You are on page 1of 25

SOLAR PV DIESEL HYBRID

POWER FOR MICRO/MINI GRIDS


IN INDONESIA

JAKARTA, 15 SEPTEMBER 2017


TOHARI HADIAT
TABLE OF CONTENTS

ELECTRIC POWER SYSTEM DEVELOPMENT PLAN


2017-2026
ENERGY MIX in 2017-2026
RENEWABLE ENERGY DEVELOPMENT PLAN
NRE (NEW AND RENEWABLE ENERGY)
DEVELOPMENT PLAN
PV DIESEL HYBRID POWER FOR MICRO/MINI GRIDS

www.pln.co.id |
ELECTRIC POWER SYSTEM
DEVELOPMENT PLAN
2017-2026

RUPTL 2017-2026
Estimation of Electric Power
Developments in 2017-2026
64
26TWh
TWh 480
TWh
32 11,7%
6 10,8
234
SULAW TWh
35 92 TW
h 10,1%
ESI %
INDONESIA
TIMUR
T
TWh KALIMAN
W
h TAN
17 12,1%

11,2%
4 MALUK
10,5%
TW U
PAPUA
SUMATERA h

9,9
201 2026
%
NUSA TENGGARA 7 8,3

7,2% %
INDONESIA
JAWA - BALI

Year 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026
Economic Growth (%) 5,20 5,10 5,50 6,10 6,50 6,48 6,46 6,44 6,42 5,40 6,35
Electrification Ratio (%) 90,65 93,41 95,89 97,32 98,8 99,53 88,82 99,99 100 100 100
www.pln.co.id |
Additional Development of Power
Generation
MW

Additional Power Plant:


2017-2019 :
27,3 GW
2017-2026 :
77,9 GW
- PLTU : 31,9 GW
- PLTGU : 18,8 GW
- PLTG/MG : 5,6 GW
- PLTA : 14,1 GW
- PLTP : 6,3 GW
- PLT Lain : 1,2 GW

Power Plant Porsion


- PLN : 20.9 GW
- IPP : 42.1 GW
- Unalocated : 14.8 GW

Note:
- 7 GW Program that
already operated until
2016 is 5.7 GW

www.pln.co.id |
Renewable Energy
Development Plan

RUPTL 2017-2026
Present Composition of RE in 1st
semester of 2017

PLTBm/ PLTG/PLTMG
PLTM PLTBg/PLTSa PLTGU
323.4 MW 154.4 MW PLTS PLTG/PLTMG
1% 0,3% 3,944 MW PLTD
13 MW
8%
0,03%
PLTP PLTU
1664.5 MW
3% PLTA PLTP
4010 MW
8% PLTGU PLTA
11,262 MW
PLTM
22%
PLTBm/PLTBg/PLTSa
PLTS
PLTD
PLTU 5,771 MW
24,883 MW 11%
48%
New additional RE Plant in 1st semester
2017 is 165 MW (supplied from PLTP
Sarulla I unit 1 : 110 MW and PLTP
Ulubelu unit 4 : 55 MW)
Total Power Plant : 51.860 MW
Total RE Power Plant : 6.165,3 W
RE Share of Total : 12 %
www.pln.co.id |
Potency of Renewable Energy Development
(RUPTL 2017-2026)

REGIONAL KALIMANTAN
REGIONAL SULAWESI &
NUSA TENGGARA REGIONAL MALUKU &
PV 80 MW
PV 170 MW PAPUA
HYDRO 1.910 MW PV
HYDRO 7.244 MW 40 MW
GEOTHERMAL 182,5 MW HYDRO
GEOTHERMAL 4.774 MW 268 MW
WIND 150 MW GEOTHERMAL
WIND 170 MW 1.526 MW
WIND 45 MW

