You are on page 1of 54

AreyanaGroupofConstructionCo.

(CCRRegistered)
House No.105A ; Kolola Pushta Road , Kabul , Afghanistan
Emails : agcc@areyanagroup.com | agcc.zk@gmail.com
ON FA5708-15-R-0007

Areyana.Group Performance

Capability statement FA5708-15-R-0007

ttention Submit responses to:'thomas.buena@auab.afcent.af.mil

Prime Contractor Areyana Group of Construction Co (AGCC)


House No.105A ; Kolola Pushta Road , Kabul , Afghanistan
DUNS # 850480848 |CAGE SHM85 JCCS Vendor ID 36747
|AISA License No: D-22456 | TIN 120 015 4 019

Government POC: Zabet Khan , AGCC Director


agcc@areyanagroup.com.|.agcc.zk@gmail.com

GCCagreeswithallterms,conditions,andprovisionsincludedinthe
olicitationandallamendmentsnamedabove,agcc@areyanagroup.com|agcc.zk@gmail.com



Cell:+93(0)798921548|JCCSVendorID36747|AISALicenseNo:D22456
DUNS#850480848|CAGECODE:SHM85|ActiveinCCR|www.areyanagroup.com




AreyanaGroupofConstructionCo.(CCRRegistered)
House No.105A ; Kolola Pushta Road , Kabul , Afghanistan
Emails : agcc@areyanagroup.com | agcc.zk@gmail.com

PAGE 1 of 4

SECTION1.GENERAL

1.BusinessName:AREYANAGROUPOFCONSTRUCTIONCOMPANY

2.BusinessAddress:HouseNo.105A,KololaPushtaRoad,Kabul,Afghanistan.

3.CageCode:SHM85

4.NAICSCodes:237130

5.IsyourcompanyregisteredinJCCS?;YES,JCCSVendorID36747

6.ExpirationofAISALicense:19/06/2016

7.ResponsiblePointofContact:
Name:ZabitKhan,AGCCDirector
Telephone:0093(0)798921548
Email:agcc.zk@gmail.com|agcc@areyanagroup.com|www.areyanagroup.com

SECTION2.CONTRACTORARRANGEMENT

1.__X__Ourfirmwillbeproposingonthisprojectasa:Solecontractor
Primecontractorperformingatleast50%oftheworkwithsubcontractor(s)
Primecontractorperformingatleast50%oftheworkwiththefollowingteammembersubcontractor(s)
(Insertbusinessname,businesssize,cagecode,andworkwhichwillbesubcontracted).
Jointventurewith(Insertbusinessname,businesssize,andcagecode).

SECTION3.CAPABILITY

1.Ifawardedacontract,themaximumcapacityourfirmcanadequatelyperformandprovideFinancial
Surety(e.g.PerformanceandPaymentBondorIrrevocableLetterofCredit)foranycontract(3,000,000.00
dollars).

Cell:+93(0)798921548|JCCSVendorID36747|AISALicenseNo:D22456
DUNS#850480848|CAGECODE:SHM85|ActiveinCCR|www.areyanagroup.com

AreyanaGroupofConstructionCo.(CCRRegistered)
House No.105A ; Kolola Pushta Road , Kabul , Afghanistan
Emails : agcc@areyanagroup.com | agcc.zk@gmail.com
Solicitation W56KJD-16-R-XX01

PAGE 2 of 4

2.Ourfirm_x__has/___hasnotperformedworkfortheCorpsofEngineersinAfghanistanorIraq.Provide
ContractnumbersPOCinformationandbriefScopeofWork.(Checkbox)

AGCCPrime Project Total DollarValue Agency:POCName:EmailAddress


ContractNumber Name/Scopeof Month
forProject work
ANCOPPatrol 16 USACE
W5J9LE12C0013 BattalionatTarin Months $13,058,609.03 POCName: JONATHAN BYRD,
Kowt,Uruzgan P.E.
province, Email:
Afghanistan Jonathan.E.Byrd@usace.army.mil
W5J9LE13C0024 ANARMHSchool 12 $1,419,701.00 USACE
House,CampHero, Months POCName: JohnTaylor
Kandahar, Email:
Afghanistan John.G.Taylor@usace.army.mil
W5J9LE13C0026 ANA,RPTC,Well 6 $1,699,503.92 USACE
andFence, Months POCName: JohnTaylor
Kandahar, Email:
Afghanistan John.G.Taylor@usace.army.mil

W5J9LE12C0044 ConstructionANP 12 $4,754,401.51 USACE
PRCLashkarGah, Months POCName: KevinGray
HelmandProvince Email:
,Afghanistan Kevin.L.Gray@usace.army.mil

