.1
Kaca polos 5 mm m2 1.000 95,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

4. Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas III tertutup (lebar sampai 90 cm)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.700 75,000.00
Tukang Kayu L.02 OH 2.100 90,000.00
Kepala Tukang L.03 OH 0.210 110,000.00
Mandor L.04 OH 0.035 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu klas III m3 0.025 3,500,000.00
Paku 1 cm - 2,5 cm kg 0.030 18,000.00
Lem kayu kg 0.500 13,000.00
Plywood tebal 4 mm Lembar 1.000 60,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

5. Pemasangan 1 m2 jalusi kusen, kayu kelas II


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.670 75,000.00
Tukang Kayu L.02 OH 2.000 90,000.00
Kepala Tukang L.03 OH 0.200 110,000.00
Mandor L.04 OH 0.335 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu klas II m3 0.060 5,500,000.00
Paku 1 cm - 2,5 cm kg 0.150 18,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

6. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas II bentang 6 meter

DIV. 4.6.1
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 4.000 75,000.00
Tukang Kayu L.02 OH 12.000 90,000.00
Kepala Tukang L.03 OH 1.200 110,000.00
Mandor L.04 OH 0.200 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu klas II m3 1.100 5,800,000.00
Besi strip tebal 5mm kg 15.000 11,000.00
Paku 12 cm kg 5.600 18,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

7. Pemasangan 1 m3 konstruksi gordeng, kayu kelas II


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 6.700 75,000.00
Tukang Kayu L.02 OH 20.100 90,000.00
Kepala Tukang L.03 OH 2.010 110,000.00
Mandor L.04 OH 0.335 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu klas II m3 1.100 5,800,000.00
Besi strip tebal 5mm kg 15.000 11,000.00
Paku 12 cm kg 3.000 18,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

8. Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas III


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 75,000.00
Tukang Kayu L.02 OH 0.100 90,000.00
Kepala Tukang L.03 OH 0.010 110,000.00
Mandor L.04 OH 0.005 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kaso 5x7 cm m3 0.014 3,800,000.00
Reng 2x3 cm m3 0.036 3,800,000.00
Paku 5 dan 10 cm kg 0.250 18,000.00
JUMLAH TENAGA BAHAN

DIV. 4.6.1
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

9. Pemasangan 1 m2 rangka langit-langit (50x100) cm, kayu kelas III


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.150 75,000.00
Tukang Kayu L.02 OH 0.300 90,000.00
Kepala Tukang L.03 OH 0.030 110,000.00
Mandor L.04 OH 0.075 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kaso 5x7 cm m3 0.0154 3,800,000.00
Paku kg 0.200 18,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

10. Pemasangan 1 m2 rangka langit-langit (60x60) cm, III


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.200 75,000.00
Tukang Kayu L.02 OH 0.300 90,000.00
Kepala Tukang L.03 OH 0.030 110,000.00
Mandor L.04 OH 0.010 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kaso 5x7 cm m3 0.0163 3,800,000.00
Paku kg 0.250 18,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

11. Pemasangan 1 m' lisplank ukuran (3x20) cm, kayu kelas II


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 75,000.00
Tukang Kayu L.02 OH 0.200 90,000.00

DIV. 4.6.1
Kepala Tukang L.03 OH 0.020 110,000.00
Mandor L.04 OH 0.005 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu klas II m3 0.0108 5,500,000.00
Paku kg 0.100 18,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

12. Pemasangan 1 m' lisplank ukuran (3x30) cm, kayu kelas II


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 75,000.00
Tukang Kayu L.02 OH 0.200 90,000.00
Kepala Tukang L.03 OH 0.020 110,000.00
Mandor L.04 OH 0.005 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu klas II m3 0.0110 5,500,000.00
Paku kg 0.050 18,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

13. Pemasangan 1 m2 rangka dinding pemisah (60x120) cm kayu kelas III


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.150 75,000.00
Tukang Kayu L.02 OH 0.450 90,000.00
Kepala Tukang L.03 OH 0.045 110,000.00
Mandor L.04 OH 0.008 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu klas III m3 0.0280 3,800,000.00
Paku kg 0.150 18,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

DIV. 4.6.1
14. Pemasangan 1 m2 rangka dinding pemisah plywood rangkap, rangka kayu kelas III
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.028 75,000.00
Tukang Kayu L.02 OH 0.150 90,000.00
Kepala Tukang L.03 OH 0.860 110,000.00
Mandor L.04 OH 0.560 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu klas III, 6x12 m3 0.0280 3,800,000.00
Paku kg 0.1500 18,000.00
Plywood 4 mm, 120x240 Lembar 0.8600 60,000.00
Lem kayu kg 0.560 13,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

15. Pemasangan 1 m2 dinding lambrisering dari papan kayu kelas II


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.600 75,000.00
Tukang Kayu L.02 OH 1.800 90,000.00
Kepala Tukang L.03 OH 0.180 110,000.00
Mandor L.04 OH 0.030 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu m3 0.0070 5,500,000.00
Paku kg 0.1000 18,000.00
Paku skrup kg 0.1500 18,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

18. Pemasangan 1 m2 dinding lambrisering dari plywood ukuran (120x240) cm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.025 75,000.00
Tukang Kayu L.02 OH 0.075 90,000.00
Kepala Tukang L.03 OH 0.008 110,000.00
Mandor L.04 OH 0.001 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Plywod 4 mm m3 0.4000 60,000.00

DIV. 4.6.1
Paku 1' dan 2,5' kg 0.0500 18,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

19. Pemasangan 1 m' kalsiplank


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 75,000.00
Tukang Kayu L.02 OH 0.200 90,000.00
Kepala Tukang L.03 OH 0.020 110,000.00
Mandor L.04 OH 0.005 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kalsiplank btg 0.3500 45,000.00
Paku kg 0.100 18,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

DIV. 4.6.1
Jumlah Harga (Rp)