REGIONAL SUMATERA
PV 235 MW
HYDRO 5.916 MW
GEOTHERMAL 12.912 MW
WIND 0 MW

TOTAL INDONESIA
SISTEM JAWA-BALI
PV 200 MW PV 725 MW
HYDRO 5.837 MW HYDRO 21.175 MW
GEOTHERMAL 10.149 MW
GEOTHERMAL 29.543,5 MW
WIND 250 MW
WIND 615 MW

www.pln.co.id |
Additional of RE Power Generation Plan
Based on RUPTL 2017-2026

No Pembangkit - EBT Kapasitas 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Jumlah
1 PLTP MW 305 165 315 186 365 790 345 1,015 2,510 294 6,290
2 PLTA MW 18 87 323 154 1,800 1,555 2,035 1,697 3,675 1,000 12,342
3 PLTMH MW 68 112 163 198 388 326 178 30 150 81 1,694
4 PLT Surya MWp 20 13 24 - - - - - - - 57
5 PLT Bayu MW - - 215 280 120 - - - - - 615
6 PLT Biomass/Sampah MW 43 76 243 93 91 6 - - - - 552
7 PLT Kelautan MW - - - - - - - - - - -
8 PLT Bio-Fuel Ribu Kilo Liter 930 731 331 263 197 108 112 116 123 129 3,041
Jumlah MW 453 453 1,282 911 2,764 2,676 2,557 2,742 6,335 1,375 21,549

www.pln.co.id |
Present Composition of RE in 1st
semester of 2017

PLTBm/ PLTG/PLTMG
PLTM PLTBg/PLTSa PLTGU
323.4 MW 154.4 MW PLTS PLTG/PLTMG
1% 0,3% 3,944 MW PLTD
13 MW
8%
0,03%
PLTP PLTU
1664.5 MW
3% PLTA PLTP
4010 MW
8% PLTGU PLTA
11,262 MW PLTM
22%
PLTBm/PLTBg/PLTSa
PLTS
PLTD
PLTU 5,771 MW
24,883 MW 11%
48%
New additional RE Plant in 1st semester
2017 is 165 MW (supplied from PLTP
Sarulla I unit 1 : 110 MW and PLTP
Ulubelu unit 4 : 55 MW)
Total Power Plant : 51.860 MW
Total RE Power Plant : 6.165,3 W
RE Share of Total : 12 %
www.pln.co.id |
Potency of Renewable Energy Development
(RUPTL 2017-2026)

REGIONAL KALIMANTAN
REGIONAL SULAWESI & NUSA
TENGGARA REGIONAL MALUKU & PAPUA
PV 80 MW
PV 170 MW
HYDRO 1.910 MW PV 40 MW
HYDRO 7.244 MW
GEOTHERMAL 182,5 MW HYDRO 268 MW
GEOTHERMAL 4.774 MW
WIND 150 MW GEOTHERMAL 1.526 MW
WIND 170 MW
WIND 45 MW

REGIONAL SUMATERA
PV 235 MW
HYDRO 5.916 MW
GEOTHERMAL 12.912 MW
WIND 0 MW

TOTAL INDONESIA
SISTEM JAWA-BALI
PV 200 MW PV 725 MW
HYDRO 5.837 MW HYDRO 21.175 MW
GEOTHERMAL 10.149 MW
GEOTHERMAL 29.543,5 MW
WIND 250 MW
WIND 615 MW

www.pln.co.id |
Additional NRE Estimation per Sept 2107

For PLTP Additional


Estimation Based on RUPTL www.pln.co.id |
STRATEGY TO DEVELOP
HYBRID POWER SYSTEM
Development of Hybrid Powerplant

ONGRID ??

Hybrid
Power
Plant

OFFGRID

www.pln.co.id |
Strategy to develop Hybrid Power
1. The development of RE plant remains concerned with supply-
demand balance, system readiness and economy.
2. Maximizing the potential of local RE resources to rise electrification
ratios in Eastern Indonesia
3. Develop hybrid power system for areas that have been supplied
from diesel with under 12 operation hours/day and for unserves
areas.
4. Centralized PV is developed to enable remote communities that far
from the grid in underdeveloped areas, the foremost islands
bordering with neighboring countries and other outer islands.
5. Micro grid development for isolated areas, which have not been
planned to be developed for distribution lines or small thermal
generators, it is proposed to use PV.
6. Develop Smart Grid and Control System to increase RE
penetration level in PLN system.