W5J9JE12D0004 ANPUPSubstation 18 $1,074,254.85 USACE
0002 ,ShybarDistrict, Months POCName: AdamD.Walker
BamyanProvince Email:
Afghanistan Adam.D.Walker@usace.army.mil

3.Ourfirm_x__is/___isnotcapableandinterestedinperformingthisworkinAfghanistan.(Checkbox)

4.Ourfirm_x__is/___isnotcapableofprovidingabigguaranteeof20%oftheestimatedproject
magnitude.(Checkbox)

Cell:+93(0)798921548|JCCSVendorID36747|AISALicenseNo:D22456
DUNS#850480848|CAGECODE:SHM85|ActiveinCCR|www.areyanagroup.com

AreyanaGroupofConstructionCo.(CCRRegistered)
House No.105A ; Kolola Pushta Road , Kabul , Afghanistan
Emails : agcc@areyanagroup.com | agcc.zk@gmail.com
SolicitationW56KJD-16-R-XX01

PAGE 3 of 4

5.Ourfirm_x__is/___isnotcapableofprovidingperformanceandpaymentbondswithintheestimated
magnitudeoftheproject.(Checkbox)

6.Ourfirm_x__is/___isnotthenecessarydocuments/permits/certificationsrequiredtoperformworkin
Afghanistan.(Checkbox)

7.Ourfirm_x__has/___hasnotconstructedsimilarfacilitieslistedunderthisproject.ProvideContract
numbersPOCinformationandbriefScopeofWork.(Checkbox)seetableforanswertoQuestionNo.0002

8.Ourfirm_x__does/___doesnothavethecapability,qualifications,ANDEXPERIENCEtoperform
constructioninanoverseasenvironment,toincludeLOGISTICALSUPPORT,MEDICALSUPPORT,AND
SECURITYforourpersonnel,materialsandequipment,indangerousareasorwarzones,including
subcontractorsandsuppliers.

9.Ifawardedacontract,ourfirm_x__is/___isnotcapabletoperformatleast51%ofthecostofthe
constructionandrelatedservices.

10.Basedonyourpreviousexperience,identifythepercentworkeffortyouwouldexpecttosubcontract:
(20%)

11.Ourfirmisperforming,orhassuccessfullyperformedSiteAdaptand/orconstructionoffacilities.
(Providenameofprojectlocation,typeofworkperformed,roleoffirm(prime,sub,teammember),dollar
valueofworkperformedbyyourfirmpercentageoftotalcontractvalueperformedbyyourfirm,anddate
workwasperformed.Includenomorethantwosinglespaced,10font,81/2"x11"pagescontainingthis
information.)

AGCCPrime Project Total DollarValue Agency:POCName:EmailAddress


ContractNumber Name/Scopeof Month
forProject work
ANCOPPatrol 16 USACE
W5J9LE12C0013 BattalionatTarin Months $13,058,609.03 POCName: JONATHAN BYRD,
Kowt,Uruzgan P.E.
province, Email:
Afghanistan Jonathan.E.Byrd@usace.army.mil
W5J9LE13C0024 ANARMHSchool 12 $1,419,701.00 USACE
House,CampHero, Months POCName: JohnTaylor
Kandahar, Email:
Afghanistan John.G.Taylor@usace.army.mil

Cell:+93(0)798921548|JCCSVendorID36747|AISALicenseNo:D22456
DUNS#850480848|CAGECODE:SHM85|ActiveinCCR|www.areyanagroup.com

AreyanaGroupofConstructionCo.(CCRRegistered)
House No.105A ; Kolola Pushta Road , Kabul , Afghanistan
Emails : agcc@areyanagroup.com | agcc.zk@gmail.com
Solicitation NO W56KJD-16-R-XX01

W5J9LE13C0026 ANA,RPTC,Well 6 $1,699,503.92 USACE


andFence, Months POCName: JohnTaylor
Kandahar, Email:
Afghanistan John.G.Taylor@usace.army.mil

W5J9LE12C0044 ConstructionANP 12 $4,754,401.51 USACE
PRCLashkarGah, Months POCName: KevinGray
HelmandProvince Email:
,Afghanistan Kevin.L.Gray@usace.army.mil

W5J9JE12D0004 ANPUPSubstation 18 $1,074,254.85 USACE
0002 ,ShybarDistrict, Months POCName: AdamD.Walker
BamyanProvince Email:
Afghanistan Adam.D.Walker@usace.army.mil

12.Ourfirm_x__is/___isnotexperiencedinobtainingDefenseBaseAct(DBA)insuranceforourpersonnel.

13.Ourfirm__x_is/___isnotexperiencedwithoperatingunderSPOTrequirements.