450,000.00
1,620,000.00
198,000.00
33,000.00
2,301,000.00

6,960,000.00
22,500.00
13,000.00
6,995,500.00

-
-

9,296,500.00
1,394,475.00
10,690,975.00

Jumlah Harga (Rp)

75,000.00
270,000.00
33,000.00
5,500.00
383,500.00

140,000.00
6,500.00
146,500.00

-
-

530,000.00
79,500.00
609,500.00

Jumlah Harga (Rp)

60,000.00
216,000.00
26,400.00
4,400.00
306,800.00

84,000.00
3,900.00

DIV. 4.6.1
95,000.00
182,900.00

-
-

489,700.00
73,455.00
563,155.00

tutup (lebar sampai 90 cm)


Jumlah Harga (Rp)

52,500.00
189,000.00
23,100.00
3,850.00
268,450.00

87,500.00
540.00
6,500.00
60,000.00
154,540.00

-
-

422,990.00
63,448.50
486,438.50

Jumlah Harga (Rp)

50,250.00
180,000.00
22,000.00
36,850.00
289,100.00

330,000.00
2,700.00
332,700.00

-
-

621,800.00
93,270.00
715,070.00

entang 6 meter

DIV. 4.6.1
Jumlah Harga (Rp)

300,000.00
1,080,000.00
132,000.00
22,000.00
1,534,000.00

6,380,000.00
165,000.00
100,800.00
6,645,800.00

-
-

8,179,800.00
1,226,970.00
9,406,770.00

Jumlah Harga (Rp)

502,500.00
1,809,000.00
221,100.00
36,850.00
2,569,450.00

502,500.00
1,809,000.00
221,100.00
2,532,600.00

-
-

5,102,050.00
765,307.50
5,867,357.50

Jumlah Harga (Rp)

7,500.00
9,000.00
1,100.00
550.00
18,150.00

53,200.00
136,800.00
4,500.00
194,500.00

DIV. 4.6.1
-
-

212,650.00
31,897.50
244,547.50

Jumlah Harga (Rp)

11,250.00
27,000.00
3,300.00
8,250.00
49,800.00

58,520.00
3,600.00
62,120.00

-
-

111,920.00
16,788.00
128,708.00

Jumlah Harga (Rp)

15,000.00
27,000.00
3,300.00
1,100.00
46,400.00

61,940.00
4,500.00
66,440.00

-
-

112,840.00
16,926.00
129,766.00

Jumlah Harga (Rp)

7,500.00
18,000.00

DIV. 4.6.1
2,200.00
550.00
28,250.00

59,400.00
1,800.00
61,200.00

-
-

89,450.00
13,417.50
102,867.50

Jumlah Harga (Rp)

7,500.00
18,000.00
2,200.00
550.00
28,250.00

60,500.00
900.00
61,400.00

-
-

89,650.00
13,447.50
103,097.50

Jumlah Harga (Rp)

11,250.00
40,500.00
4,950.00
880.00
57,580.00

106,400.00
2,700.00
109,100.00

-
-

166,680.00
25,002.00
191,682.00

DIV. 4.6.1
ayu kelas III
Jumlah Harga (Rp)

2,100.00
13,500.00
94,600.00
61,600.00
171,800.00

106,400.00
2,700.00
51,600.00
7,280.00
167,980.00

-
-

339,780.00
50,967.00
390,747.00

Jumlah Harga (Rp)

45,000.00
162,000.00
19,800.00
3,300.00
230,100.00

38,500.00
1,800.00
2,700.00
43,000.00

-
-

273,100.00
40,965.00
314,065.00

Jumlah Harga (Rp)

1,875.00
6,750.00
880.00
110.00
9,615.00

24,000.00

DIV. 4.6.1
900.00
24,900.00

-
-

34,515.00
5,177.25
39,692.25

Jumlah Harga (Rp)

7,500.00
18,000.00
2,200.00
550.00
28,250.00

15,750.00
1,800.00
17,550.00

-
-

45,800.00
6,870.00
52,670.00

DIV. 4.6.1
4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA

1. Pemasangan 1 buah kunci tanam


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.010 75,000.00
Tukang Kayu L.02 OH 0.500 90,000.00
Kepala Tukang L.03 OH 0.050 110,000.00
Mandor L.04 OH 0.005 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kunci tanam biasa bh 1.000 95,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

2. Pemasangan 1 buah kunci tanam kamar mandi


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.005 75,000.00
Tukang Kayu L.02 OH 0.500 90,000.00
Kepala Tukang L.03 OH 0.050 110,000.00
Mandor L.04 OH 0.003 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kunci kecil tanam KM bh 1.000 35,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

3. Pemasangan 1 buah kunci silinder


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.005 75,000.00
Tukang Kayu L.02 OH 0.500 90,000.00
Kepala Tukang L.03 OH 0.050 110,000.00
Mandor L.04 OH 0.003 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kunci bulat ex. SES bh 1.000 125,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

DIV. 4.6.2
D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

4. Pemasangan 1 buah engsel pintu


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.015 75,000.00
Tukang Kayu L.02 OH 0.150 90,000.00
Kepala Tukang L.03 OH 0.015 110,000.00
Mandor L.04 OH 0.0008 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Engsel pintu biasa bh 1.000 7,500.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

5. Pemasangan 1 buah engsel jendela kupu-kupu


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.010 75,000.00
Tukang Kayu L.02 OH 0.100 90,000.00
Kepala Tukang L.03 OH 0.010 110,000.00
Mandor L.04 OH 0.0005 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Engsel jendela biasa bh 1.000 6,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

6. Pemasangan 1 buah spring knip


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.015 75,000.00
Tukang Kayu L.02 OH 0.150 90,000.00
Kepala Tukang L.03 OH 0.015 110,000.00
Mandor L.04 OH 0.0080 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Spring knip stainless stell bh 1.000 16,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