www.pln.co.id |
Types of Hybrid Power Development

1. PV Diesel hybrid power system developed by PLN (off grid)


2. Hybrid power projects proposed by IPPs though MOU with PLN

www.pln.co.id |
Definition Hybrid
Grid which has embedded and synchronized generation
facilities of dispatchable and non-dispatchablen nature.

www.pln.co.id |
Proposal Hybrid Power Project (MOU with IPPs)

Power Generation Location Installed


Hybrid Technology
No. Company Name Capacity
Type Province City
(MW)
a. Nusa Tenggara Barat Sumbawa 10
Bima / Sape 9
b. Maluku Poka Ambon 10

Tenaga Hybrid c. Jawa Timur


Madura (Kangean) 5
1 PT. SUMBERDAYA SEWATAMA (PLTS + PLTD /
PLTMG) d. Papua Waena 20
e. Sulawesi Bombana 10
Bangka 5
f. Sumatera Belitung 5
Nias 10

Tenaga Hybrid
PT. ARSARI ENVIRO INDUSTRI AND
2 (PLTS + PLTD / b. Bangka Belitung Bangka 20
SUNPOWER SYSTEMS SARL
PLTMG)

a. Sulawesi Selatan Pulau Selayar 10.1


PT. UPC RENEWABLES INDONESIA Wind + Solar PV
DAN Pulau Kei. Kecil 10.1
3
PT. BINATEK ENERGI BARU
TERBARUKAN b. Maluku Ambon 16.8
Solar PV + Mini Pulau Buru 10
Hidro

www.pln.co.id |
Proposal Hybrid Power Project (MOU with IPPs)

Power Generation Location


Hybrid Technology
No. Company Name Installed
Type
Province City Capacity
(MW)
Kalimantan Selatan Tanah Laut 80
Jawa Barat Cirebon 100
Wind + Solar PV Jawa Tengah Tegal & Brebes 70
Jawa Timur Tuban 80
Sulawesi Barat Majene 75
Nusa Tenggara Sumbawa
4 PT. AKUO ENERGY INDONESIA 3+3

Bima 4
Solar PV + Diesel
Sumba 8
Larantuka 8
Labuan Bajo 4
Sumatera Belitung 15
Sumba 10.1
Tenaga Hybrid a. Nusa Tenggara
5 PACE ENERGY PTE. LTD
(PLTS + PLTB) Sumbawa 10
b. Kalimantan Selatan Tanah Laut 70

www.pln.co.id |
Proposal Hybrid Power Project (MOU with IPPs)
Power Generation Location
Hybrid Technology
No. Company Name Installed
Type
Province City Capacity
Alor (Kalabahi) 1.2
(MW)
Rote Ndao 1.2
Sabu Raijua 0.9
Lembata
NTT
Adonara 0.9
Aesesa 0.7
PLTS+PLTD/PLTM
6 Arya Watala Betun 0.6
G
Bajawa 1.3
Waikabubak 1
Empang 2
Lunyuk 1.5
NTB Sape 2
Dompu 2
Pekat 2

Ra'as 1

Sepanjang 2

PLTS+PLTD/PLTM
7 PT AKA SINERGI GROUP Madura Isolated Sapudi 2
G/Storage
Kangean (Kec.
2
Arjasa)

Gili Iyang 1

www.pln.co.id |
Proposal Hybrid Power Project (MOU with IPPs)

Summary

Total Location Estimated Capacity

46 716.4 MW

www.pln.co.id |
THANK YOU
ENERGY MIX in 2017 - 2026
RUPTL 2017-2026
Target of Energy Mix
BAURAN ENERGI PRIMER
(Listrik dan Non Listrik)
(Kebijakan Energi Nasional, PP
23
6
%
No.79/2014) 23% 22 EBT
% % Minyak Bumi
30 41
%
30
25 Gas
% %
% Batubara

REALISASI TARGET
2013 2025
BAURAN ENERGI PEMBANGKIT LISTRIK
(Draft RUKN 2015-2034)
12%
25%
53% 24 50
% % 24%
11 1
% %

REALISASI TARGET
2014 2025
www.pln.co.id | 2
4
Bauran

www.pln.co.id |