14.Ourfirm_x__has/___hasnotperformedaconstructioncontractintheKabulProvince.Ifyes,provide
thecontractnumber:
W91B4N11C0013

15.Ourfirm__x_does/___doesnothavespecifictypeofworkexperienceindesignandconstructionof
transmissionlines,substations,electricalutilitysystems,andsecurity.Ifyes,provide the contract number
point of contact information and brief summary of the Scope of Work. See answer to question
No.0002 .

PAGE 4 of 4

Cell:+93(0)798921548|JCCSVendorID36747|AISALicenseNo:D22456
DUNS#850480848|CAGECODE:SHM85|ActiveinCCR|www.areyanagroup.com

AGCCOFCompanyCompletedProjectsasPrimeContractor

Contract No Agency Locations Province Budget ($)


CAMP Eggers All Over 100,000,000
W91B4M-11-A-0008 All Over Afghanistan
(KRCC) Afghanistan USD
RCC Salerno Khost 642300 USD
W91B4P-11-C-0009 FOB Salerno

H92237-09-C-0574 Bagram Office Herat 385000 USD


Shindand
H92237-09-C-0483 Bagram Office Helmand 482000 USD
CAMP Shorabak

W90YVD-09-C-5016 RCC Shank Lowger 189000 USD


FOB Shank

W90YVD-09-C-5017 Lowger 167000 USD


RCC Shank FOB Shank

W90U42-09-P-6072 Paktika 68000 USD


RCC Sharana FOB Sharana
W91B4P-09-C-0028 Paktia 586000 USD
RCC Salerno RTC Gardez
W91B4P-09-C-0010 Khost 678000 USD
RCC Salerno FOB Salerno
W91B4P-08-C-0278 Paktia 268000 USD
RCC Salerno FOB Salerno
W90YVD-09-C-7058 Lowger 1,500,000
RCC Shank FOB Shank
USD
W90YVD10C8002 Lowger 143600 USD
RCC Shank COP Barki Barak
W90YVD09C7032 Wardak 540000 USD
RCC Shank COP Apache
W90YVD09C7081 Lowger 135400 USD
RCC Shank FOB Shank
W90YVD09C2003 Lowger 854000 USD
RCC Shank FOB Shank
W90YVD09C7048 Lowger 1,265,000
RCC Shank FOB Shank
USD
W91B4P09C0061 Paktia 165400 USD
RCC Salerno FOB Thunder
W90YVD-10-C-5016 RCC Shank FOB Shank Lowger 85000 USD
Ghazni 1,450,000
W90U42-10-C-4188 RCC Andar
USD
Sharana
Paktika 789000
W9042-10-C-4151 RCC FOB Rushmore
USD
Shanran
Paktia 145600
W91B4P-10-C-0096 RCC Salerno RTC Gardez
USD
W91B4P-10-C-0089 RCC Salerno OCC P Khost Khost 65000 USD
Khost 543000
W91B4P-10-C-0092 RCC Salerno Anzerki
USD
Khost 165000
W91B4P-11-C-0011 RCC Salerno COP BAK
USD
W91B4P-10-C-0050 RCC Salerno Narizah Khost 687000
H9237-11-C-0576 Bagram office FOB Ghazni Ghazni 84300 USD

H9237-11-C-0655 Bagram Office FOB thunder Gardez 98700 USD
Ghazni 167000
W90U42-11-C-4082 RCC Sharana FOB Warrior
USD
Wardak 645000
W90YVD-10-C-7030 RCC Shank Chak - Wardak USD

1:IDJCCSVendorID36747|AISALicenseNo:D22456DUNS#850480848|CAGECODE:SHM85|
ActiveinCCR|www.areyanagroup.comANDCell:+93(0)798921548|
DEPARTMENT OF THE ARMY
COMBINED JOINT SPECIAL OPERATIONS TASK FORCE. AFGHANISTAN
SPECIAL OPERATIONS TASK FORCE- EAST
BAGRAM, AFGHANISTAN
REPLYTO APO AE 09354
ATTENTION OF:

SOTF-E-54 9 JI.INE 2OI1

MEMORANDUM FOR RECORD

SUBJECT: Letter of Recommendation for Areyana Construction Group

l. In May 2011, members of Areyana Construction Group arrived at a new site being
constructed by our organization in the vicinity of Gardez, on FOB Thunder. We had contracted an
order for the construction of a latrine/laundry shed (approximately 32' x 20') with a completion date
of25 June 201 l.

2. The members of Areyana Construction Group performed much better than we expected.
They dug a septic tank using only hand tools, emplaced cinder blocks by hand and built the latrine
with the required number of toilets, showers, and sinks. They did not complain, and asked only for
the bare necessities of life: water, a place to use the toilet, time to pray and to eat, and reasonable
break periods. They complied with all our instructions and were friendly, helpful, and the foreman
spoke passable English, which made the job even easier.