DIV. 4.6.2
JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

7. Pemasangan 1 buah kait angin


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.015 75,000.00
Tukang Kayu L.02 OH 0.150 90,000.00
Kepala Tukang L.03 OH 0.015 110,000.00
Mandor L.04 OH 0.0080 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kait angin stainless stell bh 1.000 22,500.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

8. Pemasangan 1 buah door closer


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.050 75,000.00
Tukang Kayu L.02 OH 0.500 90,000.00
Kepala Tukang L.03 OH 0.050 110,000.00
Mandor L.04 OH 0.0030 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Door closer kw 2 bh 1.000 150,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

9. Pemasangan 1 buah kunci slot


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.020 75,000.00
Tukang Kayu L.02 OH 0.200 90,000.00
Kepala Tukang L.03 OH 0.020 110,000.00
Mandor L.04 OH 0.0010 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kunci slot stainless stell bh 1.000 17,500.00

DIV. 4.6.2
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

10. Pemasangan 1 buah Door handle


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.050 75,000.00
Tukang Kayu L.02 OH 0.500 90,000.00
Kepala Tukang L.03 OH 0.050 110,000.00
Mandor L.04 OH 0.0030 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Door handle bh 1.000 120,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

11. Pemasangan 1 buah door stop


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.010 75,000.00
Tukang Kayu L.02 OH 0.100 90,000.00
Kepala Tukang L.03 OH 0.010 110,000.00
Mandor L.04 OH 0.0050 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Door stop bh 1.000 57,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

12. Pemasangan 1 m2 kaca tebal 5 mm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.015 75,000.00
Tukang Kaca L.02 OH 0.150 90,000.00
Kepala Tukang L.03 OH 0.015 110,000.00
Mandor L.04 OH 0.0008 110,000.00
JUMLAH TENAGA KERJA

DIV. 4.6.2
B BAHAN
Kaca tebal 5 mm m2 1.100 95,000.00
Sealent bh 0.050 25,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

13. Pemasangan 1 m2 kaca tebal 8 mm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.017 75,000.00
Tukang Kayu L.02 OH 0.170 90,000.00
Kepala Tukang L.03 OH 0.017 110,000.00
Mandor L.04 OH 0.0009 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kaca tebal 8 mm m2 1.100 200,000.00
Sealent bh 0.070 25,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

14. Pemasangan 1 m2 kaca tebal 12 mm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.025 75,000.00
Tukang Kayu L.02 OH 0.250 90,000.00
Kepala Tukang L.03 OH 0.025 110,000.00
Mandor L.04 OH 0.0013 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kaca tebal 12 mm m2 1.100 450,000.00
Sealent bh 0.070 25,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

15. Pemasangan 1 m2 kaca patri tebal 5 mm

DIV. 4.6.2
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.075 75,000.00
Tukang Kayu L.02 OH 0.150 90,000.00
Kepala Tukang L.03 OH 0.015 110,000.00
Mandor L.04 OH 0.0040 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kaca patri 5 mm m2 1.100 2,000,000.00
Sealent bh 0.050 25,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

16. Pemasangan 1 buah kunci stainless steel


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.010 75,000.00
Tukang Kayu L.02 OH 0.500 90,000.00
Kepala Tukang L.03 OH 0.050 110,000.00
Mandor L.04 OH 0.005 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Handle kunci bh 1.000 150,000.00
Silinder bh 1.000 100,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

DIV. 4.6.2
Jumlah Harga (Rp)

750.00
45,000.00
5,500.00
550.00
51,800.00

95,000.00
95,000.00

-
-

146,800.00
22,020.00
168,820.00

Jumlah Harga (Rp)

375.00
45,000.00
5,500.00
330.00
51,205.00

35,000.00
35,000.00

-
-

86,205.00
12,930.75
99,135.75

Jumlah Harga (Rp)

375.00
45,000.00
5,500.00
330.00
51,205.00

125,000.00
125,000.00

-
-

DIV. 4.6.2
176,205.00
26,430.75
202,635.75

Jumlah Harga (Rp)

1,125.00
13,500.00
1,650.00
88.00
16,363.00

7,500.00
7,500.00

-
-

23,863.00
3,579.45
27,442.45

Jumlah Harga (Rp)

750.00
9,000.00
1,100.00
55.00
10,905.00

6,000.00
6,000.00

-
-

16,905.00
2,535.75
19,440.75

Jumlah Harga (Rp)

1,125.00
13,500.00
1,650.00
880.00
17,155.00

16,000.00
16,000.00

DIV. 4.6.2
-
-

33,155.00
4,973.25
38,128.25

Jumlah Harga (Rp)

1,125.00
13,500.00
1,650.00
880.00
17,155.00

22,500.00
22,500.00

-
-

39,655.00
5,948.25
45,603.25

Jumlah Harga (Rp)

3,750.00
45,000.00
5,500.00
330.00
54,580.00

150,000.00
150,000.00

-
-

204,580.00
30,687.00
235,267.00

Jumlah Harga (Rp)

1,500.00
18,000.00
2,200.00
110.00
21,810.00

17,500.00

DIV. 4.6.2
17,500.00

-
-

39,310.00
5,896.50
45,206.50

Jumlah Harga (Rp)

3,750.00
45,000.00
5,500.00
330.00
54,580.00

120,000.00
120,000.00

-
-

174,580.00
26,187.00
200,767.00

Jumlah Harga (Rp)

750.00
9,000.00
1,100.00
550.00
11,400.00

57,000.00
57,000.00

-
-

68,400.00
10,260.00
78,660.00

Jumlah Harga (Rp)

1,125.00
13,500.00
1,650.00
88.00
16,363.00

DIV. 4.6.2
104,500.00
1,250.00
104,500.00

-
-

120,863.00
18,129.45
138,992.45

Jumlah Harga (Rp)

1,275.00
15,300.00
1,870.00
99.00
18,544.00

220,000.00
1,750.00
220,000.00

-
-

238,544.00
35,781.60
274,325.60

Jumlah Harga (Rp)

1,875.00
22,500.00
2,750.00
143.00
27,268.00

495,000.00
1,750.00
495,000.00

-
-

522,268.00
78,340.20
600,608.20

DIV. 4.6.2
Jumlah Harga (Rp)

5,625.00
13,500.00
1,650.00
440.00
21,215.00

2,200,000.00
1,250.00
2,200,000.00

-
-

2,221,215.00
333,182.25
2,554,397.25

Jumlah Harga (Rp)

750.00
45,000.00
5,500.00
550.00
51,800.00

150,000.00
100,000.00
250,000.00

-
-

301,800.00
45,270.00
347,070.00

DIV. 4.6.2
4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN

1. 1 m2 Pengikisan/pengerokan permukaan cat lama


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.150 75,000.00
Mandor L.04 OH 0.003 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Soda api bh 0.050 40,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

2. 1 m2 Pengecatan bidang kayu baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.070 75,000.00
Tukang cat L.02 OH 0.009 90,000.00
Kepala tukang L.03 OH 0.006 110,000.00
Mandor L.04 OH 0.003 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Cat menie kg 0.200 34,000.00
Plamur kg 0.150 12,000.00
Cat dasar kg 0.170 31,000.00
Cat penutup kg 0.260 49,000.00
Kuas bh 0.010 5,000.00
Pengencer kg 0.030 25,000.00
Amplas Lbr 0.200 5,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

3. Pelaburan 1 m2 bidang kayu dengan teak oil


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.040 75,000.00
Tukang cat L.02 OH 0.063 90,000.00
Kepala tukang L.03 OH 0.063 110,000.00
Mandor L.04 OH 0.003 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Teak oil L 0.360 57,500.00

DIV. 4.7.1
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

4. Pelaburan 1 m2 bidang kayu dengan politur


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.040 75,000.00
Tukang cat L.02 OH 0.060 90,000.00
Kepala tukang L.03 OH 0.016 110,000.00
Mandor L.04 OH 0.003 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Politur L 0.150 12,000.00
Politur jadi L 0.372 76,500.00
Amplas Lbr 2.000 5,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

5. Pelaburan 1 m2 bidang kayu dengan cat residu dan ter


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 75,000.00
Mandor L.04 OH 0.006 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Residu atau ter L 0.350 4,500.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

DIV. 4.7.1
D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

6. Pelaburan 1 m2 bidang kayu dengan vernis


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.160 75,000.00
Tukang cat L.02 OH 0.160 90,000.00
Kepala tukang L.03 OH 0.016 110,000.00
Mandor L.04 OH 0.003 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Vernis L 0.150 46,500.00
Dempul Kg 0.050 45,000.00
Ampelas Lbr 0.100 5,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

7. Pengecatan 1 m2 tembok baru untuk interior ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.020 75,000.00
Tukang cat L.02 OH 0.063 90,000.00
Kepala tukang L.03 OH 0.0063 110,000.00
Mandor L.04 OH 0.003 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Plamir L 0.100 9,000.00
Cat dasar Kg 0.100 25,000.00
Cat penutup ex. Vinilex kg 0.260 19,600.00

DIV. 4.7.1
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

8. Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup)


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.028 75,000.00
Tukang cat L.02 OH 0.042 90,000.00
Kepala tukang L.03 OH 0.0042 110,000.00
Mandor L.04 OH 0.003 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Cat dasar Kg 0.120 25,000.00
Cat penutup ex. Vinilex Lbr 0.180 19,600.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

9. Pemasangan 1 m2 wallpaper
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.020 75,000.00
Tukang cat L.02 OH 0.200 90,000.00
Kepala tukang L.03 OH 0.0200 110,000.00
Mandor L.04 OH 0.003 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Wallpaper m2 1.200 40,333.00
Lem Kg 0.200 45,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

DIV. 4.7.1
10. Pengecatan 1 m2 permukaan baja dengan menie besi
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.060 75,000.00
Tukang cat L.02 OH 0.060 90,000.00
Kepala tukang L.03 OH 0.0120 110,000.00
Mandor L.04 OH 0.0030 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Menie besi kg 0.100 34,000.00
Kuas bh 0.010 5,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

11. Pengecatam 1 m2 permukaan baja galvanis secara manual sisitem 1 lapis cat
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.060 75,000.00
Tukang cat L.02 OH 0.060 90,000.00
Kepala tukang L.03 OH 0.0120 110,000.00
Mandor L.04 OH 0.0030 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Cat kg 0.300 49,000.00
Kuas bh 0.010 5,000.00
Pengencer L 0.010 25,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

12. Pengecatan 1 m2 tembok baru untuk exterior ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA

DIV. 4.7.1
Pekerja L.01 OH 0.020 75,000.00
Tukang cat L.02 OH 0.063 90,000.00
Kepala tukang L.03 OH 0.0063 110,000.00
Mandor L.04 OH 0.003 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Plamir L 0.100 9,000.00
Cat dasar Kg 0.100 25,000.00
Cat penutup ex. Dulux L 0.260 96,120.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

DIV. 4.7.1
Jumlah Harga (Rp)

11,250.00
330.00
11,580.00

2,000.00
2,000.00

-
-

13,580.00
2,037.00
15,617.00

lapis cat penutup)


Jumlah Harga (Rp)

5,250.00
810.00
660.00
330.00
7,050.00

6,800.00
1,800.00
5,270.00
12,740.00
50.00
750.00
1,000.00
28,410.00

-
-

35,460.00
5,319.00
40,779.00

Jumlah Harga (Rp)

3,000.00
5,670.00
6,930.00
330.00
15,930.00

20,700.00

DIV. 4.7.1
20,700.00

-
-

36,630.00
5,494.50
42,124.50

Jumlah Harga (Rp)