3. The actual work they performed was as specified in the contract; the roofing, framing,
interior and exterior walls, floors and foundations were all constructed to standard. The tile and
latrine-specific items were adequate with no gross problems observed. They were relatively safe; no
one was injured during the construction and there were no grossly unsafe acts observed, which is
exceptional for local hire labor in Afghanistan. All things considered, I would definitely hire this
company again. They have demonstrated that they are willing to work long hours without complaint,
construct the required structures as specified in the statement of work, and comply with all security
standards without complaint. This made things easy and when working in an austere setting, it gave
us one less challenge to worry about.

4. The point of contact for this memorandum is the undersigned at VOSP 431-6562 or via
unc lassifi ed emai I at sotfeast. s4.ast@gma i l.corn.

-EAST 54 OIC
Certificate of Appreciation
Presented To
Mr Safiullah Noor
Mr.
QCS & Submittal Coordinator of Areyana Group of Construction Company
AGCC
on January 0808, 2014
For outstanding support of the US Army Corps of Engineers,
Marmal Resident Office. Your hard work and dedication to the
ANP Provincial Response Company, Pol-e-Khumri, Baghlan Province Project is truly appreciated.
AUDEVERT.TIF Digitally signed by
AUDEVERT.TIFFANY.NICOLE.1091064460
DN: c=US, o=U.S. Government, ou=DoD,
FANY.NICOLE.1 ou=PKI, ou=USA,
cn=AUDEVERT.TIFFANY.NICOLE.1091064

Tiffany N. Audevert
091064460 460
Date: 2014.01.09 17:50:22 +04'30'

TIFFANY N N. AUDEVERT
Project Engineer
USACE
.

The U.S. Army Corps of Engineers


Transatlantic Afghanistan District
Certificate of Successful Completion
is awarded to:
Bassir Ahmad
in recognition of your contributions as the Snr. Electrical Designer for Omran, Inc., supporting
USACE operations in Afghanistan. Your valued service for the Transatlantic Afghanistan District was
key to the successful completion of contract W5J9JE-13-C-0011 Afghan Public Protection Force O&M
Upgrades, Kabul City, Kabul Province, Afghanistan. Your efforts, selfless courage, technical skill,
and dedication were instrumental in the successful completion of this project.
This certificate is presented by the Kabul Area Office and U.S. Army Corps of Engineers.
BUILDING STRONG!
Douglass Newton, P.E.
NEWTON.DOUGLASS. Digitally signed by NEWTON.DOUGLASS.P.1285340744
DN: c=US, o=U.S. Government, ou=DoD, ou=PKI,
Project Engineer, Kabul South Resident Office
ou=USA, cn=NEWTON.DOUGLASS.P.1285340744
P.1285340744 Date: 2014.07.08 10:03:46 +04'30'
US Army Corps Of Engineers
s Y*br
>"
h s $$F"S$
N
8i S \.F
so
U $ss
so k N Ss\
\tr sR b
rL)
\^
\ni
.\S r:) s$
S\d

Rb'
r
g$ \)s\.S
3
\

:d
';.
st
*N
\,.

(.) S*)
\. (/\
Ss
,Yg
rirl
t-l H
{\ \l

ss
=N O.
S
\ti
q
\-S

El 8(
(),

*
s
BT
e(
\

,,;,
':{
ii
;r:rl
il
i$i
?l

*:
.

The U.S. Army Corps of Engineers


Transatlantic Afghanistan District
Certificate of Successful Completion
is awarded to:
Bassir Ahmad
in recognition of your contributions as the Snr. Electrical Designer for Omran, Inc., supporting
USACE operations in Afghanistan. Your valued service for the Transatlantic Afghanistan District was
key to the successful completion of contract W5J9JE-13-C-0011 Afghan Public Protection Force O&M
Upgrades, Kabul City, Kabul Province, Afghanistan. Your efforts, selfless courage, technical skill,
and dedication were instrumental in the successful completion of this project.
This certificate is presented by the Kabul Area Office and U.S. Army Corps of Engineers.
BUILDING STRONG!
Douglass Newton, P.E.
NEWTON.DOUGLASS. Digitally signed by NEWTON.DOUGLASS.P.1285340744
DN: c=US, o=U.S. Government, ou=DoD, ou=PKI,
Project Engineer, Kabul South Resident Office
ou=USA, cn=NEWTON.DOUGLASS.P.1285340744
P.1285340744 Date: 2014.07.08 10:03:46 +04'30'
US Army Corps Of Engineers