3,000.00
5,400.00
1,760.00
330.00
10,490.00

1,800.00
28,458.00
10,000.00
40,258.00

-
-

50,748.00
7,612.20
58,360.20

Jumlah Harga (Rp)

7,500.00
660.00
8,160.00

1,575.00
1,575.00

-
-

DIV. 4.7.1
9,735.00
1,460.25
11,195.25

Jumlah Harga (Rp)

12,000.00
14,400.00
1,760.00
330.00
28,490.00

6,975.00
2,250.00
500.00
9,725.00

-
-

38,215.00
5,732.25
43,947.25

t dasar, 2 lapis cat penutup)


Jumlah Harga (Rp)

1,500.00
5,670.00
693.00
330.00
8,193.00

900.00
2,500.00
5,096.00

DIV. 4.7.1
8,496.00

-
-

16,689.00
2,503.35
19,192.35

Jumlah Harga (Rp)

2,100.00
3,780.00
462.00
330.00
6,672.00

3,000.00
3,528.00
6,528.00

-
-

13,200.00
1,980.00
15,180.00

Jumlah Harga (Rp)

1,500.00
18,000.00
2,200.00
275.00
21,975.00

48,399.60
9,000.00
57,399.60

-
-

79,374.60
11,906.19
91,280.79

DIV. 4.7.1
Jumlah Harga (Rp)

4,500.00
5,400.00
1,320.00
330.00
11,550.00

3,400.00
50.00
3,450.00

-
-

15,000.00
2,250.00
17,250.00

Jumlah Harga (Rp)

4,500.00
5,400.00
1,320.00
330.00
11,550.00

14,700.00
50.00
250.00
15,000.00

-
-

26,550.00
3,982.50
30,532.50

t dasar, 2 lapis cat penutup)


Jumlah Harga (Rp)

DIV. 4.7.1
1,500.00
5,670.00
693.00
330.00
8,193.00

900.00
2,500.00
24,991.20
28,391.20

-
-

36,584.20
5,487.63
42,071.83

DIV. 4.7.1
5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG

1. Pemasangan 1 buah closed duduk


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 3.300 75,000.00
Tukang batu L.02 OH 1.100 90,000.00
Kepala Tukang L.03 OH 0.010 110,000.00
Mandor L.04 OH 0.160 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Closed duduk ex. AmStand unit 1.000 1,250,000.00
Perlengkapan Ls 6%xclosed
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

2. Pemasangan 1 buah closed jongkok


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 75,000.00
Tukang batu L.02 OH 0.300 90,000.00
Kepala Tukang L.03 OH 0.150 110,000.00
Mandor L.04 OH 0.050 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Closed jongkok biasa unit 1.000 95,000.00
Semen Portland kg 6.000 1,300.00
Pasir pasang m3 0.010 85,000.00
Batu bata bh 7.000 550.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

3. Pemasangan 1 buah urinoir


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 75,000.00
Tukang batu L.02 OH 1.000 90,000.00
Kepala Tukang L.03 OH 0.100 110,000.00
Mandor L.04 OH 0.050 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Urinoir ex. Amstand unit 1.000 1,550,000.00
Semen Portland kg 6.000 1,300.00
Pasir pasang m3 0.010 85,000.00
Perlengkapan 30%xurinoir
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

DIV. 5.1.1
4. Pemasangan 1 buah wastafel
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 1.200 75,000.00
Tukang batu L.02 OH 1.450 90,000.00
Kepala Tukang L.03 OH 0.150 110,000.00
Mandor L.04 OH 0.060 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Wastafel unit 1.000 550,000.00
Semen Portland kg 6.000 1,300.00
Pasir pasang m3 0.010 85,000.00
Perlengkapan 12 x wastafel
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

5. Pemasangan 1 buah bathube


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.075 75,000.00
Tukang batu L.02 OH 0.750 90,000.00
Kepala Tukang L.03 OH 0.075 110,000.00
Mandor L.04 OH 0.003 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bathube unit 1.000 9,392,000.00
Perlengkapan % 20.000
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

6. Pemasangan 1 buah bak fibreglass vol 1 m3


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 75,000.00
Tukang batu L.02 OH 0.450 90,000.00
Kepala Tukang L.03 OH 0.045 110,000.00
Mandor L.04 OH 0.015 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bak fibreglass unit 1.000 395,000.00
Perlengkapan Ls 12%xbak
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

DIV. 5.1.1
D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

7. Pemasangan 1 buah bak cuci piring stainlessteel


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.030 75,000.00
Tukang batu L.02 OH 0.300 90,000.00
Kepala Tukang L.03 OH 0.030 110,000.00
Mandor L.04 OH 0.015 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bak cuci piring stainless Steel unit 1.000 400,000.00
Waterdrain unit 1.000 25,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

8. Pemasangan 1 buah floor drain


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.010 75,000.00
Tukang batu L.02 OH 0.100 90,000.00
Kepala Tukang L.03 OH 0.010 110,000.00
Mandor L.04 OH 0.005 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Floor drain unit 1.000 125,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

9. Pemasangan 1 m' pipa galvanis diameter 1/2"


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.054 75,000.00
Tukang batu L.02 OH 0.090 90,000.00
Kepala Tukang L.03 OH 0.009 110,000.00
Mandor L.04 OH 0.027 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa galvanis 1/2" m 1.200 10,833.33

DIV. 5.1.1
Perlenglapan Ls 35%xpipa
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

10. Pemasangan 1 buah kran diameter 1/2" atau 3/4"


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.010 75,000.00
Tukang L.02 OH 0.100 90,000.00
Kepala Tukang L.03 OH 0.040 110,000.00
Mandor L.04 OH 0.005 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kran air ex. onda m 1.000 35,000.00
Sealtape Buah 0.025 3,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

11. Pemasangan 1 m' pipa galvanis diameter 3/4"


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.054 75,000.00
Tukang batu L.02 OH 0.090 90,000.00
Kepala Tukang L.03 OH 0.009 110,000.00
Mandor L.04 OH 0.027 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa galvanis 3/4" m 1.200 14,166.67
Perlengkapan Ls 35%xpipa
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

12. Pemasangan 1 m' pipa PVC tipe AW diameter 1/2"


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.036 75,000.00
Tukang batu L.02 OH 0.060 90,000.00
Kepala Tukang L.03 OH 0.006 110,000.00
Mandor L.04 OH 0.002 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC tipe AW 1/2" m 1.200 2,833.33
Perlengkapan Ls 35%xpipa
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)

DIV. 5.1.1
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

13. Pemasangan 1 m' pipa PVC tipe AW diameter 3/4"


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.036 75,000.00
Tukang batu L.02 OH 0.060 90,000.00
Kepala Tukang L.03 OH 0.006 110,000.00
Mandor L.04 OH 0.002 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC tipe AW 3/4" m 1.200 3,666.67
Perlengkapan Ls 35%xpipa
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

14. Pemasangan 1 m' pipa PVC tipe DW diameter 3"


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.081 75,000.00
Tukang batu L.02 OH 0.135 90,000.00
Kepala Tukang L.03 OH 0.0135 110,000.00
Mandor L.04 OH 0.004 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC tipe AW 3/4" m 1.200 18,166.67
Perlengkapan Ls 35%xpipa
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

15. Pemasangan 1 m' pipa PVC tipe DW diameter 4"


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.081 75,000.00
Tukang batu L.02 OH 0.135 90,000.00
Kepala Tukang L.03 OH 0.0135 110,000.00
Mandor L.04 OH 0.004 110,000.00
JUMLAH TENAGA KERJA
B BAHAN

DIV. 5.1.1
Pipa PVC tipe AW 3/4" m 1.200 116,000.00
Perlengkapan Ls 35%xpipa
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

16. Pemasangan 1 m' pipa beton diameter 30-100 cm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.380 75,000.00
Tukang batu L.02 OH 0.190 90,000.00
Kepala Tukang L.03 OH 0.019 110,000.00
Mandor L.04 OH 0.019 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Buis beton dia. 100 bh 1.100 800,000.00
Batu bata m3 0.550 550.00
Semen Portland kg 10.300 1,300.00
Pasir pasang m3 0.061 85,000.00
Pasir urug m3 0.069 65,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

DIV. 5.1.1
Jumlah Harga (Rp)

247,500.00
99,000.00
1,100.00
17,600.00
365,200.00

1,250,000.00
75,000.00
1,325,000.00

-
-

1,690,200.00
253,530.00
1,943,730.00

Jumlah Harga (Rp)

75,000.00
27,000.00
16,500.00
5,500.00
124,000.00

95,000.00
7,800.00
850.00
3,850.00
107,500.00

-
-

231,500.00
34,725.00
266,225.00

Jumlah Harga (Rp)

75,000.00
90,000.00
11,000.00
5,500.00
181,500.00

1,550,000.00
7,800.00
850.00
465,000.00
2,023,650.00

-
-

2,205,150.00
330,772.50
2,535,922.50

DIV. 5.1.1
Jumlah Harga (Rp)

90,000.00
130,500.00
16,500.00
6,600.00
243,600.00

550,000.00
7,800.00
850.00
66,000.00
624,650.00

-
-

868,250.00
130,237.50
998,487.50

Jumlah Harga (Rp)

5,625.00
67,500.00
8,250.00
330.00
81,705.00

9,392,000.00
1,878,400.00
11,270,400.00

-
-

11,352,105.00
1,702,815.75
13,054,920.75

Jumlah Harga (Rp)

22,500.00
40,500.00
4,950.00
1,650.00
69,600.00

395,000.00
47,400.00
442,400.00

-
-

DIV. 5.1.1
512,000.00
76,800.00
588,800.00

Jumlah Harga (Rp)

2,250.00
27,000.00
3,300.00
1,650.00
34,200.00

400,000.00
25,000.00
425,000.00

-
-

459,200.00
68,880.00
528,080.00

Jumlah Harga (Rp)

750.00
9,000.00
1,100.00
550.00
11,400.00

125,000.00
125,000.00

-
-

136,400.00
20,460.00
156,860.00

Jumlah Harga (Rp)

4,050.00
8,100.00
990.00
2,970.00
16,110.00

13,000.00

DIV. 5.1.1
3,791.67
13,000.00

-
-

29,110.00
4,366.50
33,476.50

Jumlah Harga (Rp)

750.00
9,000.00
4,400.00
550.00
14,700.00

35,000.00
75.00
35,075.00

-
-

49,775.00
7,466.25
57,241.25

Jumlah Harga (Rp)

4,050.00
8,100.00
990.00
2,970.00
16,110.00

17,000.00
4,958.33
17,000.00

-
-

33,110.00
4,966.50
38,076.50

Jumlah Harga (Rp)

2,700.00
5,400.00
660.00
220.00
8,980.00

3,400.00
991.67
3,400.00

-
-

12,380.00

DIV. 5.1.1
1,857.00
14,237.00

Jumlah Harga (Rp)

2,700.00
5,400.00
660.00
220.00
8,980.00

4,400.00
1,283.33
4,400.00

-
-

13,380.00
2,007.00
15,387.00

Jumlah Harga (Rp)

6,075.00
12,150.00
1,485.00
440.00
20,150.00

21,800.00
6,358.33
21,800.00

-
-

41,950.00
6,292.50
48,242.50

Jumlah Harga (Rp)

6,075.00
12,150.00
1,485.00
440.00
20,150.00

DIV. 5.1.1
139,200.00
40,600.00
139,200.00

-
-

159,350.00
23,902.50
183,252.50

Jumlah Harga (Rp)

28,500.00
17,100.00
2,090.00
2,090.00
49,780.00

880,000.00
302.50
13,390.00
5,185.00
4,485.00
880,000.00

-
-

929,780.00
139,467.00
1,069,247.00

DIV. 5.1.1
HARGA SATUAN PEKERJAAN LAIN-LAIN

1. Pemasangan 1 m2 rangka atap baja ringan ex. TASO


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.200 75,000.00
Tukang L.02 OH 0.450 90,000.00
Kepala Tukang L.03 OH 0.010 110,000.00
Mandor L.04 OH 0.050 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Smartruss C 75.80 m 1.488 13,666.67
Smartruss C 75.75 m 2.232 12,000.00
Reng AZ 0,55mm x 6m m 5.400 5,750.00
Srew bh 38.000 165.00
Dynabolt bh 1.600 1,000.00
Valery Gutter Talang Jurai m 0.124 37,500.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

2. Pemasangan 1 m2 paving blok 10x20 mutu K200


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.350 75,000.00
Tukang L.02 OH
Kepala Tukang L.03 OH
Mandor L.04 OH 0.018 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Persegi panjang t. 8 cm bh 44.000 1,931.82
Pasir m3 0.100 65,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

3. Pemasangan 1 titik nyala Lampu


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH
Tukang L.02 OH 0.1350 90,000.00
Kepala Tukang L.03 OH 0.0135 110,000.00
Mandor L.04 OH 0.0050 110,000.00
JUMLAH TENAGA KERJA

DIV. Lain2
B BAHAN
NYM 2 x 2,5 mm2 m 15.000 9,000.00
Perlengkapan ( 35% harga conduit,klem,isolasi )
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

4. Pemasangan 1 titik nyala stop kontak


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH
Tukang L.02 OH 0.1350 90,000.00
Kepala Tukang L.03 OH 0.0135 110,000.00
Mandor L.04 OH 0.0050 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
NYM 3 x 2,5 mm2 m 15.000 11,000.00
Perlengkapan ( 35% harga conduit,klem,isolasi )
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
15% E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

DIV. Lain2
15%

DIV. Lain2
Jumlah Harga (Rp)

15,000.00
40,500.00
1,100.00 4 m 145 rb
5,500.00 6 m 225rb
62,100.00

20,336.00
26,784.00
31,050.00
6,270.00
1,600.00
4,650.00
90,690.00

-
-

152,790.00
22,918.50
175,708.50

Jumlah Harga (Rp)

26,250.00
-
-
1,925.00
28,175.00

85,000.00
6,500.00
91,500.00

-
-

119,675.00
17,951.25
137,626.25

Jumlah Harga (Rp)

-
12,150.00
1,485.00
550.00
14,185.00

DIV. Lain2
135,000.00
47,250.00
182,250.00

-
-

196,435.00
29,465.25
225,900.25

Jumlah Harga (Rp)

-
12,150.00
1,485.00
550.00
14,185.00

165,000.00
57,750.00
222,750.00

-
-

236,935.00
35,540.25
272,475.25

DIV. Lain2
2.3.1. 1. Menggali 1 m3 tanah biasa sedalam 1 m
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.750 75,000.00
Mandor L.04 OH 0.025 110,000.00
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH TENAGA BAHAN


C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 10% X D
F. Harga Satuan Pekerjaan (D+E)

4. Menggali 1 m3 tanah lumpur sedalam 1 m


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 1.200 75,000.00
Mandor L.04 OH 0.045 110,000.00
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH TENAGA BAHAN


C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

9. Pengurugan 1 m3 dengan pasir urug


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 75,000.00
Mandor L.04 OH 0.010 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pasir urug m3 1.200 65,000.00

JUMLAH TENAGA BAHAN


C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

4.4.1 2. Pemasangan 1 m2 dinding bata lobang tebal 1 batu campuran 1 SP:4PP

Analisa Cor Beton


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.600 75,000.00
Tukang Batu L.02 OH 0.200 90,000.00
Kepala Tukang L.03 OH 0.020 110,000.00
Mandor L.04 OH 0.030 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata merah bh 140.000 550.00
Semen Portland kg 26.550 1,300.00
Pasir pasang m3 0.093 85,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

4.4.1 4. Membuat 1 m3 beton mutu F'c=19,3 Mpa (K225), slump (122) cm, w/c=0,58
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 1.650 75,000.00
Tukang Batu L.02 OH 0.275 90,000.00
Kepala Tukang L.03 OH 0.028 110,000.00
Mandor L.04 OH 0.083 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 371.000 1,300.00
Pasir Beton kg 698.000 60.71
Kerikil (Maks. 30mm) kg 1047.000 351.85
Air Liter 215.000 40.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

Taksir Pemasangan 1 m2 bekesting untuk pondasi


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.520 75,000.00
Tukang Kayu L.02 OH 0.260 90,000.00
Kepala Tukang L.03 OH 0.026 110,000.00
Mandor L.04 OH 0.026 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu m3 0.040 1,600,000.00
Paku 5-10 cm kg 0.300 18,000.00
Minyak bekesting Liter 0.100 11,125.00
JUMLAH TENAGA BAHAN
C. PERALATAN

Analisa Cor Beton


JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

Taksir Pemasangan 1 m2 bekesting untuk kolom


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.330 75,000.00
Tukang Kayu L.02 OH 0.165 90,000.00
Kepala Tukang L.03 OH 0.017 110,000.00
Mandor L.04 OH 0.017 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu m3 0.020 1,600,000.00
Paku 5-12 cm kg 0.200 18,000.00
Minyak bekesting Liter 0.200 11,125.00
Balok kayu m3 0.008 1,600,000.00
Papan racuk kpg 1.380 25,000.00
Dolken Kayu 8-10cm p.4m Batang 1.000 8,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

Taksir Pemasangan 1 m2 bekesting untuk balok


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.330 75,000.00
Tukang Kayu L.02 OH 0.165 90,000.00
Kepala Tukang L.03 OH 0.017 110,000.00
Mandor L.04 OH 0.017 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu m3 0.020 1,600,000.00
Paku 5-12 cm kg 0.200 18,000.00
Minyak bekesting Liter 0.200 11,125.00
Balok m3 0.009 1,600,000.00
Papan Racuk kpg 1.380 25,000.00
Dolken Kayu 8-10cm p.4m Batang 1.000 8,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

Taksir Pemasangan 1 m2 bekesting untuk lantai


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)

Analisa Cor Beton


A. TENAGA
Pekerja L.01 OH 0.330 75,000.00
Tukang Kayu L.02 OH 0.165 90,000.00
Kepala Tukang L.03 OH 0.017 110,000.00
Mandor L.04 OH 0.017 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu m3 0.020 1,600,000.00
Paku 5-12 cm kg 0.200 18,000.00
Minyak bekesting Liter 0.200 11,125.00
Balok m3 0.008 1,600,000.00
Papan Racuk kpg 1.380 25,000.00
Dolken Kayu 8-10cm p.4m Batang 3.000 8,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

Taksir Pembesian 10 kg dengan besi polos atau besi ulir


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.070 75,000.00
Tukang Batu L.02 OH 0.070 90,000.00
Kepala Tukang L.03 OH 0.007 110,000.00
Mandor L.04 OH 0.004 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Besi beton (polos/ulir) kg 10.500 9,704.64
Kawat beton kg 0.150 18,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)
1 kg

Taksir 1 m' pasang mal untuk jalan rigid pavement


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 75,000.00
Tukang Batu L.02 OH 0.100 90,000.00
Kepala Tukang L.03 OH 0.010 110,000.00
Mandor L.04 OH 0.005 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu racuk m3 0.010 1,200,000.00
Balok kayu m3 0.006 1,600,000.00
Paku kg 0.150 18,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

Analisa Cor Beton


JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

Taksir 1 m2 pasang cerucup gelam untuk jerambah beton (p.1,5m-20 cm)


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 75,000.00
Tukang Batu L.02 OH 90,000.00
Kepala Tukang L.03 OH 0.030 110,000.00
Mandor L.04 OH 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Gelam dia.6-8 btg 6.000 8,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

Taksir 1 m2 labur aspal + labur pasir


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.006 75,000.00
Tukang Batu L.02 OH 90,000.00
Kepala Tukang L.03 OH 110,000.00
Mandor L.04 OH 0.00042 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Aspal bitumen kg 1.208 12,000.00
Pasir pasang m3 0.018 85,000.00

JUMLAH TENAGA BAHAN


C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

Analisa Cor Beton


Jumlah Harga (Rp)

56,250.00
2,750.00
59,000.00

-
-

-
-

59,000.00
5,900.00
64,900.00

Jumlah Harga (Rp)

90,000.00
4,950.00
94,950.00

-
-

-
-

94,950.00
9,495.00
104,445.00

Jumlah Harga (Rp)

22,500.00
1,100.00
23,600.00

78,000.00
-
78,000.00

-
-

101,600.00
10,160.00
111,760.00

Analisa Cor Beton


Jumlah Harga (Rp)

45,000.00
18,000.00
2,200.00
3,300.00
68,500.00

77,000.00
34,515.00
7,905.00
119,420.00

-
-

187,920.00
28,188.00
216,108.00

Jumlah Harga (Rp)

123,750.00
24,750.00
3,080.00
9,130.00
160,710.00

482,300.00
42,378.57
368,388.89
8,600.00
901,667.46

-
-

1,062,377.46
159,356.62
1,221,734.08

Jumlah Harga (Rp)

39,000.00
23,400.00
2,860.00
2,860.00
68,120.00

64,000.00
5,400.00
1,112.50
70,512.50

Analisa Cor Beton


-

138,632.50
20,794.88
159,427.38

Jumlah Harga (Rp)

24,750.00 0.5 0.660


14,850.00 0.330
1,815.00 0.033
1,815.00 0.033
43,230.00

32,000.00 0.5 0.040


3,600.00 0.400
2,225.00 0.200
12,000.00 0.015
34,500.00 1.315
8,000.00 2.000
92,325.00

-
-

135,555.00
20,333.25
155,888.25

Jumlah Harga (Rp)

24,750.00 0.5 0.660


14,850.00 0.330
1,815.00 0.033
1,815.00 0.033
43,230.00

32,000.00 0.5 0.040


3,600.00 0.400
2,225.00 0.200
14,400.00 0.018
34,500.00 1.380
8,000.00 2.000
94,725.00

-
-

137,955.00
20,693.25
158,648.25

Jumlah Harga (Rp)

Analisa Cor Beton


24,750.00 0.5 0.660
14,850.00 0.330
1,815.00 0.033
1,815.00 0.033
43,230.00

32,000.00 0.5 0.040


3,600.00 0.400
2,225.00 0.200
12,000.00 0.015
34,500.00 1.380
24,000.00 6.000
108,325.00

-
-

151,555.00
22,733.25
174,288.25

Jumlah Harga (Rp)

5,250.00
6,300.00
770.00
440.00
12,760.00

101,898.72
2,700.00
104,598.72

-
-

117,358.72
17,603.81
134,962.53
13,496.25

Jumlah Harga (Rp)

7,500.00 upah pasang bouwplank


9,000.00
1,100.00
550.00
18,150.00

12,000.00 1 kpg = m; l. 25 cm; p=3,8m


9,600.00 balok 30 cm
2,700.00 1 m @ 6 patok; 1 patok@ 40cm
24,300.00

Analisa Cor Beton


-
-

42,450.00
6,367.50
48,817.50

Jumlah Harga (Rp)

22,500.00 SNI lama


-
3,300.00
-
25,800.00

48,000.00
48,000.00

-
-

73,800.00
11,070.00
84,870.00

Jumlah Harga (Rp) 2400

437.50
-
-
45.83
483.33

14,500.00
1,522.92

16,022.92

-
-

16,506.25
2,475.94
18,982.19

Analisa Cor Beton

You might also like